This statement of work and related solicitation document outline requirements for an incinerator refractory demolition and reline project. The United States Department of Agriculture Agricultural Research Service is seeking a contractor to remove and replace refractory lining in the primary and secondary chambers of Incinerator 5 located at its facility in Ames, Iowa. The refractory must be able to withstand temperatures of 3000 degrees Fahrenheit and the interior chamber dimensions must match existing specifications. Interested small businesses have until May 11, 2023 to submit questions, with responses provided via amendment. Site visits are scheduled for May 3-4, 2023 with registration required by May 1. Proposals must be submitted through the System for Award Management website and the project is set aside for small businesses with a size standard of $45 million. The selected contractor must complete all work within 90 days of receiving notice to proceed and the incinerator must pass emissions testing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12505B23R0006 Amendment 2_MG.pdf | ||
| 12505B23R0006 Amendment 1.pdf | ||
| 8. Past Performance Questionnaire.pdf | ||
| 5. Material Submittal Form (002).pdf | ||
| 3. Drawings_0413-0801 Upgrade Building 5 Incinerator As-Built Drawings 3-9-2011.pdf | ||
| 6. ARS-371.pdf | ||
| 1. 12505B23R0006 - Incinerator 5.pdf | ||
| 7. ARS-372.pdf | ||
| 4. Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Project: Incinerator 5 Refractory Demolition and Reline
GENERAL INFORMATION
1.0 Scope of Work: The requirement is for incinerator 5 demolition and relining of the refractory. The new refractory must match the existing dimensions once the work has been completed. The current dimensions are shown in the attached drawings.
The dimensions must not change to remain in compliance with our air quality permit from the Iowa Department of Natural Resources.
2.0 Background: The United State Department of Agriculture, USDA, Agriculture
Research Service, ARS, located in Ames, Iowa has a requirement for removal and replacement of refractory in Incinerator 5. The USDA operates this controlled air incinerator at a rate of 500 pounds per hour. The refractory in this incinerator is exhibiting cracking and separation in several areas in the primary and secondary chambers. This incinerator was upgraded in 2010 and the refractory in the primary and secondary chambers were relined at that time. There have been several areas of refractory that has been patched sense that time. The incinerator will now require the demolition and replacement of all refractories below the charge door and below the stack.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks: All new construction shall conform to standards as called out in the drawings attached. Contractor shall prepare the primary and secondary chambers for refractory removal and installation. This will include the removal and reinstall blowers, burners, and thermocouples as needed. Once the preparation is completed the contractor shall remove existing refractory, insulating brick and temperature resistant insulation and dispose of it properly. After the refractory, insulating brick and insulation has been removed the contractor shall check walls for any heat damage and notify COR of any damage. Any damage found shall be repair as needed by the contractor. The contractor shall check interior of the incinerator for broken anchors and prepare primary and secondary chambers for new anchors and install anchors. Contractor shall then install temperature resistant ceramic fiber insulation and the 2600 IFB insulating brick to the walls.
Contractor shall then apply new refractory rated for 3000F to the interior of Incinerator 5 primary and secondary chambers. Contractor shall complete the installation of the refractory so that it conforms to standards as called out in the drawings attached. The contractor will be on site for required cure process.
The contractor shall then restore work area to pre-work conditions.
4.0 Government Furnished: The Government shall Lock Out Tag Out incinerator 5 isolating all power supplies to incinerator 5 including electric, gas, air and hydraulic. Contractor shall Lock Out Tag Out all sources of energy to the incinerator in addition to the USDA. The Government shall furnish water for cleaning and preparation work, electrical power, and compressed air at 95-100psi.
The Government will operate the incinerator to assist the contractor in the contractor’s task n curing the new refractory to the temperature as recommended by the manufacturer.
5.0 Deliverables / Schedule:
Performance Requirements
Required Services Performance Objective Performance Requirement
Removal of existing refractory
Contractor will remove existing refractory, insulating brick, and temperature resistant insulation from primary and secondary chambers
All material will be removed below charge door and below the stack. Old refractory will be removed from the building and disposed of properly.
Damage to exterior shell
Contractor will check exterior shell of Primary and secondary chambers for heat damage.
Any damage to the exterior shell of the primary and secondary chambers will be reported to the COR.
Install anchors
Contractor will install support anchors to the walls to hold refractory in place.
All damaged anchors will be replaced with new.
Enough anchors will be installed to support the new refractory being installed.
Refractory material
Contractor will supply material capable of withstanding 3000F
All material specifications will be checked to ensure that all temperature requirements are met.
Primary and Secondary Chamber Dimensions
Contractor will reline the primary and secondary chambers of incinerator 5 so that it conforms to standards as called out in the drawings attached.
The primary and secondary chambers of incinerator 5 dimensions will conform to the dimensions provided on the attached drawings so that incinerator 5 still meets the standards outlined in our Air Quality Permit from the Iowa Department of Natural Resources.
Safety Contractor is responsible for contractor personnel safety and is required to abide by all applicable OSHA, Local State and Federal Safety Laws and regulations.
All required safety equipment, safety glasses and steel toed boots will be donned while on USDA property. Hard Hat, face shield and dust masks must be added during demolition of existing refractory.
Security Contractor shall provide names of contractor employees to the guards to verify employee requesting access to site.
Contractor personnel shall sign in and sign out every time they enter and exit the facility.
Contractor personnel shall present a valid photo government issued ID every time they enter the site.
Contractor personnel shall be supplied a NCAH badge that must be displayed at all times while on site. Contractor personnel shall return the NCAH badge every time they leave the secure facility
Testing requirements Follow all DNR testing requirements These relined chambers shall match the original dimensions shown on the attached drawings as required by the IDNR air quality permit. The completed incinerator must pass an emissions test per 567 Iowa Administrative Code (IAC)
Chapter 25. The following must be tested:
Particulate Emissions test for PM
Nitrogen Oxides (NOx) Visible Emissions (opacity)
6.0 Safety: The contractor is responsible for contractor personnel safety and is required to abide by all applicable OSHA, Local State and Federal safety laws and regulations.
7.0 Travel: The contractor is responsible for all mobilization/demobilization to and from the site.
8.0 Security Requirements: The names of contractor employees will be given to the guard desk to verify employee requesting access to site. Contractor personnel shall sign in and sign out every time they enter or exit the facility. Contractor personnel shall sign in and sign out every time they enter or exit the facility. Contractor personnel shall present a valid photo government issued ID every time they enter the site. Contractor personnel shall be supplied a NCAH badge that must be always displayed while on site. Contractor personnel shall return the NCAH badge every time they leave the secure facility. Contractor personnel shall be always escorted while within the secure areas of the NCAH facility.
9.0 Place of Performance: The Work is located at the National Center for Animal
Health in Ames Iowa. The incinerator is located in the lower level of Building 5. There is a metal stairway leading to the lower level of Building 5.
There is a catwalk over the open area of Building 5 incinerator room which Will allow access to lowering longer sections of material. The distance from Ground level to the lower level is 22’.
10.0 Period of Performance: The work shall be completed 90 days from contract Award.
11.0 Evaluation Factors: The contractor shall deliver fully relined primary and secondary combustion chambers. These relined chambers shall match the original dimensions shown on the attached drawing as required by the IDNR air quality permit. The completed incinerator must pass an emissions test per 567 Iowa
Administrative Code (IAC) Chapter 25. The following must be tested: Particulate Emissions test for PM and PM, Nitrogen Oxides (NOx), Visible Emissions (opacity). The end product shall be a completely restored primary and secondary refractory relining. The new refractory lining shall withstand 3000 F and the internal dimensions of the chambers shall be the same dimensions as the original refractory.
12.0 Technical Point of Contact: Don Brown 515-357-8718
13.0 Data Rights: Not Applicable
14.0 Section 508-Electronic and Information Technology Standards:
Not Applicable
Attachment: Drawings from 2010 Incinerator Upgrade Project.
File details come from the government source that posted it. Updated .