ATCH_2_SOW__SITE_PREP_AND_FILL_HWY_80_East_CHKPNT_.pdf
PDF 136 KB Posted
- Solicitation number
- 20087018
About this file
Description of requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATCH_3_MATRIX_FOR_RFQ.xls | XLS spreadsheet | |
| ATCH_3_MATRIX_FOR_RFQ.xls | XLS spreadsheet | |
| SF18-95_ATCH_1_RFQ__.pdf | ||
| ATCH_3_MATRIX_FOR_RFQ.xls | XLS spreadsheet | |
| ATCH_4__WAGE_DET_AS_OF_8_6_15.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Fill material and Site Prep for Highway 80 East Checkpoint
1. BACKGROUND: The purchase of fill material for site preparation of the Douglas
Station’s Highway 80 East Checkpoint. The fill material will be utilized at the Highway 80 East Checkpoint (mile marker 390) (N 31.52268; W -109.30220). The fill material will be needed to bring the road shoulder up to grade with the existing asphalt roadway. This will provide an area to place all necessary equipment for checkpoint operations. It will also provide adequate space for in-coming vehicles to enter inspection areas at the checkpoint.
2. SCOPE: The fill material provided by the vendor will be utilized at the Douglas
Station’s Highway 80 East Checkpoint (MM 390). The purchased fill material will serve the purpose of binging the road shoulder up to grade with the existing asphalt roadway.
It will also provide an area to place all necessary equipment for checkpoint operations and adequate space for in-coming vehicles to enter inspection areas at the checkpoint.
The fill material and site prep work is needed to improve the location in order to conduct operations at the Highway 80 East Checkpoint.
2.1 Vendor will deliver the fill material to the Highway 80 East Checkpoint location. Site prep work (spreading, compacting, leveling etc…) will be conducted by FM&E. Vendor will coordinate with the FM&E point of contact (POC) prior to starting the project.
3. DELIVERABLES AND DELIVERY SCHEDULE: The purchased fill material will be delivered to the Highway 80 East Checkpoint (mile marker 390) (N 31.52268; W - 109.30220). The time frame for the delivery must occur within thirty (30) days from contract award date unless another date has been agreed upon by the Facilities Management Agent and the Contract Specialist.
4. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION: FM&E will conduct the site prep work. Site prep must be conducted in order to initiate checkpoint operations.
5. PLACE OF PERFORMANCE: The site prep work will take place at the Highway 80 East Checkpoint at Mile Marker 390 (N 31.52268; W -109.30220) within the Douglas Border Patrol Station’s area of responsibility.
Location
Highway 80 East Checkpoint Mile Marker 390
GPS: N 31.52268; W -109.30220
Douglas, AZ 85607
6. PERIOD OF PERFORMANCE: The Douglas Border Patrol Station will conduct checkpoint operations year round, as operational needs dictate, from the Highway 80 East Checkpoint.
7. SECURITY: The Highway 80 East Checkpoint will be staffed by personnel from the
Douglas Border Patrol Station.
9. POINTS OF CONTACT
Office of Border Patrol (OBP) POC Alejandro Martinez Douglas, Arizona Border Patrol Station 1608 S. Kings Highway Douglas, AZ 85607 520-805-6921 Alejandro.X.Martinez@dhs.cbp.gov
FM&E POC
Jay Pullis Tucson Sector Facility Manager, Facilities Division
520 514 4677/ BB 520 437 6864
Jay.p.pullis@cbp.dhs.gov
Contracting Officer:
Teresa Nechvatal Pacific Operations Border Enforcement Contracting Division 520 407 2807 Teresa.Nechvatal@cbp.dhs.gov mailto:Alejandro.X.Martinez@dhs.cbp.gov mailto:Jay.p.pullis@cbp.dhs.gov mailto:Teresa.Nechvatal@cbp.dhs.gov
File details come from the government source that posted it. Updated .