2023118.pdf

PDF 149 KB Posted

Attached to
Washington G&O - 8th to 3rd
Solicitation number
2023118
Issued by
Spokane County, Tacoma City, Washington

About this file

This is a Scope of Work document for the Washington State Department of Transportation (WSDOT) for the G&O project from 8th to 3rd Avenue. The project encompasses approximately 12,000 square yards of 2-inch hot mix asphalt (HMA) milling and repaving, 1,200 linear feet of 6-inch to 12-inch water main installation with associated pavement repair, replacement of 17 wheelchair ramps, signal replacement, sundry utility adjustments, and miscellaneous related items. The work includes coordination with multiple utility providers and adherence to WSDOT's standard specifications and special provisions for pavement, drainage, and accessibility improvements.

The project requires contractors to comply with prevailing wage requirements and applicable federal and state labor standards. All work must meet WSDOT's current standards and specifications, with specific attention to Americans with Disabilities Act (ADA) compliance for the wheelchair ramp replacements and traffic control during construction. Contractors must be prepared to manage utility coordination, including water main installation and adjustments to existing utilities, while maintaining traffic flow and public safety throughout the project duration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .