Vendor Q A 1 - General IDIQ Questions
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NPIN General & BASIC IDIQ Technical Questions
| # |
| Questions |
| Responses |
| 1 |
| RFP Section F.5, Page 14 |
Can the Government identify the estimated Task Order work that will be performed on-site versus off-site at a Contractor facility?
All work procured can be performed off-site.
| 2 |
| The RFP (Attachment J.6: Domain 1: Information and Communication Technology) references Attachment: J.5 as the “Technical Specification for current NPIN Products and Services” (page 8), but Attachment J.5 is the Quality Assurance Surveillance Plan (QASP). In order to have sufficient time to review this additional material and address any potential questions, can the Government please provide as soon as possible the “Technical Specifications for Current NPIN Products and Services” as referenced in the RFP? |
The Technical Specification document and NPIN Software and Subscriptions have been added to the solicitation. Please see attachments J.8 and J.9.
| 3 |
| It is required to provide the CVs and/or Resumes of all Key Personnel? |
| Yes. |
| 4 |
| Does CDC anticipate that the NPIN office will remain in Corporate Square? |
The government offices will remain at Corporate Square. The place of performance will be at the contractor’s facilities.
| 5 |
| Section B.5, Maximum Ceiling Price, page 3 |
Does the maximum value of $45,000,000 apply to all contracts and all task orders that are awarded over the 5-year contract period?
Yes.
| 6 |
| Section B.6.3, Time and Materials and Labor-Hour, page 3 |
With regard to the statement, “The Basic Contract does not provide Loaded Hourly Labor Rates for T&M and L-H Type Orders extending beyond the period of performance of the Basic Agreement.” Is this implying that the Government will not be using T&M Contracts for any orders issued after the basic period of performance?
This section is revised in amendment 00002.
| 7 |
| Section B.8 Contract Structure, page 4 |
The RFP states that the Government will provide a minimum of 10 calendar days to respond. Given that these will be competitive RFTOPs and similar vehicles from CDC allow for typically 20 calendar days to respond, will the Government consider revising the 10 calendar days to 20 calendar days?
10 days will be the minimum; however, the days to respond will be determined for each request for task order propoposal depending on the circumstances.
| 8 |
| Section C.3.1 Domain 1 and C.3.2 Domain 2, page 7 |
Is it the Government’s intent to award Domain 1 and Domain 2 based solely on the proposals submitted, as two separate task order awards?
Task Orders will be awarded to the vendor whose proposal provides the best value to the Government.
| 9 |
| Section C.4 Security Requirements, paragraphs b. and c. page 8 |
This paragraph states in part that 1 week prior to commencement of contract performance the Contractor shall submit for every Contractor employee listed in the table mentioned in paragraph 2 above as requiring either HHS facility access or information system access. Can the Government clarify that the table is to be submitted as part of each Task Order proposal? Also, can the Government clarify that the 1 week prior refers to commencement of an awarded task order?
This section is deleted in amendment 00002.
| 10 |
| Section C.6. Government Furnished Property, page 10. |
How is the government intending to make the property available to Contractors? Where is the cost of relocating the material to be accounted for?
Yes, the government will make property available to contractor. After award, the government will determine what property needs to be transferred and cost will be paid accordingly.
| 11 |
| Section G.9.3.c , page 21 |
Exhibit III lists SF 1035, but only SF 1034 is included in the RFP. Please advise if SF 1035 is required when invoices requesting payment are submitted.
In accordance with the instructions at G.9, the contractor may use either standard forms 1035 and 1034 or the Contractor’s own invoice form. The attachment J3 is updated to include both forms in amendment 00002.
| 12 |
| Section H.1, page 24 |
Are the Key Personnel to be listed for Tasks 1 and 2 since that is the only definitive scope of work known at the moment?
Yes.
| 13 |
| Section H.10, Government Furnished Property, page 29 |
This section states no material, labor or facilities will be furnished unless specified on a Task Order. However, Exhibit J4 has a list of GFP/GFE. Please advise if the GFE will or will not be provided. If provided, will the Government pay for the transportation?
After award, the government will determine what property needs to be transferred and cost will be paid accordingly.
| 14 |
| Section H.11, Incremental Funding, page 29. |
This section states that the Government intends to award a cost reimbursement contract; however, other contract types are called out. Please clarify.
Varying contract types might be used in future task orders; however, task order 1 and 2 included in the solicitation will be cost-plus-fixed-fee.
Is there physical space leased by the government that will be available throughout the performance period? If yes, where is it located?
The government has not and will not pay for leased office space related to this contract. Furthermore, it is up to bidders to identify office space.
Is there a possibility that the NPIN social media channels will be divided?
No.
| Attachment J4. This attachment provides a list of government owned-furnished equipment inventory. Which, if any, of the leased or furnished equipment will be available to the contractor? |
| After award the government will determine what property needs to be transferred and cost will be paid accordingly. |
| 18 |
| Will other CIOs within CDC be able to utilize the NPIN contract? |
All services including future task order awards are only for The National Center for HIV/AID, Viral Hepatitis, STD and TB prevention (NCHHSTP)
| 19 |
| Attachment J4 provides an extensive list of government owned equipment associated with NPIN. If the two sample task orders are awarded to different vendors, how will the equipment be split between the two vendors? |
After award the government will determine what property needs to be transferred and cost will be paid accordingly.
| 20 |
| Are the requirements presented in the Task Orders new or existing work? |
| The requirements are a combination of new work and existing work. |
| 21 |
| What has been the historical level of effort (in terms of type and number of staff) required to support each of the Task Orders? |
| Offerors are expected to use their judgment and expertise to develop an independent proposal based on the requirements in the Performance Work Statement. |
| 22 |
| Both Task Orders require a full-time Project Director. Can one full-time person be split between both task orders or is it expected that a full-time person will be required for each task order? |
Yes, a project director can be split between both task orders.
| 23 |
| 1. Regarding task numbering: Page 6 and 7 of 70, Section C.3, Table, shows Domain 1 “Focus Areas” as numbered 1.1 through 1.4 and Domain 2 “Focus Areas” numbered 2.1 through 2.6. |
However, Section C.3.1 refers to what appears to be the same information included in the “Focus Areas” as Tasks and numbers them Task 1 through 4 and Task 5 through 6 for Domain 1 and 2, respectively.
Subsequently, in Attachment J.6, page 2, re RFTOP #0001, “Focus Areas” are listed as 1.1 through 1.3 (not 1.4) and in Attachment J.7, “Focus Areas” are listed as 2.1 through 2.5 (not 2.6) and Attachment Focus Areas do not correspond to the same groupings as the Tasks on pages 6 and 7. For example, Focus Area 1.4 in Section C.3 is the Web Content Management System (WCMS), however WCMS is combined in Attachment 6 with Focus Area 1.1 Similarly the titles of Domain 2 Focus Areas do not correspond when Section C.3 titles and numbers are compared to Attachment J.7 titles and numbers.
· Question (a): Which numbering system takes precedence? When we refer to a given Task and/or Focus Area, should we use the numbering system in the Basic contract, or the numbering system in the RFTOPs in Attachment J.6 and J.7?
· Question (b): Should we refer to Tasks or Focus Areas, or both?
· Question (c): Do we need to cross-reference those areas that are referred to differently in various parts of the proposal?
This will be corrected in amendment 00002.
| 24 |
| Can the government provide a list of the components that make up the IT Infrastructure the web content is running on? |
The Technical Specification document and NPIN Software and Subscriptions have been added to the solicitation. Please see attachments J.8 and J.9.
| 25 |
| Describe Current Web development IT server structure (i.e. Development/Stage/Production servers?) |
The NPIN IT infrastructure will resides behind the CDC firewall. Contractors will have access to Development/Staging. Contractors will not have access to the production environment.
| 26 |
| Are there any current mobile applications that need to be maintained? What are these mobile applications? |
| No specific mobile application per se as all of our websites are coded for ready responsive design. |
| 27 |
| What software tools are being used to program/edit/manage/publish the content? |
| Drupal is the Content Management (CMS) system currently being used. |
| 28 |
| Can you provide current Section 508 Audit of NPIN holdings? |
| All NPIN website are 508 compliant. This includes all materials within the databases. All websites must maintain a 90% 508 compliance rate. |
| 29 |
| How many documents are prepared for electronic distribution that need to meet Section 508 standards? |
| There isn’t a standard. Some announcements have attachments while others announcements have links. The estimate would be around 50% of the documents sent as electronic distribution will need to become 508 compliant. |
| 30 |
| Will the government provide all servers and software (including 508 evaluation tools) required to operate and update the existing Internet presence? If not, which will the government provide and what does the contractor need to provide? |
| The vendor is expected to obtain and deploy the appropriate software to mange all NPIN servers, databases and IT assets The cost will be charged to the contract. |
| 31 |
| How many minutes of closed captioning services need to be provided? |
| Projects that require captioning services will be scoped at the beginning on the project; however no more than 15 hours of captioning is expected. |
| 32 |
| How many virtualized hosting environments are there? |
| The NPIN platform is currently being migrated into the CDC infrastructure. During this process changes may occur that could make the answers to the questions outdated. All instance of the NPIN platform will be virtualized (i.e. Development, Staging, Production etc.). |
| 33 |
| How many servers need to be maintained? |
| The NPIN platform is currently being migrated into the CDC infrastructure. During this process changes may occur that could make the answers to the questions outdated. At this time we are estimating 15 servers. |
| 34 |
| Are KNOWIT responses done manually? |
| No the KNOWIT code is a data feed from the Resources and Services Database. |
| 35 |
| NPIN Search tools employed: |
a. Is there an NPIN website-wide page search tool? If so, what is the tool’s vendor and name?
b. Do each of the databases have their own search tool or is there a search tool that covers all databases?
a. Yes there is website wide page search tool please refer to the Technical Specifications for Current NPIN Products and Services.
b. Yes each database has there own search tool but there is also a unified search for all of four databases.
| 36 |
| How many microsites are there that need to be maintained and how many new sites are developed each year? |
| There are less than 15 microsites currently to maintain. NPIN currently only has three websites, there have not been any new websites developed over the last 10 years. |
| 37 |
| How many RSS feeds and Listserves are there? |
| Currently are less than 75 listsservs and less than 25 RSS feeds. |
| 38 |
| How much travel, for what purpose and for which LCATs is involved in performing the tasks in the RFP? |
The only travel that is approved for this contract is for conferences. Travel cost should not exceed $20,000.
| 39 |
| Is there a help/service/request desk involved? Please provide the following if so: |
a. Number of resources at the help desk, specified by LCAT and annual work effort hours
b. Help Desk software tools used if any
c. Hours of operation
a. NPIN replies to customer e-mails received via info@cdcnpin.org, and NPIN-Requests@cdcnpin.org On average NPIN receives less than 100 patron e-mails per month. Emails address other miscellaneous topics, such as NPIN webinars, funding/grants, the Organizations Database, and subscriptions.
b. No software tools.
c. Hours of operation is from 9-5pm. Responses to emails are in English and Spanish.
| 40 |
| Are there any statistics that the government can provide on number of annual distinct visitors to the NPIN web sites, volume of documents downloaded, web pages with highest number of hits, annual growth rates, etc. |
| On average The NPIN websites receive the following monthly visitors: |
Cdcnpin.org—224,000 Hivtest.cdc.gov—127,000 Findtbresources.org---10,000 (The other data is not being collected in this manner)
| 41 |
| What are the main processes by which NPIN supports their partner network? Specifically: |
a. How is a new partner added to the network?
b. How requests are for information handled that cannot be satisfied by downloading information from one of the NPIN websites or databases? (e.g. a request for information that is responded to with paper or other format that is not electronic). What are the process steps and the LCATs involved?
a. Partners fill out an organization update form or an email is sent to the database team to add/update an organization’s information. Or the database team will update the record accordingly.
b. An email is sent to the CDC COR to answer.
| 42 |
| What metrics and statistics can the government provide covering the following areas: |
a. Total number of requests for information served?
b. Total number of pages, documents, videos, etc. provided?
c. Annual growth of the partner network participants?
Due to the broadness of these questions the government can not answer these questions.
| 43 |
| Are there any international network partners served? |
No.
| 44 |
| Task 4 mentions a Web Content Management System (WCMS). Is this a COTS/GOTS product or custom? If COTS/GOTS what is the brand/name and version of the product? |
The NPIN Web Content Management System (WCMS) service is Drupal.
| 45 |
| Section C.3.1.Task 2 - Mentions that NPIN manages more than 16,000 records. What type of records are these? e.g. are these network partner/organization records? |
| Organizations records, test locations, partner services and funding information. |
| 46 |
| What is the size (in GB) of the content stored in the NPIN databases (Organizations, Materials, Funding)? |
| While the NPIN platform is currently being migrated into the CDC infrastructure. During this process changes may occur that could make the answers to the questions outdated. As of the time of this inquiry, the database is currently approximately 2GB. |
| 47 |
| What organization or vendor is currently maintaining the NPIN IT infrastructure? |
| Dataprise is the current vendor that maintains the NPIN IT infrastructure. Please refer to the Technical Specifications for Current NPIN Products and Services for additional information |
| 48 |
| What is the relevance of Attachment_J4_-_Government_Owned-Furnished_Equipment_Inventory_List to the tasks mentioned in the RFP? |
| The information is provided as an FYI as a list of current government property that can be used as apart of the contract award. |
| 49 |
| Although not specifically mentioned in the RFP, does the offeror need to have the following: |
a. Access to and a relationship with conference centers that are outside of the CDC conference center facilities
b. Access to Conference Management Software
a. No.
b. No.
| 50 |
| What analytics tool is currently used for analysis of data in the databases (not web content)? |
The analytic tools currently being used is Google Analytics.
| 51 |
| What version of Drupal are you currently on? Is there a planned upgrade within the next 12 months? |
| The NPIN platform is currently being migrated into the CDC infrastructure. During this process changes may occur that could make the answers to the questions outdated. Aquia Drupal and Drupal Commons - (version 7.15) Currently there aren’t any plans to update, but that may change depending on website/partner needs. |
| 52 |
| Is there a list of Drupal modules used on the existing websites? |
| See answer to question 51 |
| 53 |
| What are the existing SLAs for the management of your infrastructure, database uptime, backup and recovery and related operations? |
| The NPIN platform is currently being migrated into the CDC infrastructure. During this process, changes may occur that could make the answers to the questions outdated. However, the SLA expectation is for 8 business hours support 5 days a week. |
| 54 |
| Do you have a specific records management technology that contractor needs to work with in compliance to the NARA GRS regulations? |
| The contractor shall follow a records management policy and plan for the management of records and program documentation that ensures compliance with applicable federal records policies. All federal records must be maintained in accordance with the retention periods and disposition instructions outlined by CDC Records Control Schedules and NARA General Records Schedule (GRS). Applicable Records Management required at CDC includes GRS 20 Electronic Records and GRS 24 Information Technology Operations and Management Records. |
| 55 |
| Can you describe the current scope of the RESTful APIs developed or planned to support the emerging needs of NCHHSTP? |
| The Government would like vendors to propose various activities using restful APIs technology and the uses of other new technologies based upon the governments needs within the PWS. |
| 56 |
| Is there documentation describing the current API interfaces? If so, can that be shared through an amendment to this RFP? |
No there isn’t documentation describing the current API interfaces. The Government is asking vendors to provide API solutions for our web products and services. Please visit cdcnpin.org and hivtest.cdc.gov
| 57 |
| Is NPIN currently supported by contractor(s) for the same or similar work in this RFP? If so, is the contract a single award or a multiple award? Who are the current contractor(s)? |
| The current contractor is Danya International |
| 58 |
| If NPIN is not currently supported by contractors for the same or similar work, is the CDC National AIDS Clearinghouse still supported by contractor support? If so, who is the current contractor(s)? |
| Please see answer 57 |
| 59 |
| C.6 Transition Plan – can CDC provide further details regarding the length of time suggested for the transition-in period? |
The Transition-in period will range between 6-8 weeks.
| 60 |
| There is a reference to “Web 3.0” technologies. This term does not have a standard definition (per http://en.wikipedia.org/wiki/Web_2.0#Web_3.0); could you clarify what is intended? |
Web 3.0: Is about the Web becoming smarter, getting to know your users better from your browsing history (and all you've contributed to it during Web 2.0) and automatically delivering content that’s relevant to our partner needs. Please see the reference below:
http://www.macmillandictionary.com/us/buzzword/entries/web3.html
| 61 |
| In clause C.4.c, CDC requires a list of employees who require HHS facility or IS access one week prior to the commencement of contract performance. Can CDC please specify “commencement of contract performance?” Is this after award, after the kickoff meeting but prior to execution of a transition plan or task performance? |
| This clause is removed in amendment 00002. |
| 62 |
| Does the current IDIQ contract specify requirements for a Transition-Out plan? |
| No. |
| 63 |
| How many database administrators currently manage NPIN’s functional needs and at what level of effort do they perform? |
Offerors are expected to use their judgment and expertise to develop an independent proposal based on the requirements in the Performance Work Statement
| 64 |
| For pricing purposes, can CDC provide any additional specifications regarding new and special data products? If the specifications are unknown, can CDC provide an example of a special product that has been created through the existing contract? |
| An example of a special data product could be a RSS feed created for the state health department in Florida of all their testing locations. The government is looking for vendors to provide solutions to the needs outlined within the PWS. |
| 65 |
| Clause L.9.d states that the reasonableness of price for this procurement will be based on adequate price competition, and that offerors are not required to submit cost or pricing data. Can you clarify how adequate price competition will be determined without cost or pricing data? |
In accordance with FAR 15.403-3(b), “when adequate price competition exists (see 15.403-1(c)(1)), generally no additional data are necessary to determine the reasonableness of price.”
However, this section is revised in amendment 00002 to specify that it is related to certified cost or pricing data.
| 66 |
| Please provide clarification on what information CDC requires for subcontractors. |
| L.9 requires disclosure of subcontracts as related to the technical proposal. |
L.12 allows for past performance information for major subcontractors.
Cost for subcontracts would also be expected in the business proposal for the two sample task orders.
| 67 |
| Attachments J.6 and J.7 describe “Performance-Oriented Staffing and Results Incentives”. Can CDC clarify what is meant by “across the board” in limiting incentives to 2%? |
| The language limiting incentives is removed in amendment 00002. |
| 68 |
| The RFTOP indicates that “Subcontractor and consultants shall be viewed as performance partners and shall be held accountable for achieving performance results in accordance with the performance management framework and plan.” Can CDC specify how it intends to hold subcontractors and consultants “accountable?” |
| CDC’s relationship is with the prime contractor not the performance partners. Deliverables are the responsibility of the prime contractor—the prime contractor must ensure their performance partners meet the agreed upon deliverables stated within the contract not CDC. |
| 69 |
| There are inconsistencies between the task orders under each Domain in the Solicitation and Appendices 6 & 7. The Solicitation identifies four focus areas under Domain 1 and six under Domain 2. Appendix 6 identifies only three focus areas for Domain 1, while Appendix 7 identifies five for Domain 2. Can CDC clarify on the correct number of focus areas and their numbering? |
| See Reponses 23 above |
| 70 |
| Attachment J.6 page 3, refers to Section Web-based Information Development and Management, which is a scope area in Domain/Sample Task Order 2. Please clarify. |
| Please refer to this is definition: http://en.wikipedia.org/wiki/Web_development |
| 71 |
| Attachment J. 4 includes a GFE Inventory list. Please clarify how this inventory will be distributed in the event of a multiple award? |
| After award the government will determine what property needs to be transferred and cost will be paid accordingly. |
| 72 |
| Please clarify the relationship between the work performed under Domain 1 and Domain 2; it appears that without careful consideration there could be duplication of costs, particularly if Task Orders are awarded to multiple contractors. |
Domain 1 is intended to provide the operational infrastructure for the NPIN enterprise. Largely digital in nature, this domain seeks to provide leverage websites, databases, social media, API (and other assets) to meet the needs of NPIN partners. Domain 2 seeks to leverage the aforementioned operational assets to support, communicate with and engage NPIN partners.
| 73 |
| In Attachment J.6 Page 4, refers to the fact that the website addresses will need to be prominently displayed on all materials and page 3 indicates that the addresses will change. Given that change, will any materials need to be redesigned and reprinted? If so, in what Domain will that task be performed? |
| No materials will need to be printed since the government will maintain all new websites URL as well as old URLs as redirects. |
| 74 |
| What physical inventory is currently maintained by NPIN? What volume of physical inventory is planned? What responsibility will the contractor have in maintaining and storing inventory? |
Please refer to the government owned property list. After award the government will determine what property needs to be transferred and cost will be paid accordingly. There will be no storing property fee. If the equipment is not needed the government will discard the property.
| 75 |
| Is the NPIN Inventory Database Attachment J.7 the same as the Downloadable Materials Database referenced in Attachment J.6? If not, please clarify the differences. If so, please clarify contractor responsibilities between the Domain sample Task Orders in regards to the database. |
The NPIN Inventory Database provides the operational mechanism by which materials are identified and pooled. The NPIN Downloadable Materials Database serves as the consumer interface to access these materials. Offerors responding to J.6 will develop the mechanism for 3rd party downloadable materials – whereas offerors in J.7 will focus on optimizing the curation and distribution of said materials to partners.
| 76 |
| Section C.4 age 8, please clarify which positions require Public Level Trust 5 or 6 clearance. For those positions, please confirm that the cost of security investigations for Public Level Trust 5 or 6 positions will be borne by the government or permitted as an allowable cost under the contract. |
| This clause is removed in amendment 00002. |
| 77 |
| What software licenses will the contractor have access to through the contract (e.g. Omniture)? |
The Technical Specification document and NPIN Software and Subscriptions have been added to the solicitation. Please see attachments J.8 and J.9.
| 78 |
| In Attachment J.6 on page 11, please clarify the reference to a potential new vendor? |
| The PWS has been updated to reflect change. |
| 79 |
| On page 7, Section 3.1.1 and C.3.2 – Tasks 1 and Task 5 appear to overlap. Can CDC clarify the difference between these tasks? |
| Task 1 focuses primarily on coding and development of webpages. |
Task 5 focuses primarily on tool creation, content and management of the webpages.
| 80 |
| Basic IDIQ Contract: |
Task 1. Information and Communication Technology 5. Attachment J.6, Task #1, Domain 1, Information and Communication Technology, pg. 15, Security Compliance, Project Management, and Section 508 Guidance, a draft Data Systems Security Plan (SSP) is due with proposal submission, however this plan is not included as a deliverable per Section C.9, Delivery Schedule for Specified Products.
Question - Will the SSP be include at Section C.9?
Yes the Security Compliance plan (SSP) has been added to the deliverables table in attachment J.6 page 20
| 81 |
| BASIC IDIQ CONTRACT |
1. Does NPIN use a news aggregator for the Prevention News section?
Yes currently it’s a news aggregator service, but this service is not included within the current PWS.
File details come from the government source that posted it. Updated .