2.2.11._Design_Professional.pdf

PDF 92 KB Posted

Attached to
On Call Architect Review Services State and local contract opportunity
Solicitation number
260117
Issued by
Pima County, Tucson City, Arizona

About this file

This document is a regulatory specification from the City of Tucson, Arizona, defining the position and responsibilities of a Design Professional (DP) within the city's planning and development framework. The Design Professional position serves two primary functions: reviewing building permits for projects within Neighborhood Preservation Zone (NPZ) overlays for compliance with applicable design manuals, and reviewing proposed buildings, structures, landscaping, architectural features, subdivisions, development plans, and site plans in accordance with the Unified Development Code (UDC). The DP is appointed by the Mayor and Council upon recommendation from the Planning and Development Services Director and must be a registered architect, preferably with historic preservation experience, for NPZ reviews, or a registered architect or landscape architect for subdivision reviews. The position involves conducting design reviews, providing written reports with findings and recommendations to the PDSD Director, and reviewing Flexible Lot Development (FLD) projects for compliance with specific architectural, functional, and mitigation standards.

The Design Professional may recommend conditions on project approvals to mitigate design impacts on development zones and surrounding residential areas and may recommend projects that meet specific findings related to public health, safety, light and air provisions, and nuisance prevention. The DP must comply with the City of Tucson's ethics and conflict of interest policies and administrative directives, avoiding professional services on projects where judgment could be compromised by competing interests or responsibilities. Additional responsibilities may be assigned by the PDSD Director as needed for UDC implementation. This specification aligns with the City of Tucson's On Call Architect Review Services procurement, which seeks multiple qualified consultants to provide miscellaneous architect review services as detailed in the corresponding Scope of Work.

View the file

Other files for this state and local contract opportunity

Other files attached to On Call Architect Review Services, newest first.
File Type Posted
On_Call_Architect_Review_Services.pdf PDF
260117_SBE_Program_Provisions.pdf PDF
OFFER_AND_ACCEPTANCE_RFQ.pdf PDF
DBE_Program_Provisions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2.2.11. DESIGN PROFESSIONAL

The position of Design Professional (DP) is established: 1) to review building permits for projects located in the Neighborhood Preservation Zone (NPZ) overlays for compliance with applicable design manuals, and 2) to review proposed buildings , structures , landscaping , architectural features, of proposed subdivisions , development plans, and site plans , as set forth in the UDC .

A. Appointment and Qualifications

1. Appointment

The PDSD Director shall recommend a candidate(s) for the position of DP. The Mayor and Council shall appoint one or more DPs.

2. Qualifications

a. NPZ Review

The DP shall be a registered architect, preferably with historic preservation experience.

b. Subdivision Review

The DP shall be a registered architect or landscape architect.

B. Powers and Duties

1. Neighborhood Preservation Zone (NPZ) Design Review

The DP shall review applications for building permits for projects located within adopted NPZs for compliance with the applicable Design Manual and Section 5.10.3, Neighborhood Preservation Zone Design Review Procedure.

The DP will forward a written report with findings and recommendation to the PDSD Director . The Director shall take into account the recommendations of the DP when considering approval of the application.

2. Flexible Lot Development (FLD) Project Review

The DP shall review FLD projects for compliance with, but not limited to:

a. Architectural variation, Section 8.7.3.M.1;

b. Functional open space , Section 8.7.3.F.1 & .2;

c. Modifications to street perimeter yard setbacks , Section 8.7.3.L.2;

d. Privacy mitigation , Section 8.7.3.M.2.b;

e. Transition edge treatment, Section 8.7.3.M.2.a;

f. Recommendation on FLD Review

The DP shall forward a written recommendation with findings to the PDSD Director. The Director shall consider the DP’s recommendation and render a decision on the FLD.

g. Findings for FLD Privacy Mitigation Plan

The DP may recommend a project if it meets the following findings:

(1) Will not be detrimental to public health and safety;

(2) Will not impair an adequate supply of light and air to adjoining properties; and,

(3) Will not create a nuisance to surrounding properties.

3. Conditions

12/18/24, 9:29 AM export.amlegal.com/api/export-requests/4716afef-49fd-4c2d-b180-33c260816b16/download/ https://export.amlegal.com/api/export-requests/4716afef-49fd-4c2d-b180-33c260816b16/download/ 1/2

a. NPZ Review

The DP may recommend conditions on the approval of a building permit to ensure that the design of the project mitigates the impact of the project on the subject development zone .

b. FLD Review

The DP may recommend conditions on the approval of an FLD to ensure that the design of the FLD mitigates the impact of the FLD and provides suitable transitions to the adjoining existing residential developments .

4. Conflict of Interest

The DP shall not render professional services under this section on any project if the DP’s judgment could be affected by responsibilities to, or interest in another project or person or by the DP’s own interests. The DP shall comply with City of Tucson Administrative Directive 2.02-14 and Policy 282, Ethics and Conflict of Interest for City Officers and Employees.

5. Other Responsibilities

The DP shall perform such other functions as may be required by the UDC . Additionally, the PDSD Director may request other design assistance and recommendations as needed in implementing the UDC .

12/18/24, 9:29 AM export.amlegal.com/api/export-requests/4716afef-49fd-4c2d-b180-33c260816b16/download/ https://export.amlegal.com/api/export-requests/4716afef-49fd-4c2d-b180-33c260816b16/download/ 2/2

File details come from the government source that posted it. Updated .