2. SOW - Replace Epoxy Floor Coating_Bowling Green.pdf

PDF 43 MB Posted

Attached to
Replace Epoxy Floor Coating Federal contract opportunity
Solicitation number
12505B22R0011
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

This solicitation requests proposals to replace epoxy floor coating at the Bowling Green, KY location of the United States Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area. The requirement is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The estimated value is between $250,000 to $500,000 and the period of performance is 150 days from notice to proceed. Site visits are scheduled for June 21st and 22nd and questions are due by July 1st with answers posted as an amendment. Proposals are due through the System for Award Management website. Biobased products must be used where reasonably available and priced.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Epoxy Floor Coating, newest first.
File Type Posted
12505B22R0011 Amendment 01_6.23.22.pdf PDF
12505B22R0011_Site Visit Sign in Sheet_20220621-ReplaceEpoxyFloorCoating.pdf PDF
9. Recently Replaced Component Form blank.pdf PDF
10. New Asset.pdf PDF
7. ARS-372.pdf PDF
6. ARS-371.pdf PDF
5. COVID Vaccination Attestation.pdf PDF
8. Material Submittal Register.pdf PDF
1. 12505B22R0011 - Replace Expoxy Floor Coating_Bowling Green.pdf PDF
4. Past Performance Questionnaire.pdf PDF
3. Wage Determination.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Epoxy Floor Coating

USDA-ARS FOOD ANIMAL

ENVIRONMENTAL SYSTEMS

2413 NASHVILLE ROAD.

BOWLING GREEN, KY 42101-3576

TOC 001

3.31.2022

USDA-ARS FOOD ANIMAL ENVIRONMENTAL SYSTEMS

2413 NASHVILLE ROAD.

BOWLING GREEN, KY 42101-3576

STATEMENT OF WORK TABLE OF CONTENTS

STATEMENT OF WORK GROUP

STATEMENT OF WORK

Written Statement of Work………………………………pages 002-007 Specification Section 09 65 19………………………….pages 008-014 Specification Section 09665……………………………..pages 015-020 Condensed Plan Pages………………………………….pages 021-024 Approximate Dimensions of Rooms…………………….page 025 Exhibit A (Lab Equipment and Storage Room Layout and Inventory) …………………………………………….pages 026-048 ASTM F 710 Referenced Standard……………………..pages 049-054 List of Equipment………………………………………….page 055 Emission Room Sample Pictures………………………..pages 056-058 Hydrology Room Sample Pictures………………………pages 059-065 Microbiology Room Sample Pictures……………………pages 066-071 Soil Room Sample Picture………………………………..page 072 Storage Room View……………………………………….page 073 Nashville Road Emergency Exits………………………..page 074 Chemical List……………………………………………….pages 075-128 Submittal Transmittal template…………………………...pages 129-130

END OF STATEMENT OF WORK TABLE OF CONTENTS

March 31, 2022

USDA-ARS FOOD ANIMAL ENVIRONMENTAL SYSTEMS

2413 NASHVILLE ROAD.

BOWLING GREEN, KY 42101-3576

Statement of Work (SOW):

1. The Project generally consists of Base work that requires the removal of existing epoxy floor coatings, along with removal of existing cove base in Lab Rooms 110, 111, 112, 113, 114,115, and 116---all identified in SOW floor plan attachments. The existing epoxy floor coating is failing and will require full removal leaving the concrete ready to receive new welded-seam sheet flooring system with integral base suitable for use in a BSL-2 lab environment, per CDC surfaces requirements. Epoxy removal shall be accomplished by mechanical means and methods as no chemical/solvent methods will be allowed. Note that Storage Room 119 may receive Vinyl Composition Tile (VCT) and rubber cove base--see Option 1 for additional information. Note: Dust mitigation and containment is of the utmost importance for the duration of the Project.

The work will also necessitate the moving of existing appliances such as freezers, refrigerators, large gas cylinders, and other lab equipment. An itemized list of the appliances and equipment is included in this SOW, along with representative photos of the room equipment. Note: About half of storage room 119 may be used by the Contractor as a staging area to temporarily house the appliances and equipment. This SOW contains videos of the Lab Rooms and inner spaces, along with the Storage Room. If bidders are unable to view the videos, please notify the CO.

2. This SOW consists of a written description of the work, pictures showing typical floor conditions (that may or may not include additional written descriptions), videos, existing drawings, flooring specifications, referenced standards, Equipment List, Exhibit A, and FAR Solicitation and Contract clauses that are identified in the complete Solicitation package.

The SOW is in PDF format. Note that attachments can be minimized or maximized in size for greater clarity.

3. Project Location: USDA—ARS 2413 Nashville Road, Bowling Green, KY 42101- 3576. Note: This Location is within an existing building owned by Western Kentucky University (WKU).

4. Contracting Officer (CO): Mr. Josh Dobereiner; (309) 681-6410, or as may be determined at a later date.

5. Point of Contact at Location for access to rooms and such: Ms Jerri Hills, Custodial Worker, jerri.hills@usda.gov Office: 270-781-2260 ext. 228 or Cell:

270-792-8159

6. Administrative Officer at Location: Ms Maria Rech; 270 781-2260 ext. 224.

7. Contractor shall coordinate all work activities with the Location prior to starting any work. Endeavor to schedule and coordinate work in a manner that on-going, normal day-to-day operations are not affected negatively. Contractor shall be aware that the work takes place in a Federal Government leased space at Western Kentucky University and all regulations and requirements for access must be strictly adhered to. Project shall be left broom-clean at the end of each workday. If Storage room 119 is used for staging, endeavor to maintain egress to emergency door. Place signage at each room under construction indicating that the room is under construction and is off-limits. Parking is available for free.

8. Point of Contact at Midwest Area Peoria, IL: Tim Golden; Technical Advisor.

Mobile; 309.419.3106. Office; 309.681.6615.

9. The Contractor shall furnish all labor, materials, equipment, supplies, transportation, utilities, supervision, *safety equipment, and incidentals for all elements of the work in accordance with this SOW to provide an installation that is complete and usable in every respect, and ready for use by Final Completion date. * Note: Contractor is solely responsible for safety measures and conformance to applicable requirements in accordance with FAR clauses referenced in Solicitation package.

10. NOTE: Basis-of-design products are indicated in this SOW to convey a specified standard of quality and salient characteristics desired but are not to be considered a single-source specification. Contractor-proposed equals will be considered. “Mannington”, “Mondo”, and “Nora” welded seam floors with integral cove (flash) base may meet requirements, however:

The Contractor must compare and validate that quality and salient characteristics are equal and approve the proposed equal products prior to submission for Govt.

review and approval. Additional work required to incorporate Contractor-proposed equals shall be at the Contractor’s expense.

11. Period of performance shall be: 150 calendar days after Notice to Proceed is issued by CO. All submittals shall be distributed to and reviewed by the Govt.

prior to commencing work at the site. Purchase of materials prior to submittal approvals are at the Contractor’s risk.

12. Existing conditions: Selected Contractor shall field verify all existing conditions that may impact the work and alert the CO and Technical Advisor immediately if conditions are discovered that differ from the SOW. Contractor shall point out discrepancies between work identified in this SOW and actual field-verified conditions--if they exist, prior to performing work. Items not identified in SOW may be treated as unforeseen conditions and priced in accordance with standard FAR contract clauses. Contractor shall provide (to CO and Technical Advisor) mailto:jerri.hills@usda.gov daily pictures that correspond with each daily field report of the Work underway.

The daily pictures and Field Reports shall be submitted on a daily basis.

13. General Demolition Notes: Contractor is responsible for removing, hauling away, and legally disposing of existing components that are indicated to be removed/demolished. Dust containment is of the utmost importance while the project is underway. Contractor must prevent dust and fumes from entering HVAC system. Proposal shall include a detailed description of the dust-containment and mitigation means and methods that will be used to prevent dust and fumes from entering HVAC system, under doors, etc. A Pre-Demolition Meeting shall occur at the job site prior to commencement of demolition.

Contractor shall provide detailed meeting minutes to the CO of what was discussed, questions raised, answers provided, and other topics of discussion.

14. New Work.

Base:

a. Provide labor services to move items in rooms as needed to perform flooring work (see “List of Equipment” and “Exhibit A”.) All labor force shall have experience moving similar equipment. Note: Refrigerators and freezers will be emptied and refilled by the User. Coordinate with flooring installation—including adhesive cure time needed---and move items back after flooring completion.

Provide plywood or “Masonite” runways, furniture moving aids and/or specialty moving equipment for moving large heavy items and for large furniture moves on the floor, even after adhesive is fully cured. Install flooring protectors as needed to keep from damaging floor from point loads of items. About half of Storage Room 119 may be used as a staging area to temporarily store the items that are to be removed from the lab rooms.

b. Sensitive equipment/items will be moved by the User. All other items will remain in place. Contractor is responsible for covering and protecting cabinets/countertops as part of the dust mitigation/containment work.

Exercise care in working around the covered equipment.

c. Remove all epoxy floor coatings and cove base in rooms identified in SOW. Chemical/solvent means of removal are not allowed. Generally, follow Resilient Floor Covering Institute (RFCI) recommendations for removal of existing floor coating. RWP_MASTER_English_2018.pdf (rfci.com)

d. Install new welded seam resilient sheet flooring with integral cove (flash) base. Basis of design is: “Armstrong MedinPure with Diamond 10 Technology” MedinPure PVC-Free with Diamond 10 Technology | Armstrong Flooring Commercial Owner will choose color from manufacturer’s standard color choices.

e. Follow all manufacturer’s installation recommendations including bond, moisture, and pH testing. Determine the need for Product Performance under Concentrated Static and Dynamic Loads regarding the use of hard-setting reactive adhesives at such areas, or entire room.

https://www.armstrongflooring.com/pdbupimages-flr/224433.pdf https://rfci.com/wp-content/uploads/2018/04/RWP_MASTER_English_2018.pdf https://rfci.com/wp-content/uploads/2018/04/RWP_MASTER_English_2018.pdf https://www.armstrongflooring.com/commercial/en-us/products/hom/medinpure.html https://www.armstrongflooring.com/commercial/en-us/products/hom/medinpure.html https://www.armstrongflooring.com/pdbupimages-flr/224433.pdf

f. Extend integral base a minimum of four (4) inches up the wall, or as needed to conceal adhesive residue and/or paint lines. Provide trim piece at top of integral cove (flash) base. Integral cove (flash) base shall be provided at all wall/floor intersections and casework/floor intersections.

g. Provide other trim accessories as identified in the 09665 Resilient Sheet Flooring specification.

h. Instruct User as to suitable flooring protectors that may be needed to protect the new flooring from damage.

i. Instruct User regarding potential spills of chemicals on flooring. See “Chemical List”.

j. Instruct User as to the selection and use of non-staining anti-fatigue mats.

Option 1; Install new VCT in Storage Room 119:

a. Provide twelve (12) inch x twelve (12) inch Vinyl Composition Tile (VCT), and four (4) inch rubber cove base. Basis of design for cove base is:

https://www.armstrongflooring.com/commercial/en-us/products/ima/wall-bases.html Basis of design for VCT is “Armstrong Safety Zone Tile”:

Safety Zone Tile | Armstrong Flooring Commercial

b. Install VCT and rubber cove base in accordance with manufacturer’s recommendations and attached specification section 09 65 19.

c. Fill gap (between top of concrete floor and bottom of drywall) with a non-wicking material such as intumescent expandable foam, or intumescent sealant. Trim filler flush with wall prior to cove base installation. Provide submittal for filler product.

d. Note: Storage Room 119 is to receive new VCT and cove base on one half of the room at a time. User will move most items in the room. Items that shall be Contractor-moved are identified on List of Equipment and Exhibit A. Coordinate closely with User for work in this area.

14. Applicable Codes:

i. ARS Facilities Design Standards 242.1; Attachment 9 - ARS Design Standards (242.1M-ARS).pdf - GovTribe ;

ii. All current Kentucky State Building Codes and

iii. All current Bowling Green, Kentucky codes.

15. Submittals:

Use ARS submittal/transmittal form included with this SOW for each submittal.

Submittals are required for each product used, as well as for various testing requirements. Submit to USDA/ARS for review and approval of all items noted above, and all other components intended for use on the project associated with the products noted above. The review by USDA shall be for general compliance with Statement of Work. Markings for comments and approval of the submittals by USDA shall not be construed as releasing the Contractor from compliance with the specified requirements. Provide submittals in editable PDF format.

https://www.armstrongflooring.com/commercial/en-us/products/ima/wall-bases.html https://www.armstrongflooring.com/commercial/en-us/products/ima/wall-bases.html https://www.armstrongflooring.com/commercial/en-us/products/srf/safety-zone.html https://govtribe.com/file/government-file/attachment-9-ars-design-standards-242-dot-1m-ars-dot-pdf-1 https://govtribe.com/file/government-file/attachment-9-ars-design-standards-242-dot-1m-ars-dot-pdf-1

Provide a work schedule including a full, detailed plan for dust mitigation and containment for review prior to starting work at site.

Work schedule shall also show submittal review dates considering a re-submittal, along with a submittal schedule showing each submittal coordinated with installation or application dates. Note that the govt. may take up to 10 working days to return submittals. Submittals may be distributed via email to Tim.Golden@usda.gov and CO. CO contact information will be provided at a Pre-Construction meeting. Contractor shall take meeting minutes and distribute to CO and Technical Advisor. Submittal transmittal sheets shall accompany each submittal. The submittal transmittal sheet will be distributed at the pre-construction meeting.

Photos of the work taking place each day, along with a daily report indicating workers present, weather conditions, differing site conditions encountered, and the like shall be provided on a daily basis to Tim.Golden@ars.usda.gov

Mock-up: See Specifications.

CLOSEOUT SUBMITTALS

A. Operating and Maintenance Data. Compile all approved submittals on a thumb drive to be provided to the Location.

B. Warranties: Executed copies of approved warranty forms.

C. Instruct User on Manufacturer’s floor care recommendations, including disallowed chemicals and cleaners for installed flooring.

ATTIC STOCK

A. See Specifications and Bid Option requirements.

16. General:

In executing the Work, the Contractor shall coordinate access to all areas with the Location. Contractor shall verify all parking, security, and health requirements with the Administrative Officer. All work must also be coordinated with Location personnel who will be identified in a preconstruction meeting. The work cannot negatively impact day to day operations, including air quality.

Protect areas in the building from all demolition activities.

17. Site Visit:

Interested parties are strongly encouraged to visit the site of the proposed work and review the existing conditions there relating to construction and labor, and to be fully informed as to the facilities involved, and the difficulties and restrictions that may affect the performance of the Contract. Failure to visit the site will not disqualify those submitting a proposal. However, change order requests for items that could have been reasonably ascertainable from a site visit (and included in a proposal) will be reviewed by the CO and evaluated accordingly.

18. Proposal:

mailto:Tim.Golden@usda.gov mailto:Tim.Golden@ars.usda.gov

a. Proposal shall contain the following minimum information:

i. Manufacturer’s brand names for each component.

ii. Break out labor and material costs for Base and Option 1, including labor work associated with moving existing furnishings/equipment.

iii. Include a written description of the dust mitigation and containment strategy, demolition, floor prep, and floor installations.

iv. Include a line item for Product Performance under Concentrated Static and Dynamic Loads regarding the use of hard-setting reactive adhesives under specific appliances, or entire floor area, if applicable.

v. Additional information as may be requested by CO to properly evaluate proposal.

END

SECTION 09 65 19

Resilient Tile Flooring

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Flooring and accessories as shown on the drawings and schedules and as indicated by the requirements of this section.

B. Related Documents

1. Statement of Work and FAR Solicitation and Contract clauses.

1.02 REFERENCES

A. Resilient Floor Covering Institute (RFCI).

B. ASTM International:

1. ASTM E 648 Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source

2. ASTM E 662 Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials

3. ASTM F 710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring

4. ASTM F 1066 Standard Specification for Vinyl Composition Tile

5. ASTM F 1861 Standard Specification for Resilient Wall Base

6. ASTM F 1869 Standard Test Method for Measuring Vapor Emission Rate of

Concrete Subfloor Using Anhydrous Calcium Chloride

7. ASTM F 2170 Standard Test Method for Determining Relative Humidity in Concrete

Floor Slabs Using in situ Probes C. National Fire Protection Association (NFPA):

1. NFPA 253 Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source

2. NFPA 258 Standard Test Method for Measuring the Smoke Generated by Solid Materials

1.03 SYSTEM DESCRIPTION

A. Performance Requirements: Provide flooring which has been manufactured, fabricated, and installed to performance criteria certified by manufacturer without defects, damage, or failure.

B. Administrative Requirements

1. Pre-installation Meeting: Conduct an on-site pre-installation meeting to verify project requirements, substrate conditions, manufacturer’s installation instructions and manufacturer’s warranty requirements. Comply with Statement of Work.

2. Pre-installation Testing: Conduct pre-installation testing as follows: moisture tests, bond test, pH test.

C. Test Installations/ Mock-ups: Install at the project site a job mock-up using acceptable products and manufacturer approved installation methods, including concrete substrate testing. Obtain Contracting Officer’s acceptance of finish color, texture and pattern, and workmanship standards.

1. Mock-Up Size: Minimum of 12’ x 12’.

2. Maintenance: Maintain mock-up during construction for workmanship comparison;

remove and legally dispose of mock-up when no longer required.

3. Incorporation: Mock-up may be incorporated into the final construction with

Contracting Officer’s approval.

D. Sequencing and Scheduling

1. Install flooring and accessories as needed to coordinate with User. Close spaces to traffic during the installation of the flooring.

2. Do not install flooring over concrete slabs until they are sufficiently dry to achieve a bond with the adhesive, in accordance with the manufacturer's recommended bond, moisture tests and pH test.

1.04 SUBMITTALS

A. Submit shop drawings, seaming plan, coving details, and manufacturer's technical data and bulletins, installation and maintenance instructions for flooring and accessories.

B. Submit the manufacturer's standard samples showing the standard colors for flooring and applicable accessories.

C. Submit Safety Data Sheets (SDS) available for adhesives, moisture mitigation systems, primers, patching/leveling compounds, floor finishes (polishes) and cleaning agents and Material Information Sheets for flooring products.

D. If required, submit the manufacturer's certification that the flooring has been tested by an independent laboratory and complies with the required fire tests.

E. Closeout Submittals: Submit the following:

1. Operation and Maintenance Data: Operation and maintenance data for installed products in accordance with Statement of Work. Include methods for maintaining installed products, and precautions against cleaning materials and methods detrimental to finishes and performance. See attached “Chemical List” and provide guidance on potential spills.

2. Warranty: Warranty documents specified herein

1.05 QUALITY ASSURANCE

A. Single-Source Responsibility: provide types of flooring and accessories supplied by one manufacturer, including moisture mitigation systems, primers, leveling and patching compounds, and adhesives.

B. Select an installer who is experienced and competent in the installation of Armstrong resilient vinyl composition tile flooring and the use of Armstrong Flooring subfloor preparation products.

1. Engage installers certified as Armstrong Commercial Flooring Certified Installers

2. Confirm installer's certification by requesting their credentials

C. Fire Performance Characteristics: Provide resilient vinyl composition tile flooring with the following fire performance characteristics as determined by testing material in accordance with

ASTM test methods indicated below by a certified testing laboratory or other testing agency acceptable to authorities having jurisdiction:

1. ASTM E 648 Critical Radiant Flux of 0.45 watts per sq. cm. or greater, Class I

2. ASTM E 662 (Smoke Generation) Maximum Specific Optical Density of 450 or less

1.06 DELIVERY, STORAGE AND HANDLING

A. Comply with Statement of Work and FAR Solicitation and Contract clauses.

B. Comply with manufacturer's ordering instructions and lead time requirements to avoid construction delays.

C. Deliver materials in good condition to the jobsite in the manufacturer's original unopened containers that bear the name and brand of the manufacturer, project identification, and shipping and handling instructions.

D. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.

1.07 PROJECT CONDITIONS

A. Maintain a minimum temperature in the spaces to receive the flooring and accessories of 65ºF (18ºC) and a maximum temperature of 100ºF (38ºC) for at least 48 hours before, during, and for not less than 48 hours after installation. Thereafter, maintain a minimum temperature of 55ºF (13ºC) in areas where work is completed. Protect all materials from the direct flow of heat from hot-air registers, radiators, or other heating fixtures and appliances. Refer to product installation recommendations for a complete guide on project conditions.

1.08 LIMITED WARRANTY

A. Resilient Flooring: Submit a written warranty executed by the manufacturer, agreeing to repair or replace resilient flooring that fails within the warranty period.

B. Limited Warranty Period: 5 years

C. Limited Warranty shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and will be in addition to and run concurrent with other warranties made by the Contractor under the requirements of the Contract Documents.

D. For the Limited Warranty to be valid, this product is required to be installed using the appropriate Armstrong Flooring Guaranteed Installation System. Product installed not using the specific instructions from the Guaranteed Installation System will void the warranty.

1.10 MAINTENANCE

A. Extra Materials: Deliver extra materials to Owner. Furnish extra materials from same production run as products installed. Packaged with protective covering for storage and identified with appropriate labels.

1. Quantity: Furnish quantity of flooring units equal to 10% of amount installed.

2. Delivery, Storage and Protection: Comply with Owner's requirements for delivery, storage and protection of extra material.

PART 2 - PRODUCTS

2.01 MANUFACTURER

A. Resilient tile flooring, wall base, adhesives and subfloor preparation products and accessories: See Basis of Design in Statement of Work.

2.02 RESILIENT TILE FLOORING MATERIALS

A. Provide Slip-Retardant Tile Flooring.

1. Description: Vinyl tile composed of polyvinyl chloride resin, plasticizers, fillers, pigment, and grit. Tile shall have a nominal 0.020 in. (0.51 mm) thick pattern layer containing proprietary slip-retardant grit.

2. Tile shall meet size, thickness, indentation, impact, deflection, dimensional stability, resistance to chemicals, squareness, and resistance to heat requirements of ASTM F 1066 Standard Specification for Vinyl Composition Tile, Class 2, through pattern.

3. Pattern and Color: As selected by Government from standard color choices and patterns.

4. Size: 12 in. x 12 in.

5. Thickness: 1/8"/0.125 in. (3.2mm)

2.03 PRODUCT SUBSTITUTION

A. Substitutions: In accordance with applicable FAR clauses.

2.04 WALL BASE MATERIALS

A. For top set wall base: Provide 1/8 in. (3.18 mm) thick, 4 in. (10.16 cm) high Color-Integrated Wall Base with a matte finish, conforming to ASTM F 1861, Type TP - Rubber, Thermoplastic, Group 1 - Solid, Style B – Cove.

2.05 ADHESIVES

A. For Tile Installation System, Full Spread: Provide adhesive under the tile and wall base adhesive at the wall base as recommended by the flooring manufacturer.

2.06 ACCESSORIES

A. For patching, smoothing, and leveling monolithic subfloors, as recommended by flooring manufacturer.

B. [For priming porous substrates to aid in adhesive bond strength and reducing subfloor porosity, provide S-464 Prime Strong™ acrylic primer for porous substrates. For non-porous substrates, provide S-465 NP Prime Strong™ epoxy primer for non-porous substrates].

C. [For creating a moisture barrier, provide S-462 Seal Strong™ two-part moisture mitigation system].

D. For sealing joints between the top of wall base or integral cove cap and irregular wall surfaces such as masonry, provide plastic filler applied according to the manufacturer's recommendations.

E. Provide transition/reducing strips tapered to meet abutting materials.

F. Provide threshold of thickness and width as needed to transition to other floor surfaces.

G. Provide resilient edge strips of width shown on the drawings, of equal gauge to the flooring, homogeneous vinyl or rubber composition, tapered or bullnose edge, with color to match or contrast with the flooring, or as selected by the Government from standard colors available.

H. Provide metal edge strips of width shown on the drawings and of required thickness to protect exposed edges of the flooring. Provide units of maximum available length to minimize the number of joints. Use butt-type metal edge strips for concealed anchorage or overlap-type metal edge strips for exposed anchorage. Unless otherwise shown, provide strips made of extruded aluminum with a mill finish.

PART 3 - EXECUTION

3.01 MANUFACTURER’S INSTRUCTIONS

A. Compliance: Comply with manufacturer’s product data, including technical bulletins, product catalog, installation instructions, and product carton instructions for installation and maintenance procedures as needed.

3.02 EXAMINATION

A. Site Verification of Conditions: Verify substrate conditions (which have been previously installed under other sections) are acceptable for product installation in accordance with manufacturer's instructions (i.e. moisture tests, bond test, pH test, etc.).

B. Visually inspect flooring materials, adhesives and accessories prior to installation. Flooring material with visual defects shall not be installed and shall not be considered as a legitimate claim.

C. Examine subfloors prior to installation to determine that surfaces are smooth and free from cracks, holes, ridges, and other defects that might prevent adhesive bond or impair durability or appearance of the flooring material.

D. Inspect subfloors prior to installation to determine that surfaces are free from curing, sealing, parting and hardening compounds; residual adhesives; adhesive removers; and other foreign materials that might prevent adhesive bond. Visually inspect for evidence of moisture, alkaline salts, carbonation, dusting, mold, or mildew.

E. Report conditions contrary to contract requirements that would prevent a proper installation.

Do not proceed with the installation until unsatisfactory conditions have been corrected.

F. Failure to call attention to defects or imperfections will be construed as acceptance and approval of the subfloor. Installation indicates acceptance of substrates with regard to conditions existing at the time of installation.

3.03 PREPARATION

A. Subfloor Preparation: Smooth concrete surfaces, removing rough areas, projections, ridges, and bumps, and filling low spots, control or construction joints, and other defects with manufacturer’s recommended products.

B. Subfloor Cleaning: The surface shall be free of dust, solvents, varnish, paint, wax, oil, grease, sealers, release agents, curing compounds, residual adhesive, adhesive removers and other foreign materials that might affect the adhesion of resilient flooring to the concrete or cause a discoloration of the flooring from below. Remove residual adhesives as recommended by the flooring manufacturer. Remove curing and hardening compounds not compatible with the adhesives used, as indicated by a bond test or by the compound manufacturer's recommendations for flooring. Avoid organic solvents. Spray paints, permanent markers and other indelible ink markers must not be used to write on the back of the flooring material or used to mark the concrete slab as they could bleed through, telegraphing up to the surface and permanently staining the flooring material. If these contaminants are present on the substrate they must be mechanically removed prior to the installation of the flooring material.

Refer to ASTM F 710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring for additional information on subfloor preparation.

C. For Tile High-Moisture Installation perform subfloor moisture testing in accordance with ASTM F 2170, “Standard Test Method for Determining Relative Humidity in Concrete Slabs Using in-situ Probes” or ASTM F 1869,“Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride” and Bond Tests. to determine if surfaces are dry; free of curing and hardening compounds, old adhesive, and other coatings; and ready to receive flooring. Relative humidity shall not exceed 95%.][MVER shall not exceed 7 lbs./1000 sq. ft./24 hrs. On installations where both the Percent Relative Humidity and the Moisture Vapor Emission Rate tests are conducted, results for both tests shall comply with the allowable limits listed above. Do not proceed with flooring installation until results of moisture tests are acceptable. All test results shall be documented and retained.

D. Concrete pH Testing: Perform pH tests on concrete floors regardless of their age or grade level. All test results shall be documented, distributed to the CO, and retained with the Contractor at the site and with the close-out documents.

3.04 INSTALLATION OF FLOORING

A. Install flooring in strict accordance with referenced standards and manufacturer’s recommendations.

B. Vacuum concrete prior to spreading adhesive. Install flooring wall to wall before the installation of floor-set cabinets, casework, furniture, equipment, movable partitions, etc.

Extend flooring into toe spaces, door recesses, closets, and similar openings as shown on the drawings.

C. If required, install flooring on pan-type floor access covers. Maintain continuity of color and pattern within pieces of flooring installed on these covers. Adhere flooring to the subfloor around covers and to covers.

D. Scribe, cut, and fit to permanent fixtures, columns, walls, partitions, pipes, outlets, and built-in furniture and cabinets.

E. Install flooring with adhesives, tools, and procedures in strict accordance with the manufacturer's written instructions. Observe the recommended adhesive trowel notching, open times, and working times.

3.05 INSTALLATION OF ACCESSORIES

A. Apply top set wall base to walls, columns, casework, and other permanent fixtures in areas where top-set base is required. Install base in lengths as long as practical, with inside corners fabricated from base materials that are mitered or coped. Tightly bond base to vertical substrate with continuous contact at horizontal and vertical surfaces.

B. Fill voids with plastic filler along the top edge of the resilient wall base or integral cove cap on masonry surfaces or other similar irregular substrates.

C. Place resilient edge strips tightly butted to flooring, and secure with adhesive recommended by the edge strip manufacturer. Install edge strips at edges of flooring that would otherwise be exposed.

D. Apply [butt-type] [overlap] metal edge strips where shown on the drawings, [before] [after] flooring installation. Secure units to the substrate, complying with the edge strip manufacturer's recommendations.

3.06 CLEANING

A. Perform initial and on-going maintenance according to the latest edition of the maintenance recommendations from the manufacturer.

3.07 PROTECTION

A. Protect installed flooring as recommended by the flooring manufacturer against damage from rolling loads, other trades, or the placement of fixtures and furnishings.

END OF SECTION

Tim.Golden Cross-Out

09-06M

SECTION 09665

RESILIENT SHEET FLOORING

PART 1 - GENERAL

1.1 DESCRIPTION

A. This Section specifies the installation of sheet flooring with backing and integral cove base.

1.2 SUBMITTALS

A. Submit in accordance with Statement of Work.

B. Submit shop drawings, seaming plan, coving details, and manufacturer's technical data and bulletins, installation and maintenance instructions for flooring and accessories.

C. Manufacturer's Literature and Data:

l. Description of products provided.

2. Color choices for flooring and welding rods from Manufacturer’s standard colors.

3. Sheet flooring manufacturers' recommendations for adhesives, underlayment, and primers.

4. Application and installation instructions.

5. Installer qualification certificates for each installer.

D. Samples:

1. Sheet material: 300 mm (12 inches) square for each type, pattern, and color.

2. Edge strips: 150 mm (6 inches) long each type.

3. Cap strip and fillet strip for integral base.

E. Administrative Requirements:

1. Pre-installation Meeting: Conduct an on-site pre-installation meeting to verify project requirements, substrate conditions, manufacturer’s installation instructions and manufacturer’s warranty requirements.

Indicate adhesive type on shop drawings. Comply with SOW and General Provisions and Clauses. Provide meeting minutes to CO prior to installation of flooring; include verification of floor flatness, ambient room temperature, relative humidity

2. Pre-installation Testing: Conduct pre-installation testing as follows: moisture tests, bond test, pH test. Provide results to CO prior to installation of flooring.

3. Test Installations/ Mock-ups: Install at the project site a job mock-up using acceptable products and manufacturer approved installation methods, including concrete substrate testing. Obtain Owner’s acceptance of finish color, texture and pattern, and workmanship standards.

4. Mock-Up Size: Mock-up may be in a closet or small room.

5. Maintenance: Maintain mock-up during construction for workmanship comparison; remove and legally dispose of mock-up when no longer required.

6. Incorporation: Mock-up may be incorporated into the final construction with Owner's approval.

7. Installer qualifications: Installers must have manufacturer’s installer qualification certificate for the type of flooring being installed.

F. Closeout Submittals: Submit the following:

1. Operation and Maintenance Data: Operation and maintenance data for installed products. Include methods for maintaining installed products, and precautions against cleaning materials and methods detrimental to finishes and performance. See attached “Chemical List” and provide guidance on potential spills.

2. Submit Safety Data Sheets (SDS) available for adhesives, moisture mitigation systems, primers, patching/leveling compounds, floor finishes (polishes) and cleaning agents and Material Information Sheets for flooring products.

G. Warranty: 10-year Manufacturer’s standard warranty.

1.3 DELIVERY AND STORAGE

A. Deliver sheet flooring full width roll, completely enclosed in factory wrap, clearly marked with the manufacturer's number, type and color, production run number and manufacture date.

B. Deliver other materials in original sealed packages or containers;

labeled for identification with the manufacturer's name and brand.

C. Store materials in weathertight and dry storage facility.

D. Store sheet flooring on end.

E. Protect from damage from handling, weather, and construction operation before, during and after installation.

1.4 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by basic designation only.

B. American Society for Testing and Materials (ASTM):

E648-06.................Critical Radiant Flux of Floor Covering Systems using a Radiant Energy Source

E662-05.................Specific Optical Density of Smoke Generated by

Solid Materials

F710-05.................Preparing Concrete Floors and Other Monolithic

Floors to Receive Resilient Flooring

F1303-04................Sheet Vinyl Floor Covering with Backing

C. Resilient Floor Covering Institute (RFCI):

Technical Manual........Recommended Installation Practice for Homogenous

Sheet Flooring, Fully Adhered D. ASTM F 710 Standard Practice for Preparing Concrete Floors to Receive

Resilient Flooring

PART 2 - PRODUCTS

2.1 SHEET FLOORING

A. ASTM F1303, Type II, Grade 1, except for backing requirements. Foam backed sheet flooring is not acceptable.

B. Minimum nominal thickness 2 mm (0.08 inch); 1800 mm (6 ft) minimum width.

C. Critical Radiant Flux: 0.45 watts per sq.cm or more, class I, per ASTM E648.

D. Smoke density: less than 450 per ASTM E662.

E. Color and pattern of sheet flooring of the same production run.

2.2 ADHESIVES

Water resistant type recommended by the sheet flooring manufacturer for the conditions of use, including Product Performance under Concentrated

Static and Dynamic Loads.

2.3 BASE CAP STRIP AND COVE STRIP

A. Provide top edge trim caps of plastic, anodized aluminum, or plastic zero reducer for integral flash cove as approved by the Government.

2.4 LEVELING COMPOUND (FOR CONCRETE FLOORS)

Provide cementitious products with latex or polyvinyl acetate resins in the mix.

2.5 PRIMER (FOR CONCRETE SUBFLOORS)

As recommended by the adhesive or sheet flooring manufacturer.

2.6 EDGE STRIPS

A. Extruded aluminum, mill finish, mechanically cleaned.

B. 28 mm (1-l/8 inch) wide, 6 mm (1/4 inch) thick, bevel one edge to 3 mm

(1/8 inch) thick.

C. Drill and counter sink edge strips for flat head screws. Space holes near ends and approximately 225 mm (9 inches) on center in between.

2.7 SEALANT

A. As approved by Government.

B. Compatible with sheet flooring.

PART 3 - EXECUTION

3.1 PROJECT CONDITIONS

A. Maintain temperature of sheet flooring above 36 °C (65 °F), for 48 hours before installation.

B. Maintain temperature of rooms where sheet flooring work occurs above

36 °C (65 °F), for 48 hours, before installation and during installation.

C. After installation, maintain temperature at or above 36 °C (65 °F.)

D. Building is permanently enclosed.

E. Wet construction in or near areas to receive sheet flooring is complete, dry and cured.

3.2 SUBFLOOR PREPARATION

A. Verify that concrete slabs comply with ASTM F710.

B. Correct conditions which will impair proper installation, including trowel marks, pits, dents, protrusions, cracks or joints.

C. Fill cracks, joints, depressions, and other irregularities in concrete with leveling compound.

1. Do not use adhesive for filling or leveling purposes.

2. Do not use leveling compound to correct imperfections which can be corrected by spot grinding.

3. Trowel to smooth surface free of trowel marks, pits, dents, protrusions, cracks or joint lines.

D. Clean floor of oil, paint, dust and deleterious substances. Leave floor dry and cured free of residue from existing curing or cleaning agents.

Vacuum floor prior to applying floor adhesive.

E. Concrete Subfloor Testing:

Determine adhesion and dryness of the floor by bond and moisture tests as recommended by RFCI Technical Manual, Recommended Installation

Practice for Homogenous Sheet Flooring, Fully Adhered.

F. Prime concrete subfloor if priming is recommended by adhesive manufacturer.

G. Preparation shall include the removal of existing epoxy floor coating, and existing cove base. Do not use chemicals/solvents to remove adhesives.

3.3 INSTALLATION

A. Comply with manufacturer’s product data, including technical bulletins, product catalog, installation instructions, and product carton instructions for installation and maintenance procedures as needed.

B. Inform the Contracting Officer of conflicts between this section and the manufacturer’s instructions or recommendations for auxiliary materials, or installation methods, before proceeding.

C. Install sheet in full coverage adhesives.

1. Air pockets or loose edges will not be accepted.

2. Trim sheet materials to touch in the length of intersection at pipes and vertical projections, seal joints at pipe with approved sealant.

D. Keep joints to a minimum; avoid small filler pieces or strips.

E. Follow manufacturer’s recommendations for seams at butt joints. Do not leave any open joints that would be readily visible from a standing position.

F. Follow manufacturer’s recommendations regarding pattern match, if applicable.

G. Installation of Edge Strips:

1. Locate edge strips under center lines of doors and where flooring terminates unless otherwise indicated.

2. Set aluminum strips in adhesive, anchor with lead anchors and stainless steel Phillips screws.

H. Integral Cove Base Installation:

1. Set preformed fillet strip to receive base.

2. Install the base with adhesive, terminate expose edge with the cap strip.

3. Form internal and external corners to the geometric shape generated by the cove at either straight or radius corners.

4. Solvent weld joints as specified for the flooring. Seal cap strip to wall with an approved sealant.

5. Unless otherwise specified or shown where sheet flooring is scheduled, provide integral base at intersection of floor and vertical surfaces, including casework.

3.4 CLEANING AND PROTECTION

A. Clean small adhesive marks during application of sheet flooring and base before adhesive sets, excessive adhesive smearing will not be accepted.

B. Keep traffic off sheet flooring for 24 hours after installation.

C. Clean and polish materials per flooring manufacturer’s written recommendations.

D. Where construction traffic is anticipated, cover sheet flooring with reinforced kraft paper properly secured and maintained until removal is authorized by the Contracting Officer. Use releasable, non-staining tape on all edges of protective covering to prevent small dirt particles from getting under the paper and/or plywood/”Masonite”.

E. Where protective materials are removed and immediately prior to acceptance, repair any damage, re-clean sheet flooring, lightly re-apply polish and buff floor.

- - - E N D - - -g 3-

-5

I

., 17'-0 1/16" I

� GAS CYLINDER

L-------------±-s_

T _o R A

GE

AR

_�-----------------!-✓7'7< _!, �,rt---------, / �VESTIBU�r � 1101t

/ \12 _..., I 13 _ 14

'-... L,J

LOBBY ®7

1102 l'io \ I

LO: �·

�' 0

OFFICE

11031 ±10' -6"

I

CENTER PARTITIONS BETWEEN / /

EXISTING STOREFRONT OPENINGS ___J,/

I>- 4

�FICE

I 1O4 I

• ±10'-4" •------~----------- --

� STORAGE

11191

Gr r-.J

Q, CJ

If-.---�- EXISTING

/ WORK CUBICLES

I

/0 v

OPEN OFFICE

11 os 1

/:J ,() qi

==-◊==='¼

,,--... r"'-18 l./

OFFICE

1105 I

±1 o' -4". .. . , .

".J ,..___,1 "'-I

OFFICE CONFERENCE

1106 I

±9'-10"

\_ CENTER PARTITION BETWEEN

EXISTING STOREFRONT OPENING

1107 I r--------- t-

I I

I I

I

I

I I I

I

I

I "---------n

0-_/ I&I

15 F

II

� \\\\llllllf1, FLOOR PLAN ,,,, '�, G · A,,�',,,,, ! (__1������======¾',,,,=// N O R T H ,,�n ....... ;:1;1 ,,..,., =

� 1., .-r-.\ST • / � � -v.J•�\;;

A 100 SCALE: 1 /8" = 1 '-0"

f 1•

NO.

! ! � ut�iM0

NW _¥

,h en: -::. •• L... OF l 2

A-E FIRM USDA

PROJECT MANAGER EPM

RPP

DESIGNER

RPP

PPM

KEYED NEW WORK NOTES

0 IN HATCHED AR�S. PROVIDE PIPE BEDDING

AND CONCRETE TOPPING AT NEW BELOW

FLOOR PLUMBING LINES. FINISH CONCRETE

TO MATCH EXISTING.

G) NEW 3-5/8" METAL STUD WALL WITH

SOUND BATT INSULATION AND 5/8" THICK

TYPE X GYPSUM BOARD BOTH SIDES .

EXTEND TO UNDERSIDE OF EXISTING ROOF

DECK AND FIRE CAULK.

0 NEW 3-5/8" METAL STUD WALL W/ 5/8"

GYPSUM BOARD BOTH SIDES. EXTEND TO

9' -6" A.F.F. AND BRACE STUDS TO

STRUCTURE ABOVE AT 48" 0. C.

© NEW 3-5/8" METAL STUD WALL W/ SOUND

BATT INSULATION ANO 5/8" GYPSUM BOARD

BOTH SIDES. EXTEND PARTITION TO 1'

ABOVE CEILING AND BRACE STUDS TO

STRUCTURE ABOVE AT 48" O.C.

0 EXISTING ELECTRICAL TRANSFORMER IN NEW

LOCATION. SEE ELECTRICAL

© PROVIDE 2X8 SOLID WOOD BLOCKING AT 8'

A.F.F. FOR MONITOR MOUNT BY OWNER.

COORDINATE EXACT LOCATION WITH OWNER.

0 NEW SAFETY STATION AND FLOOR DRAIN

© NEW STEEL PIPE COLUMN AND BASE PLATE

FOR ROOFTOP EQUIPMENT SUPPORT. SEE

STRUCTURAL DRAWING.

SEE FLASHING DETAIL 2/A103 FOR THRU

ROOF PENETRATION.

© EXISTING STEEL PIPE COLUMNS TO REMAIN.

®o NEW SEMI-RECESSED FIRE EXTINGUISHER

CABINET AND FIRE EXTINGUISHER IN

EXISTING GYP. BOARD/MTL STUD WALL

MOUNT TOP OF CABINET 48" ABOVE FLOOR.

@ EXISTING FIRE EXTINGUISHER TO REMAIN.

BY DESCRIPTION

REVISIONS

U ck.sAgricultural

Research Service

S -----------------1

FOOD ANIMAL ENVIRONMENTAL SYSTEMS

D

RESEARCH UNIT OFFICES AND LABS

WESTERN KENTUCKY UNIVERSITY

A

BOWLING GREEN, KENTUCKY

FLOOR PLAN

-:;_ •••1 f°N-uc •• 3: AGRICULTURAL RESEARCH SERVICE SHEET_;;.,!_ �., -1 l,•••••�••• ,,- CHECKED BY SAFETY & HEALTH PROJECT NO.

i 1;a .,,,< r;c H 1 , FEJ MID souTH AREA A 1 00

,,, g 11tI111 1 II '' JOB If REAL PROPERTY DATE

� 1493-A 08/01 /1

STONEVILLE, MS 5 OF 28

��L------------------------------------------------------------------------------------------------..i..------------------"'------------....i----

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Text Box Rooms marked with yellow highlight are Base Bid.

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Text Box Room marked with green highlight is Bid Option 1.

Tim.Golden

Approx. Dimensions

FAESRU LAB FLOOR

PROJECT

LAB EQUIPMENT LAYOUT AND INVENTORY

Tim.Golden

Exhibit A

LAB ITEMS NEEDING TO BE MOVED

Item# Room Item Note

1 Environmental Lab Refrigerator with only front casters and has glass

2 Environmental Lab Refrigerator/Incubator with casters

3 Environmental Lab Refrigerator/Incubator with casters

4 Soils Lab Refrigerator with only front casters and has glass

5 Emissions Lab Refrigerator/Incubator with casters

6 Emissions Lab Metal Storage Cage

7 Hydrology Lab Biosafety Cabinet no casters and has glass

8 Hydrology Lab Freezer no casters

9 Hydrology Lab Ulta Low Freezer with casters

10 Hydrology Lab 2 Stacked Incubators no casters

11 Hydrology Lab Refrigerator with casters and has glass

12 Hydrology Lab Refrigerator/Incubator with casters

13 Autoclave Autoclave no casters and has water exhaust pipe

14 Autoclave Autoclave no casters and has water exhaust pipe

15 Microbiology Lab Flammables Cabinet no casters

16 Microbiology Lab Refrigerator/Freezer with only front casters and has glass

17 Microbiology Lab Ulta Low Freezer with casters

18 Microbiology Lab Biosafety Cabinet no casters and has glass

19 Microbiology Lab Incubator no casters and has glass

20 Microbiology Lab Refrigerator/Incubator with casters and has glass

21 Microbiology Lab 2 Stacked Incubators no casters

22 Microbiology Lab Filing Cabinet no casters

ENVIRONMENTAL LAB

ENVIRONMENTAL LAB CONTINUED

ENVIRONMENTAL LAB

VIDEO

SOILS LAB

SOILS LAB

EMISSIONS LAB

EMISSIONS LAB

HYDROLOGY LAB

HYDROLOGY LAB CONTINUED

HYDROLOGY LAB

VIDEOS

AUTOCLAVE ROOM

AUTOCLAVE ROOM

MICROBIOLOGY LAB

MICROBIOLOGY LAB CONTINUED

MICROBIOLOGY LAB CONTINUED

MICROBIOLOGY LAB

STORAGE AREA (STAGING AREA)

STORAGE ITEMS NEEDING TO BE MOVED

23 Storage Area Freezer with casters 24 Storage Area Refrigerator with casters 25 Storage Area Freezer no casters 26 Storage Area Anaerobic Chamber no casters 27 Storage Area Centrifuge and Incubator no casters 28 Storage Area Refrigerator no casters 29 Storage Area Acids Cabinet no casters 30 Storage Area Flammables Cabinet no casters 31 Storage Area Refrigerator no casters

STORAGE AREA

STORAGE AREA CONTINUED

Designation: F 710 – 05

Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring1

This standard is issued under the fixed designation F 710; the number immediately following the designation indicates the year of original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A superscript epsilon (e) indicates an editorial change since the last revision or reapproval.

1. Scope

1.1 This practice covers the determination of the acceptabil-ity of a concrete floor for the installation of resilient flooring.

1.2 This practice includes suggestions for the construction

of a concrete floor to ensure its acceptability for installation of resilient flooring.

1.3 This practice does not cover the adequacy of the

concrete floor to perform its structural requirements.

1.4 This practice covers the necessary preparation of con-

crete floors prior to the installation of resilient flooring.

1.5 This practice does not supersede in any manner the

resilient flooring or adhesive manufacturer’s written instruc-tions. Consult the individual manufacturer for specific recom-mendations.

1.6 This standard does not purport to address all of the

safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. See 5.1, 7.1.1, and

7.1.2 for specific warning statements.

1.7 The values stated in inch-pound units are to be regarded

as standard. The values in parentheses are mathematical conversions to SI units and are provided for information only.

2. Referenced Documents

2.1 ASTM Standards: 2

C 109/C 109M Test Method for Compressive Strength of Hydraulic Cement Mortars

C…

This is the start of the file's text. The full file is on GovTribe.