0001-Amend SOW and Quantity Survey.pdf

PDF 420 KB Posted

Attached to
ADA Restroom Restoration Federal contract opportunity
Solicitation number
19MX5324Q0019
Issued by
Department of State US Embassy Mexico

About this file

This solicitation seeks proposals for remodeling and renovation services of restrooms in a residence in Mexico City to comply with American Disability Act specifications. The U.S. Embassy Mexico City requires a contractor to expand the dimensions of one restroom with one toilet and two urinals, and bring it in line with ADA standards, which involves adding extra urinals and toilets. A site visit will take place on February 26, 2024, with questions due by February 27, 2024 and proposals due by March 1, 2024. All contractors must be technically qualified, financially responsible, have necessary personnel and equipment, and meet all local licensing, insurance, and bonding requirements. Contractors must also have good experience and past performance, and be registered in SAM. Electronic submission of proposals is permitted.

View the file

Other files for this federal contract opportunity

Other files attached to ADA Restroom Restoration, newest first.
File Type Posted
Questions-Answers.pdf PDF
Site Visit Minutes.pdf PDF
19MX5324Q0019 ADA Restroom Restoration.pdf PDF
Vendor Portal 3.pdf PDF
Vendor Portal 2.pdf PDF
Safety Management Plan.docx DOCX document
SF-1442 19MX5324Q0019.pdf PDF
Vendor Portal 1.pdf PDF
Vendor Portal 4.pdf PDF
Hot Work.doc DOC document
Work at heights.xlsx XLSX spreadsheet
JHA 2022.xlsx XLSX spreadsheet
Letter to Offerors - ADA Restroom Restoration.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 29 SBU - CONTRACTING AND ACQUISITIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 29

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

February 28, 2024

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

U. S. Embassy Mexico City General Services Office/Contracts Paseo de la Reforma No. 305 Colonia Cuauhtemoc 06500 Mexico, D. F.

U. S. Embassy Mexico City Facilities Management Office (FAC) Paseo de la Reforma No. 305 Colonia Cuauhtemoc 06500 Mexico, D. F.

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, city, county, State, and ZIP Code)

9A. AMENDMENT OF SOLICITATION NO.

19MX5324Q0019

9B. DATED (SEE ITEM 11)

February 16, 2024

10A. MODIFICATION OF CONTRACT/ORDER NO.

CODE: FACILITY CODE:

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

☒ The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ☐ is extended, ☒ is not extended.

Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

☐ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

☐ B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

☐ C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

☐ D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor ☐ is not, ☐ is required to sign this document and return ________ original(s) to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to include additional tasks that are required for this project. See the enclosed Attachment which is the continuation sheet to this.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (revised 11/2016) Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243

SBU - CONTRACTING AND ACQUISITIONS

Continuation to SF-1442, Block 13

Amendment 0001 to Solicitation Number 19MX5324Q0019

PART 3 – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS – SECTION

A – LIST OF ATTACHMENTS

ATTACHMENT 3 – STATEMENT OF WORK - A.3.1 – Statement of Work – B.

Objectives

1. Work to be performed:

A. Sub-paragraph 1.20 is hereby added at the end of paragraph 1, Preliminary Work, which shall read as follows:

“1.20. Demolition of masonry bases and bench "slab" in expansion area. The dimensions of the bases are approximately 1.08 x 1.20 x 0.65 m (2 pieces) and the bench area is 3.0 x 1.20 x 0.35 m (including masonry base and 10 cm slab). Includes labor, tools, hauling and removal of the material produced by the demolition outside the work site to a locally authorized dump.”

5. Woodwork

B. A new sub-paragraph 5.1 is added at the beginning of paragraph 5, Woodwork, which shall read as follows:

“5.1. Supply and installation of solid wood door (CMR-104) 1.00 m x

2.10 m and high-quality pine wood frame with strips every 30 cm in both directions according to design (equal to existing) with slow energy swing door operator "Magic-Access" type Stanley or equivalent brand in specifications, performance, quality, and warranty. Includes:

door opening system, veneer equal to existing, sanding, painting, wood frame with the same finish of the door, chambranas, hinges, finish equal to existing white color, materials, hauling, cuts, waste, fitting, fixing, labor, equipment, tools, door opening system installation, electrical installation, commissioning, and everything necessary for its correct operation.”

SBU - CONTRACTING AND ACQUISITIONS

7.1. Air Conditioning

C. Sub-paragraph 7.1 is hereby reworded to reflect the actual requirement for this stage of the project and shall read as follows:

“7.1. Relocation, installation, and start-up of Carrier brand injection equipment (existing); relocation, installation, and start-up of discharge grate in wall (existing) and closure of elongated grate out of use in false ceiling. Includes: material, ductwork, labor, tools, hauling, removal of the dismantled grid to an authorized off-site dump site, and everything necessary for its correct execution and good operation.”

ATTACHMENT 5 – QUANTITY SURVEY

D. As a result of changes in letters A, B and C, above, CLIN 1.20, new CLIN

5.1 and CLIN 7.1 are hereby added and or modified in the Quantity Survey.

Therefore, ATTACHMENT 3 – STATEMENT OF WORK and ATTACHMENT 5 – QUANTITY SURVEY, are hereby deleted in its entirety and replaced to read as follows:

SBU - CONTRACTING AND ACQUISITIONS

“J.3 ATTACHMENT 3 – STATEMENT OF WORK

STATEMENT OF WORK

(SOW ADA Men’s Restroom Restoration)

Project Title: ADA Men’s Restroom Restoration

Address: To be provided upon award.

Drafted by: FAC, Project Manager, Alejandrina Falcon

Cleared by: FAC, Res Ops, Enrique Alvarez

Deputy Facility Manager – Edward Smith

Date: February 2024

SBU - CONTRACTING AND ACQUISITIONS

J.3.1 STATEMENT OF WORK

A. Introduction/background:

The United States Government (USG) is soliciting the services of a contractor to remodel, improve upon, and bring into ADA compliance the Men's Restroom (cabinets, fixtures, drywall, floor and wall tile, toilet, urinal, sinks, countertops, light fixtures, electrical outlets, exhaust fans, cubicle partitions) at a U.S. Embassy property in Mexico City. This project is being solicited on behalf of the Embassy in conjunction with the State Department's Office of Overseas Buildings Operations

(OBO).

The United States Government (USG) requires a professional contractor with general services to “Repair by reinstallation and bring into ADA compliance first floor men’s restroom”.

The contractor shall be fully responsible for performing all the necessary work including, but not limited to temporary partitions to isolate the renovation areas;

removal of the existing first floor men’s restroom cabinetry, furniture, fixtures;

reinstallation of drywall sheets, electrical, plumbing, masonry and finishing work;

special disconnections of fixtures, appliances, and accessories are required to facilitate improvement. The refurbishment shall use only high-quality, first-class materials (all properly evaluated and approved by the project's Contracting Officer Representative (COR)).

B. Objectives

The contractor shall perform all the necessary work including, but not limited to temporary partitions to isolate the renovation areas; removal of the existing restroom’s cabinetry, furniture, fixtures; reinstallation of drywall sheets, electrical, plumbing, masonry and finishing work; special disconnections of fixtures, appliances, and accessories are required to facilitate improvement. The refurbishment shall use only high-quality, first-class materials (all properly evaluated and approved by the project's Contracting Officer Representative (COR)).

1. Work to be performed:

First Floor Men’s Restroom

1. Preliminary Work

SBU - CONTRACTING AND ACQUISITIONS

1.1. Delimiting and protecting the work area with heavy duty plastic, corrugated cardboard and/or kraft paper, using blue (painter's) tape to prevent the spread of dust and mitigate any damage to USG property (furniture, floors, or other rooms).

1.2. Supply and installation of walls for the protection of area based on plasterboard of 1.22m x 2.44m x 12.7mm on a single side, consisting of a structure of galvanized profiles of 6.35 cm, cal. 26, separated every 60 cm, these once introduced into 6.35 cm cal. 26 tie-out channels which are anchored to the floor and slab with fixers (1" 1/4" and 1" framer screws). Includes: finish ready to receive painting, normal or flexible perfacings according to provides, profile and channel cal. 26, 6.35 cm thick, metal corners and edges, redimix in all joints, plaster panel, supply of materials, tools, equipment, freight, carrying, labor, and everything necessary for correct installation.

1.3. Supply and installation of corrugated cardboard 48" x 250' for floor protection. Includes: tools, materials, labor, and everything necessary for its correct installation.

1.4. Dismantling of existing division screens in toilets and urinals by manual means. Includes: removal of doors, total removal, loading, carrying, cutting in fixing, removal to warehouse on site, tools, labor, and everything necessary for their correct execution.

1.5. Uninstallation of bathroom furniture (toilets, sinks, urinals) with recovery. Includes: plugging of hydraulic pipe and sanitary, hauling to the site warehouse, labor, equipment, and tools.

1.6. Disassembly of the sink cabinet. Includes: tools, materials, labor, transportation to the warehouse on site.

1.7. Dismantling of sanitary accessories (tool holder, towel holder, safety bars, etc.).

1.8. Cancellation and dismantling of existing water intake in wall and floor.

Includes: elimination of existing piping, patching, removal, tools, labor, and everything necessary for its correct execution.

SBU - CONTRACTING AND ACQUISITIONS

1.9. Cancellation and dismantling of existing 2" drainage in wall and floor, Includes: elimination of existing pipe, patching, removal, tools, labor, and everything necessary for its correct execution.

1.10. Cancellation and dismantling of existing 4" drainage in wall and floor, Includes: elimination of existing pipe, patching, removal, tools, labor, and everything necessary for its correct execution.

1.11. Demolition of existing wall 0 to 3.50 m height, by manual means.

Includes: demolition of structural elements such as rebar frames, enclosures, beams, etc., cancellation and removal of any electrical, telephone or data outlets that may exist, tools, equipment, freight, scaffolding, loading, and carrying out of the site and labor for their correct execution.

1.12. Demolition of finishing on existing marble type floor, by manual means. Includes: tools, equipment, labor, loading and carrying and everything necessary for its correct execution.

1.13. Dismantling and recovery of existing marble type piece. Includes:

tools, equipment, labor, hauling to the site warehouse, and everything necessary for its correct execution.

1.14. Dismantiling of existing light fixtures. Includes: electrical disconnection, carrying, removal, tools, labo, and everything necessary for its correct execution.

1.15. Cancellation of electrical outputs of existing lights. Includes:

disconnection, removal of cable, hose and/or pipe, carrying, removal, labor, and everything necessary for its correct execution.

1.16. Cancellation of electrical outputs of existing contacts and switches.

Includes: disconnection, removal of cable, hose and/or pipe, carrying, removal, labor, and everything necessary for its correct execution.

1.17. General daily cleaning during the construction and at the end for delivery. Includes: cleaning of floors, tiles, marble, windows, carrying, stacking, loading and removal of weekly debris by dump truck off the construction to a collection center, tools, equipment, labor, and everything necessary for its correct execution.

SBU - CONTRACTING AND ACQUISITIONS

1.18. Carrying material from demolitions.

1.19. Removal of material product from demolitions to official distribution.

1.20. Demolition of masonry bases and bench "slab" in expansion area. The dimensions of the bases are approximately 1.08 x 1.20 x 0.65 m (2 pieces) and the bench area is 3.0 x 1.20 x 0.35 m (including masonry base and 10 cm slab). Includes labor, tools, hauling and removal of the material produced by the demolition outside the work site to a locally authorized dump.

2. Civil Work

2.1. Slots in wall to receive electrical pipe from 13 to 52 mm, includes:

cutting with disc, covering, and repairing slot, tool, equipment, scaffolding, loading, and carrying and labor for its correct installation.

3. Finishes

3.1. Supply and installation of a wall based on gypsum board of 1.22m x 2.44m x 12.7mm on two sides, consisting of a structure of galvanized profiles of 6.35 cm, cal. 26, separated every 60 cm, these in turn inserted into mooring channels of 6.35 cm cal. 26 which are anchored to the floor and slab with fixers (framer screws of 1" 1/4" and 1").

Includes: finish ready to receive painting, normal or flexible perfacings as applicable, profile and channel cal. 26, 6.35 cm thick, metal corners and edges, redimix in all joints, gypsum panel (water resistant type), supply of materials, tools, equipment, freight, carrying, labor, and everything necessary for its correct installation.

3.2. Supply and installation wall based on cement board of 1.22m x 2.44m x 12.7mm on two sides, consisting of a structure of galvanized profiles of 6.35 cm, cal. 26, separated every 60 cm, these in turn inserted into mooring channels of 6.35 cm cal.26 which are anchored to the floor and slab with fixers (framer screws of 1" 1/4" and 1"). includes: finish ready to receive painting, normal or flexible perfacings as applicable, profile and channel cal. 26, 6.35 cm thick, metal corners and edges, redimix in all joints, cement board panel, supply of materials, tools, equipment, freight, carrying, labor, and everything necessary for its correct installation.

SBU - CONTRACTING AND ACQUISITIONS

3.3. Fine flattening of paste on wall from floor to ceiling, finished to receive paint. Includes: wall repair, wall edge, window edges, column and beam edges, materials, elevations, carrying, waste, labor, tools, scaffolds, equipment, and everything necessary for its correct execution.

3.4. Supply and application of vinyl paint Comex Vinimex brand color ring 314-01 on walls and inside doors and windows on plaster and cement board wall, height from 0.00 to 3.00 m. Includes: a primary coat, supply of materials, tool, equipment, ladders, freight, carrying, labor, and everything necessary for its correct application.

3.5. Supply and application of vinyl paint Comex Vinimex brand, matte white color on existing ceiling, height from 0.00 to 3.00 m. Includes: a primary hand, supply of materials, tools, equipment, ladders, freight, carrying, labor, and everything what you need for its correct application.

3.6. Supply and installation of Interceramic brand porcelain flooring 60 x 120 m mod. Serenity color Atlantic gray, nozzle color authorized by supervision, seated with crest white cement. Includes: supply of materials, cutting, tools, equipment, freight, repairs, carrying, labor, and everything necessary for its correct installation.

3.7. Supply and installation of Interceramic brand porcelain piece 60m x 120m mod. Serenity color Atlantic gray, nozzle color authorized by supervision, seated with crest white cement. Includes: supply of materials, cutting, tools, equipment, freight, repairs, carrying, labor, and everything necessary for its correct installation.

3.8. Supply and installation of baseboard marble type piece brand, model, and color like the existing finish, nozzle color authorized by supervision, seated with crest white cement. Includes: supply of materials, cutting, tools, equipment, freight, patching, carrying, handling work and everything necessary for its correct installation.

3.9. Supply and installation of division screens in urinals, Sanilock brand or similar, measurements 1.20m x 0.46m, stainless steel finish. Includes:

2" x 4" double monten profile forming a box for support of screens

SBU - CONTRACTING AND ACQUISITIONS

fixed to walls, 3 Urinillo modules, kit for installation and covers, labor, material, tools, carrying and everything necessary for its correct installation.

3.10. Supply and installation of door for toilet, sanilock brand or similar measurements 0.60 x 2.10 m, stainless steel finish. includes: 2" x 4" double monten profile forming a box for support of screens fixed to walls, kit for installation and covers, labor, material, tools, carrying and everything necessary for its correct installation.

3.11. Opening and forging of lighting holes, leaving a finish equal to the existing ready to receive paint. Includes: demolition and plastering, fillets, labor, tools, materials, equipment, scaffolds, and everything necessary for its correct execution.

4. Hydraulic and Sanitary Installation

4.1. Interconnection of the hydro sanitary system. Includes: tools, materials, labor, and everything necessary for its correct execution.

4.2. Supply and installation of water intake through Tuboplus pipe with flushometer. Includes: cut-off valve, elbows, couplings, tees, reductions, material, labor, tools, consumables, accessories, storage, transfer to the site, cleaning, airtightness tests, step in slab-wall, repairing and everything necessary for its correct execution.

4.3. Supply and installation of 2" drainage using PVC pipe with flushometer. Includes: yee, elbows, couplings, tees, reductions, material, labor, tools, consumables, accessories, storage, transfer to the site, cleaning, air-tightness tests, step in slab-wall, resignments and everything necessary for its correct execution.

4.4. Supply and installation of 4" drainage using PVC pipe with flushometer. Includes: yee, elbows, couplings, tees, reductions, material, labor, tools, consumables, accessories, storage, transfer to the site, cleaning, air-tightness tests, step in slab-wall, resignments and everything necessary for its correct execution.

4.5. Supply and installation of Helvex brand urinal, model MG Ferry in white color, with flushometer. Includes: coflex brand installation kit, SBU - CONTRACTING AND ACQUISITIONS stop key, material, labor, tools, equipment, freight, carriage, and everything necessary for its correctness facility.

4.6. Supply and installation of Kohler undermount bathroom sink, model Verticyl K-2882-HW1, color white. Includes: coflex brand installation kit, stop key, material, labor, tools, equipment, freight, carriage, and everything necessary to its correct installation.

4.7. Supply and installation of Kohler brand toilet, model Aerodyne K- 3869LM-S-0, white color. Includes: hidden trap, installation kit, stop key, material, labor, tools, equipment, freight, carrying and everything necessary for its correct installation.

4.8. Supply and installation of oval sink and single lever brand Kohler model K-14406-CP, chrome finish. Includes: installation kit necessary for the hydraulic operation of the same, material, labor, tools, equipment, freight, carrying and everything necessary for correct installation.

4.9. Supply and installation of bar for sink furniture based on Marblock brand marble plate, Statuary model, 2 cm thick, includes: installation, tools, freight, and everything necessary for its correct execution.

4.10. Supply and installation of gaskets, hoses, and valves in furniture.

4.11. Supply and installation of soap dispenser. Includes: correct fixation, sealant, tools, equipment, labor, and everything necessary for its correct execution.

4.12. Supply and installation of Kohler covered double toilet tissue holder, model Components K-78384-CP, color polished chrome. Includes:

correct fixation, sealant, tool, equipment, labor, and everything necessary for its correct execution.

4.13. Supply and installation of Helvex safety straight bar 27.5", model B- 700-S, color polished chrome. Includes: correct fixing, tool, equipment, labor, and everything necessary for its correct execution.

4.14. Supply and installation of Kohler towel bar 24", model Components K- 78373-CP, color polished chrome, includes: correct fixation, tool, equipment, labor, and everything necessary for its correct execution.

SBU - CONTRACTING AND ACQUISITIONS

4.15. Supply and installation float glass sink mirror with dimensions of 1.05 m wide x 1.00 m high with frosted perimeter frame. Includes: material, labor, tools, equipment, and everything necessary for its correct installation.

4.16. Supply and installation float glass sink mirror with dimensions of 0.63 m wide x 1.3 m high, with frosted perimeter frame, includes: material, labor, tools, equipment, and everything needed for correct installation.

5. Woodwork

5.1. Supply and installation of solid wood door (CMR-104) 1.00 m x 2.10 m and high-quality pine wood frame with strips every 30 cm in both directions according to design (equal to existing) with slow energy swing door operator "Magic-Access" type Stanley or equivalent brand in specifications, performance, quality, and warranty. Includes: door opening system, veneer equal to existing, sanding, painting, wood frame with the same finish of the door, chambranas, hinges, finish equal to existing white color, materials, hauling, cuts, waste, fitting, fixing, labor, equipment, tools, door opening system installation, electrical installation, commissioning, and everything necessary for its correct operation.

5.2. Supply and installation of solid wood door 1.00m x 2.10m and high-quality pine wood frame with strips every 30 cm in both directions according to design (equal to existing). Includes: veneer equal to existing, sanding, painting, wood frame with the same finish of the door, trims, hinges, finish equal to existing white color, materials, hauling, cuts, waste, fitting, fixing, labor, equipment, and tools.

5.3. Supply and installation of solid wood door of 0.95m x 2.10m and high-quality pine wood frame with strips every 30 cm. in both directions according to design (equal to existing). Includes: veneer equal to the existing, sanding, painting, wood frame with the same finish of the door, trims, hinges, door frame with the same finish as the existing.

door, trims, hinges, finish equal to existing white color, materials, hauling, cuts, waste, fitting, fastening, labor, equipment, and tools.

SBU - CONTRACTING AND ACQUISITIONS

5.4. Supply and installation of solid wood door of 0.60m x 2.10m and high-quality pine wood frames with strips every 30 cm in both directions according to design (equal to existing). Includes: veneer equal to existing, sanding, painting, wood frame with the same finish of the door, trims, hinges, finish equal to existing white color, materials, hauling, cuts, waste, fitting, fixing, labor, equipment, and tools.

5.5. Supply and fabrication of new wooden cabinet for sink with marble cover, finished with Arauco composite panel door 15 mm model "Ash Precomposed". Includes: material, tools, labor, freight, transportation, and everything necessary for its correct execution.

6. Electrical Installation

6.1. Electrical wiring for light fixtures. Includes: galvanized boxes, cables of the indicated gauges and diameters, fed from the existing panel, connections, test fixtures, general repairs, labor, tools, equipment, and everything necessary for its correct installation.

6.2. Electrical wiring for GFCI outlet. Includes: galvanized boxes, cables of the indicated gauges and diameters, fed from the existing panel, connections, test fixing, general repairs, labor, tools, equipment, and everything necessary for its correct installation.

6.3. Electrical wiring for switches. Includes: galvanized boxes, cables of the indicated gauges and diameters, fed from the existing panel, connections, fixing, tests, general repairs, labor, tools, equipment, and everything necessary for its correct installation.

6.4. Supply and installation of led light fixture for recessed ceiling of 24 watts, aluminum body with white coating, opal pc diffuser. Includes:

material, hauling, labor, connection, operation tests and everything necessary for its correct installation.

6.5. Supply and installation of one-way switch. Includes: fixture, connections, fastening, tests, general repairs, grooves in wall, floor, or ceiling.

6.6. Supply and installation of GFCI type electrical outlet with galvanized electrical box type “chalupa" 4x2x2 and cover. Includes: supply, SBU - CONTRACTING AND ACQUISITIONS connections, fixing, testing, general restraining, groove in floor or roof wall.

6.7. Supply and installation of exhaust fan, including support, fixing hardware to sheet duct, material, labor, tools, consumables, accessories, storage, transportation to the construction site, cleaning, airtightness tests, slab-wall installation, patching and everything necessary for its correct execution.

6.8. Enabled and interconnection with existing installation. Includes:

connections, operation tests and everything necessary for its correct execution.

7. Air Conditioning

7.1. Relocation, installation, and start-up of Carrier brand injection equipment (existing); relocation, installation, and start-up of discharge grate in wall (existing) and closure of elongated grate out of use in false ceiling. Includes: material, ductwork, labor, tools, hauling, removal of the dismantled grid to an authorized off-site dump site, and everything necessary for its correct execution and good operation.

7.2. Exhaust system in toilets.

GENERAL NOTES:

(a) The contractor must have a field superintendent on site to be responsible for and always supervise the work. The superintendent shall keep a logbook and shall provide the COR with a weekly work report with photographs, describing the work performed, the progress achieved and the scheduled progress, to verify that there are no delays in the work.

(b) All designs, elements, finishes, colors and/or accessories must be approved in writing by the COR.

(c) There is no place on site to pile debris or materials.

(d) Payment will only cover the installed material, and not any generated waste.

SBU - CONTRACTING AND ACQUISITIONS

(e) After completing the work, perform a professional detailed final cleaning of the interior and affected areas in the property.

(f) The contractor must be responsible for the following: to perform all necessary work meeting U.S. construction standards; to bring the power and/or water service from the connection point provided by the U.S. embassy to the required work site.

(g) The contractor must manufacture the cabinetry in their shop and be ready for installation anytime after delivery, as determined by the

COR.

MATERIALS/SPECIFICATIONS

(a) The contractor shall certify that all materials/specifications are those required in this SOW.

(b) If case of any deviations to the materials required herein, the contractor shall provide a complete description and specifications of the materials suggested.

(c) The COR must approve all deviations in writing and the materials must be Underwritten Laboratories (UL) or Facility Management (FM) approved.

WORK REQUIREMENTS

Technical Requirements/Specific Requirements:

(a) The contractor must perform daily cleaning of the work area. The contractor shall provide all labor, equipment, and materials to complete the project and shall ensure that it has adequate resources to successfully manage and deliver this project on-time and within the quoted amount. The contractor will use all the necessary precautions to maintain the safety in the workplace.

(b) In addition to the daily cleaning, contractor must remove any debris/garbage on a weekly basis off the property compound.

SBU - CONTRACTING AND ACQUISITIONS

(c) The contractor must follow and meet U.S. and local construction codes and procedures as well as OSHA Safety Standards & OSHA Regulations, which are available at www.osha.gov.

(d) The contractor must meet the applicable technical criteria codes for the most recent codes including:

I. International Building Code, II. International Fire Code (IFC), III. International Mechanical Code (IMC), IV. National Electrical Code (NEC) and

V. All other applicable Local Codes. Code books are available online, in bookstores and/or in libraries.

Commencement, Completion of Work and Working Hours

(a) The whole project shall be completed by the contractor within forty-five (45) consecutive workdays from the Notice to Proceed issued by Contracting Officer. The contractor must have the personnel, technical and financial resources to execute the work in the proposed time. The entire contract shall be completed within nine 9 weeks and the entire period of performance shall not exceed one (1) year.

(b) All work shall be performed during normal working hours from 09:00 to 16:30, Monday through Friday. The need to work on a Saturday, Sunday, or holiday may arise. Other hours, if requested by the Contractor, may be approved by the Contracting Officer's Representative (COR). The Contractor shall give 24 hours advance notice to the COR who will consider any deviation from the hours identified above. Changes in work hours, initiated by the Contractor, will not be a cause for a price increase.

http://www.osha.gov/

SBU - CONTRACTING AND ACQUISITIONS

Contractor's personnel

All personnel assigned by the contractor for the performance of the respective services shall be supervised by the contractor. There shall be no employer -employee relationship between the USG and the contractor's personnel.

Subcontractors may only be employed with the express written consent of the COR.

USG furnished materials/equipment:

(a) The USG shall provide a Facility COR.

(b) The USG shall provide electrical power within the working area.

Supporting Information

Security

(a) A U.S. Government employee is to be always with the contractor’s workers while they are on site. No worker/equipment/material/vehicle will be allowed to enter the compound or any building without written approval from the embassy RSO (Regional Security Office).

(b) If requested by the contractor, the U.S. Embassy will provide a space to the contractor to store their tools needed for the construction.

(c) No dedicated telephone service/extension is to be provided to the contractor by the U.S. Embassy. The contractor can only use the property telephone service if it is to report a critical emergency and always with previous approval of the COR.

Floor Plans and Men’s Restroom Detail

(a) Please refer to floor plans and kitchen detail in Attachment 4.

Inspection and Acceptance

Quality assurance:

The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to conduct quality assurance to ensure that contract standards are achieved.

SBU - CONTRACTING AND ACQUISITIONS

The contractor shall institute an appropriate inspection system including:

(a) Develop and maintain checklists of duties to be carried out.

(b) Ensure these duties are closely monitored by the foremen staff and skilled workers.

(c) Perform inspections at all work locations to determine whether the various services are being performed according to the contract requirements.

Inspection Reports:

(a) On a weekly basis, the Contractor must submit project progress reports to the COR, detailing all activities accomplished that week, inspections conducted and their results, and detailing all activities anticipated for the upcoming week.

(b) The contractor shall promptly correct and improve the reported shortcomings and/or understand conditions noted in the progress reports at no additional expense to the Government.

ATTACHMENT 5 – QUANTITY SURVEY

Contractor shall enter the Price per Unit and Total Cost per CLIN (Contract Line-Item Number) based on the description service column. Prices are to be inclusive of all work indicated in the SOW and based on quantities indicated on this quantity survey page. The Contractor shall indicate the Currency and shall include VAT charges (if applicable) as a separate CLIN at the bottom of the total cost amount. No additional line items shall be added to the contract or to this quantity survey, and the quantities stated in the Total Quantity Units column shall NOT be changed.

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

FIRST FLOOR - MEN´S RESTROOM / ACCESIBLE MEN´S RESTROOM

1. PRELIMINARS MEN´S RESTROOM

1.1

DELIMITING AND PROTECTING THE WORK AREA WITH HEAVY DUTY

PLASTIC, CORRUGATED CARDBOARD AND/OR KRAFT PAPER, USING BLUE

(PAINTER'S) TAPE TO PREVENT THE SPREAD OF DUST AND MITIGATE ANY

DAMAGE TO USG PROPERTY (FURNITURE, FLOORS, OR OTHER ROOMS).

SET 1.00 $0.00

1.2

SUPPLY AND INSTALLATION OF WALLS FOR THE PROTECTION OF AREA

BASED ON PLASTERBOARD OF 1.22m x 2.44m x 12.7mm ON A SINGLE SIDE, CONSISTING OF A STRUCTURE OF GALVANIZED PROFILES OF 6.35 CM, CAL

26, SEPARATED EVERY 60 CM, THESE ONCE INTRODUCED INTO 6.35 CM

CAL.26 TIE-OUT CHANNELS WHICH ARE ANCHORED TO THE FLOOR AND

SLAB WITH FIXERS (1" 1/4" AND 1" FRAMER SCREWS). INCLUDES: FINISH

READY TO RECEIVE PAINTING, NORMAL OR FLEXIBLE PERFACINGS

ACCORDING TO PROVIDES, PROFILE AND CHANNEL CAL. 26, 6.35 CM THICK,

METAL CORNERS AND EDGES, REDIMIX IN ALL JOINTS, PLASTER PANEL,

SUPPLY OF MATERIALS, TOOLS, EQUIPMENT, FREIGHT, CARRYING, LABOR

AND EVERYTHING NECESSARY FOR

CORRECT INSTALLATION.

SQM 40.00 $0.00

1.3

SUPPLY AND INSTALLATION OF CORRUGATED CARDBOARD 48" X 250' FOR

FLOOR PROTECTION. INCLUDES: TOOLS, MATERIALS, LABOR AND

EVERYTHING NECESSARY FOR ITS CORRECT INSTALLATION.

SQM 18.00 $0.00

1.4

DISMANTLING OF EXISTING DIVISION SCREENS IN TOILETS AND URINALS BY

MANUAL MEANS INCLUDES: REMOVAL OF DOORS, TOTAL REMOVAL,

LOADING, CARRYING, CUTTING IN FIXING, REMOVAL TO WAREHOUSE ON

SITE, TOOLS, LABOR AND EVERYTHING NECESSARY FOR THEIR CORRECT

EXECUTION.

LOT 1.00 $0.00

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

1.5

UNINSTALLATION OF BATHROOM FURNITURE (TOILETS, SINKS, URINALS)

WITH RECOVERY, INCLUDES: PLUGGING OF HYDRAULIC PIPE AND

SANITARY, HAULING TO THE SITE WAREHOUSE, LABOR, EQUIPMENT AND

TOOLS.

EACH 4.00 $0.00

1.6 DISASSEMBLY OF THE SINK CABINET INCLUDES: TOOLS, MATERIALS, LABOR,

TRANSPORTATION TO THE WAREHOUSE ON SITE. EACH 1.00 $0.00

1.7 DISMANTLING OF SANITARY ACCESSORIES (TOOL HOLDER, TOWEL HOLDER,

SAFETY BARS, ETC). LOT 1.00 $0.00

1.8

CANCELLATION AND DISMANTLING OF EXISTING WATER INTAKE IN WALL

AND FLOOR, INCLUDES: ELIMINATION OF EXISTING PIPING, PATCHING ,

REMOVAL, TOOLS, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT

EXECUTION.

EACH 4.00 $0.00

1.9

CANCELLATION AND DISMANTLING OF EXISTING 2" DRAINAGE IN WALL

AND FLOOR, INCLUDES: ELIMINATION OF EXISTING PIPE, PATCHING,

REMOVAL, TOOLS, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT

EXECUTION.

EACH 1.00 $0.00

1.10

CANCELLATION AND DISMANTLING OF EXISTING 4" DRAINAGE IN WALL

AND FLOOR, INCLUDES: ELIMINATION OF EXISTING PIPE, PATCHING,

REMOVAL, TOOLS, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT

EXECUTION.

EACH 3.00 $0.00

1.11

DEMOLITION OF EXISTING WALL 0 TO 3.50 M HEIGHT, BY MANUAL MEANS,

INCLUDES: DEMOLITION OF STRUCTURAL ELEMENTS SUCH AS REBAR

FRAMES, ENCLOSURES, BEAMS, ETC, CANCELLATION AND REMOVAL OF

ANY ELECTRICAL, TELEPHONE OR DATA OUTLETS THAT MAY EXIST, TOOLS,

EQUIPMENT, FREIGHT, SCAFFOLDING, LOADING AND CARRYING OUT OF

THE SITE AND LABOR FOR THEIR CORRECT EXECUTION.

SQM 5.00 $0.00

1.12

DEMOLITION OF FINISHING ON EXISTING MARBLE TYPE FLOOR, BY

MANUAL MEANS, INCLUDES: TOOLS, EQUIPMENT, LABOR, LOADING AND

CARRYING AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

SQM 20.00 $0.00

1.13

DISMANTLING AND RECOVERY OF EXISTING MARBLE TYPE PIECE,

INCLUDES: TOOLS, EQUIPMENT, LABOR, HAULING TO THE SITE

WAREHOUSE, AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

M 14.00 $0.00

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

1.14

DISMANTLING OF EXISTING LIGHTS, INCLUDES: ELECTRICAL

DISCONNECTION, CARRYING, REMOVAL, TOOLS, LABOR AND EVERYTHING

NECESSARY FOR ITS CORRECT EXECUTION.

EACH 3.00 $0.00

1.15

CANCELLATION OF ELECTRICAL OUTPUTS OF EXISTING LIGHTS INCLUDES:

DISCONNECTION, REMOVAL OF CABLE, HOSE AND/OR PIPE, CARRYING,

REMOVAL, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT

EXECUTION.

EACH 3.00 $0.00

1.16

CANCELLATION OF ELECTRICAL OUTPUTS OF EXISTING CONTACTS AND

SWITCHES INCLUDES: DISCONNECTION, REMOVAL OF CABLE, HOSE

AND/OR PIPE, CARRYING, REMOVAL, LABOR AND EVERYTHING NECESSARY

FOR ITS CORRECT EXECUTION.

EACH 1.00 $0.00

1.17

GENERAL DAILY CLEANING DURING THE CONSTRUCTION AND AT THE END

FOR DELIVERY, INCLUDES: CLEANING OF FLOORS, TILES, MARBLE,

WINDOWS, CARRYING, STACKING, LOADING AND REMOVAL OF WEEKLY

DEBRIS BY DUMP TRUCK OFF THE CONSTRUCTION TO A COLLECTION

CENTER, TOOLS, EQUIPMENT , LABOR, AND EVERYTHING NECESSARY FOR

ITS CORRECT EXECUTION.

LOT 1.00 $0.00

1.18 CARRYING MATERIAL FROM DEMOLITIONS. M³ 7.00 $0.00

1.19 REMOVAL OF MATERIAL PRODUCT FROM DEMOLITIONS TO OFFICIAL

DISTRIBUTION. M³ 7.00 $0.00

1.20

DEMOLITION OF MASONRY BASES AND BENCH "SLAB" IN EXPANSION AREA.

THE DIMENSIONS OF THE BASES ARE APPROXIMATELY 1.08 X 1.20 X 0.65 M

(2 PIECES) AND THE BENCH AREA IS 3.0 X 1.20 X 0.35 M (INCLUDING

MASONRY BASE AND 10 CM SLAB). INCLUDES; LABOR, TOOLS, HAULING

AND REMOVAL OF THE MATERIAL PRODUCED BY THE DEMOLITION

OUTSIDE THE WORK SITE TO A LOCALLY AUTHORIZED DUMP.

LOT 1.00 $0.00

2. CIVIL WORK

2.1

SLOTS IN WALL TO RECEIVE ELECTRICAL PIPE FROM 13 TO 52 MM,

INCLUDES: CUTTING WITH DISC, COVERING AND REPAIRING SLOT, TOOL,

EQUIPMENT, SCAFFOLDING, LOADING AND CARRYING AND LABOR FOR ITS

CORRECT INSTALLATION.

3. FINISHES

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

3.1

SUPPLY AND INSTALLATION OF A WALL BASED ON GYPSUM BOARD OF

1.22m x 2.44m x 12.7mm ON TWO SIDES, CONSISTING OF A STRUCTURE OF

GALVANIZED PROFILES OF 6.35 CM, CAL 26, SEPARATED EVERY 60 CM,

THESE IN TURN INSERTED INTO MOORING CHANNELS OF 6.35 CM CAL.26

WHICH ARE ANCHORED TO THE FLOOR AND SLAB WITH FIXERS (FRAMER

SCREWS OF 1" 1/4" AND 1"). INCLUDES: FINISH READY TO RECEIVE

PAINTING, NORMAL OR FLEXIBLE PERFACINGS AS APPLICABLE, PROFILE

AND CHANNEL CAL. 26, 6.35 CM THICK, METAL CORNERS AND EDGES,

REDIMIX IN ALL JOINTS, GYPSUM PANEL (WATER RESISTANT TYPE), SUPPLY

OF MATERIALS, TOOLS, EQUIPMENT, FREIGHT, CARRYING, LABOR AND

EVERYTHING NECESSARY FOR ITS CORRECT INSTALLATION.

SQM 20.00 $0.00

3.2

SUPPLY AND INSTALLATION WALL BASED ON CEMENT BOARD OF 1.22m x 2.44m x 12.7mm ON TWO SIDES, CONSISTING OF A STRUCTURE OF

GALVANIZED PROFILES OF 6.35 CM, CAL 26, SEPARATED EVERY 60 CM,

THESE IN TURN INSERTED INTO MOORING CHANNELS OF 6.35 CM CAL.26

WHICH ARE ANCHORED TO THE FLOOR AND SLAB WITH FIXERS (FRAMER

SCREWS OF 1" 1/4" AND 1"). INCLUDES: FINISH READY TO RECEIVE

PAINTING, NORMAL OR FLEXIBLE PERFACINGS AS APPLICABLE, PROFILE

AND CHANNEL CAL. 26, 6.35 CM THICK, METAL CORNERS AND EDGES,

REDIMIX IN ALL JOINTS, CEMENT BOARD PANEL, SUPPLY OF MATERIALS,

TOOLS, EQUIPMENT, FREIGHT, CARRYING, LABOR AND EVERYTHING

NECESSARY FOR ITS CORRECT INSTALLATION.

SQM 17.00 $0.00

3.3

FINE FLATTENING OF PASTE ON WALL FROM FLOOR TO CEILING, FINISHED

TO RECEIVE PAINT, INCLUDES: WALL REPAIR, WALL EDGE, WINDOW EDGES,

COLUMN AND BEAM EDGES, MATERIALS, ELEVATIONS, CARRYING, WASTE,

LABOR, TOOLS, SCAFFOLDS , EQUIPMENT AND EVERYTHING NECESSARY

FOR ITS CORRECT EXECUTION.

SQM 133.00 $0.00

3.4

SUPPLY AND APPLICATION OF VINYL PAINT BRAND COMEX VINIMEX COLOR

RING 314-01 ON WALLS AND INSIDE DOORS AND WINDOWS ON PLASTER

AND CEMENT BOARD WALL, HEIGHT FROM 0.00 TO 3.00 M, INCLUDES: A

PRIMARY COAT, SUPPLY OF MATERIALS, TOOL , EQUIPMENT, LADDERS,

FREIGHT, CARRYING, LABOR AND EVERYTHING NECESSARY FOR ITS

CORRECT APPLICATION.

SQM 113.00 $0.00

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

3.5

SUPPLY AND APPLICATION OF COMEX VINIMEX BRAND VINYL PAINT,

MATTE WHITE COLOR ON EXISTING CEILING, HEIGHT FROM 0.00 TO 3.00

M, INCLUDES: A PRIMARY HAND, SUPPLY OF MATERIALS, TOOLS,

EQUIPMENT, LADDERS, FREIGHT, CARRYING, LABOR AND EVERYTHING

WHAT YOU NEED FOR ITS CORRECT APPLICATION.

SQM 20.00 $0.00

3.6

SUPPLY AND INSTALLATION OF INTERCERAMIC BRAND PORCELAIN

FLOORING 60 X 120 M MOD. SERENITY COLOR ATLANTIC GRAY, NOZZLE

COLOR AUTHORIZED BY SUPERVISION, SEATED WITH CREST WHITE

CEMENT, INCLUDES: SUPPLY OF MATERIALS, CUTTING, TOOLS,

EQUIPMENT, FREIGHT, REPAIRS, CARRYING, LABOR AND EVERYTHING

NECESSARY FOR ITS CORRECT INSTALLATION.

SQM 20.00 $0.00

3.7

SUPPLY AND INSTALLATION OF INTERCERAMIC BRAND PORCELAIN PIECE

60m X 120m MOD. SERENITY COLOR ATLANTIC GRAY, NOZZLE COLOR

AUTHORIZED BY SUPERVISION, SEATED WITH CREST WHITE CEMENT,

INCLUDES: SUPPLY OF MATERIALS, CUTTING, TOOLS, EQUIPMENT,

FREIGHT, REPAIRS, CARRYING, LABOR AND EVERYTHING NECESSARY FOR

ITS CORRECT INSTALLATION.

M 35.00 $0.00

3.8

SUPPLY AND INSTALLATION OF BASEBOARD MARBLE TYPE PIECE BRAND,

MODEL AND COLOR SIMILAR TO THE EXISTING FINISH, NOZZLE COLOR

AUTHORIZED BY SUPERVISION, SEATED WITH CREST WHITE CEMENT.

INCLUDES: SUPPLY OF MATERIALS, CUTTING, TOOLS, EQUIPMENT,

FREIGHT, PATCHING, CARRYING, HANDLING WORK AND EVERYTHING

NECESSARY FOR ITS CORRECT INSTALLATION.

M 13.00 $0.00

3.9

SUPPLY AND INSTALLATION OF DIVISION SCREENS IN URINALS, SANILOCK

BRAND OR SIMILAR, MEASUREMENTS 1.20m x 0.46m, STAINLESS STEEL

FINISH. INCLUDES: 2" X 4" DOUBLE MONTEN PROFILE FORMING A BOX FOR

SUPPORT OF SCREENS FIXED TO WALLS, 3 URINILLO MODULES, KIT FOR

INSTALLATION AND COVERS, LABOR, MATERIAL, TOOLS, CARRYING AND

EVERYTHING NECESSARY FOR ITS CORRECT INSTALLATION.

EACH 2.00 $0.00

3.10

SUPPLY AND INSTALLATION OF DOOR FOR TOILET, SANILOCK BRAND OR

SIMILAR MEASUREMENTS 0.60 X 2.10 M, STAINLESS STEEL FINISH.

INCLUDES: 2" X 4" DOUBLE MONTEN PROFILE FORMING A BOX FOR

SUPPORT OF SCREENS FIXED TO WALLS, KIT FOR INSTALLATION AND

COVERS, LABOR, MATERIAL, TOOLS, CARRYING AND EVERYTHING

NECESSARY FOR ITS CORRECT INSTALLATION.

EACH 1.00 $0.00

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

3.11

OPENING AND FORGING OF LIGHTING HOLES, LEAVING A FINISH EQUAL TO

THE EXISTING READY TO RECEIVE PAINT, INCLUDES: DEMOLITION AND

PLASTERING, FILLETS, LABOR, TOOLS, MATERIALS, EQUIPMENT, SCAFFOLDS

AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

LOT 1.00 $0.00

4. HYDRAULIC AND SANITARY INSTALLATION

4.1

INTERCONNECTION OF THE HYDROSANITARY SYSTEM INCLUDES: TOOLS,

MATERIALS, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT

EXECUTION.

LOT 1.00 $0.00

4.2

SUPPLY AND INSTALLATION OF WATER INTAKE THROUGH TUBOPLUS PIPE

WITH FLUSHOMETER. INCLUDES: CUT-OFF VALVE, ELBOWS, COUPLINGS,

TEES, REDUCTIONS, MATERIAL, LABOR, TOOLS, CONSUMABLES,

ACCESSORIES, STORAGE, TRANSFER TO THE SITE, CLEANING, AIRTIGHTNESS

TESTS, STEP IN SLAB-WALL, REPAIRING AND EVERYTHING NECESSARY FOR

ITS CORRECT EXECUTION.

EACH 8.00 $0.00

4.3

SUPPLY AND INSTALLATION OF 2" DRAINAGE USING PVC PIPE WITH

FLUSHOMETER. INCLUDES: YEE, ELBOWS, COUPLINGS, TEES, REDUCTIONS,

MATERIAL, LABOR, TOOLS, CONSUMABLES, ACCESSORIES, STORAGE,

TRANSFER TO THE SITE, CLEANING , AIR-TIGHTNESS TESTS, STEP IN SLAB-

WALL, RESIGNMENTS AND EVERYTHING NECESSARY FOR ITS CORRECT

EXECUTION.

EACH 6.00 $0.00

4.4

SUPPLY AND INSTALLATION OF 4" DRAINAGE USING PVC PIPE WITH

FLUSHOMETER. INCLUDES: YEE, ELBOWS, COUPLINGS, TEES, REDUCTIONS,

MATERIAL, LABOR, TOOLS, CONSUMABLES, ACCESSORIES, STORAGE,

TRANSFER TO THE SITE, CLEANING , AIR-TIGHTNESS TESTS, STEP IN SLAB-

WALL, RESIGNMENTS AND EVERYTHING NECESSARY FOR ITS CORRECT

EXECUTION.

EACH 2.00 $0.00

4.5

SUPPLY AND INSTALLATION OF HELVEX BRAND URINARY, MODEL MG

FERRY IN WHITE COLOR, WITH FLUSHOMETER, INCLUDES: COFLEX BRAND

INSTALLATION KIT, STOP KEY, MATERIAL, LABOR, TOOLS, EQUIPMENT,

FREIGHT, CARRIAGE AND EVERYTHING NECESSARY FOR ITS CORRECTNESS

FACILITY.

EACH 3.00 $0.00

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

4.6

SUPPLY AND INSTALLATION OF KOHLER UNDERMOUNT BATHROOM SINK,

MODEL VERTICYL K-2882-HW1, COLOR WHITE, INCLUDES: COFLEX BRAND

INSTALLATION KIT, STOP KEY, MATERIAL, LABOR, TOOLS, EQUIPMENT,

FREIGHT, CARRIAGE AND EVERYTHING NECESSARY TO ITS CORRECT

INSTALLATION.

EACH 3.00 $0.00

4.7

SUPPLY AND INSTALLATION OF KOHLER BRAND TOILET, MODEL. AERODYNE

K-3869LM-S-0, WHITE COLOR INCLUDES: HIDDEN TRAP, INSTALLATION KIT,

STOP KEY, MATERIAL, LABOR, TOOLS, EQUIPMENT, FREIGHT, CARRYING

AND EVERYTHING NECESSARY FOR ITS CORRECT INSTALLATION.

EACH 2.00 $0.00

4.8

SUPPLY AND INSTALLATION OF OVAL SINK AND SINGLE LEVER BRAND

KOHLER MODEL K-14406-CP, CHROME FINISH, INCLUDES: INSTALLATION

KIT NECESSARY FOR THE HYDRAULIC OPERATION OF THE SAME, MATERIAL,

LABOR, TOOLS, EQUIPMENT, FREIGHT, CARRYING AND EVERYTHING

NECESSARY FOR CORRECT INSTALLATION.

EACH 3.00 $0.00

4.9

SUPPLY AND INSTALLATION OF BAR FOR SINK FURNITURE BASED ON

MARBLOCK BRAND MARBLE PLATE, STATUARY MODEL, 2 CM THICK,

INCLUDES: INSTALLATION, TOOLS, FREIGHT AND EVERYTHING NECESSARY

FOR ITS CORRECT EXECUTION.

EACH 2.00 $0.00

4.10 SUPPLY AND INSTALLATION OF GASKETS, HOSES AND VALVES IN

FURNITURE. LOT 1.00 $0.00

4.11

SUPPLY AND INSTALLATION OF SOAP DISPENSER, INCLUDES: CORRECT

FIXATION, SEALANT, TOOLS, EQUIPMENT, LABOR AND EVERYTHING

NECESSARY FOR ITS CORRECT EXECUTION.

EACH 2.00 $0.00

4.12

SUPPLY AND INSTALLATION OF KOHLER COVERED DOUBLE TOILET TISSUE

HOLDER, MODEL COMPONENTS K-78384-CP, COLOR POLISHED CHROME,

INCLUDES: CORRECT FIXATION, SEALANT, TOOL, EQUIPMENT, LABOR AND

EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

EACH 2.00 $0.00

4.13

SUPPLY AND INSTALLATION OF HELVEX SAFETY STRAIGT BAR 27.5", MODEL

B-700-S, COLOR POLISHED CHROME INCLUDES: CORRECT FIXING, TOOL,

EQUIPMENT, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT

EXECUTION.

EACH 2.00 $0.00

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

4.14

SUPPLY AND INSTALLATION OF KOHLER TOWEL BAR 24", MODEL

COMPONENTS K-78373-CP, COLOR POLISHED CHROME, INCLUDES:

CORRECT FIXATION, TOOL, EQUIPMENT, LABOR AND EVERYTHING

NECESSARY FOR ITS CORRECT EXECUTION.

EACH 2.00 $0.00

4.15

SUPPLY AND INSTALLATION FLOAT GLASS SINK MIRROR WITH DIMENSIONS

OF 1.05 M WIDE X 1.00 M HIGH WITH FROSTED PERIMETER FRAME,

INCLUDES: MATERIAL, LABOR, TOOLS, EQUIPMENT AND EVERYTHING

NECESSARY FOR ITS CORRECT INSTALLATION.

EACH 1.00 $0.00

4.16

SUPPLY AND INSTALLATION FLOAT GLASS SINK MIRROR WITH DIMENSIONS

OF 0.63 M WIDE X 1.3 M HIGH, WITH FROSTED PERIMETER FRAME,

INCLUDES: MATERIAL, LABOR, TOOLS, EQUIPMENT AND EVERYTHING

NEEDED FOR CORRECT INSTALLATION.

EACH 1.00 $0.00

5. WOODWORK

5.1

SUPPLY AND INSTALLATION OF SOLID WOOD DOOR (CMR-104) 1.00 M x

2.10 M AND HIGH QUALITY PINE WOOD FRAME WITH STRIPS EVERY 30 CM

IN BOTH DIRECTIONS ACCORDING TO DESIGN (EQUAL TO EXISTING) WITH

SLOW ENERGY SWING DOOR OPERATOR "MAGIC-ACCESS" TYPE STANLEY

OR EQUIVALENT BRAND IN SPECIFICATIONS, PERFORMANCE, QUALITY AND

WARRANTY. INCLUDES: DOOR OPENING SYSTEM, VENEER EQUAL TO

EXISTING, SANDING, PAINTING, WOOD FRAME WITH THE SAME FINISH OF

THE DOOR, CHAMBRANAS, HINGES, FINISH EQUAL TO EXISTING WHITE

COLOR, MATERIALS, HAULING, CUTS, WASTE, FITTING, FIXING, LABOR,

EQUIPMENT, TOOLS, DOOR OPENING SYSTEM INSTALLATION, ELECTRICAL

INSTALLATION, COMMISSIONING AND EVERYTHING NECESSARY FOR ITS

CORRECT OPERATION.

EACH 1.00 $0.00

5.2

SUPPLY AND INSTALLATION OF SOLID WOOD DOOR 1.00m x 2.10m AND

HIGH QUALITY PINE WOOD FRAME WITH STRIPS EVERY 30 CM. IN BOTH

DIRECTIONS ACCORDING TO DESIGN (EQUAL TO EXISTING), INCLUDES:

VENEER EQUAL TO EXISTING, SANDING, PAINTING, WOOD FRAME WITH

THE SAME FINISH OF THE DOOR, CHAMBRANAS, HINGES, FINISH EQUAL TO

EXISTING WHITE COLOR, MATERIALS, HAULING, CUTS, WASTE, FITTING,

FIXING, LABOR, EQUIPMENT AND TOOLS.

EACH 1.00 $0.00

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

5.3

SUPPLY AND INSTALLATION OF SOLID WOOD DOOR OF 0.95m x 2.10m AND

HIGH QUALITY PINE WOOD FRAME WITH STRIPS EVERY 30 CM. IN BOTH

DIRECTIONS ACCORDING TO DESIGN (EQUAL TO EXISTING), INCLUDES:

VENEER EQUAL TO THE EXISTING, SANDING, PAINTING, WOOD FRAME

WITH THE SAME FINISH OF THE DOOR, TRIMS, HINGES, DOOR FRAME WITH

THE SAME FINISH AS THE EXISTING. DOOR, TRIMS, HINGES, FINISH EQUAL

TO EXISTING WHITE COLOR, MATERIALS, HAULING, CUTS, WASTE, FITTING,

FASTENING, LABOR, EQUIPMENT AND TOOLS.

EACH 1.00 $0.00

5.4

SUPPLY AND INSTALLATION OF SOLID WOOD DOOR OF 0.60m x 2.10m AND

HIGH QUALITYPINE WOOD FRAMES WITH STRIPS EVERY 30 CM. IN BOTH

DIRECTIONS ACCORDING TO DESIGN (EQUAL TO EXISTING), INCLUDES:

VENEER EQUAL TO EXISTING, SANDING, PAINTING, WOOD FRAME WITH

THE SAME FINISH OF THE DOOR, TRIMS, HINGES, FINISH EQUAL TO

EXISTING WHITE COLOR, MATERIALS, HAULING, CUTS, WASTE, FITTING,

FIXING, LABOR, EQUIPMENT AND TOOLS.

EACH 1.00 $0.00

5.5

SUPPLY AND FABRICATION OF NEW WOODEN CABINET FOR SINK WITH

MARBLE COVER, FINISHED WITH ARAUCO COMPOSITE PANEL DOOR 15 MM

MODEL "ASH PRECOMPOSED" INCLUDES: MATERIAL, TOOLS, LABOR,

FREIGHT, TRANSPORTATION AND EVERYTHING NECESSARY FOR ITS

CORRECT EXECUTION.

EACH 2.00 $0.00

6. ELECTRICAL INSTALLATION

6.1

ELECTRICAL WIRING FOR LIGHT FIXTURES, INCLUDES: GALVANIZED BOXES,

CABLES OF THE INDICATED SIZES AND DIAMETERS, FED FROM THE EXISTING

PANEL, CONNECTIONS, TEST FIXTURES, GENERAL REPAIRS, LABOR, TOOLS,

EQUIPMENT AND EVERYTHING NECESSARY FOR ITS CORRECT

INSTALLATION.

EACH 5.00 $0.00

6.2

ELECTRICAL WIRING FOR GFCI OUTLET, INCLUDES: GALVANIZED BOXES,

CABLES OF THE INDICATED GAUGES AND DIAMETERS, FED FROM THE

EXISTING PANEL, CONNECTIONS, TEST FIXING, GENERAL REPAIRS, LABOR,

TOOLS, EQUIPMENT AND EVERYTHING NECESSARY FOR ITS CORRECT

INSTALLATION.

EACH 3.00 $0.00

CLIN DESCRIPTION SERVICE UNIT PRICE PER UNIT

TOTAL

QUANTITY

UNITS

TOTAL COST

6.3

ELECTRICAL WIRING FOR SWITCHES, INCLUDES: GALVANIZED BOXES,

CABLES OF THE INDICATED GAUGES AND DIAMETERS, FED FROM THE

EXISTING PANEL, CONNECTIONS, FIXING, TESTS, GENERAL REPAIRS, LABOR,

TOOLS, EQUIPMENT AND EVERYTHING NECESSARY FOR ITS CORRECT

INSTALLATION.

EACH 4.00 $0.00

6.4

S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .