20213640 001 BOM.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Fox Mountain Communications Shelter Federal contract opportunity
Solicitation number
12760421Q0157
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Fox Mountain Communications Shelter, newest first.
File Type Posted
WDOL building.pdf PDF
Fox Mtn New Shelter Questions - Reply 20 Jul 21.pdf PDF
Fox Mountain - Specification Package 2 - Final.pdf PDF
Request for Quote.pdf PDF
Shelter PWS March_30_2021.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

SITERegionIAS PMOBOM Amount
Fox Mountain Shelter3Marcella Lucero$ - 0
Fox Mountain IB, Grding3Marcella Lucero$ - 0
Total$ - 0

R3 Fox Mountain Shelter Bill of Materials

Shipping Information: Use one sheet per shipping location.
Unit Name to Ship to:Gila NF
Point of Contact (Local SAT):Jacob Bettencourt
Phone (Local SAT):
Street Address:3005 Camino Del Bosque
City, State:Silver City NM
Zip:88061
Additional Information needed for request.
Project Point of Contact (name and phone):Yana Patton
Additional Technical Contact (name and phone), if applicable:Francisco Lucero
WR # or Incident Number:WR20213640
Override/Job Code:2505/NFXF8319
Q-CODEN/A
IAS PMOMarcella Lucero
UIAN/A
BOC3220
AAP #:RPSH
POW Line Item # and Project DescriptionFox Mountain Communications Shelter
Contract Number and Vendor, if applicable:
Vendor address, point of contact name and phone number, if applicable:
COR, if applicable:Marc Kaschmitter
Comments:Fox Mountian Communications Site: Lat 34⁰ 4' 40.43" Long 108⁰ 42' 18.63" Elevation: 9367' Door direction: East
LINE
ITEMDESCRIPTIONManufacturers Part Number and/or Critical SpecificationsUnit of IssueQTYUNIT
PRICETOTAL

PRICE

1SHELTER DESCRIPTION
2Prefabricated Concrete Building (8'x10'x8')EA1$ - 0$ - 0
3SPECIAL FEATURES:
42 hour fire rating$ - 0$ - 0
5UL-752 Level 4- (Bullet Resistant) Ballistic rated walls$ - 0$ - 0
6ROOF AND FLOOR
7Roof coating: Standard UNIFLEX$ - 0$ - 0
8Floor: Standard tile$ - 0$ - 0
9INTERIOR WALLS AND CEILING:
10FRP (Fiber-Reinforced Plastic) covered plywood$ - 0$ - 0
11DOOR: Direction North
123070 Door, 18 Gauge GalvanizedEA1$ - 0$ - 0
133070 Frame, 16 Gauge GalvanizedEA1$ - 0$ - 0
14Closer: HD Dorma Grade-1, Aluminum, spring door saver, dead stop, thumb openEA2$ - 0$ - 0
15Lock: 626-Entry w/deadbolt functionEA1$ - 0$ - 0
16Cylinder Housing, Combined Core, Control Keyway, KeysEA1$ - 0$ - 0
17Latch Protector (SS)EA1$ - 0$ - 0
18Door PullEA2$ - 0$ - 0
19Magnetic Weather StrippingEA1$ - 0$ - 0
20Drip Cap: 76" x 2-1/2"EA1$ - 0$ - 0
21SS Hinges: Ball BearingEA3$ - 0$ - 0
22Threshold: Bumper 36"1$ - 0$ - 0
23Threshold: Saddle 36"EA1$ - 0$ - 0
24Cable Tray:EA
2512" wide steel cable trays (over equipment racks to antenna entry)1$ - 0$ - 0
26Cable Entry:EA
27Cable Entries ("Waveguide Entrance Panels"): 8 PortEA1$ - 0$ - 0
28Door Canopy: 24"x80"1$ - 0$ - 0
29Electrical:
120V/240V, 200A, Single Phase
20 Space breaker panel with snap in breakers: Nema 1 surface mount enclosureEA1$ - 0$ - 0
30Type 1 single phase hardware surge suppressor 120/240 1PEA1$ - 0$ - 0
31Grounding:EA
322AWG Halo ground approximately 6" below ceiling, (with stand-off brackets) Equipment racks with grounding bars with 2AWG connected and run to master ground bar. 1/4" x 4" x 20" Provisions for the connection of a grounding electrode conductor at the shelter service equipmentEA1$ - 0$ - 0
33Interior Lights:
34Interior Light FixturesEA2$ - 0$ - 0
35Wall SwitchEA1$ - 0$ - 0
36Receptacles:$ - 0
37Wall mount receptaclesEA4$ - 0$ - 0
38Ceiling mount twist lock receptaclesEA4$ - 0$ - 0
39Equipment Racks:
402 post, floor mounted 19" equipment rack with ground barsEA4Included
41Solar
42Solar Rack MountsEA0$ - 0$ - 0
43Safety Equipment:$ - 0
44Fire Extinguisher, Electrical ratedEA0$ - 0$ - 0
45Eye wash stationEA0$ - 0$ - 0
46Smoke detectorEA0$ - 0$ - 0
47Ventilation:
481 Ton HVACEA1$ - 0$ - 0
49Other:
50Shelter drawings and DocumentationEA1Included
51Total for Shelter and Components$ - 0
52
53Transportion to Near SiteEA1$ - 0$ - 0
54Transportation to Site and Installation with CraneEA1$ - 0$ - 0
55Backhaul of old shelter - 8'x16' aprox 6000lbsEA1$ - 0$ - 0
56Subtotal$ - 0
57
58
59
60GRAND TOTAL$ - 0

R3 Fox Mountain IB & Grding Bill of Materials

Shipping Information: Use one sheet per shipping location.
Unit Name to Ship to:Gila NF
Point of Contact (Local SAT):Jacob Bettencourt
Phone (Local SAT):
Street Address:3005 Camino Del Bosque
City, State:Silver City NM
Zip:88061
Additional Information needed for request.
Project Point of Contact (name and phone):Yana Patton
Additional Technical Contact (name and phone), if applicable:Francisco Lucero
WR # or Incident Number:WR20213640
Override/Job Code:2505/NFXF8319
Q-CODEN/A
IAS PMOMarcella Lucero
UIAN/A
BOC3220
AAP #:RPSH
POW Line Item # and Project DescriptionFox Mountain Communications Shelter
Contract Number and Vendor, if applicable:
Vendor address, point of contact name and phone number, if applicable:
COR, if applicable:Marc Kaschmitter
Comments:Fox Mountian Communications Site: Lat 34⁰ 4' 40.43" Long 108⁰ 42' 18.63" Elevation: 9367' Door direction: East
LINE
ITEMDESCRIPTIONManufacturers Part Number and/or Critical SpecificationsUnit of IssueQTYUNIT
PRICETOTAL

PRICE

1Site Grounding Based on Provided Lyncole 5ohm Design
2MaterialsEA1$ - 0$ - 0
3LaborEA1$ - 0$ - 0
4Post installation testingEA1$ - 0$ - 0
5Ice Bridge Approx 10 feet installed between shelter and tower
6MaterialsEA1$ - 0$ - 0
7LaborEA1$ - 0$ - 0
8RF Cabling, Replace (2) Existing RF Cables with LDF4, antenna to polyphasers
9MaterialsEA1$ - 0$ - 0
10LaborEA1$ - 0$ - 0
11Safety Climb, install safety climb Kit on existing clmibing ladder
12MaterialsEA1$ - 0$ - 0
13LaborEA1$ - 0$ - 0
14Electrical, disconnect 240vac from existing shelter, reconnect 240vac to new shelter
15MaterialsEA1$ - 0$ - 0
16LaborEA1$ - 0$ - 0
17Level Existing Foundation, apply layer of aggregate on foundation to level surface
18MaterialsEA1$ - 0$ - 0
19LaborEA1$ - 0$ - 0
20Subtotal$ - 0
21
22
23
24GRAND TOTAL$ - 0

File details come from the government source that posted it. Updated .