QA 19GE5020R0063.pdf
PDF 54 KB Posted
- Attached to
- VSAT Internet Service, US Embassy Yaounde, Cameroon Federal contract opportunity
- Solicitation number
- 19GE5020R0063_
About this file
This document contains questions and answers regarding a solicitation for VSAT internet service for the US Embassy in Yaounde, Cameroon. Key details include the requirement for 32 Mbps up/down bandwidth with equipment to be provided by the contractor. No substantial obstructions exist at the installation site and the service is needed as soon as possible. Past performance questionnaires should be included in proposals. The Department of State is the contracting agency and the contractor must comply with host country regulations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA 19GE5020R0063 Part 2.pdf | ||
| Amendment 19GE5020R0063 0002.pdf | ||
| Amendment 19GE5020R0063 0001.pdf | ||
| Attachement 1 FW14.pdf | ||
| Attachment 3 - PastPerfQuestionnaire.pdf | ||
| Solicitation 19GE5020R0063 Vsat Yaounde.pdf | ||
| Attachment 2 - Information - Experience List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENSITIVE BUT UNCLASSIFIED
19GE5020R0063 VSAT Internet Service Yaoundé Questions and Answers Updated to 8/20/2020
Question 1: Could you please indicate what is the bandwidth required?
Answer 1: The bandwidth required is 32 Mbps up/32 Mbps down.
Question 2: Does the client already have the equipment? If so, can the client please provide a copy of the list.
Answer 2: The Contractor shall be responsible to supply all equipment.
Question 3. Will a Value Added Tax/Levy exemption be applied for this solicitation?
Answer 3: Yes
Question 4: Is it possible for us to submit an authorization after contract award, in case we are successful?
Answer 4. If the offeror has not obtained such authorization, it will be necessary to submit:
a) A thorough description as to what steps you have taken to investigate all requirements to obtain authorization to perform in the country of performance
b) Details of your findings and a description of what your organization will actually be required to undertake to obtain licensing and requisite permit(s)
c) Any impact such authorization may have on the contractor’s operating name and address
d) Specific information concerning the period of time you anticipate it will take to obtain appropriate authorization. Any plan reflecting a protracted period (i.e. more than 15 calendar days after award) in obtaining license(s) and/or permit(s) shall be rejected at the discretion of the Contracting Officer since further delay would other- wise harm the Government.
Question 5: Is it allowed for us to partner with a local company which is registered in Cameroon in this scenario, can provide the service and teleport support and services while the local company provides local support.
Answer 5: DOSAR 652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999) warrants you to be in compliance with all necessary requirements to do business and operate in the country of performance. Other than to review the steps you have taken to ensure compliance with host nation law, it is not the intention of the US Government to rule on whether or not, as a matter of general responsibility, the contractor fulfils licensing requirements. DOSAR 652.242-73 places on the contractor the responsibility for obtaining all licenses and permits necessary to perform the contract. The obligations to have necessary licenses apply to the “contractor” not the offeror and come into effect only at contract award. Even after award, the clause by itself does not require production of proof of licensing, but it does preclude the contractor from relying on delays in obtaining licensing as an excuse for failing to begin performance. Requesting participating contractors to submit information with their proposals concerning their respective investigations into licensing status, is aimed at precluding such post award delays which could lead to contract default in the event the successful contractor is unable to obtain required authorization.
Question 6: Do you have any requirements regarding the antenna size, modem type, RF cable length between antenna location and the main room and BUC size?
Answer 6: 50 feet from roof location to network switch. The roof location previously housed a 5 meter dish. The site has no obstructions. The site is a service building that I single story and 15 feet to the roof line from pavement. It is by the parking lot so there will never be any tall obstructions. Line of sight is clear in all directions. The building has previously housed similar equipment which has since been removed.
Question 7: Can you please provide required data Rate (Transmission speed) referenced by the
POW.
i. Required Transmission speed (Kbps or Mbps) From Washington, DC Metro Area (CONUS) to AMERICAN EMBASSY YAOUNDE ?
ii. Required Transmission speed (Kbps or Mbps) From AMERICAN EMBASSY YAOUNDE to the Washington, DC Metro Area (CONUS)
Answer 7: 32 Mbps up/32 Mbps down
Question 8: Is the satellite terminal to be furnished by the contractor to be included in the monthly service – Monthly Recurring Charges (MRC)?
Answer 8. The satellite terminal equipment is to be furnished by the contractor and included in the price proposal.
Question 9: What is the maximum allowed size of the Satellite terminal (earth station antenna size)?
Answer 9: Size necessary for proper operation.
Question 10: Are there any line of sight obstructions to the Earth Station Antenna (ESA)?
Answer 10: There are no substantial obstructions.
Question 11: Are there any Radio Towers, Microwave towers or WiMax (IEEE 802.16) in the vicinity?
Answer 11: No
Question 12: What is the IFL length (in meters or feet) from satellite modem to Antenna ?
Answer 12: 50 feet
Question 13: Is iDirect satellite modem required or can provider choose alternate satellite modem to optimize delivery of service?
Answer 13: The provider may choose.
Question 14: What is the anticipated expansion (data rate / transmission speed), if any, to facilitate the sizing of the Satellite Terminal?
Answer 14: 32Mbps
Question 15: What is signal element timing?
Answer 15: Must carry internet
Question 16: Should we have our previous clients fill out the Past Performance sheets and then include that as separate documentation in our proposal?
Answer 16: That is acceptable.
Question 17: The CLIN 0001 contains the following period of performance: "(Start to End) Date 09/01/2020 to 08/31/2021". When does the service needs to start?
Answer 17: The Government desire to have this service starting as soon as possible. The exact commence of the service will be specified at the time of contract award.
Question 18: Section C.1.1. Requirements states: "The experience and expertise to install a commercial satellite service with associated Internet connectivity on the US Embassy compound in Yaoundé, Cameroon." Can you please confirm if the US Embassy compound is a part of the US Embassy territory and as such is exempt from the host country licensing regulations in the telecommunications area?
Answer 18: No, the US Embassy complies with host country regulations in respect of telecommunication licensing issues.
Question 19: Section 52.215-1 Addendum Instructions to Offerors, PART I – TECHNICAL CAPABILITY PROPOSAL, point 4) Past Performance Information states: "b). The Offeror will be responsible for contacting the past performance points of contact referenced by offerors in their proposal. Are the completed questionnaires part of the offeror's proposal package and should the filled in questionnaires be returned by the same deadline as the proposal?
Answer 19: Past Performance are part of the proposal and should be send via email with the Technical proposal.
Question 20: The requirement states credits are applied to each individual service. Our understanding is that this solicitation is for wireless satellite service to deliver high speed internet. Is there more than one service we should be focused on?
Answer 20: The reference is to upstream and downstream.
Question 21: This section dictates the use of standard C-band to deliver the service, which normally is included in the beginning of the SOW. Also, there is no mention of specific data throughput rates for the up and downlinks, or even mention of anticipated traffic required to traverse the network to size it properly.
Is the Government looking for a strictly C-band solution or are you open to alternative solutions in bands delivering greater throughput and lower cost?
Is the Government identifying C-band due to pre-existing infrastructure located at the Cameroon location? If so, who owns the contract for the current infrastructure/service?
Without an example of traffic patterns and data usage rates, how is the vendor to properly size a wireless satellite network given the LPTA evaluation criteria?
Answer 21: Contractor shall propose the technology that they have to provide the requested bandwidth.
Question 22: SOW – NOC Locations (pg. 9 of 62) – e) Government has identified 4 key locations and roles that must be identified in the proposal response, dictating how a vendor provides NOC support services.
US based companies provide global NOC support services all the time without the need for an additional International NOC location. Also, the title of Global Operations Director can be different depending on the company with the same responsibility level. Will the Government allow a vendor to provide their own NOC structure approach instead of dictating the different levels as is stated in the current SOW?
Answer 22: Proposals shall be based upon the NOC support services included in the SOW.
Additional alternate price proposals may be considered.