This document consists of multiple contract change notices for Michigan Department of Transportation's (MDOT) indefinite delivery contract number 200000000843 with Corby Energy Services, Inc. The contract is managed by MDOT's Program Manager James Roath and Contract Administrator Anna Swanson, with David Carpenter, Jr. serving as the contractor's representative. The contract falls under the State of Michigan Procurement system and is classified as a statewide contract for as-needed services.
The contract covers culvert rehabilitation and drainage restoration services throughout Michigan. The initial contract period ran from May 11, 2020, through May 10, 2023, with three one-year options available. Change notices document cumulative value increases from $45.5 million to $91.5 million, with the most recent extension exercising the final option year and adding a six-month extension through November 10, 2026. Payment terms are Net 45 days, with P-card and payment request options available. The contract includes detailed line-item pricing for various repair methodologies including cured-in-place pipe (CIPP) lining, auger bore installation, open-cut repairs, slip lining, and ancillary services such as exploratory excavation, night work lighting, and slope paving. Prices are specified by culvert diameter and repair type, with rates ranging from $75 per linear foot for joint sealing to $3,000 per linear foot for 72-inch diameter open-cut repairs, plus hourly rates for specialized work. All contract terms, conditions, and specifications remain consistent across the change notices unless specifically modified.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT CHANGE NOTICE
Change Notice Number 15 .
to
Contract Number 200000000843.
C O
N T
R A
C T
O R
Corby Energy Services, Inc
S T
A T
E P ro g ra m M a n a g e r
James Roath MDOT
6001 Schooner Drive 517-230-5361
Belleville, MI 48112 RoathJ1@michigan.gov
David Carpenter, Jr.
C o n tr a c t
A d m in is tr a to r Anna Swanson MDOT
734-547-9236 517-230-2063 dcarpenter@corbyenergy.com Swansona1@michigan.gov
VS0020117
STATE OF MICHIGAN PROCUREMENT
Michigan Department of Transportation
425 W. Ottawa Street, Lansing, MI 48933 P.O. Box 30050, Lansing, MI 48909
CONTRACT SUMMARY
DESCRIPTION: Culvert Rehabilitation and Drainage Restoration.
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
May 11, 2020 May 10, 2023 Three 1-year May 10, 2026
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
☐ P-card ☐ Payment Request (PRC) ☐ Other ☐ Yes ☒ No
MINIMUM DELIVERY REQUIREMENTS
DESCRIPTION OF CHANGE NOTICE
OPTION LENGTH OF OPTION EXTENSION
LENGTH OF
EXTENSION
REVISED EXP. DATE
☐ ☒ Six (6) months November 10, 2026
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$81,500,000.00 $10,000,000.00 $91,500,000.00
DESCRIPTION: Upon execution and State Ad Board approval on April 28, 2026, this Contract is exercising a six-month extension and is increased $10,000,000.00 for continued as-needed culvert rehabilitation and drainage restoration services. The revised contract expiration date is November 10, 2026.
All other terms, conditions and specifications remain the same. Per Contractor and Agency agreement.
Change Notice Number 1414 .
to
Contract Number 200000000843.
C O
N T
R A
C T
O R
Corby Energy Services, Inc
S T
A T
E P ro g ra m M a n a g e r
James Roath MDOT
6001 Schooner Drive 517-230-5361
Belleville, MI 48112 RoathJ1@michigan.gov
David Carpenter, Jr.
C o n tr a ct
A d m in is tr a to r Anna Swanson MDOT
734-547-9236 517-230-2063 dcarpenter@corbyenergy.com Swansona1@michigan.gov
VS0020117
STATE OF MICHIGAN PROCUREMENT
Michigan Department of Transportation
425 W. Ottawa Street, Lansing, MI 48933 P.O. Box 30050, Lansing, MI 48909
CONTRACT SUMMARY
DESCRIPTION: Culvert Rehabilitation and Drainage Restoration.
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
May 11, 2020 May 10, 2023 Three 1-year May 10, 2026
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
" P-card " Payment Request (PRC) " Other " Yes # NoNo
MINIMUM DELIVERY REQUIREMENTS
DESCRIPTION OF CHANGE NOTICE
OPTION LENGTH OF OPTION EXTENSION
LENGTH OF
EXTENSION
REVISED EXP. DATE
" " No Change
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$73,500,000.00 $8,000,000.00 $81,500,000.00
DESCRIPTION: Upon execution and State Ad Board approval on February 17, 2026, the contract value is increased $8,000,000.00 for continued as-needed culvert rehabilitation and drainage restoration services.
Change Notice Number 13 .
to
Contract Number 200000000843.
C O
N T
R A
C T
O R
Corby Energy Services, Inc
S T
A T
E P ro g ra m M a n a g e r
James Roath MDOT
6001 Schooner Drive 517-230-5361
Belleville, MI 48112 RoathJ1@michigan.gov
David Carpenter, Jr.
C o n tr a ct
A d m in is tr a to r Anna Swanson MDOT
734-547-9236 517-230-2063 dcarpenter@corbyenergy.com Swansona1@michigan.gov
VS0020117
STATE OF MICHIGAN PROCUREMENT
Michigan Department of Transportation
425 W. Ottawa Street, Lansing, MI 48933 P.O. Box 30050, Lansing, MI 48909
CONTRACT SUMMARY
DESCRIPTION: Culvert Rehabilitation and Drainage Restoration.
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
May 11, 2020 May 10, 2023 Three 1-year May 10, 2026
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
☐ P-card ☐ Payment Request (PRC) ☐ Other ☐ Yes ☒ No
MINIMUM DELIVERY REQUIREMENTS
DESCRIPTION OF CHANGE NOTICE
OPTION LENGTH OF OPTION EXTENSION
LENGTH OF
EXTENSION
REVISED EXP. DATE
☐ ☐ No Change
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$65,500,000.00 $8,000,000.00 $73,500,000.00
DESCRIPTION: Upon execution and State Ad Board approval on August 26, 2025, the contract value is increased $8,000,000.00 for continued as-needed culvert rehabilitation and drainage restoration services.
Change Notice Number 12 .
to
Contract Number 200000000843.
C O
N T
R A
C T
R
Corby Energy Services, Inc
S T
A T
E
P ro g ra m
M a n a g e r James Roath MDOT
6001 Schooner Drive 517-230-5361
Belleville, MI 48112 RoathJ1@michigan.gov
David Carpenter, Jr.
C o n tr a c t
A d m in is tr a to r Anna Swanson MDOT
734-547-9236 517-230-2063 dcarpenter@corbyenergy.com Swansona1@michigan.gov
VS0020117
STATE OF MICHIGAN PROCUREMENT
Michigan Department of Transportation 425 W. Ottawa Street, Lansing, MI 48933 P.O. Box 30050, Lansing, MI 48909
CONTRACT SUMMARY
DESCRIPTION: Culvert Rehabilitation and Drainage Restoration
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
May 11, 2020 May 10, 2023 Three 1-year May 10, 2025
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
☐ P-card ☐ Payment Request (PRC) ☐ Other ☐ Yes ☒ No
MINIMUM DELIVERY REQUIREMENTS
DESCRIPTION OF CHANGE NOTICE
OPTION LENGTH OF OPTION EXTENSION
LENGTH OF
EXTENSION
REVISED EXP. DATE
☒ 1 year ☐ May 10, 2026
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$55,500,000.00 $10,000,000.00 $65,500,000.00 DESCRIPTION: Upon execution and State Ad Board approval on January 28, 2025, the following changes are made:
1. Exercise the third and final option year.
2. The contract value is increased $10,000,000.00 for continued as-needed culvert rehabilitation and drainage restoration services.
3. Add line items for additional repair types, materials, and resources for as needed culvert rehabilitation and drainage restoration services.
All other terms, conditions and specifications remain the same. Per Contractor and Agency agreement.
Contract No. 200000000843 Contract Change Notice #12
Contract Change Notice #12 to add line items for additional repair types, materials, resources and hourly rate (to apply to specific drainage repairs where line items are not provided). These other types will provide additional means of repair for both culverts and their associated drainage parts. These items are as follows:
1. Aggregate Road Hard Surface: This item will be used to establish specified hard surface, compacted in place aggregate. This item will be used in conjunction with roadway, shoulders, drives and walks.
a. Regions: All
b. Unit of Measure: Square Yard
c. Not to Exceed Price: $50.00
2. Rip Rap Placed on slopes or used as check dams: This item will be used when directed to place riprap on slopes or to build check dams or energy dissipaters.
a. Regions: All
b. Unit of Measure: Square Yard
c. Not to Exceed Price: $485.00
3. Street Sweeping: This item will be used when agreed upon, project specific.
a. Regions: All
b. Unit of Measure: Each
c. Not to Exceed Price: $1,950.00
Revised 2/2019
Change Notice Number 11
N T
R A
C T
Corby Energy Services, Inc.
T
A g n a g e r
James Roath MDOT
6001 Schooner Drive 517-230-5361
Belleville, MI 48112 RoathJ1@michigan.gov
David Carpenter, Jr.
C o n tr a c t
A d m in is tr a to r Anna Swanson MDOT
734-547-9236 517-230-2063 dcarpenter@corbyenergy.com Swansona1@michigan.gov
VS0020117
STATE OF MICHIGAN PROCUREMENT
Michigan Department of Transportation 425 W. Ottawa Street, Lansing, MI 48933 P.O.Box 30050, Lansing, MI 48909
CONTRACT SUMMARY
DESCRIPTION: Culvert Rehabilitation and Drainage Restoration
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
May 11, 2020 May 10, 2023 Three 1-year May 10, 2025
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
LENGTH OF
EXTENSION
REVISED EXP. DATE
☐ ☐ No Change
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$45,500,000.00 $10,000,000.00 $55,500,000.00
DESCRIPTION: Upon execution, the following changes are made:
1. The Contract is modified to add line items for additional repair types, materials, and resources for as needed culvert rehabilitation and drainage restoration services.
2. The contract value is increased $10,000,000.00 for continued as-needed culvert rehabilitation and drainage restoration services.
3. The State’s Contract Administrator is updated to Anna Swanson.
All other specifications, and contract terms remain the same. Per contractor and agency agreement and State Administrative Board approval dated 7/16/2024
Contract Change Notice #11
Contract Change Notice #11 to add line items for additional repair types, materials, resources, and hourly rates (to apply to specific drainage repairs where line items are not provided). These other types will provide additional means of repair for both culverts and their associated drainage parts.
These items are as follows:
1. Dynamic Cone Penetrometer Testing: This item will be used to check density of subsurface soil as directed by MDOT. This item will be used in conjunction with soil stabilization needs.
a. Regions: All
b. Unit of Measure: EA
c. Not to Exceed Price: $750.00
2. Slope Paving: This item will be used for drainage improvements that require the installation or replacement of slope paving.
a. Regions: All
b. Unit of Measure: SY
c. Not to Exceed Price: $290.00
i. Slope Paving Header:
1. Regions: All
2. Unit of Measure: FT
3. Not to Exceed Price: $440.00
3. Concrete or Asphalt Testing: This item will be used when MDOT requests that testing be performed.
a. Regions: All
b. Unit of Measure: EA
c. Not to Exceed Price: $3,500.00
4. Night Work Lighting: This item will be used when night work is necessary to complete drainage improvements or culvert repairs.
a. Regions: All
b. Unit of Measure: Day
c. Not to Exceed Price: $1,500.00
5. Exploratory Excavation: This item will be used in situations where exploratory excavation is necessary to determine the location, condition, connectivity, or other purposes so that drainage improvements can be executed (as agreed beforehand).
a. Regions: All
b. Unit of Measure: HR
c. Not to Exceed Price: $1,100.00
6. Slip lining Set-up: This item is to be used in conjunction with pay item Section D ‘Slip Lining.’ Set up charge applies to each specific slip lining location/culvert. This item is separate from mobilization or performing the actual work.
c. Not to Exceed Price: $10,000.00
Change Notice Number 10 .
N T
R A
C T
T
A g n a g e r
James Roath MDOT
6001 Schooner Drive 517-230-5361
Belleville, MI 48112 RoathJ1@michigan.gov
David Carpenter, Jr.
C o n tr a c t
A d m in is tr a to r Laura Dotson MDOT
734-547-9236 517-230-1612 dcarpenter@corbyenergy.com DotsonL2@michigan.gov
VS0020117
STATE OF MICHIGAN PROCUREMENT
Michigan Department of Transportation 425 W. Ottawa Street, Lansing, MI 48933 P.O.Box 30050, Lansing, MI 48909
CONTRACT SUMMARY
DESCRIPTION: Culvert Rehabilitation and Drainage Restoration
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
May 11, 2020 May 10, 2023 Three 1-year May 10, 2025
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
LENGTH OF
EXTENSION
REVISED EXP. DATE
☐ ☐ No Change
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$45,500,000.00 $0.00 $45,500,000.00 DESCRIPTION: Upon execution, the Contract is modified to add line items for additional repair types, materials, and resources for as needed culvert rehabilitation and drainage restoration services. All other specifications, and contract terms remain the same. Per contractor and agency agreement.
Contract Change Notice #10
Contract Change Notice #10 to add line items for additional repair types, materials, resources, and hourly rates (to apply to specific drainage repairs where line items are not provided). These other types will provide additional means of repair for both culverts and their associated drainage parts.
These items are as follows:
1. Auger Bore Installation of Culvert/Drainage: This item is intended to be used in the event that an existing culvert is in such condition that other methodologies will not facilitate the necessary renewal in kind or greater. Other pay items apply. Eighty foot minimum.
a. Regions: All
b. Unit of Measure: LF
c. Not to Exceed Price:
i. 12”: $300.00
ii. 15”: $375.00
iii. 18”: $500.00
iv. 21”: $675.00
v. 24”: $850.00
vi. 30”: $950.00
vii. 36”: $1,200.00
viii. 42”: $1,300.00
ix. 48”: $1,400.00
x. 54”: $1,650.00
xi. 60: $1,950.00
xii. 66”: $2,500.00
xiii. 72”: $3,000.00
2. Clean and seal joints of structures/box & wall ends: This item will be used to seal leaking joints to stop infiltration/exfiltration, erosion, and structural deterioration (when required).
a. Regions: All
b. Unit of Measure: LF
c. Not to Exceed Price: $75.00
6 0 0 1 SCHOONER D R . • P O BOX 9 1 0 • B E L L E V I L L E , M I 4 8 1 1 2
PHONE: ( 7 3 4 ) 4 8 1 - 0 8 7 2 • FAX: ( 7 3 4 ) 4 8 2 - 1 5 0 5
3. Open-cut Repair of Culverts: This item will be used when a culvert needs to be extended, repaired, or replaced by means of excavation in non-hard surface locations. Other pay items apply.
a. Regions: All
b. Unit of Measure: LF
c. Not to Exceed Price:
i. 8”: $195.00
ii. 10”: $225.00
iii. 12”: $250.00
iv. 15”: $275.00
v. 18”: $300.00
vi. 21”: $400.00
vii. 24”: $500.00
viii. 30”: $600.00
ix. 36”: $700.00
x. 42”: $800.00
xi. 48”: $1,000.00
xii. 54”: $1,500.00
xiii. 60: $2,000.00
xiv. 66”: $2,500.00
xv. 72”: $3,000.00
4. Removal of Culverts: This item will be used when a culvert is being removed for purposes of extending, repairing, or replacing by means of excavation in non-hard surface locations.
Other pay items apply.
a. Regions: All
b. Unit of Measure: LF
c. Not to Exceed Price:
i. 8”: $135.00
ii. 10”: $165.00
iii. 12”: $190.00
iv. 15”: $215.00
v. 18”: $240.00
vi. 21”: $350.00
vii. 24”: $375.00
viii. 30”: $440.00
ix. 36”: $525.00
x. 42”: $600.00
xi. 48”: $750.00
xii. 54”: $1,000.00
xiii. 60: $1,500.00
xiv. 66”: $2,000.00
xv. 72”: $3,000.00
6 0 0 1 SCHOONER D R . • P O BOX 9 1 0 • B E L L E V I L L E , M I 4 8 1 1 2
PHONE: ( 7 3 4 ) 4 8 1 - 0 8 7 2 • FAX: ( 7 3 4 ) 4 8 2 - 1 5 0 5
5. Stump Removal: This item will be used to remove stumps from drainage areas or access points. Disposal will be invoiced under the appropriate pay item.
a. Regions: All
b. Unit of Measure: EA
c. Not to Exceed Price: $150.00
6. Point Repair/Collar: This item will be used to make physical repairs less than ten feet deep that require excavation (not covered under other pay items). This includes up to two feet of physical repair. Additional length charges are shown below.
a. Regions: All
b. Unit of Measure: EA
c. Not to Exceed Price: $5,000.00
i. Additional length up to 10’ deep for 8”-24” pipe: $480.00
ii. Additional length up to 10’ deep for 27”-48” pipe: $1,000.00
iii. Additional length up to 15’ deep for 8”-24” pipe: $1,000.00
iv. Additional length up to 15’ deep for 27”-48” pipe: $1,500.00
7. Cold Weather Protection: This item will be used to cover the cost for cold weather protection where work requirements deem it necessary.
a. Regions: All
b. Unit of Measure: EA
c. Not to Exceed Price: $7,500.00
8. Galvanic Anode Protection: This item will be used for culverts when exposed rebar requires such installation as directed by MDOT.
a. Regions: All
b. Unit of Measure: EA
c. Not to Exceed Price: $75.00
9. Inaccessible Outlet/Inlet Locations: This item will be used for culverts that have outlets or inlets that are not accessible by conventional means due to water levels, environmental restrictions, or other (as agreed beforehand).
a. Regions: All
c. Not to Exceed Price: $20,000.00
Section A: Cured-in-place Pipe (CIPP) Lining
(Prices based on 80' minimum length) Quantity Unit Unit Price
6-inch diameter x 4.5-mm thickness 1 Linear Foot 95.00$
8-inch diameter x 6.0-mm thickness 1 Linear Foot 95.00$
10-inch diameter x 6.0-mm thickness 1 Linear Foot 100.00$
12-inch diameter x 6.0-mm thickness 1 Linear Foot 105.00$
15-inch diameter x 7.5-mm thickness 1 Linear Foot 110.00$
18-inch diameter x 9.0-mm thickness 1 Linear Foot 120.00$
21-inch diameter x 9.0-mm thickness 1 Linear Foot 135.00$
24-inch diameter x 10.5-mm thickness 1 Linear Foot 160.00$
27-inch diameter x 10.5-mm thickness 1 Linear Foot 205.00$
30-inch diameter x 12.0-mm thickness 1 Linear Foot 225.00$
33-inch diameter x 12.0-mm thickness 1 Linear Foot 300.00$
36-inch diameter x 12.0-mm thickness 1 Linear Foot 325.00$
42-inch diameter x 13.5-mm thickness 1 Linear Foot 400.00$
48-inch diameter x 15.0-mm thickness 1 Linear Foot 525.00$
54-inch diameter x 18.0-mm thickness 1 Linear Foot 800.00$
6-inch thru 8-inch diameter additional 1.5 mm thickness 1 Linear Foot 3.00$
10-inch thru 12-inch diameter additional 1.5 mm thickness 1 Linear Foot 5.00$
15-inch thru 18-inch diameter additional 1.5 mm thickness 1 Linear Foot 8.00$
21-inch thru 24-inch diameter additional 1.5 mm thickness 1 Linear Foot 10.00$
27-inch diameter additional 1.5 mm thickness 1 Linear Foot 11.00$
30-inch diameter additional 1.5 mm thickness 1 Linear Foot 12.00$
33-inch diameter additional 1.5 mm thickness 1 Linear Foot 13.00$
36-inch diameter additional 1.5 mm thickness 1 Linear Foot 14.00$
42-inch diameter additional 1.5 mm thickness 1 Linear Foot 18.00$
48-inch diameter additional 1.5 mm thickness 1 Linear Foot 30.00$
54-inch diameter additional 1.5 mm thickness 1 Linear Foot 50.00$
6-inch thru 10-inch diameter Backyard Easement Setup Per Install Length 1 Linear Foot 13.00$
12-inch thru 18-inch diameter Backyard Easement Setup Per Install Length 1 Linear Foot 15.00$
Timber Matting for Setup 1 Square Yard 225.00$
Internal Reconnection of service connection by robotic cutter 1 Each 350.00$
Sealing of service connection with chemical grouting after internal reconnection (minimum quantity of 15 to be completed per mobilization) 1 Each 550.00$
Concrete Cloth 1 Square Foot 25.00$
Section B: CIPP Lateral Renewal Systems
(Prices based on 10' minimum length) Quantity Unit Unit Price
4-inch to 6-inch Internal installation and cure of top hat shaped structure up to 5' from main <15"diameter - No cleanout required 1 Each 5,200.00$
4-inch to 6-inch Internal installation and cure of top hat shaped structure up to 20' from main <15"diameter - Cleanout required 1 Each 7,500.00$
4-inch to 6-inch Installation and cure of structural lateral liner from main beyond 20' from main <15" diameter - Cleanout Required 1 Linear Foot 135.00$
4-inch to 6-inch Installation and cure of structural lateral liner from surface clean out to main 1 Linear Foot 155.00$
4-inch to 6-inch Set-up charge per line section for installations of <20 total laterals per project 1 Each 1,500.00$
4-inch to 6-inch installation of a surface cleanout or access pit 1 Each 4,500.00$
Section C: CIPP Point Repairs
(Prices based on 4' minimum length) Quantity Unit Unit Price
6-inch diameter x 4.5-mm thickness 1 Linear Foot 800.00$
8-inch diameter x 6.0-mm thickness 1 Linear Foot 975.00$
10-inch diameter x 6.0-mm thickness 1 Linear Foot 1,000.00$
Schedule B - Pricing - Southwest Region
12-inch diameter x 6.0-mm thickness 1 Linear Foot 1,050.00$
15-inch diameter x 7.5-mm thickness 1 Linear Foot 1,125.00$
18-inch diameter x 9.0-mm thickness 1 Linear Foot 1,238.00$
21-inch diameter x 9.0-mm thickness 1 Linear Foot 1,375.00$
24-inch diameter x 10.5-mm thickness 1 Linear Foot 1,400.00$
27-inch diameter x 10.5-mm thickness 1 Linear Foot 1,438.00$
30-inch diameter x 12.0-mm thickness 1 Linear Foot 1,538.00$
33-inch diameter x 12.0-mm thickness 1 Linear Foot 1,738.00$
36-inch diameter x 12.0-mm thickness 1 Linear Foot 1,775.00$
42-inch diameter x 13.5-mm thickness 1 Linear Foot 1,906.00$
48-inch diameter x 15.0-mm thickness 1 Linear Foot 1,993.00$
54-inch diameter x 18.0-mm thickness 1 Linear Foot 3,250.00$
6-inch thru 8-inch diameter additional 1.5 mm thickness 1 Linear Foot 45.00$
10-inch thru 12-inch diameter additional 1.5 mm thickness 1 Linear Foot 55.00$
15-inch thru 18-inch diameter additional 1.5 mm thickness 1 Linear Foot 65.00$
21-inch thru 24-inch diameter additional 1.5 mm thickness 1 Linear Foot 75.00$
27-inch diameter additional 1.5 mm thickness 1 Linear Foot 80.00$
30-inch diameter additional 1.5 mm thickness 1 Linear Foot 85.00$
33-inch diameter additional 1.5 mm thickness 1 Linear Foot 90.00$
36-inch diameter additional 1.5 mm thickness 1 Linear Foot 100.00$
42-inch diameter additional 1.5 mm thickness 1 Linear Foot 105.00$
48-inch diameter additional 1.5 mm thickness 1 Linear Foot 110.00$
54-inch diameter additional 1.5 mm thickness 1 Linear Foot 125.00$
Section D: Polyethylene (PE) Slip Lining - OPTIONAL BID SECTION
(Prices based on 80' minimum length) Quantity Unit Unit Price
4-inch diameter 1 Linear Foot 55.00$
6-inch diameter 1 Linear Foot 65.00$
8-inch diameter 1 Linear Foot 75.00$
10-inch diameter 1 Linear Foot 85.00$
12-inch diameter 1 Linear Foot 90.00$
18-inch diameter 1 Linear Foot 100.00$
24-inch diameter 1 Linear Foot 150.00$
30-inch diameter 1 Linear Foot 225.00$
36-inch diameter 1 Linear Foot 310.00$
42-inch diameter 1 Linear Foot 400.00$
48-inch diameter 1 Linear Foot 450.00$
54-inch diameter 1 Linear Foot 500.00$
Annular Space - Grouting 1 Cubic Yard 325.00$
Bulkheads 1 Each 500.00$
Note: Pipe Fusing/Joining in Section J
Section E: Pipe Bursting (with High-Density Polyethylene (HDPE) or Polyvinyl Chloride (PVC)) - OPTIONAL BID SECTION
(Prices based on 80' minimum length) Quantity Unit Unit Price
6-inch diameter 1 Linear Foot 125.00$
8-inch diameter 1 Linear Foot 125.00$
10-inch diameter 1 Linear Foot 150.00$
12-inch diameter 1 Linear Foot 175.00$
14-inch diameter 1 Linear Foot 200.00$
16-inch diameter 1 Linear Foot 250.00$
18-inch diameter 1 Linear Foot 275.00$
20-inch diameter 1 Linear Foot 300.00$
24-inch diameter 1 Linear Foot 500.00$
30-inch diameter 1 Linear Foot 750.00$
36-inch diameter 1 Linear Foot 1,000.00$
42-inch diameter 1 Linear Foot 1,500.00$
48-inch diameter 1 Linear Foot 1,750.00$
54-inch diameter 1 Linear Foot 2,000.00$
Setup fee per Pipe Bursting segment 1 Each 25,000.00$
Note: Pipe Fusing/Joining in Section J
Section F: Manhole Connections Quantity Unit Unit Price
6-inch diameter 1 Each 350.00$
8-inch diameter 1 Each 375.00$
10-inch diameter 1 Each 400.00$
12-inch diameter 1 Each 450.00$
14-inch diameter 1 Each 475.00$
16-inch diameter 1 Each 500.00$
18-inch diameter 1 Each 750.00$
20-inch diameter 1 Each 1,000.00$
Section G: Manhole Rehabilitation - OPTIONAL BID SECTION Quantity Unit Unit Price
All sizes installation of manhole chimney seals 1 Each 1,250.00$
Grouting of heavy infiltration to facilitate manhole rehab 1 Each 1,750.00$
Manhole rehabilitation - cementitious 1 Square Foot 25.00$
Manhole rehabilitation - epoxy 1 Square Foot 53.00$
Manhole rehabilitation - polyurethane 1 Square Foot 38.00$
Section H: Cleaning and Closed Circuit Television (CCTV) Pipe Inspection
(Prices based on 80' minimum length) Quantity Unit Unit Price
6-inch thru 12-inch diameter Clean & CCTV 1 Linear Foot 20.00$
15-inch thru 21-inch diameter Clean & CCTV 1 Linear Foot 25.00$
24-inch thru 33-inch diameter Clean & CCTV 1 Linear Foot 30.00$
36-inch thru 42-inch diameter Clean & CCTV 1 Linear Foot 35.00$
48-inch thru 54-inch diameter Clean & CCTV 1 Linear Foot 40.00$
6-inch thru 15-inch diameter Post & CCTV Inspection after Rehabilitation 1 Linear Foot 2.00$
18-inch thru 27-inch diameter Post & CCTV Inspection after Rehabilitation 1 Linear Foot 2.00$
30-inch or Larger diameter Post & CCTV Inspection after Rehabilitation 1 Linear Foot 2.00$
Re-setup for clean & & CCTV Inspection due to Point Repairs 1 Each 425.00$
Root Removal 1 Linear Foot 15.00$
Grease Removal 1 Linear Foot 15.00$
Heavy Cleaning (more than three passes) 1 Hour 425.00$
Other Remote Obstruction Removal (max 10 linear foot) 1 Each 1,500.00$
Above Ground Physical Inspection 1 Linear Foot 5.00$
Culvert End Cleanout 1 Each 3,500.00$
Section I: Bypass for Culverts and Associated Items Quantity Unit Unit Price
Set Up 4-inch diameter Pump (Per Pump) 1 Each 750.00$
Set Up 6-inch diameter Pump (Per Pump) 1 Each 1,500.00$
Set Up 8-inch diameter Pump (Per Pump) 1 Each 2,250.00$
Set Up 12-inch diameter Pump (Per Pump) 1 Each 5,000.00$
Set Up 4-inch diameter Piping 1 Linear Foot 50.00$
Set Up 6-inch diameter Piping 1 Linear Foot 75.00$
Set Up 8-inch diameter Piping 1 Linear Foot 100.00$
Set Up 12-inch diameter Piping 1 Linear Foot 150.00$
Set Up 18-inch diameter Piping 1 Linear Foot 200.00$
Operate 4-inch diameter Pumping System 1 Day 1,500.00$
Operate 6-inch diameter Pumping System 1 Day 1,750.00$
Operate 8-inch diameter Pumping System 1 Day 2,500.00$
Operate 12-inch diameter Pumping System 1 Day 3,000.00$
Bypass - Driveway Ramp (Setup, Operate, Maintain) 1 Each 1,500.00$
Bypass - Street Ramp (Setup, Operate, Maintain) 1 Each 1,500.00$
Bypass - Street Trenching for 8-inch diameter Pipe (Setup, Operate, Maintain) 1 Linear Foot 100.00$
Bypass - Street Trenching for 12-inch diameter Pipe (Setup, Operate, Maintain) 1 Linear Foot 150.00$
Bypass - Street Trenching for 18-inch diameter Pipe (Setup, Operate, Maintain) 1 Linear Foot 175.00$
Bypass Plan (3rd Party Certified) 1 Each 3,500.00$
Section J: Pipe Fusing/Joining - OPTIONAL BID SECTION Quantity Unit Unit Price
Setup fee per pull segment 1 Segment 2,000.00$
6-inch thru 12-inch diameter 1 Linear Foot 15.00$
13-inch thru 18-inch diameter 1 Linear Foot 25.00$
19-inch thru 24-inch diameter 1 Linear Foot 50.00$
25-inch thru 42-inch diameter 1 Linear Foot 75.00$
43-inch thru 48-inch diameter 1 Linear Foot 100.00$
49-inch thru 54-inch diameter 1 Linear Foot 125.00$
Section K: Additional Items (As needed per project) Quantity Unit Unit Price
a) Mobilization/Erosion Control
Mobilization 1 Each 20,000.00$
Erosion Control 1 Linear Foot 20.00$
Flex-A-Mat 1 Square Foot 11.00$
Injected Soil Stabilization (slopes/embankments) 1 Pound 14.50$
Temporary Steel Sheeting 1 Square Foot 40.00$
Turbidity Curtain 1 Linear Foot 75.00$
Inaccessible Outlet/Inlet Locations 1 Each 20,000.00$
b) Excavation/Backfill
0 to 4 feet deep 1 Cubic Foot 10.00$
4 to 6 feet deep 1 Cubic Foot 15.00$
6 to 10 feet deep 1 Cubic Foot 20.00$
c) Trench Shoring
4 to 6 feet deep 1 Trench/week 1,000.00$
6 to 10 feet deep 1 Trench/week 1,500.00$
d) Surface Restoration
Sod 1 Square Foot 15.00$
Seed & Mulch 1 Square Foot 0.25$
Straw Matting 1 Square Foot 0.40$
4-inch concrete 1 Square Foot 25.00$
6-inch concrete 1 Square Foot 30.00$
8-inch concrete 1 Square Foot 35.00$
10-inch concrete 1 Square Foot 40.00$
12-inch concrete 1 Square Foot 45.00$
2-inch asphalt 1 Square Foot 25.00$
3-inch asphalt 1 Square Foot 30.00$
4-inch asphalt 1 Square Foot 35.00$
6-inch asphalt 1 Square Foot 40.00$
8-inch asphalt 1 Square Foot 45.00$
10-inch asphalt 1 Square Foot 50.00$
12-inch asphalt 1 Square Foot 55.00$
Saw Cut 1 Linear Foot 7.50$
Curb 1 Linear Foot 75.00$
Slope Restoration 1 Square Yard 15.00$
Ditch Grading 1 Linear Foot 50.00$
HMA Patching 1 Ton 595.00$
Guardrail Remove and Replace 1 Linear Foot 30.00$
Topsoil 1 Cubic Yard 85.00$
Concrete Spillway 1 Linear Foot 195.00$
Geo-Web Slope Restoration 1 Square Yard 25.00$
Watering Vegetation 1 Hour 225.00$
Geo-Fabric 1 Square Yard 7.00$
Concrete Shoulder Gutter 1 Each 2,000.00$
Detectable Warning Surface ADA Tile 1 Square Foot 60.00$
Slope Reinforcement Matting (SRM) 1 Square Foot 20.00$
e) Materials
Excavation and Culvert Bedding 1 Ton 50.00$
Rip Rap 1 Ton 150.00$
Sand 1 Ton 50.00$
Gravel 1 Ton 50.00$
21AA 1 Ton 50.00$
Flowable Fill (Voids) 1 Cubic Yard 300.00$
Embankment/Class II Fill 1 Cubic Yard 75.00$
Cement Treated Aggregate 1 Ton 185.00$
f) Maintenance of Traffic
Sinage 1 Each Month 5.00$
Flagmen 1 Hour 240.00$
Attenuator Vechicle 1 Each Day 1,460.00$
Arrow Board 1 Each Day 66.00$
Traffic Lane Shift 1 Each 1,500.00$
Traffic Control Plan (certified) 1 Each 780.00$
Traffic Detour 1 Each 20,000.00$
Message Boards 1 Each Week 2,900.00$
Temporary Traffic Signals delivered/set-up 1 Each 7,500.00$
Temporary Traffic Signals Operational 1 Each Week 3,500.00$
g) Miscellaneous
Tree Removal 1 Each 5,000.00$
Permit Fees 1 Each 2,500.00$
Water Charges 1 Each 3,000.00$
Disposal Fees 1 Each 4,500.00$
Concrete Barrier Temporary 1 Linear Foot 175.00$
Formed Concrete 1 Cubic Yard 1,750.00$
Slope Paving 1 Square Yard 230.00$
Clearing and grubbing 1 Each 7,500.00$
Curb and Gutter 1 Linear Foot 85.00$
Barrier Wall Repair (5' minimum per location) 1 Linear Foot 1,590.00$
Coring and Raising Frame and Cover 1 Each 7,200.00$
Jet Filter 1 Each 1,000.00$
Misc. Electric Materials 1 Lump Sum 25,000.00$
Stump Removal 1 Each 150.00$
Cold Weather Protection 1 Each 7,500.00$
Galvanic Anode Protection 1 Each 75.00$
Note: Additional Items may apply to each section of the Contract
Section L: Professional Services, Civil Engineering, and Land Surveying Quantity Unit Unit Price
Firm Principal 1 Hour 275.00$
Senior Project Manager 1 Hour 225.00$
Project Manager 1 Hour 200.00$
Coordinator 1 Hour 150.00$
Project surveyor 1 Hour 145.00$
Project engineer 1 Hour 175.00$
Engineering Technician 1 Hour 125.00$
Two person field survey crew 1 Hour 250.00$
One person field survey crew 1 Hour 125.00$
Administrative services 1 Hour 95.00$
Section M: Mechanical Joint Seals Quantity Unit Unit Price
24-inch diameter 1 Each $ 3,200.00
27-inch diameter 1 Each $ 3,300.00
30-inch diameter 1 Each $ 3,400.00
33-inch diameter 1 Each $ 3,550.00
36-inch diameter 1 Each $ 3,600.00
42-inch diameter 1 Each $ 3,800.00
48-inch diameter 1 Each $ 3,900.00
54-inch diameter 1 Each $ 4,500.00
60-inch diameter 1 Each $ 5,000.00
66-inch diameter 1 Each $ 7,500.00
72-inch diameter 1 Each $ 8,250.00
78-inch diameter 1 Each $ 9,000.00
84-inch diameter 1 Each $ 9,500.00
96-inch diameter 1 Each $ 11,000.00
108-inch diameter 1 Each $ 11,750.00
120-inch diameter 1 Each $ 12,225.00
132-inch diameter 1 Each $ 13,000.00
144-inch diameter 1 Each $ 13,500.00
Joint Contraction 1 Linear Foot $ 20.00
Section N: Segmented Replacement Piping Quantity Unit Unit Price
8-inch diameter 1 Square Foot $ 95.00
10-inch diameter 1 Square Foot $ 100.00
12-inch diameter 1 Square Foot $ 105.00
15-inch diameter 1 Square Foot $ 110.00
18-inch diameter 1 Square Foot $ 120.00
24-inch diameter 1 Square Foot $ 160.00
30-inch diameter 1 Square Foot $ 225.00
36-inch diameter 1 Square Foot $ 325.00
42-inch diameter 1 Square Foot $ 400.00
48-inch diameter 1 Square Foot $ 525.00
54-inch diameter 1 Square Foot $ 800.00
60-inch diameter 1 Square Foot $ 900.00
66-inch diameter 1 Square Foot $ 1,000.00
72-inch diameter 1 Square Foot $ 1,250.00
78-inch diameter 1 Square Foot $ 1,500.00
84-inch diameter 1 Square Foot $ 1,750.00
Section O: Drainage Structure Remove and Replace Quantity Unit Unit Price
24-inch diameter 1 Each $ 3,500.00
36-inch diameter 1 Each $ 6,500.00
48-inch diameter 1 Each $ 9,500.00
60-inch diameter 1 Each $ 12,500.00
72-inch diameter 1 Each $ 15,000.00
84-inch diameter 1 Each $ 20,000.00
Adjust Structure 1 Each $ 2,500.00
Frame and Cover Replace 1 Each $ 950.00
Structure Reconstruct 1 Vertical Foot $ 850.00
Drainage Pipe 6-inch 1 Linear Foot $ 75.00
French Drains 1 Each $ 1,800.00
Cleaning of Structures 1 Hourly $ 425.00
Drainage Structure Tap (up to 24") 1 Each $ 2,800.00
Clean and Seal Joints of Structures/box and wall ends 1 Linear Foot $ 75.00
Section P: End Sections Remove and Replace Quantity Unit Unit Price
12-inch to 18-inch outlet 1 Each $ 2,500.00
21-inch to 30-inch outlet 1 Each $ 5,500.00
33-inch to 48-inch outlet 1 Each $ 9,500.00
54-inch to 66-inch outlet 1 Each $ 12,500.00
Section Q: End wall Remove and Replace Quantity Unit Unit Price
12-inch to 18-inch outlet 1 Each $ 5,500.00
21-inch to 30-inch outlet 1 Each $ 8,500.00
33-inch to 48-inch outlet 1 Each $ 10,500.00
54-inch to 66-inch outlet 1 Each $ 15,500.00
Section R: Labor/Equipment Quantity Unit Unit Price
Supervisor 1 Hour $ 150.00
Foreman 1 Hour $ 130.00
Operator 1 Hour $ 120.00
Laborer 1 Hour $ 86.00
Finisher 1 Hour $ 95.00
Truck Driver 1 Hour $ 85.00
Excavator M318 (equiv.) 1 Hour $ 243.00
Excavator 325 (equiv.) 1 Hour $ 260.00
Excavator 315 (equiv.) 1 Hour $ 142.00
Excavator 308 (equiv.) 1 Hour $ 120.00
Excavator 305 (equiv.) 1 Hour $ 115.00
Loader 936 (equiv.) 1 Hour $ 125.00
Backhoe 1 Hour $ 98.00
Skid Steer 1 Hour $ 60.00
Dump Truck 5 yard (equiv.) 1 Hour $ 72.00
Quad Axle semi-dump 1 Hour $ 72.00
Gravel Train 1 Hour $ 83.00
Lowboy Trailer 1 Hour $ 83.00
Foreman Pick-up 1 Hour $ 30.00
Jobsite Pick-up 1 Hour $ 20.00
Utility Truck w/tools 1 Hour $ 63.00
Flatbed Truck 1 Hour $ 43.00
Dozer 1 Hour $ 175.00
Mini Excavator 1 Hour $ 130.00
Hydro-Excavator 1 Hour $ 395.00
Section S: Equipment Quantity Unit Unit Price
Generator 1 Day $ 230.00
185 CFM compressor 1 Day $ 243.00
Light Tower 1 Day $ 245.00
Concrete Saw 1 Day $ 300.00
Pipe Saw 1 Day $ 70.00
Place Compactor 1 Day $ 113.00
Misc. tools (jackhammers/spades/drills) 1 Day $ 120.00
Steel plates 1 Day $ 67.00
Traffic Barrell 1 Day $ 10.00
Section T: Glare Screen Repair Quantity Unit Unit Price
1' to 5' 1 Linear Foot $ 2,000.00
6' to 10' 1 Linear Foot $ 1,500.00
11' to 15' 1 Linear Foot $ 1,000.00
16' to 20' 1 Linear Foot $ 750.00
Section U: Auger Bore Installation of Culvert/Drainage (80 foot minimum) Quantity Unit Unit Price
12" 1 Linear Foot $ 300.00
15" 1 Linear Foot $ 375.00
18" 1 Linear Foot $ 500.00
21" 1 Linear Foot $ 675.00
24" 1 Linear Foot $ 850.00
30" 1 Linear Foot $ 950.00
36" 1 Linear Foot $ 1,200.00
42" 1 Linear Foot $ 1,300.00
48" 1 Linear Foot $ 1,400.00
54" 1 Linear Foot $ 1,650.00
60" 1 Linear Foot $ 1,950.00
66" 1 Linear Foot $ 2,500.00
72" 1 Linear Foot $ 3,000.00
Section V: Open Cut Repair of Culverts Quantity Unit Unit Price
8" 1 Linear Foot $ 195.00
10" 1 Linear Foot $ 225.00
12" 1 Linear Foot $ 250.00
15" 1 Linear Foot $ 275.00
18" 1 Linear Foot $ 300.00
21" 1 Linear Foot $ 400.00
24" 1 Linear Foot $ 500.00
30" 1 Linear Foot $ 600.00
36" 1 Linear Foot $ 700.00
42" 1 Linear Foot $ 800.00
48" 1 Linear Foot $ 1,000.00
54" 1 Linear Foot $ 1,500.00
60" 1 Linear Foot $ 2,000.00
66" 1 Linear Foot $ 2,500.00
72" 1 Linear Foot $ 3,000.00
Section W: Removal of Culverts Quantity Unit Unit Price
8" 1 Linear Foot $ 135.00
10" 1 Linear Foot $ 165.00
12" 1 Linear Foot $ 190.00
15" 1 Linear Foot $ 215.00
18" 1 Linear Foot $ 240.00
21" 1 Linear Foot $ 350.00
24" 1 Linear Foot $ 375.00
30" 1 Linear Foot $ 440.00
36" 1 Linear Foot $ 525.00
42" 1 Linear Foot $ 600.00
48" 1 Linear Foot $ 750.00
54" 1 Linear Foot $ 1,000.00
60" 1 Linear Foot $ 1,500.00
66" 1 Linear Foot $ 2,000.00
72" 1 Linear Foot $ 3,000.00
Section X: Point Repair/Collar Quantity Unit Unit Price
Additional Length up to 10' deep for 8"-24" pipe 1 Each $ 480.00
Additional Length up to 10' deep for 27"-48" pipe 1 Each $ 1,000.00
Additional Length up to 15' deep for 8"-24" pipe 1 Each $ 1,000.00
Additional Length up to 15' deep for 27"-48" pipe 1 Each $ 1,500.00
All unit prices are not to exceed pricing. Vendor must allow for lower pricing to be available for similar product and service purchases. $ 552,954.65
Section A: Cured-in-place Pipe (CIPP) Lining
(Prices based on 80' minimum length) Quantity Unit Unit Price
6-inch diameter x 4.5-mm thickness 1 Linear Foot 95.00$
8-inch diameter x 6.0-mm thickness 1 Linear Foot 95.00$
10-inch diameter x 6.0-mm thickness 1 Linear Foot 100.00$
12-inch diameter x 6.0-mm thickness 1 Linear Foot 105.00$
15-inch diameter x 7.5-mm thickness 1 Linear Foot 110.00$
18-inch diameter x 9.0-mm thickness 1 Linear Foot 120.00$
21-inch diameter x 9.0-mm thickness 1 Linear Foot 135.00$
24-inch diameter x 10.5-mm thickness 1 Linear Foot 160.00$
27-inch diameter x 10.5-mm thickness 1 Linear Foot 205.00$
30-inch diameter x 12.0-mm thickness 1 Linear Foot 225.00$
33-inch diameter x 12.0-mm thickness 1 Linear Foot 300.00$
36-inch diameter x 12.0-mm thickness 1 Linear Foot 325.00$
42-inch diameter x 13.5-mm thickness 1 Linear Foot 400.00$
48-inch diameter x 15.0-mm thickness 1 Linear Foot 525.00$
54-inch diameter x 18.0-mm thickness 1 Linear Foot 800.00$
6-inch thru 8-inch diameter additional 1.5 mm thickness 1 Linear Foot 3.00$
10-inch thru 12-inch diameter additional 1.5 mm thickness 1 Linear Foot 5.00$
15-inch thru 18-inch diameter additional 1.5 mm thickness 1 Linear Foot 8.00$
21-inch thru 24-inch diameter additional 1.5 mm thickness 1 Linear Foot 10.00$
27-inch diameter additional 1.5 mm thickness 1 Linear Foot 11.00$
30-inch diameter additional 1.5 mm thickness 1 Linear Foot 12.00$
33-inch diameter additional 1.5 mm thickness 1 Linear Foot 13.00$
36-inch diameter additional 1.5 mm thickness 1 Linear Foot 14.00$
42-inch diameter additional 1.5 mm thickness 1 Linear Foot 18.00$
48-inch diameter additional 1.5 mm thickness 1 Linear Foot 30.00$
54-inch diameter additional 1.5 mm thickness 1 Linear Foot 50.00$
6-inch thru 10-inch diameter Backyard Easement Setup Per Install Length 1 Linear Foot 13.00$
12-inch thru 18-inch diameter Backyard Easement Setup Per Install Length 1 Linear Foot 15.00$
Timber Matting for Setup 1 Square Yard 225.00$
Internal Reconnection of service connection by robotic cutter 1 Each 350.00$
Sealing of service connection with chemical grouting after internal reconnection (minimum quantity of 15 to be completed per mobilization) 1 Each 550.00$
Concrete Cloth 1 Square Foot 25.00$
Section B: CIPP Lateral Renewal Systems
(Prices based on 10' minimum length) Quantity Unit Unit Price
4-inch to 6-inch Internal installation and cure of top hat shaped structure up to 5' from main <15"diameter - No cleanout required 1 Each 5,200.00$
4-inch to 6-inch Internal installation and cure of top hat shaped structure up to 20' from main <15"diameter - Cleanout required 1 Each 7,500.00$
4-inch to 6-inch Installation and cure of structural lateral liner from main beyond 20' from main <15" diameter - Cleanout Required 1 Linear Foot 135.00$
4-inch to 6-inch Installation and cure of structural lateral liner from surface clean out to main 1 Linear Foot 155.00$
4-inch to 6-inch Set-up charge per line section for installations of <20 total laterals per project 1 Each 1,500.00$
4-inch to 6-inch installation of a surface cleanout or access pit 1 Each 4,500.00$
Section C: CIPP Point Repairs
(Prices based on 4' minimum length) Quantity Unit Unit Price
6-inch diameter x 4.5-mm thickness 1 Linear Foot 800.00$
8-inch diameter x 6.0-mm thickness 1 Linear Foot 975.00$
10-inch diameter x 6.0-mm thickness 1 Linear Foot 1,000.00$
Schedule B - Pricing - Southwest Region
12-inch diameter x 6.0-mm thickness 1 Linear Foot 1,050.00$
15-inch diameter x 7.5-mm thickness 1 Linear Foot 1,125.00$
18-inch diameter x 9.0-mm thickness 1 Linear Foot 1,238.00$
21-inch diameter x 9.0-mm thickness 1 Linear Foot 1,375.00$
24-inch diameter x 10.5-mm thickness 1 Linear Foot 1,400.00$
27-inch diameter x 10.5-mm thickness 1 Linear Foot 1,438.00$
30-inch diameter x 12.0-mm thickness 1 Linear Foot 1,538.00$
33-inch diameter x 12.0-mm thickness 1 Linear Foot 1,738.00$
36-inch diameter x 12.0-mm thickness 1 Linear Foot 1,775.00$
42-inch diameter x 13.5-mm thickness 1 Linear Foot 1,906.00$
48-inch diameter x 15.0-mm thickness 1 Linear Foot 1,993.00$
54-inch diameter x 18.0-mm thickness 1 Linear Foot 3,250.00$
6-inch thru 8-inch diameter additional 1.5 mm thickness 1 Linear Foot 45.00$
10-inch thru 12-inch diameter additional 1.5 mm thickness 1 Linear Foot 55.00$
15-inch thru 18-inch diameter additional 1.5 mm thickness 1 Linear Foot 65.00$
21-inch thru 24-inch diameter additional 1.5 mm thickness 1 Linear Foot 75.00$
27-inch diameter additional 1.5 mm thickness 1 Linear Foot 80.00$
30-inch diameter additional 1.5 mm thickness 1 Linear Foot 85.00$
33-inch diameter additional 1.5 mm thickness 1 Linear Foot 90.00$
36-inch diameter additional 1.5 mm thickness 1 Linear Foot 100.00$
42-inch diameter additional 1.5 mm thickness 1 Linear Foot 105.00$
48-inch diameter additional 1.5 mm thickness 1 Linear Foot 110.00$
54-inch diameter additional 1.5 mm thickness 1 Linear Foot 125.00$
Section D: Polyethylene (PE) Slip Lining - OPTIONAL BID SECTION
(Prices based on 80' minimum length) Quantity Unit Unit Price
4-inch diameter 1 Linear Foot 55.00$
6-inch diameter 1 Linear Foot 65.00$
8-inch diameter 1 Linear Foot 75.00$
10-inch diameter 1 Linear Foot 85.00$
12-inch diameter 1 Linear Foot 90.00$
18-inch diameter 1 Linear Foot 100.00$
24-inch diameter 1 Linear Foot 150.00$
30-inch diameter 1 Linear Foot 225.00$
36-inch diameter 1 Linear Foot 310.00$
42-inch diameter 1 Linear Foot 400.00$
48-inch diameter 1 Linear Foot 450.00$
54-inch diameter 1 Linear Foot 500.00$
Annular Space - Grouting 1 Cubic Yard 325.00$
Bulkheads 1 Each 500.00$
Note: Pipe Fusing/Joining in Section J
Section E: Pipe Bursting (with High-Density Polyethylene (HDPE) or Polyvinyl Chloride (PVC)) - OPTIONAL BID SECTION
(Prices based on 80' minimum length) Quantity Unit Unit Price
6-inch diameter 1 Linear Foot 125.00$
8-inch diameter 1 Linear Foot 125.00$
10-inch diameter 1 Linear Foot 150.00$
12-inch diameter 1 Linear Foot 175.00$
14-inch diameter 1 Linear Foot 200.00$
16-inch diameter 1 Linear Foot 250.00$
18-inch diameter 1 Linear Foot 275.00$
20-inch diameter 1 Linear Foot 300.00$
24-inch diameter 1 Linear Foot 500.00$
30-inch diameter 1 Linear Foot 750.00$
36-inch diameter 1 Linear Foot 1,000.00$
42-inch diameter 1 Linear Foot 1,500.00$
48-inch diameter 1 Linear Foot 1,750.00$
54-inch diameter 1 Linear Foot 2,000.00$
Setup fee per Pipe Bursting segment 1 Each 25,000.00$
Note: Pipe Fusing/Joining in Section J
Section F: Manhole Connections Quantity Unit Unit Price
6-inch diameter 1 Each 350.00$
8-inch diameter 1 Each 375.00$
10-inch diameter 1 Each 400.00$
12-inch diameter 1 Each 450.00$
14-inch diameter 1 Each 475.00$
16-inch diameter 1 Each 500.00$
18-inch diameter 1 Each 750.00$
20-inch diameter 1 Each 1,000.00$
Section G: Manhole Rehabilitation - OPTIONAL BID SECTION Quantity Unit Unit Price
All sizes installation of manhole chimney seals 1 Each 1,250.00$
Grouting of heavy infiltration to facilitate manhole rehab 1 Each 1,750.00$
Manhole rehabilitation - cementitious 1 Square Foot 25.00$
Manhole rehabilitation - epoxy 1 Square Foot 53.00$
Manhole rehabilitation - polyurethane 1 Square Foot 38.00$
Section H: Cleaning and Closed Circuit Television (CCTV) Pipe Inspection
(Prices based on 80' minimum length) Quantity Unit Unit Price
6-inch thru 12-inch diameter Clean & CCTV 1 Linear Foot 20.00$
15-inch thru 21-inch diameter Clean & CCTV 1 Linear Foot 25.00$
24-inch thru 33-inch diameter Clean & CCTV 1 Linear Foot 30.00$
36-inch thru 42-inch diameter Clean & CCTV 1 Linear Foot 35.00$
48-inch thru 54-inch diameter Clean & CCTV 1 Linear Foot 40.00$
6-inch thru 15-inch diameter Post & CCTV Inspection after Rehabilitation 1 Linear Foot 2.00$
18-inch thru 27-inch diameter Post & CCTV Inspection after Rehabilitation 1 Linear Foot 2.00$
30-inch or Larger diameter Post & CCTV Inspection after Rehabilitation 1 Linear Foot 2.00$
Re-setup for clean & & CCTV Inspection due to Point Repairs 1 Each 425.00$
Root Removal 1 Linear Foot 15.00$
Grease Removal 1 Linear Foot 15.00$
Heavy Cleaning (more than three passes) 1 Hour 425.00$
Other Remote Obstruction Removal (max 10 linear foot) 1 Each 1,500.00$
Above Ground Physical Inspection 1 Linear Foot 5.00$
Culvert End Cleanout 1 Each 3,500.00$
Section I: Bypass for Culverts and Associated Items Quantity Unit Unit Price
Set Up 4-inch diameter Pump (Per Pump) 1 Each 750.00$
Set Up 6-inch diameter Pump (Per Pump) 1 Each 1,500.00$
Set Up 8-inch diameter Pump (Per Pump) 1 Each 2,250.00$
Set Up 12-inch diameter Pump (Per Pump) 1 Each 5,000.00$
Set Up 4-inch diameter Piping 1 Linear Foot 50.00$
Set Up 6-inch diameter Piping 1 Linear Foot 75.00$
Set Up 8-inch diameter Piping 1 Linear Foot 100.00$
Set Up 12-inch diameter Piping 1 Linear Foot 150.00$
Set Up 18-inch diameter Piping 1 Linear Foot 200.00$
Operate 4-inch diameter Pumping System 1 Day 1,500.00$
Operate 6-inch diameter Pumping System 1 Day 1,750.00$
Operate 8-inch diameter Pumping System 1 Day 2,500.00$
Operate 12-inch diameter Pumping System 1 Day 3,000.00$
Bypass - Driveway Ramp (Setup, Operate, Maintain) 1 Each 1,500.00$
Bypass - Street Ramp (Setup, Operate, Maintain) 1 Each 1,500.00$
Bypass - Street Trenching for 8-inch diameter Pipe (Setup, Operate, Maintain) 1 Linear Foot 100.00$
Bypass - Street Trenching for 12-inch diameter Pipe (Setup, Operate, Maintain) 1 Linear Foot 150.00$
Bypass - Street Trenching for 18-inch diameter Pipe (Setup, Operate, Maintain) 1 Linear Foot 175.00$
Bypass Plan (3rd Party Certified) 1 Each 3,500.00$
Section J: Pipe Fusing/Joining - OPTIONAL BID SECTION Quantity Unit Unit Price
Setup fee per pull segment 1 Segment 2,000.00$
6-inch thru 12-inch diameter 1 Linear Foot 15.00$
13-inch thru 18-inch diameter 1 Linear Foot 25.00$
19-inch thru 24-inch diameter 1 Linear Foot 50.00$
25-inch thru 42-inch diameter 1 Linear Foot 75.00$
43-inch thru 48-inch diameter 1 Linear Foot 100.00$
49-inch thru 54-inch diameter 1 Linear Foot 125.00$
Section K: Additional Items (As needed per project) Quantity Unit Unit Price
a) Mobilization/Erosion Control
Mobilization 1 Each 20,000.00$
Erosion Control 1 Linear Foot 20.00$
Flex-A-Mat 1 Square Foot 11.00$
Injected Soil Stabilization (slopes/embankments) 1 Pound 14.50$
Temporary Steel Sheeting 1 Square Foot 40.00$
Turbidity Curtain 1 Linear Foot 75.00$
Inaccessible Outlet/Inlet Locations 1 Each 20,000.00$
b) Excavation/Backfill
0 to 4 feet deep 1 Cubic Foot 10.00$
4 to 6 feet deep 1 Cubic Foot 15.00$
6 to 10 feet deep 1 Cubic Foot 20.00$
c) Trench Shoring
4 to 6 feet deep 1 Trench/week 1,000.00$
6 to 10 feet deep 1 Trench/week 1,500.00$
d) Surface Restoration
Sod 1 Square Foot 15.00$
Seed & Mulch 1 Square Foot 0.25$
Straw Matting 1 Square Foot 0.40$
4-inch concrete 1 Square Foot 25.00$
6-inch concrete 1 Square Foot 30.00$
8-inch concrete 1 Square Foot 35.00$
10-inch concrete 1 Square Foot 40.00$
12-inch concrete 1 Square Foot 45.00$
2-inch asphalt 1 Square Foot 25.00$
3-inch asphalt 1 Square Foot 30.00$
4-inch asphalt 1 Square Foot 35.00$
6-inch asphalt 1 Square Foot 40.00$
8-inch asphalt 1 Square Foot 45.00$
10-inch asphalt 1 Square Foot 50.00$
12-inch asphalt 1 Square Foot 55.00$
Saw Cut 1 Linear Foot 7.50$
Curb 1 Linear Foot 75.00$
Slope Restoration 1 Square Yard 15.00$
Ditch Grading 1 Linear Foot 50.00$
HMA Patching 1 Ton 595.00$
Guardrail Remove and Replace 1 Linear Foot 30.00$
Topsoil 1 Cubic Yard 85.00$
Concrete Spillway 1 Linear Foot 195.00$
Geo-Web Slope Restoration 1 Square Yard 25.00$
Watering Vegetation 1 Hour 225.00$
Geo-Fabric 1 Square Yard 7.00$
Concrete Shoulder Gutter 1 Each 2,000.00$
Detectable Warning Surface ADA Tile 1 Square Foot 60.00$
Slope Reinforcement Matting (SRM) 1 Square Foot 20.00$
e) Materials
Excavation and Culvert Bedding 1 Ton 50.00$
Rip Rap 1 Ton 150.00$
Sand 1 Ton 50.00$
Gravel 1 Ton 50.00$
21AA 1 Ton 50.00$
Flowable Fill (Voids) 1 Cubic Yard 300.00$
Embankment/Class II Fill 1 Cubic Yard 75.00$
Cement Treated Aggregate 1 Ton 185.00$
f) Maintenance of Traffic
Sinage 1 Each Month 5.00$
Flagmen 1 Hour 240.00$
Attenuator Vechicle 1 Each Day 1,460.00$
Arrow Board 1 Each Day 66.00$
Traffic Lane Shift 1 Each 1,500.00$
Traffic Control Plan (certified) 1 Each 780.00$
Traffic Detour 1 Each 20,000.00$
Message Boards 1 Each Week 2,900.00$
Temporary Traffic Signals delivered/set-up 1 Each 7,500.00$
Temporary Traffic Signals Operational 1 Each Week 3,500.00$
g) Miscellaneous
Tree Removal 1 Each 5,000.00$
Permit Fees 1 Each 2,500.00$
Water Charges 1 Each 3,000.00$
Disposal Fees 1 Each 4,500.00$
Concrete Barrier Temporary 1 Linear Foot 175.00$
Formed Concrete 1 Cubic Yard 1,750.00$
Slope Paving 1 Square Yard 230.00$
Clearing and grubbing 1 Each 7,500.00$
Curb and Gutter 1 Linear Foot 85.00$
Barrier Wall Repair (5' minimum per location) 1 Linear Foot 1,590.00$
Coring and Raising Frame and Cover 1 Each 7,200.00$
Jet Filter 1 Each 1,000.00$
Misc. Electric Materials 1 Lump Sum 25,000.00$
Stump Removal 1 Each 150.00$
Cold Weather Protection 1 Each 7,500.00$
Galvanic Anode Protection 1 Each 75.00$
Note: Additional Items may apply to each section of the Contract
Section L: Professional Services, Civil Engineering, and Land Surveying Quantity Unit Unit Price
Firm Principal 1 Hour 275.00$
Senior Project Manager 1 Hour 225.00$
Project Manager 1 Hour 200.00$
Coordinator 1 Hour 150.00$
Project surveyor 1 Hour 145.00$
Project engineer 1 Hour 175.00$
Engineering Technician 1 Hour 125.00$
Two person field survey crew 1 Hour 250.00$
One person field survey crew 1 Hour 125.00$
Administrative services 1 Hour 95.00$
Section M: Mechanical Joint Seals Quantity Unit Unit Price
24-inch diameter 1 Each $ 3,200.00
27-inch diameter 1 Each $ 3,300.00
30-inch diameter 1 Each $ 3,400.00
33-inch diameter 1 Each $ 3,550.00
36-inch diameter 1 Each $ 3,600.00
42-inch diameter 1 Each $ 3,800.00
48-inch diameter 1 Each $ 3,900.00
54-inch diameter 1 Each $ 4,500.00
60-inch diameter 1 Each $ 5,000.00
66-inch diameter 1 Each $ 7,500.00
72-inch diameter 1 Each $ 8,250.00
78-inch diameter 1 Each $ 9,000.00
84-inch diameter 1 Each $ 9,500.00
96-inch diameter 1 Each $ 11,000.00
108-inch diameter 1 Each $ 11,750.00
120-inch diameter 1 Each $ 12,225.00
132-inch diameter 1 Each $ 13,000.00
144-inch diameter 1 Each $ 13,500.00
Joint Contraction 1 Linear Foot $ 20.00
Section N: Segmented Replacement Piping Quantity Unit Unit Price
8-inch diameter 1 Square Foot $ 95.00
10-inch diameter 1 Square Foot $ 100.00
12-inch diameter 1 Square Foot $ 105.00
15-inch diameter 1 Square Foot $ 110.00
18-inch diameter 1 Square Foot $ 120.00
24-inch diameter 1 Square Foot $ 160.00
30-inch diameter 1 Square Foot $ 225.00
36-inch diameter 1 Square Foot $ 325.00
42-inch diameter 1 Square Foot $ 400.00
48-inch diameter 1 Square Foot $ 525.00
54-inch diameter 1 Square Foot $ 800.00
60-inch diameter 1 Square Foot $ 900.00
66-inch diameter 1 Square Foot $ 1,000.00
72-inch diameter 1 Square Foot $ 1,250.00
78-inch diameter 1 Square Foot $ 1,500.00
84-inch diameter 1 Square Foot $ 1,750.00
Section O: Drainage Structure Remove and Replace Quantity Unit Unit Price
24-inch diameter 1 Each $ 3,500.00
36-inch diameter 1 Each $ 6,500.00
48-inch diameter 1 Each $ 9,500.00
60-inch diameter 1 Each $ 12,500.00
72-inch diameter 1 Each $ 15,000.00
84-inch diameter 1 Each $ 20,000.00
Adjust Structure 1 Each $ 2,500.00
Frame and Cover Replace 1 Each $ 950.00
Structure Reconstruct 1 Vertical Foot $ 850.00
Drainage Pipe 6-inch 1 Linear Foot $ 75.00
French Drains 1 Each $ 1,800.00
Cleaning of Structures 1 Hourly $ 425.00
Drainage Structure Tap (up to 24") 1 Each $ 2,800.00
Clean and Seal Joints of Structures/box and wall ends 1 Linear Foot $ 75.00
Section P: End Sections Remove and Replace Quantity Unit Unit Price
12-inch to 18-inch outlet 1 Each $ 2,500.00
21-inch to 30-inch outlet 1 Each $ 5,500.00
33-inch to 48-inch…