2-564-19 RFB 8-2026 Dwg Set.pdf
PDF 6 MB Posted
- Solicitation number
- Not on record
- Issued by
- Pennsylvania
About this file
Summary
This is a drawing set and erosion and sediment pollution control plan prepared by KLH Engineers, Inc., for the Pleasant Hills Authority in Allegheny County, Pennsylvania, detailing the Lick Run Streambank Stabilization project (Contract No. 2026-01). The project involves the installation of R-6 riprap armor along approximately 106 linear feet of streambank to stabilize and protect two separate outfalls near the Pleasant Hills Sewage Treatment Plant located at the intersection of Cochran Mill Road and Wallace Road. The work includes streambank rehabilitation, installation of riprap aprons around existing outfall structures, and restoration of disturbed areas through seeding and erosion control measures. Sealed bids are due electronically via the PennBid Program by Tuesday, September 8, 2026, at 10:00 A.M. local time, with an expected project duration of one hundred fifty (150) days. The project is located in the Lick Run Watershed (Chapter 93 - Trout Stocking Fishery) and requires compliance with Pennsylvania's underground utility line protection law, with specific notification of Peoples Natural Gas Company LLC, Columbia Gas of PA Inc., Pennsylvania Electric Co., Pennsylvania American Water, Allegheny County Department of Public Works, and local municipal authorities prior to excavation.
The plan establishes comprehensive erosion and sediment control requirements, including installation of compost filter socks, erosion control blankets on slopes greater than 3:1, rock construction entrances, and temporary native streambed and soil stockpiles with protective measures. All contractors must comply with Pennsylvania Department of Environmental Protection regulations, conduct a preconstruction meeting at least seven days prior to earth disturbance, and obtain approval from the Local Conservation District before commencing work. Construction sequencing includes three stages: initial site preparation with BMP installation, streambank rehabilitation using in-stream cofferdam diversion and riprap installation, and final restoration with permanent seeding using Formula B seed mixture and erosion control blankets. Prevailing wage rates apply, and all steel products must be domestically produced. The contractor must maintain weekly inspection logs of erosion and sediment control measures and achieve a minimum uniform 70 percent vegetative cover before removal of temporary BMPs. Awarded bidders are assessed a fee to be confirmed with PennBid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-564-19 2026-01 Bid Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing No.
Sheet No.
NOTE: IN ACCORDANCE WITH THE PENNSYLVANIA UNDERGROUND UTILITY LINE PROTECTION LAW, ACT 287 OF 1974 AS AMENDED BY ACT 50 OF 2017, THE CONTRACTOR MUST NOTIFY ALL UTILITY COMPANIES PRIOR TO EXCAVATION FOR FIELD LOCATION AND SIZE CONFORMATION. AT LEAST THREE (3) DAYS NOTIFICATION PRIOR TO THE ACTUAL START OF EXCAVATION IS REQUIRED. UTILITIES CAN BE NOTIFIED THROUGH THE PENNSYLVANIA ONE CALL SYSTEM, INC. BY CALLING 1-800-242-1776. THE PENNSYLVANIA ONE CALL DESIGN
SERIAL NUMBER FOR THIS PROJECT IS 20262103022 & 20262103023
ALLEGHENY COUNTY, PENNSYLVANIA
SCALE: 1" = 2000'
COMPANY: PEOPLES NATURAL GAS COMPANY LLC
ADDRESS: 375 N SHORE DR
PITTSBURGH, PA. 15212
CONTACT: TODD COEN
EMAIL: todd.coen@peoples-gas.com
PHONE: 412-258-4415
COMPANY: COLUMBIA GAS OF PA INC
ADDRESS: 1600 DUBLIN RD
COLUMBUS, OH. 43215
CONTACT: LISA COLLINS
EMAIL: ldugan@nisource.com
PHONE: 614-325-5961
COMPANY: SOUTH PARK TOWNSHIP
ADDRESS: 2675 BROWNSVILLE ROAD
SOUTH PARK, PA. 15129
CONTACT: AARON LAUGHLIN
EMAIL: publicworks@southparktwp.com
PHONE: 412-831-7000 EXT. 164
COMPANY: PENNSYLVANIA ELECTRIC CO
ADDRESS: 341 WHITE POND DRIVE
AKRON, OH. 44320
CONTACT: MELLYSSA ADAMS
EMAIL: madams@firstenergycorp.com
PHONE: 330-252-4013
COMPANY: PENNSYLVANIA AMERICAN WATER
ADDRESS: 500 NOBLESTOWN RD
CARNEGIE, PA. 15106
CONTACT: LUCIAN CAPPETTA
EMAIL: lucian.cappetta@amwater.com
PHONE: 412-401-1871
PROJECT LOCATION
G1 Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide.
No part of this document may be reproduced or transmitted in any form, by any means without written permission, except for brief excerpts in reviews or analysis.
TITLE SHEET
SITE PLAN
G1 C1
ESDT1
of 5
Order No.
PLEASANT HILLS AUTHORITY
DESCRIPTIONDWG. NO.SHEET NO.
UTILITIES LIST DRAWING LIST
LOCATION MAP
CONTRACT NO. 2026-01
LICK RUN STREAMBANK STABILIZATION
564-19
N
CALL BEFORE YOU DIG!
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR
CONSTRUCTION PHASE
AND 10 WORKING DAYS
IN DESIGN STAGE-STOP CALL
1-800-242-1776
PE
NN
SY
LV
ANIA ONE CALL SYSTEM
, INC
STOP -CALL BEFORE YOU D
IG
SERIAL NUMBER
20262103022 20262103023
RELEASED FOR BID
AUGUST 2026
COMPANY: ALLEGHENY COUNTY DEPT OF PUBLIC WORKS
ADDRESS: 542 FORBES AVENUE
PITTSBURGH, PA. 15219
CONTACT: JENNIFER MANCE
EMAIL: jennifer.mance@alleghenycounty.us
PHONE: 412-715-4951
COMPANY: PEOPLES NATURAL GAS COMPANY LLC
ADDRESS: 375 N SHORE DR
PITTSBURGH, PA. 15212
CONTACT: TODD COEN
EMAIL: todd.coen@peoples-gas.com
PHONE: 412-258-4415
COMPANY: JEFFERSON HILLS BOROUGH OF
ADDRESS: 925 OLD CLAIRTON RD
JEFFERSON HILLS, PA. 15025
CONTACT: SHERRY TRBOVICH
EMAIL: strbovich@jeffersonhills.net
PHONE: 412-655-7760
ESDT2
ESDT3
EROSION & SEDIMENT POLLUTION CONTROL PLAN NOTES & DETAILS
EROSION & SEDIMENT POLLUTION CONTROL PLAN NOTES & DETAILS
EROSION & SEDIMENT POLLUTION CONTROL PLAN NOTES & DETAILS
5313 Campbells Run Road, Suite 100 Pittsburgh, PA 15205
Phone: 412.494.0510 Fax: 412.494.0426 info@klhengineers.com
KLH
ENGINEERS, INC
AutoCAD SHX Text S:\Active Clients\564 Pleasant Hills Authority\564-19 Lick Run Streambank Stabilization\Dwg\G564-19-001.dwg 7/31/2026 11:16 AM Plotted By: Jason Antitomas 7/31/2026 11:16 AM Plotted By: Jason Antitomas7/31/2026 11:16 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas
Lick Run
(Ch. 93 - T
SF)
Lic k R un
(C h.
- T
SF
OPEN W
ATER
CONTRACTOR TO TIE
PROPOSED RIP-RAP ARMOR
INTO EXISTING RIP-RAP
ARMORED STREAMBANK
CS
CS
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
RCE
CS
CS
CS
CONTRACTOR
STAGING
AREA
CS
CS
TEMPORARY
NATIVE
STREAMBED
STOCKPILE
TEMPORARY
SOIL
STOCKPILE
CS
CS
CFS #1
CFS #2
CFS #3
CFS #4
CFS #5
GP 11-1 MAINTENANCE OF
WATER OBSTRUCTIONS AND
ENCROACHMENTS (OUTFALL)
GP 11 - 2 MAINTENANCE OF
WATER OBSTRUCTIONS AND
ENCROACHMENTS
(OUTFALL)
GP 3-1 STREAMBANK
PROTECTION (SEE STREAM
BANK STABILIZATION DETAIL
DRWG NO ESDT2)
GP 3-1 BANK PROTECTION
CONTRACTOR SHALL
INSTALL STREAMBANK
STABILIZATION R-6 RIPRAP
INSIDE BOLDED PERIMETER
CFS #6
CFS #7
CONTRACTOR SHALL INSTALL
STREAMBANK RESTORATION R-6
RIPRAP INSIDE BOLDED PERIMETER
PUMPED WATER FILTER BAG
CFS #8
CFS #9
R-6
ROCK
APRON
TEMPORARY COFFERDAM
DISCHARGE HOSE
DISCHARGE HOSE
PUMP INTAKE
Legend
PA DOT INFORMATION
EXISTING 10' CONTOUR
EXISTING 2' CONTOUR
EXISTING PROPERTY LINE
EXISTING GRAVEL PAVING
EXISTING ASPHALT PAVING
EXISTING BUILDING
EXISTING STORM MANHOLE
EXISTING SANITARY MANHOLE
EXISTING EVERGREEN TREE
EXISTING DECIDUOUS TREE
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING HEDGE ROW
EXISTING FENCE LINE
STREET NAMES
EXISTING WATERCOURSE
PROPOSED 10' CONTOUR
PROPOSED 2' CONTOUR
SOIL IDENTIFICATION SYMBOL
LIMIT OF DISTURBANCE
PROPERTY OWNER INDEX (ALT)
EXISTING SANITARY CO
EXISTING STORM INLETS
COMPOST SOCK
Street Name
ROCK CONSTRUCTION ENTRANCE
Stream
CS
Vb
AN
RCE
LOD
C1
S
IT
E P
LA
N
N
JM
G
ED
G
N
LR
N
LR
SITE PLAN
SCALE: 1"=10'
Order No.
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
Drawing No.
Sheet No.
of 5Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
NOTE:
564-19
A ug us t 2
LI
C
K R
U N
S T
R E
A M
B A
N K
S T
A B
IL
IZ
A T
IO
N
C O
N T
R A
C T
N O
. 2
6-
A
LL
E G
H E
N Y
C O
U N
T Y
, P E
N N
S Y
LV
A
N
IA
P
LE
A S
A N
T H
IL
LS
A U
T H
O R
IT
Y
D ra w n
B y:
D at e Is su ed
F or
D at e R ev is io ns
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C
8/
R el ea se d
Fo r B id
SCALE: 1"=10'
10' 20'010'
EROSION AND SEDIMENTATION CONTROL PLAN NOTES
1. ALL COMPOST FILTER SOCKS SHALL BE 12” MINIMUM DIAMETER AND INSTALLED AT LEVEL
GRADE IN ACCORDANCE WITH THE DETAILS AT THE GENERAL LOCATIONS AS DEPICTED ON
THE EROSION AND SEDIMENT CONTROL PLANS. SOME FIELD VARIATION FROM THE PLAN
DRAWINGS MAY BE REQUIRED TO FACILITATE PROPER COMPOST FILTER SOCK PLACEMENT.
2. PROVIDE EROSION CONTROL BLANKETS FOR ALL SLOPES 3:1 OR GREATER AND WITHIN 50'
OF ALL WATERWAYS AND WETLANDS. EROSION CONTROL BLANKETS SHALL BE S150 BY
NORTH AMERICAN GREEN OR EQUAL. SEE ATTACHED DATA SHEET.
3. ALL PERVIOUS AREAS SHALL BE RE-VEGETATED IN ACCORDANCE WITH THE SEEDING
SPECIFICATIONS.
4. CONTRACTOR SHALL NOT STORE HAZARDOUS MATERIAL OR REFUEL EQUIPMENT WITHIN
THE FLOODWAY.
5. PROVIDE COMPOST FILTER SOCKS BELOW SOIL STOCKPILES, WORK AREAS, AND WHERE
DEPICTED ON PLAN DRAWINGS IN ACCORDANCE WITH THE DETAILS.
6. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO
THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER
DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR
SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
7. PROVIDE COMPOST FILTER SOCK (12 INCH MINIMUM) BACKED BY CONCRETE BLOCKS
DOWNSLOPE OF ALL EXCAVATED MATERIAL STOCKPILES LOCATED ON PAVED SURFACES.
8. ALL SOILS WITHIN LOD ARE NE. NE--NEWARK SILT LOAM, 0 TO 3 PERCENT SLOPES,
FREQUENTLY FLOODED.
9. ALL EXCESS EXCAVATED MATERIALS SHALL REMAIN ON SITE AND SHALL BE PLACED AT A
LOCATION OUTSIDE OF FEMA DELINEATED FLOODPLAIN.
10. WILD AND STOCKED TROUT WATERS - ACTIVITIES AUTHORIZED BY THIS GENERAL PERMIT IN
REGULATED WATERS OF THIS COMMONWEALTH ARE PROHIBITED IN THE FOLLOWING
STREAMS FOR THE SPECIFIED TIME PERIOD UNLESS WRITTEN APPROVAL IS OBTAINED
FROM THE PA FISH AND BOAT COMMISSION'S DIVISION OF ENVIRONMENTAL SERVICES AT
459 ROBINSON LANE, BELLEFONTE, PA 16823-9616 OR THE LOCAL DEP REGIONAL OFFICE.
STOCKED AND WILD TROUT STREAM LOCATIONS ARE COMPILED AND AVAILABLE THROUGH
THE COMMISSION'S DIVISION OF FISHERY MANAGEMENT. STOCKED TROUT STREAMS MARCH
1 THROUGH JUNE 15 WILD TROUT STREAMS OCTOBER 1 THROUGH DECEMBER 31 LAKE
ERIE TRIBUTARIES SEPTEMBER 1 THROUGH APRIL 30.
11. CONTRACTOR SHALL CONDUCT ALL BANK REHABILITATION AND BANK PROTECTION DURING
PERIODS WHEN THE STREAM IS AT LOW FLOW.
AutoCAD SHX Text Asphalt Driveway
AutoCAD SHX Text Concrete Pad
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Concrete Pad
AutoCAD SHX Text San Mh Top=899.97 Inv.El.=893.27(In) Inv.El.=893.27(In) 36" Inv.El.=893.27(Out)
AutoCAD SHX Text Concrete Pad
AutoCAD SHX Text Aluminum Handrail
AutoCAD SHX Text Effluent Sampler
AutoCAD SHX Text Gate
AutoCAD SHX Text Strm Pipe Outlet 12" Inv.El.=893.92(Out)
AutoCAD SHX Text
12" HDPE
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text Strm Pipe Outlet 8" Inv.El.=893.37(Out)
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Rip Rap
AutoCAD SHX Text Gabion Baskets
AutoCAD SHX Text FEMA Floodway
AutoCAD SHX Text FEMA Floodway
AutoCAD SHX Text FEMA 100 YR Floodplain
AutoCAD SHX Text FEMA 500 YR Floodplain
AutoCAD SHX Text N/F PLEASANT HILLS AUTH Tax Parcel 0769-G-00030-0000-01
AutoCAD SHX Text N/F PLEASANT HILLS AUTH Tax Parcel 0769-G-00030-0000-01
AutoCAD SHX Text FEMA Floodway
AutoCAD SHX Text FEMA Floodway
AutoCAD SHX Text FEMA 100 YR Floodplain
AutoCAD SHX Text FEMA 100 YR Floodplain
AutoCAD SHX Text FEMA 500 YR Floodplain
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Asphalt Driveway
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Lawn
AutoCAD SHX Text Existing Walkway
AutoCAD SHX Text
BM#1 EL. 907.91' N360657.9710 E1348072.6810
AutoCAD SHX Text 2 Sty Brick Waste Water Treatment Plant Facility
AutoCAD SHX Text
2 Sty Brick Hse #555
AutoCAD SHX Text (Type Surface)
AutoCAD SHX Text S.R XXXX Segment XXXX Offset XXXX
AutoCAD SHX Text Items Identified with Mixed Case Text are Existing.
S:\Active Clients\564 Pleasant Hills Authority\564-19 Lick Run Streambank Stabilization\Dwg\C564-19-001.dwg 7/31/2026 11:16 AM Plotted By: Jason Antitomas 7/31/2026 11:16 AM Plotted By: Jason Antitomas7/31/2026 11:16 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas
IMPLEMENTATION OF THE EROSION SEDIMENT POLLUTION CONTROL PLAN
The foregoing procedures and all requirements of the specifications are contractual obligations of the CONTRACTOR performing the actual construction work. Said requirements also apply to any and all subcontractors working on the project. This plan will be implemented throughout the course of construction. The requirements relative to temporary control measures, early permanent restoration and minimizing work areas, are the most important factors affecting construction performance. In view of those circumstances, it is believed that this particular plan, on this particular project, will be implemented throughout the course of work.
USE OF THE EROSION SEDIMENT POLLUTION CONTROL PLAN
As previously stated herein, the "Erosion and Sediment Pollution Control Plan" has been prepared in response to and in accordance with certain rules and regulations promulgated by the Pennsylvania Department of Environmental Protection. The handling of stormwater, the topographic and geological features described, the types and classifications of soils, the staging of earthwork, the temporary and permanent control measures, and the requirements are to be used for the purpose of eliminating, minimizing, and/or controlling pollution of the streams and waterways from materials anticipated to be eroded from the earthwork to be disturbed as a result of construction of the work.
PROJECT DESCRIPTION:
The Pleasant Hills Authority owns and operates the Pleasant Hills Sewage Treatment plant located at the intersection of Cochran Mill Road and Wallace Road. The project is located in the Lick Run Watershed (Ch. 93 - TSF). The purpose of the project is to stabilize the streambank, using R-6 riprap, closest to the effluent discharge and armor the streambank to the point of meeting the existing riprap location just upstream of the project. The riprap will be installed from the toe of the slope to the top of the streambank and will be approximately 106 LF. The project will use GP-11 to maintain the land around the outfall and a GP-3 will be used to armor the streambank. GP-11-1 is for maintenance of existing outfall, we will not make changes to the existing conditions . GP-11-2 in an existing outfall and will be installing a riprap apron around the existing outfall structure as stabilization as happening.
GENERAL NOTES:
1. All earth disturbances, including clearing and grubbing as well as cuts and fills shall be done in accordance with the approved E&S plan. A copy of the approved drawings (stamped, signed and dated by the reviewing agency) must be available at the project site at all times. The reviewing agency shall be notified of any changes to the approved plan prior to implementation of those changes. The reviewing agency may require a written submittal of those changes for review and approval at its direction.
2. At least 7 days prior to starting any earth disturbance activities, including clearing and grubbing, the owner and/or operator shall invite all contractors, the landowner, appropriate municipal officials, the E&S Plan preparer, and a representative from the Local Conservation District to an on-site preconstruction meeting.
3. At least 3 days prior to starting any earth disturbance activities, or expanding into an area previously unmarked, the Pennsylvania One Call System Inc. shall be notified at 1-800-242-1776 for the location of existing underground utilities.
4. Upon installation or stabilization of all perimeter sediment control BMPs and at least 3 days prior to proceeding with bulk earth disturbance activities, the permittee or co-permittee shall provide notification to the Department or authorized conservation district.
5. All earth disturbance activities shall proceed in accordance with the sequence provided on the plan drawings.
Deviation from that sequence must be approved in writing from the Local Conservation District or by DEP prior to implementation.
6. Areas to be filled are to be cleared, grubbed, and stripped of topsoil to remove trees, vegetation, roots and other objectable material.
7. Clearing, grubbing, and topsoil stripping shall be limited to those areas described in each stage of the construction sequence. General site clearing, grubbing and topsoil stripping may not commence in any stage or phase of the project until the E&S BMPs specified by the BMP sequence for that stage or phase have been installed and are functioning as described in this E&S plan.
8. At no time shall construction vehicles be allowed to enter areas outside the limit of disturbance boundaries shown on the plan maps. These areas must be clearly marked and fenced off before clearing and grubbing operations begin.
9. Topsoil required for the establishment of vegetation shall be stockpiled at the location(s) shown on the plan map(s) in the amount necessary to complete the finish grading of all exposed areas that are to be stabilized by vegetation. Each stockpile shall be protected in the manner shown on the plan drawings. Stockpile heights shall not exceed 35 feet. Stockpile slopes shall be 2H:1V or flatter.
10. Immediately upon discovering unforeseen circumstances posing the potential for accelerated erosion and/or sediment pollution, the operator shall implement appropriate BMPs to minimize the potential for erosion and sediment pollution and notify the Local Conservation District and/or the regional office of DEP.
11. All building materials and wastes shall be removed from the site and recycled or disposed of in accordance with the Department's Solid Waste Management Regulations at 25 Pa. Code 260.1 et seq., 271.1, and 287.1 et. seq.
No building materials or wastes or unused building materials shall be burned, buried, dumped, or discharged at the site.
12. All off-site waste and borrow areas must have an E&S Plan approved by the Local Conservation District or DEP fully implemented prior to being activated.
13. The contractor is responsible for ensuring that any material brought on site is Clean Fill. Form FP-001 must be retained by the property owner for any fill material affected by a spill or release of a regulated substance but qualifying as Clean Fill due to analytical testing.
14. All pumping of water from any work area shall be done according to the procedures described in this plan, over undisturbed vegetated areas.
15. Until the site is stabilized, all erosion and sediment BMPs shall be maintained properly. Maintenance shall include inspections of all erosion and sediment BMPs after each runoff event and on a weekly basis. All preventative and remedial maintenance work, including clean out, repair, replacement, regrading, reseeding, remulching and renetting must be performed.
16. A log showing dates that E&S BMPs were inspected as well as any deficiencies found and the date they were corrected shall be maintained on the site and be made available to regulatory agency officials at the time of inspection.
17. Sediment tracked onto any public roadway or sidewalk shall be returned to the construction site by the end of each work day and disposed in the manner described in this plan. In no case shall the sediment be washed, shoveled, or swept into any roadside ditch, storm sewer, or surface water.
18. All sediment removed from BMPs shall be disposed of in the manner described on the plan drawings.
19. Areas which are to be topsoiled shall be scarified to a minimum depth of 3 to 5 inches - 6 to 12 inches on compacted soils - prior to placement of topsoil. Areas to be vegetated shall have a minimum 4 inches of topsoil in place prior to seeding and mulching. Fill outslopes shall have a minimum of 2 inches of topsoil.
20. All fills shall be compacted as required to reduce erosion, slippage, settlement, subsidence or other related problems. Fill intended to support buildings, structures and conduits, etc. shall be compacted in accordance with local requirements or codes.
21. Earthen fills shall be placed in compacted layers not to exceed 9 inches in thickness.
22. Fill materials shall be free of frozen particles, brush, roots, sod, or other foreign or objectionable materials that would interfere with or prevent construction of satisfactory fills.
23. Frozen materials or soft, mucky, or highly compressible materials shall not be incorporated into fills.
24. Fill shall not be placed on saturated or frozen surfaces.
25. Seeps or springs encountered during construction shall be handled in accordance with the standard and specification for subsurface drain or other approved method.
26. All graded areas shall be permanently stabilized immediately upon reaching finished grade. Cut slopes in competent bedrock and rock fills need not be vegetated. Seeded areas within 50 feet of a surface water, or as otherwise shown on the plan drawings, shall be blanketed according to the standards of this plan.
27. Immediately after earth disturbance activities cease in any area or subarea of the project the operator shall stabilize all disturbed areas. During non-germinating months, mulch or protective blanketing shall be applied as described in the plan. Areas not at finished grade, which will be reactivated within 1 year, may be stabilized in accordance with the temporary stabilization specifications. Those areas which will not be reactivated within 1 year shall be stabilized in accordance with the permanent stabilization specifications.
28. Permanent stabilization is defined as a minimum uniform, perennial 70 percent vegetative cover or other permanent non-vegetative cover with a density sufficient to resist accelerated erosion. Cut and fill slopes shall be capable of resisting failure due to slumping, sliding, or other movements.
29. E&S BMPs must remain functional as such until all areas tributary to them are permanently stabilized or until they are replaced by another BMP approved by the Local Conservation District or DEP.
30. Upon completion of all Earth disturbance activates and permanent stabilization of all disturbed areas, the owner and/or operator shall contact the Local Conservation District for an inspection prior to removal/conversion of the E&S BMPs.
31. After final site stabilization has been achieved, temporary E&S BMPs must be removed or converted to permanent post construction stormwater management BMPs. Areas disturbed during removal or conversion of the BMPs shall be stabilized immediately. In order to ensure rapid revegetation of disturbed areas, such removal/conversions should be done only during the germinating season.
32. Upon completion of all Earth disturbance activities and permanent stabilization of all disturbed areas, the owner and/or operator shall contact the Local Conservation District to schedule a final inspection.
33. Failure to correctly install E&S BMPs, failure to prevent sediment-laden runoff from leaving the construction site, or failure to take immediate corrective action to resolve failure of E&S BMPs may result in administrative, civil, and/or criminal penalties being instituted by the Pennsylvania Department of Environmental Protection as defined in Section 602 of the Pennsylvania Clean Streams Law. The Clean Streams Law provides for up to $10,000 per day in civil penalties, up to $10,000 in summary criminal penalties, and up to $25,000 in misdemeanor criminal penalties for each violation.
34. Concrete wash water shall be handled in the manner described on the plan drawings. In no case shall it be allowed to enter any surface waters or groundwater system.
35. All channels shall be kept free of obstructions including but not limited to fill, rocks, leaves, woody debris, accumulated sediment, excess vegetation, and construction material/wastes.
36. Underground utilities cutting through any active channel shall be immediately backfilled and the channel restored to its original cross-section and protective lining. Any base flow within the channel shall be conveyed past the work area in the manner described in this plan until such restoration is complete.
37. Erosion control blanketing shall be installed on all slopes 3H:1V or steeper within 50 feet of a surface water and on all other disturbed areas specified on the plan maps and/or detail sheets.
Species
Kentucky Bluegrass Mixture
Perennial Ryegrass Mixture (Lolium perenne) Creeping Red Fescue or Chewings Fescue
Annual Ryegrass (Lolium multiflorum) Annual Ryegrass (Lolium multiflorum)
C
E
Formula
B
98100
5.00.15 10.0
9.0 TOTAL
0.15
21.0 TOTAL
10.0 TOTAL
Germin.
Minimum %
Purity
6.0 11.0
0.15 0.20
4.00.15
WASTE MANAGEMENT
Building Materials and other construction site wastes must be properly managed and disposed of to reduce potential for pollution to surface and ground waters. Proper trash disposal, recycling of materials, proper materials handling, and spill prevention and clean up reduce the potential for construction site wastes to be mobilized by stormwater runoff and conveyed to surface waters.
Under no circumstances should erosion control BMPs be used for temporary storage of demolition materials or construction wastes.
Wherever heavy equipment will be used during construction of the cuts and fills or proposed buildings, a Pollution Prevention Contingency (PPC) Plan shall be available on site.
All applicable federal, state, and local laws and regulations should be followed in the use, handling, and disposal of potentially hazardous materials.
SITE HOUSEKEEPING AND MATERIALS MANAGEMENT
CONCRETE WASHOUT
For any project on which concrete will be poured or otherwise formed on site, a washout facility must be provided for the cleaning of chutes, mixers, and hoppers of the delivery vehicles. Under no circumstances should was water from these vehicles be allowed to enter any surface waters.
Make sure that proper signage is provided to drivers so that they are aware of the presence of washout facilities.
Washout facilities should not be placed within 50 feet of storm drains, open ditches, or surface waters. They should be in a convenient location for the trucks, preferably near the place where concrete is being poured, but far enough from other vehicular traffic to minimize the potential for accidental damage or spills. Wherever possible, they should be located on slopes not exceeding a 2% grade. Additional information on washouts may be obtained from:
http://cfpub.epa.gov/npdes/stormwater/menuofbmps/index.cfm?action=browse&Rbutton=detail&bmp=117 .
COMPOST SOCK WASHOUT
A suitable impervious geomembrane should be placed at the location of the washout. Compost socks should be staked in the manner recommended by the manufacturer around perimeter of the geomembrane so as to form a ring with the ends of the sock located at the upslope corner. Care must be taken to ensure continuous contact of the sock with the geomembrane at al locations.
Where necessary, socks may be stacked and staked so as to form a triangular cross-section.
PREFABRICATED WASHOUT CONTAINERS
Care should be taken to ensure that the containers are intended by the manufacturer for use as concrete washout BMPs, that they are watertight, and appropriately sized. Accumulated materials should be properly disposed of (preferably recycled) when they reach cleanout level.
SELF-INSTALLED WASHOUT
These should be excavated below grade to prevent runoff and the potential for breaching. They should be sized to handle solids, wash water, and rainfall. A good rule of thumb is that 7 gallons of wash water are required to wash one truck chute and 50 gallons for the hopper of a concrete pump truck.
For larger sites, a below-grade washout should be a minimum of 10 feet wide and provide at least 12 inches of freeboard above the liquid and solid waste anticipated between cleanout intervals. The pit should be lined with plastic sheeting of at least 10-mil thickness (with no holes or tears) to prevent leaching of liquids into the ground.
NOTE:
Sediment basins and sediment traps may not be used a concrete washout devices, since they discharge directly to surface waters. This discharge would have an adverse affect upon the receiving water. In addition, continued use of a basin or trap as a washout facility would significantly reduce the storage capacity of the basin or trap.
MAINTENANCE
All concrete washout facilities should be inspected daily. Damaged or leaking washouts should be deactivated and repaired or replaced immediately.
Accumulated materials should be removed when they reach 75% capacity.
Plastic liners should be replaced with each cleaning of the washout facility.
All building materials and wastes must be removed from the site and recycled or disposed of in accordance with the Department's Solid Waste Management Regulations at 25 Pa. Code Chapter 260,§§260.1 et seq., 271.1, and 287.1 et. seq. No building materials or wastes or unused building materials shall be burned, buried, dumped, or discharged at the site.
All off-site waste and borrow areas must have an E&S Plan approved by the Local Conservation District or DEP fully implemented prior to being activated.
The contractor is responsible for ensuring that any material brought on site is Clean Fill. Form FP-001 must be retained by the property owner for any fill material affected by a spill or release of a regulated substance but qualifying as Clean Fill due to analytical testing.
SEQUENCING AND STAGING OF CONSTRUCTION:
General Sequencing Notes: The intent of the sequence of construction is to ensure that adequate control measures are provided for the areas in which contruction activities are occurring at all times. Under no circumstances will construction activities begin until the erosion control devices (BMP's) for the areas involved are installed.
1. The proposed sanitary sewer installed within the noted soils will be backfilled with the same excavated material removed from the trench once the sanitary sewer is in place. There will be no change in the "USE" of the disturbed area of construction.
2. The disturbed area along the sanitary sewer & force main trench lines shall be restored to preconstruction conditions. Therefore, in these areas, the proposed contours will be equal to the existing contours.
3. The pump station site off Saxonburgh Boulevard will require fill material to allow driveway access and a building to house the pump, generators & controls. In this area, proposed contours are shown as solid lines with elevations noted necessary to achieve necessary grades.
4. The "staging" areas for the construction project have yet to be determined. Once the bid is awarded, It is the Contractor's responsibility to find sites to store his materials. If the "staging" areas are within the confines of our permitted project boundry, the Contractor must install a rock construction entrance at each location.
5. Rock construction entrances shall be installed for each location where construction vehicles will be accessing the site from a paved roadway. The Contractor shall advise the Allegheny County Conservation District of the proposed locations before installation of the rock construction entrances.
SEQUENCE OF CONSTRUCTION:
Pleasant Hills Authority - Lick Run Streambank Stabilization
STAGE 1 - INITIAL SITE PREPARATION
1. Delineate project boundary limits, disturbance limits and environmentally sensitive areas clearly marking all pertinent features in the field, where applicable.
2. Mobilize equipment to site.
3. Construct Rock Construction Entrance shown on Sheet ES1.
4. Install composite filter socks # 4 - 9
5. Placement of compost filter socks may not be limited to these areas. Compost filter socks and/or filter fabric fencing may be used in combination with seeding / mulching to stabilize areas disturbed by unforeseen construction.
STAGE 2 - REHABILITATION OF STREAMBANKS
6. Upon completion of Stage 1 of the construction sequence, and after BMPs are installed and functioning properly, install the In-stream Cofferdam Diversion at location shown on sheet ES1 in accordance with Standard Construction Figure #3.12 shown on Sheet ESDT1. Pumped water filter bag shall be used to discharge water accumulating within the work area and shall be discharging into any surface water.
7. Begin all rehabilitation of streambank activities. Rehabilitation work shall consist of earthmoving necessary to facilitate the armoring of the streambanks (GP-3). During rehabilitation of streambank activities, interim control measures shall be placed to limit excessive erosion to work area (i.e. compost filter socks).
8. Work associated with GP-11-1 shall include rehabilitation of steambanks within 50' of the existing water obstruction.
9. Install the riprap apron at the location shown on sheet ES1 and below the existing 8 inch PVC stormwater drain (GP-11-2).
STAGE 3 - FINAL RESTORATION
10. Upon completion of stage 2, install composite filter socks # 1 - 3. Apply topsoil and revegetate in accordance with the permanent seeding specifications. Once all construction related activities have ceased, then the contractor shall remove the RCE.
11. Provide seeding in accordance with the permanent seeding specifications (Formula B) and install Erosion Control Blankets upon all slopes 3:1 and greater, all disturbed areas within 50' of the top-of-bank, and as shown on the plans in accordance with the details. Compost filter sock shall remain below disturbed areas.
12. All disturbed pervious areas shall be permanently seeded within 72 hours of completion of disturbance as per the permanent seeding specifications attached. This shall include applying Seed, Mulch, Erosion Control Blankets and Compost Filter Socks, etc. as specified herein, shown on the Plans, or as required by site conditions.
13. Contractor's site superintendent will be responsible for inspection of all erosion and sedimentation pollution control measures weekly and after any runoff event. Corrective procedures will be taken immediately or within 24 hours after any inspection reveals the need for maintenance of existing measure or the placement of additional control measures to the site prior to any continued excavation activities.
14. All disturbed areas will be restored to pre-disturbed condition before removal of BMPs.
15. Upon completion of all utility grading, ESTABLISHMENT OF A MINIMUM UNIFORM, 70% VEGETATIVE
COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION, and an onsite investigation by the Local County Conservation District officials for appraisal, remove all temporary E&S BMPs. All materials cleared from BMPs are required to be mixed with topsoil and reapplied then stabilized with seeding and mulch per the attached Specifications.
CONSTRUCTION SEQUENCE NOTES:
COMPOST FILTER SOCK NOTE: Consult with Engineer prior to placement of Compost Filter Socks in addition to those shown on the Plans. Placement of Compost Filter Socks may not be limited to the locations depicted on the Plans. Placement of Compost Filter Socks upon pavement or other hard surfaces requires the use of concrete blocks (or equal) for support and backing. Compost Filter Socks shall be used to reduce sedimentation by unforeseen construction activities including but not limited to runoff bypassing other proposed BMPs, excavated materials stockpiles (soil/gravel/asphalt/concrete) not depicted on the Plans, & off-site support activities.
CONSTRUCTION AREA PREPARATION NOTE: Perform any necessary clearing and grubbing. Remove all vegetation from the work area. Strip topsoil from pervious areas and keep separate from other waste materials for eventual reuse, where appropriate. Saw cut and remove asphalt surfaces (cartway, driveways, etc.) along the proposed alignment in accordance with the specifications and details. Saw cut and remove concrete surfaces (driveways, sidewalks, curbs, etc.) along the proposed alignment in accordance with the specifications and details. These materials may be temporarily stockpiled near construction activities provided adequate sedimentation protection such as Compost Filter Socks are provided below any material stockpiles which will remain for more than the current workday, or these materials shall be placed at an approved construction support area. All excess excavated materials shall be removed from the project site prior to completion of the project in accordance with the Site Housekeeping and Materials Management Specifications.
TEMPORARY SEEDING SPECIFICATIONS:
The purpose of temporary cover is to provide short-term rapid cover for the control of runoff and erosion until vegetation or other stabilization material can be established. Temporary cover shall be applied on all sediment producing areas where the period of exposure will be more than two months, but less than twelve months. Mulch cover shall be provided for less than two month's exposure.
The utility line construction is to be progressively backfilled by end of work day. If it is necessary to stockpile soil, temporary grass cover shall be established where soil stockpiles are to be exposed for a period greater than thirty (30) days. When the soil stockpile will be exposed for a period greater than two (2) days, but less than thirty (30) days, the stockpile shall be covered with mulch or protective erosion control fabric.
The site preparation and establishment of temporary cover shall be conducted according to the following guidelines:
A. Install needed surface water control measures.
B. Perform all cultural operations at right angles to the slope.
C. Apply ground limestone according to soil test or in the absence of a soil test at the rate of
6 tons per acre.
D. Apply uniformly recommended analysis fertilizer according to soil test or 10-20-20 at the rate of 1,000 lb per acre.
E. Work in lime and fertilizer to a depth of 4 in. using any suitable equipment.
F. Temporary cover seed mixture shall conform to Formula E of the seeding specification table.
G. Cover grass seed with 1/2 in. of soil with suitable equipment.
PERMANENT SEEDING SPECIFICATIONS:
All areas will have permanent vegetation established. Areas identified as wetland shall be restored to pre-construction conditions within 10 days following acceptable installation of the crossing as previously stated. All other areas along the pipeline shall have permanent vegetation established within 2 days upon completion of the pipeline. Sediment control devises will be removed only when the final vegetative cover and permanent facilities are completed. Completed areas will be covered with a minimum 4 inches of topsoil.
After the topsoil has been properly distributed, lime in the form of raw ground limestone shall be applied in an amount to be determined from an analysis of the soil by a qualified soil sampling service; then one week after the time it has been spread, fertilizer shall be added. Fertilizer in the amount of 5-10-5, nitrogen, phosphorus and potash, respectively, shall be spread at the rate of 30
lb. per 1,000 sq. ft. after which mulch shall be added. The entire area shall then be properly tilled and handracked to a smooth, even grade. All stones shall be removed from the topsoil. The Contractor shall refer to the seeding specification table above and use Formula C for steep slopes and Formula B elsewhere. The area shall then be lightly brushed or racked to provide slight covering over the seed, after which, it shall be lightly rolled in two directions. In the sbsence of a soil test, fertilizer should be applied at a rate of 100 lb. of Nitrogen, 200 lb. of P2O5, and 200 lbs.
K2O per acre (eg. 1,000 lbs. of 10-20-20 per acre).
Sowing may be done mechanically, by hand, or by an approved method of hydroseeding. In the latter case, alternate means of fertilizing combined with seeding will be permitted upon approval of methods by the OWNER'S representative. Mulching material shall be in accordance with the recommendations of a local recognized nurseryman approved by the OWNER'S representative. The vegetated areas shall be inspected weekly and after every run-off event. Areas will be reseeded as needed until uniform 70 % perennial vegetative coverage is achieved. Maintenance may include repeated watering, mowing, and repair or replacement of the vegetation in areas that fail to show uniform growth of grass, or which are damaged in any way.
Permanently stabilized vegetation is defined as a uniform 70% vegetative cover of erosion resistant perennial species has been achieved. Also, it may be that the disturbed area is covered with an acceptable BMP which permanently minimizes accelerated erosion and sedimentation. Until such time as this standard is achieved, interim stabilization measures and temporary erosion and sediment control BMP's may not be removed.
MULCHING:
The purpose of mulch is to reduce erosion, prevent surface compaction, crusting, conserve moisture and aid in establishing plant cover and control weeds. Mulch shall be applied on any area subject to erosion, or which has unfavorable conditions for plant establishment and growth.
The practice may be used along or in conjunction with other structural and vegetative conservation practices, such as waterways, ponds, sedimentation traps, or critical planting area.
On sediment producing areas where the period of exposure is less than two months, mulch materials shall be applied according to the following guidelines:
A. For areas subject to critical erosion, temporary erosion control devices such as furrows, diversions, etc., within or adjacent to area to be mulched shall be installed.
B. Straw or hay mulch shall be applied at the rate of 3 tons per acre. Chemically treated or salted straw or hay is not acceptable as mulch.
C. Straw or hay mulch shall be anchored by either peg or twine or mulch netting.
D. Mulched areas shall be checked within 24 hours after severe storms for damage until the desired purpose of the mulching is achieved. Damaged portions of the mulch or tie-down material shall be repaired , when discovered, by end of work day.
VEGETATION
General: The work area for this project is to be permanently seeded, unless occupied by structures or paving. All areas requiring interim or final stabilization must be addressed within 72 hours of completion of disturbance, Areas utilizing vegetative stabilization must be seeded/planted in sufficient time to germinate by October 15th of each year. Seeding will be accomplished through the use of hydroseeding techniques or conventional seeding and mulching at the rate of 3.0 tons/acre as recommended in the Penn State Agronomy Guide. If seeding cannot be completed within the ten day period due to weather conditions, the disturbed area shall be mulched with straw at the rate of 1,000 sq. ft. This straw shall be anchored with mulch netting according to the manufacturer's recommendations or other appropriate means. The Contractor must conform to PennDot Pub. 408 (Sections 804 and
805) for all seeding and mulching requirements.
Temporary seeding will be used to protect exposed land surfaces which will not be permanently protected for a period of more than two months, but less than twelve months. Temporary vegetation will provide short-term rapid cover until permanent vegetation or other protection can be established.
SEEDING SPECIFICATION TABLE
% By
Weight Max % Weed
Seeding Rate Lbs.
per 1,000 SY
Seeding Dates
1. A combination of improved certified varieties with no one variety exceeding 50% of the total Ryegrass
2. Component A combination of improved certified varieties with no one variety exceeding 25% of the total Bluegrass component
Mar. 15 to Jun. 1 Aug. 1 to Oct. 15
Mar. 1 to Oct. 15
Mar. 15 to Oct. 15
Little Bluestem ((Schizachyrium Scopariu) 709945 0.10 4.0
RECOMMENDATIONS AND REQUIREMENTS FOR THE
RECYCLING AND DISPOSAL OF CONSTRUCTION WASTES
The following procedures shall be taken by the contractor to reduce, minimize, and/or eliminate the generation of wastes during construction:
- The Contractor shall ensure that proper mechanisms are in place to control waste materials.
- Waste materials which are not to be recycled shall be promptly removed from the construction At no time shall wastes be stored/stockpiled on-site or otherwise be permitted to spread to other areas of the site, onto adjacent properties, or into watercourses or wetlands.
- Trash / garbage shall be landfilled or removed via general trash pickup.
- Other construction materials which cannot be recycled shall be removed from the site in accordance with all other laws and regulations of Pennsylvania and the PA Department of Environmental Protection.
- Recycling of waste materials, where feasible, is required.
- Wherever possible, recycling of excess materials is preferred, rather than disposal.
- Recycling is best accomplished when recyclable materials are kept separately from other wastes.
-Every personnel, from the management to the operational level should work for the goal of construction waste management.
Construction wastes anticipated to be encountered on this project include, but are not limited to:
- excess soil materials (bulk grading/topsoil)
- building materials
- aggregates / asphalt
- concrete/brick/masonry
- concrete wash water
- ferrous/non-ferrous metals
- paper/cardboard
- plastic
- timber/plywood/woodchips
- trash / garbage
Newark (NE)
SOIL LIMITATIONS AND RESOLUTIONS
ESDT1
E R
O S
IO
N
S
E D
IM
E
N T
P O
LL
U
T
IO
N C
O N
T R
O L
P
LA
N N
O T
E S
D
E T
A
IL
S
JM
G
ED
G
N
LRJD
A
Order No.
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
Drawing No.
Sheet No.
of 5Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
564-19
A ug us t 2
LI
C
K R
U N
S T
R E
A M
B A
N K
S T
A B
IL
IZ
A T
IO
N
C O
N T
R A
C T
N O
. 2
6-
A
LL
E G
H E
N Y
C O
U N
T Y
, P E
N N
S Y
LV
A
N
IA
P
LE
A S
A N
T H
IL
LS
A U
T H
O R
IT
Y
D ra w n
B y:
D at e Is su ed
F or
D at e R ev is io ns
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C
8/
R el ea se d
Fo r B id
S:\Active Clients\564 Pleasant Hills Authority\564-19 Lick Run Streambank Stabilization\Dwg\ESDT564-19-001.dwg 5/28/2026 12:01 PM Plotted By: Jason Antitomas 5/28/2026 12:01 PM Plotted By: Jason Antitomas5/28/2026 12:01 PM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas
STANDARD E&S WORKSHEET #1
SOCK
NO.
DIA.
IN. LOCATION SLOPE
PERCENT
SLOPE LENGTH
ABOVE BARRIER
(FT)
"MAINTENANCE PROGRAM
PROJECT NAME: Pleasant Hills Authority Lick Run Streambank Stabilization PROJECT LOCATION: 628 Cochran Mill Rd, Jefferson Hills, PA 15025 OWNER/RESPONSIBLE: Pleasant Hills Authority NOTE: It will be the responsibility of the OWNER or their CONTRACTOR to execute the control of inspection. maintenance and repair of the various sediment control facilities according to the guldlines prescribed below and to ensure that proper mechanisms are in place to control waste materials.
NOTE: All materials removed from the various sediment control faclllties shall be recycled wherever possible. Sediment shall be spread and allowed to dry before being incorporated into the topsoil stockpile. Damaged or used BMP materials shall be disposed of properly into approved containers for disposal at a landfill."
CONTROL
MEASURE INSPECT PROBLEMS REMEDIES
"Compost Filter Socks
Standard Silt Fence"
Weekly and during or immediately following a measurable runoff event
(>0.25" rain)
Torn Fabric Replace with a continuous piece of fabric from post to post. Securely anchor with proper staples.
Collapsing of Fence
Check fence post size and spacing, gauge of wire mesh, and fabric strength. Check drainage area, slope length, and gradient behind fence. Correct any substandard condition.
Torn Filter Sock Replace with new filter sock
Sediment Accumulation Remove sediment when it reaches half the ground height of the fence.
Runoff escaping around the Fence Extend the fence.
Undermining or topping of Fence
Replace fence section with a rock filter
*SEE NOTE 1
Pumped Water Filter Bag
Daily, Weekly and during or immediately following a measurable runoff event (>0.25" rain)
Sediment Accumulation Sediment shall be removed when bags become half full
Low Vegetation Area A geotextile underlayment and flow path shall be provided
Bags located in HG or EV Watersheds
Compost Berm or Compost Filter Sock shall be installed below bags
*SEE NOTE 1
Rock Construction Entrance
Daily, Weekly and during or immediately following a measurable runoff event (>0.25" rain) Ruts and sink holes Add rock to bring to specified dimensions.
*SEE NOTE 1
Vegetation, Erosion Control Blankets
Weekly and during or immediately following a measurable runoff event
(>0.25" rain)
Rills and Gullies Fill in rills and regrade gullies
Bare Soil Patches Reseed, fertilize, and mulch bare areas
Sediment at toe of Slope Check for toe of slopediversion and install if needed
*SEE NOTE 2
"NOTES:
1. Maintenance to remedy any problems should occur within one day of discovery,
2. Maintenance to remedy any problems should occur within three days of discovery."
Slope length is not addressed by use of multiple rows of compost socks.
TABLE 4.1
Compost Sock Fabric Minimum Specifications
Material Type 3 mil HDPE 5 mil HDPE 5 mil HDPE Multi-Filament Polypropylene
(MFPP)
Heavy Duty Multi-Filament Polypropylene
(MFPP)
Material Characteristics
Sock Diameters
Mesh Opening
Tensile Strength
Ultraviolet Stability %
Origianl Strength
(ASTM G-155)
Minimum Functional Longevity
Two-ply systems
Inner Containment Netting
Outer Filtration Mesh
HDPE biaxial net Continuously wound
Fuson-welded junctures 3/4"x3/4" Max. aperture size
Composite Polypropylene Fabric (Woven layer and non-woven fleece mechanically fused via needle punch)
Sock fabrics composed of burlap may be used on projects lasting 6 months or less.
3/16" Max. aperture size
STORAGE OF STOCK PILED SOIL
2' BERM (MIN.)
2' TOE (MIN.)
REVEGETATE ALL DISTURBED
AREAS AND INSTALL EROSION
CONTROL BLANKETS
1.5' 1'
36" R-6
RIP-RAP SLOPE
PROTECTION
4" AASHTO
#1 AGGREGATE
FILTER LAYER NOTE:
LARGER DIAMETER AGGREGATE
SHALL BE PLACED AT TOE AND
UP TO NORMAL WATER
SURFACE ELEVATION.
STREAM BANK STABILIZATION DETAIL
STANDARD CONSTRUCTION DETAIL #3-1
ROCK CONSTRUCTION ENTRANCE
2' TOE (MIN.)
ESDT2
E R
O S
IO
N
S
E D
IM
E
N T
P O
LL
U
T
IO
N C
O N
T R
O L
P
LA
N N
O T
E S
D
E T
A
IL
S
JM
G
ED
G
N
LRJD
A
Order No.
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
Drawing No.
Sheet No.
of 5Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
564-19
A ug us t 2
LI
C
K R
U N
S T
R E
A M
B A
N K
S T
A B
IL
IZ
A T
IO
N
C O
N T
R A
C T
N O
. 2
6-
A
LL
E G
H E
N Y
C O
U N
T Y
, P E
N N
S Y
LV
A
N
IA
P
LE
A S
A N
T H
IL
LS
A U
T H
O R
IT
Y
D ra w n
B y:
D at e Is su ed
F or
D at e R ev is io ns
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C
8/
R el ea se d
Fo r B id
AutoCAD SHX Text 2 IN. x 2 IN. WOODEN STAKES PLACED 10 FT ON CENTER
AutoCAD SHX Text
COMPOST FILTER SOCK
AutoCAD SHX Text
BLOWN/PLACED FILTER MEDIA
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text
LOCATION:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
EDG
AutoCAD SHX Text
NLR
AutoCAD SHX Text 1/16/2026
AutoCAD SHX Text 1/16/2026
AutoCAD SHX Text 628 Cochran Mill Rd, Jefferson Hills, PA 15025
AutoCAD SHX Text Pleasant Hills Authority Lick Run Streambank Stabilization
AutoCAD SHX Text
COMPOST FILTER SOCK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Below 37" effluent discharge from WWTP
AutoCAD SHX Text 32.0
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Below 8" PVC Pipe
AutoCAD SHX Text 36.3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Adjacent to riprap tie-in point
AutoCAD SHX Text 40.0
AutoCAD SHX Text
AutoCAD SHX Text Note: * denotes triple stacked 18" compost filter socks
AutoCAD SHX Text
AutoCAD SHX Text Directly below temp. soil stockpile
AutoCAD SHX Text 10.0
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Directly below temp. native streambed stockpile
AutoCAD SHX Text 10.0
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Organic Matter Content
AutoCAD SHX Text 80%-100% (dry weight basis)
AutoCAD SHX Text Organic Portion
AutoCAD SHX Text Fibrous and Elongated
AutoCAD SHX Text pH
AutoCAD SHX Text 5.5-8.0
AutoCAD SHX Text Moisture Content
AutoCAD SHX Text 35%-55%
AutoCAD SHX Text Particle Size
AutoCAD SHX Text 98% pass through 1" screen
AutoCAD SHX Text Soluble Salt Concentration
AutoCAD SHX Text
5.0 dS Maximum
AutoCAD SHX Text %%uTable 4.2
AutoCAD SHX Text Compost Standards
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 12"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 8"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .