About this file

This is a solicitation for a firm fixed-price construction contract to provide elevator replacement services at the U.S. Embassy in Georgetown, Guyana. The scope of work includes removing the existing hydraulic elevator, backfilling and capping the hoistway, and installing a new MRL elevator. The Regional Procurement Support Office in Frankfurt, Germany will issue the solicitation in the second quarter of 2020. Offerors must provide design, management, construction, and supervision services to complete the work within established schedules. The contract price will cover all labor, materials, equipment, and services to remove the old elevator and install the new one. The deadline for offers is April 16, 2020. The Department of State is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Replacement - US Embassy Georgetown, newest first.
File Type Posted
Q and A 19GE5020R0021.pdf PDF
Guyana Layout.pdf PDF
fw14.pdf PDF
19GE5020R0021 0004.pdf PDF
iw14.pdf PDF
19GE5020R0021 0003.pdf PDF
19GE5020R0021 0002.pdf PDF
19GE5020R0021 0001.pdf PDF
J.2.1 Sample ILC - Performance Guaranty.pdf PDF
J.3.1 Sample Breakdown of Price Proposal.xlsx XLSX spreadsheet
J.1.1 Specifications.pdf PDF
J.2.2 Sample ILC - Payment Guaranty.pdf PDF
J.2.3 COR Questionnaire for TCNs.pdf PDF
J.1.2 S-15A-Elevator Plan.pdf PDF
RFP Cover Letter.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION

DOCUMENT

Elevator Replacement US Embassy Georgetown, Guyana

Solicitation No. 19GE50-20-R-0021

US Consulate General Regional Procurement Support Office Frankfurt [RPSOFR] Giessenerstrasse 30 60435 Frankfurt am Main, Germany

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

19GE5020R0021 SEALED BID (IFB)

X NEGOTIATED (RFP)

2. TYPE OF SOLICITATION 3. DATE ISSUED

02/18/2020

RATING

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

CODE FRANK

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: RPSO

FRANKFURT, 60435

GERMANY

7. ISSUED BY

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: RPSO

FRANKFURT, 60435

GERMANY

8. ADDRESS OFFER TO

9. FOR INFORMATION EMAIL: a. NAME

David D. Machen

b. TELEPHONE NO. (Include area code)(NO COLLECT CALLS) c. EMAIL machendd@state.gov

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Section A - Solicitation, Offer, and Award Section B - Supplies or Services and Price/Costs Section C - Description/Specifications/Statement of Work Section D - Packing and Marking Section E - Inspection and Acceptance Section F - Deliverables and Performance Section G - Contract Administration Data Section H - Special Contract Requirements Section I - Contract Clauses Section J - List of Attachments

J.1 Project Specifications J.2 Sample Administrative Documentation J.3 Supplementary Documents

Section K - Representations, Certifications and other Statements of Offerors Section L - Instructions, Conditions, and Notices to Offerors Section M - Evaluation factors for Award

11. The Contractor shall begin performance within ___15___ calendar days and complete it within ___F.1___ calendar days after receiving award, X notice to proceed. This performance period is X mandatory negotiable. ( (See _Section F.1_.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

X YES NO

12b. CALENDAR DAYS

Sealed offers in original and __2__ copies to perform the work required are due at the place specified in item 8 by __15:00:00__ (hour) local time __04/16/2020 __ (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

a.

b. An offer guarantee is, X is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

d.

Offers providing less than __90__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA - FAR (48 CFR) 53.236-1(e)

19GE5020R0021

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CONTACT: DUNS:

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified) G.4.2

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY FRANK

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: RPSO

FRANKFURT, 60435

GERMANY

AMERICAN EMBASSY GEORGETOWN

100 YOUND AND DUKE STREET

ATTN: OBO

GEORGETOWN

GUYANA

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No futher contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

David A. Cubitt 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 4-85) BACK

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs

SECTION B - SUPPLIES OR SERVICES AND PRICES / COSTS

B.1 SERVICES

B.2 TYPE OF CONTRACT

B.3 CONTRACT PRICE

B.4 VALUE ADDED TAX (VAT)

B.5 DEFENSE BASE ACT (DBA) INSURANCE

B.6 ABBREVIATIONS

C Descriptions/Specifications/Statement of Work

C.1 PROJECT NAME & LOCATION

C.2 STATEMENT OF WORK

C.3 PROJECT SPECIFICATIONS

C.4 PROJECT DRAWINGS

652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

D Packaging and Marking

652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE

UNITED STATES (JUL 1988)

D.1 DUTY-FREE CLEARANCE

E Inspection and Acceptance 52.246-12 Inspection of Construction (Aug 1996)

E.1 INSPECTION OF CONSTRUCTION

E.2 SUBSTANTIAL COMPLETION

E.3 USE OF EQUIPMENT BY THE GOVERNMENT

E.4 QUALITY ASSURANCE AND CONTROL

E.5 FINAL COMPLETION AND ACCEPTANCE

F Deliveries or Performance

F.1 COMMENCEMENT, PROSECUTION & COMPLETION OF WORK (FAR 52.211-10 APR

1984)

F.2 LIQUIDATED DAMAGES (FAR 52.211-12 SEP 2000)

F.3 CONTRACTOR'S SUBMISSION OF CONSTRUCTION SCHEDULES

F.4 DELIVERABLES

F.5 ACCEPTANCE OF SCHEDULE

F.6 NOTICE OF DELAY

F.7 MONTHLY PROGRESS REPORT

F.8 NOTICE TO PROCEED

F.9 WORKING HOURS

F.10 EXCUSABLE DELAYS

F.11 PRE-CONSTRUCTION CONFERENCE (FAR 52.236-26 FEB 1995)

FAR 52.242-14 SUSPENSION OF WORK (APRIL 1984)

FAR 52.242-15 STOP-WORK ORDER (AUG 1989)

FAR 52.242-17 GOVERNMENT DELAY OF WORK (APRIL 1984)

FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APRIL 1984)

G Contract Administration Data

G.1 AUTHORITY OF CONTRACTING OFFICER

G.2 CONTRACT ADMINISTRATION DATA

G.3 SUPERINTENDENCE BY THE CONTRACTOR (FAR 52.236-6 APR 1984)

G.4 PAYMENT FOR CONSTRUCTION SERVICES

G.5 ADVANCE PAYMENT

H Special Contract Requirements

H.1 BOND REQUIREMENTS

H.2 INSURANCE

H.3 DEFINITIONS

H.4 OWNERSHIP AND USE OF DOCUMENTS

H.5 SECURITY

H.6 GOVERNING LAW

H.7 LANGUAGE PROFICIENCY

H.8 LAWS AND REGULATIONS

H.9 RESPONSIBILITY OF CONTRACTOR

H.10. CONSTRUCTION OPERATIONS

H.11 TEMPORARY FACILITIES AND SERVICES

H.12 SAFETY

H.13 SUBCONTRACTORS AND SUPPLIERS

H.14 CONSTRUCTION PERSONNEL

H.15 MATERIALS AND EQUIPMENT

H.16 IMPORTED MATERIALS, EQUIPMENT, AND PERSONNEL

H.17 SPECIAL WARRANTIES

H.18 EQUITABLE ADJUSTMENTS

H.19 NONCOMPLIANCE WITH CONTRACT REQUIREMENTS

H.20 ZONING APPROVALS & BUILDING PERMITS

H.21 ASSIGNMENT

H.22 AVAILABILITY OF FUNDS

H.23 ASBESTOS-CONTAINING MATERIALS RESTRICTION

H.24 PERFORMANCE OF WORK BY THE CONTRACTOR (FAR 52.236-1 APR 1984)

H.25 CONTRACTOR RECRUITMENT OF THIRD-COUNTRY NATIONALS

I Contract Clauses 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.215-21 Alt IV Requirements for Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (Oct 2010) - Alternate IV (Oct 2010) 52.219-4 Notice of Price Evaluation preference for HUBZone Small Business Concerns (Oct 2014)..49 52.222-19 Child Labor--Cooperation with Authorities and Remedies (Oct 2019) 52.225-13 Restrictions on Certain Foreign Purchases (June 2008) 52.228-15 Performance and Payment Bonds - Construction (Oct 2010) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.242-14 Suspension of Work (Apr 1984) 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I (Sept 1996) 52.203-6 Restrictions On Subcontractor Sales To The Government (Sept 2006) 52.222-50 Combating Trafficking in Persons (Jan 2019) 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan (Mar 2015) 52.225-5 Trade Agreements (Oct 2019) 52.228-3 Workers' Compensation Insurance (Defense Base Act) (July 2014) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.247-63 Preference for U.S.-Flag Air Carriers (June 2003) 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) 52.252-2 Clauses Incorporated by Reference (Feb 1998)

652.204-70 DEPARTMENT OF STATE PERSONAL IDENTIFICATION CARD POLICY AND

PROCEDURES (FEB 2015)

652.225-71 SECTION 8(a) OF THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED

(AUG 1999)

652.229-71 PERSONAL PROPERTY DISPOSITION AT POSTS ABROAD (AUG 1999)

652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999)

652.243-70 NOTICES (AUG 1999)

J List of Attachments

SECTION J - LIST OF ATTACHMENTS

J.1 PROJECT SPECIFICATIONS

J.2 SAMPLE ADMINISTRATIVE DOCUMENTATION

J.3 SUPPLEMENTARY DOCUMENTS

K Representations, Certifications, and Other Statements of Offerors or Respondents

52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions (Sept 2007) 52.204-17 Ownership or Control of Offeror (Jul 2016) 52.222-38 Compliance with Veterans' Employment Reporting Requirements (Feb 2016) 52.203-2 Certificate Of Independent Price Determination (Apr 1985) 52.204-8 Annual Representations and Certifications (Dec 2019) 52.204-20 Predecessor of Offeror (Jul 2016) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Dec 2019) 52.204-26 Covered Telecommunications Equipment or Services-Representation (Dec 2019) 52.209-7 Information Regarding Responsibility Matters (Oct 2018) 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (Jun 2018)

652.225-70 ARAB LEAGUE BOYCOTT OF ISRAEL (AUG 1999)

K.1 AUTHORIZED CONTRACT ADMINISTRATOR

K.2 CONTRACTOR RECRUITMENT OF THIRD COUNTRY NATIONALS (TCNs)

K.3 CERTIFICATION

L Instructions, Conditions, and Notices to Offerors and Respondents 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.215-1 Instructions to Offerors-Competitive Acquisition (Jan 2017) 52.232-38 Submission of Electronic Funds Transfer Information with Offer (Jul 2013) 52.236-27 Site Visit (Construction) (Feb 1995) 52.236-28 Preparation of Proposals-Construction (September 2019) 52.204-7 System for Award Management (Oct 2018) 52.215-20 Alt IV Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (Oct 2010) - Alternate IV (Oct 2010) 52.216-1 Type of Contract (Apr 1984) 52.233-2 Service of Protest (Sept 2006)

652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)

L.1 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

L.2 SOLICITATION PROVISIONS IN FULL TEXT

L.3 MAGNITUDE OF CONSTRUCTION PROJECT

L.4 REVIEW OF DOCUMENTS

L.5 SUBMISSION OF OFFERS

L.5.4 SUMMARY OF PROPOSAL INSTRUCTIONS

L.5.5 DETAILED INSTRUCTIONS

L.6 SITE VISIT (FAR 52.236-27 Alt I FEB 1995)

L.7 PROPOSAL DUE DATE

M Evaluation Factors for Award 52.225-17 Evaluation of Foreign Currency Offers (Feb 2000)

M.1 EVALUATION OF PROPOSALS

M.2 AWARD WITHOUT DISCUSSIONS

M.3 CONTRACT AWARD

001 CLIN 0001 - REMOVAL AND DISPOSAL OF EXISTING

ELEVATOR

Construction Services, to include all labor, materials, equipment, transportation, overhead, other indirect costs, costs for insurance (other than DBA), Letters of Credit, and profit;

1.00 LT

This item shall include any and all cost to remove, transport, and dispose of the existing elevator.

Additionally, it shall include the backfilling of the hole at the base of the hoistway and capping it with concrete.

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

002 CLIN 0002 - INSTALLATION OF NEW MRL ELEVATOR

Construction Services, to include the supply and delivery of all equipment, all labor, materials, overhead, other indirect costs, costs for insurance (other than DBA), Letters of Credit, and profit;

1.00 LT

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

003 CLIN 0003 - DEFENSE BASE ACT (DBA) INSURANCE 1.00 LT

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

004 CLIN 0004 - VALUE ADDED TAX 1.00 LT

Type of Contract Pricing:

Doc Ref No:

Delivery Date FOB:

SECTION B - SUPPLIES OR SERVICES AND PRICES / COSTS

B.1 SERVICES

The Contractor shall provide for

• the removal and disposal of the one (1) direct acting hydraulic elevator,

• backfilling, and capping with conrete, the hole, at the base of the hoistway, that the previous elevator re-quired, and

• the design, supply, and installation of one (1) new MRL elevator in the existing hoistway.

All work shall be performed in accordance with the specifications contained at Section J, List of Attachments, and all other documents incorporated into this contract. The Contractor is to perform the services in accordance with the terms and conditions of this contract/solicitation, and in strict conformance with the contract clauses and any special conditions contained herein.

19GE5020R0021

Line Item Summary

Solicitation Number:

19GE5020R0021

Contract Number: Title: GEO - Elevator Replacement Date of Solicitation:

02/18/2020

Line Item No. Description Quantity Unit Unit Price Total Cost

B.2 TYPE OF CONTRACT

This is a firm fixed-price contract payable entirely in the currency indicated by the Contractor in Sub-Section B.3. No additional sums will be payable on account of any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract.

Nor will the contract price be adjusted on account of fluctuations in the currency exchange rates. Changes in the contract price or time to complete will be made only due to changes made by the Government in the work to be performed, or by delays caused by the Government (see Sub-Section F.10, Excusable Delays), as determined and approved by the Contracting Officer.

B.3 CONTRACT PRICE

The Contractor shall complete all work (including furnishing all labor, material, equipment, and services) re-quired under this contract for the following firm fixed-price and within the time specified herein. This price shall include all labor, services, materials, equipment, overhead, costs for insurance, costs of obtaining Irrevoc-able Letters of Credit, profit, travel, DBA Insurance, and any other costs required to perform and complete all construction services, in accordance with the Statement of Work (SOW), drawings, specifications, and all other contract terms and conditions stated within the contract.

The cost of any materials or equipment required in conjunction with the services rendered herein shall be included in the proposed firm fixed-price.

A Price Proposal Breakdown is provided under Section J, Attachment J.3.1 - Breakdown of Price Proposal. The Contractor shall complete the attachment and ensure that the total amount matches that of the total firm fixed-price proposal in the offeror’s price proposal in Section B.3.1.

Insurance required by FAR 52.228-3, Workers’ Compensation Insurance (Defense Base Act), shall be part of the firm fixed-price. Any costs not priced will be included in overhead and other indirect costs.

B.3.1 Total Contract Price The Offeror shall insert their total price proposal costs as follows:

CLIN Description Price

0001 REMOVAL AND DISPOSAL OF EXIST-

ING ELEVATOR:

This item shall include any and all cost to remove, transport, and dispose of the exist-ing elevator, as specified in the Statement of Work. Additionally, it shall include the backfilling of the hole at the base of the hoistway and capping it with concrete.

0002 INSTALLATION OF NEW MRL ELEV-

ATOR:

Construction services as specified in the Statement of Work

0003 DEFENSE BASE ACT (DBA) INSUR-

ANCE

0004 VALUE ADDED TAX (VAT)

Total Contract Price

(CLIN 0001 - CLIN 0004)

State Currency: __________________________________________

The offeror shall clearly identify and state the currency for all costs in their price proposal. After award, the Contractor shall invoice in and payment will be made according to the currency identified in the offerror's pro-posal, unless otherwise specified by the Contracting Officer.

B.4 VALUE ADDED TAX (VAT)

B.4.1 Including Value Added Tax in Proposals

Offerors shall identify Value Added Tax (VAT) as a separate line item in Section B.3 CONTRACT PRICE, and additionally in the required breakdown of the price proposal.

B.4.2 Including Value Added Tax in progress payments.

Value Added Tax shall be reflected as a separate cost item on all invoices submitted under the resulting con-tract. The US Government reserves the right to require documentary proof of payment of Value Added Tax claimed by the contractor against individual payment requests. Any refund of VAT to the Contractor shall be paid to the Government to the extent the Government reimbursed the contractor for the VAT payment.

B.4.3.1 Recoverable Value Added Tax.

The following conditions are required to be met in order for the US Government to recover Value Added Tax paid to contractors in the performance of this contract from the host country Ministry of Finance.

For the US Government to recover Value Added Tax, it will be necessary for the contractor, as included in Block 14 of the SF- 1442, to be a company operating within and physically located in the country of perform-ance.

This company shall also have the following registrations:

Value Added Tax Registration Number;

Dunn and Bradstreet Registration Number; and System for Award Management (SAM) Registration

B.4.3.2 Non-Recoverable Value Added Tax

It is not possible for the US Government to recover Value Added Tax from the host country Ministry of Finance against contracts awarded to companies with an address outside of the country of performance i.e. contractors who do not fulfill the requirements stated in B.4.3.1 above.

B.5 DEFENSE BASE ACT (DBA) INSURANCE

B.5 DEFENSE BASE ACT (DBA) INSURANCE

B.5.1 DBA insurance is required for all United States citizens or residents and individuals hired in the United States, regardless of citizenship for any construction and services for U. S. overseas contracts over US$3,500.00. DBA insurance is also required for all Host Country Nationals (HCNs) and Third Country Na-tionals (TCNs) working overseas unless waved by the Department of Labor (DOL). Only the countries listed currently on the DOL’s Active DBA Waivers are not required to have DBA insurance for Host Country Nation-als (HCNs) and Third Country Nationals (TCNs). See website for country waivers: ht-tps://www.dol.gov/owcp/dlhwc/dbawaivers/dbawaivers.htm). The waiver is only valid if alternative worker’s compensation benefits are provided to the waived employees pursuant to applicable local law. If there are no local worker’s compensation laws, the waiver has no effect and HCN and TCN (if applicable by local law) working under a U. S. contract shall be included and covered under the DBA.

B.5.2 The DBA insurance may be obtained from any authorized DBA insurance broker, see Sub-Section I.14, FAR 52.228-3 WORKER’S COMPENSATION INSURANCE (DEFENSE BASE ACT) (APR 1984). New DBA insurances policies can be purchased directly from any DOL approved insurance carrier. A list of DOL approved carriers may be found at http://www.dol.gov/owcp/dlhwc/lscarrier.htm.

B.5.3 The Contractor will be reimbursed for DBA only to the extent the contractor provides documentary proof that DBA has been paid and only to the extent quoted in the Pricing Schedule.

B.5.4 DBA insurance cost will be evaluated as part of the total evaluated fixed price and included in the fixed price of the contract. Where DBA is applicable, the Contractor will be required to provide evidence of insurance (certification of coverage and a paid invoice) within 15 calendar days from the date of award.

B.5.5 Guyana is currently not included on the DOL’s active waiver list, therefore DBA insurance is required for all employees performing work on this contract.

B.6 ABBREVIATIONS

CLIN Contract Line Item Number CO Contracting Officer COR Contracting Officer's Representative DOSAR Department of State Acquisition Regulations FAR Federal Acquisition Regulations ILOC Irrevocable Letter of Credit INL Internatioal Narcotics and Law Enforcement (US De-partment of State) LNTP Limited Notice to Proceed OBO Overseas Buildings Operations SOW Statement of Work QTY Quantity

Section C- Descriptions/Specifications/Statement of Work

C.1 PROJECT NAME & LOCATION

The Contractor shall furnish and install all materials required by this contract for construction services in sup-port of the Department of State's (DoS) Mission:

- Project Id: Elevator Replacement

- Location: US Embassy Georgetown, Guyana

C.2 STATEMENT OF WORK

C.2.1 DESCRIPTION

1. General

a. Completely remove and dispose of the one (1) direct acting hydraulic elevator in the Georgetown Chan-cery. Remove existing piston and jack, backfill hole and cap with concrete. Design and install one MRL elevators in the existing hoistway. The installation shall provide the largest capacity elevators that will fit into the existing hoistway.

b. The one elevator in the Chancery shall be in accordance with these specifications and the modified con-tract documents.

2. Schedule

Location CHANCERY Designation ELEV 1

Car Use Passenger Capacity 3000 lb

Speed 90 fpm Stops/Openings 3

Door Type (Front) Single Speed Side Slide Door Type (Rear) N/A

Minimum Car Dimensions Provide largest capacity lift that will fit in the existing hoistway.

Type of Operation Simplex Marine Security Panel Operation Post1

Card Reader Operation No

3. Capacity: The net lifting capacity of elevators noted above shall be in addition to the weight of the car flooring, cab and associated equipment. The weights of all cab finishes are to be confirmed by the elevator contractor

C.2.2 MISCELLANEOUS

1. Parts

a. Supply essential spare parts list with pricing, subsequent to final acceptance of the equipment, at the prevailing prices.

C.2.3 MAINTENANCE

1. Initial Maintenance Service: Beginning at Substantial Completion, provide full maintenance service for a minimum of 12 months, using skilled competent employees trained by the elevator manufacturer. Mainten-ance shall, at no additional cost to the government, include monthly preventive maintenance, repair or re-placement of worn or defective components, lubrication, cleaning, and adjusting as required for proper el-evator operation at rated speed and capacity. Use parts and supplies as used in the manufacture and install-ation of original equipment.

a. Perform maintenance, including emergency call back service at no additional cost to the Government:

i. Qualified mechanic shall respond within one hour

ii. No elevator shall be out of service for more than 24 hours.

C.2.4 SUBMITTALS

1. Product Data for each elevator including capacities, sizes, performances, operations, safety features, fin-ishes, and similar information.

2. Shop Drawings for each elevator showing plans, elevations, sections, and large-scale details indicating ser-vice at each landing, coordination with building structure, and relationships with other construction. Show pit, pit ladder, light, service outlet, and sump pump. Indicate variations from specified requirements, max-imum dynamic and static loads imposed on building structure at points of support, and locations of equip-ment and signals. Include maximum and average power demands. Shop drawings shall be prepared and submitted by the construction contractor for OBO approval based upon actual construction and equipment procurement conditions as also reflected in pertinent manufacturers' data and as-built drawings to be sub-mitted to OBO as one complete, comprehensive elevators' proposal package.

3. Samples of exposed finishes for car, hoistway doors, and signal equipment, 75-mm-square samples of sheet materials, and 100-mm-lengths of running trim members.

4. Maintenance manuals for each different electric traction elevator, including operation and maintenance in-structions, parts listing with sources indicated, recommended parts inventory listing, emergency instruc-tions, and similar information shall be provided in English. Include all diagnostic and repair information available to manufacturer's Installer's maintenance personnel.

5. Unit Material Detail Report

C.2.5 QUALITY ASSURANCE

1. Installer Qualifications: Engage the elevator manufacturer or an experienced installer approved by the el-evator manufacturer who has completed elevator installations similar in material, design, and extent to that indicated for this Project and with a record of successful in-service performance.

2. Manufacturers will only be considered that service the local area of the project, and which can provide 1-hour response time for emergency call-backs.

3. Regulatory Requirements: Provide either of the 2 standards below. When a Standard or Code conflicts with the Specification, OBO Elevator Management (AHJ) shall provide the final determination for the op-eration or equipment required to be installed on this project.

a. U.S. Codes and Standards: Minimum standards for the design, installation and operations of el-evator systems include the latest edition at time of award for the following:

i. ASME A17.1/CSA B44 Elevator and Escalator Safety Code.

ii. ASME A17.3 Existing Elevator Safety Code.

iii. ASME A18.1 Safety Standard for Platform Lifts and Stairway Chairlifts.

iv. NFPA 70 National Electric Code.

v. NFPA 72 National Fire Alarm and Signaling Code.

vi. ISO 14798:2009 Risk Assessment.

vii. 2012 International Building Code.

1. Accessibility – Chapter 11.

viii. Seismic Performance: Elevator system shall withstand the effects of earthquake motions determined according to ASCE/SEI 7 and shall comply with elevator safety requirements for seismic risk Zone 2 or greater in ASME A17.1/CSA B44.

1. Project location seismic zone: 2B

b. U.S. Versus Host Country Codes and Standards: Provisions of the host country's local codes and standards shall be applied to the design of the embassy building project. As a general rule, the more stringent of the provisions will be followed in cases of conflict between U.S. codes and stand-ards and the host country's local codes and standards. The following European Committee Stand-ardization (CEN) lift standards are approved for host country lift codes:

i. EN-20 and EN-50

ii. EN81-1; 1998 +A3;2009 safety Rules for the construction of installation of lifts (Electric Lifts).

iii. EN 81-2 ; 1998 +A3;2009 safety Rules for the construction of installation of lifts (Hydraulic Lifts).

iv. EN 81-21: 2009 New passenger and goods passenger lifts in existing buildings.

v. EN 81-28: 2003 Remote alarm on passenger and goods passenger lifts.

vi. EN 81-58: 2003 Landing Doors fire resistance.

vii. EN 81-70: 2003 Accessibilities to lifts for persons with disability.

viii.EN 81-71: 2006 Vandal resistant Lifts.

ix. EN 81-72: 2003 Firefighters’ Lifts.

x. EN 81-73: 2005 Behavior of Lifts in event of fire.

c. An OBO Elevator Management Specialist shall witness final code authority elevat-or inspection, commissioning and acceptance.

C.2.5.1 WARRANTY

A. General Warranty: The contractor shall provide a twelve-month guarantee of all workmanship and material commencing from the date of final acceptance of the elevator. The elevator warranty specified in this Article shall not deprive the Government of other rights the Government may have under the other provisions of the Contract Documents and shall be in addition to, and run concur-rent with, other warranties made by the Contractor under requirements of the Contract Documents.

C.3 PROJECT SPECIFICATIONS

The Project Specifications and Statement of Work are attached in Section J. Any inconsistency in the contract requirements shall be resolved by giving precedence in the order outlined in Section I, FAR 52.215-8 - Order of Precedence - Uniform Contract Format; however, any inconsistencies in respect to the Project Drawings and Specifications shall be governed by FAR 52.236-21.

C.4 PROJECT DRAWINGS

Project Drawings are provided in Section J, Attachment J.1.3. In case of differences between small and large-scale drawings, the latter shall govern. Where a portion of the work is drawn in detail and the remainder of the work is indicated in outline, the parts drawn in detail shall apply also to all portions of the work.

652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

(a) The Contracting Officer may designate in writing one or more Government employees, by name and posi-tion title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer's Representative (COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, un-less the COR is a warranted Contracting Officer and this authority is delegated in the designation.

(b) The COR, who will be appointed at the time of contract award, is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation re-quired by the contract. The COR may provide technical advice, substantive guidance, inspections, invoice ap-proval (except for the final invoice, which must be approved by the Contracting Officer), and other purposes as deemed necessary under the contract. The COR is designated as the authority to act for the Contracting Officer in matters concerning technical clarification, random inspection of Contractor performance to ensure compli-ance with contract specifications and acceptance of the Contractor's performance under this contract. The COR will coordinate all work with the Contractor during the term of this contract. The COR is not authorized to alter the contract's terms, or conditions, including the design to budget parameter. Such changes must be authorized by the Contracting Officer in a written modification to the contract.

Section D- Packaging and Marking

652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE UNITED STATES (JUL 1988)

This is to certify that the item(s) covered by this contract is/are for export solely for the use of the U.S. Foreign Service Post identified in the contract schedule.

The Contractor shall use a photocopy of this contract as evidence of intent to export. Final proof of exportation may be obtained from the agent handling the shipment. Such proof shall be accepted in lieu of payment of ex-cise tax.

(End of clause)

D.1 DUTY-FREE CLEARANCE

In accordance with procedures described in Section H.16, if applicable, duty-free clearance shall include all imported materials, equipment. All shipping containers or otherwise, shall be labeled as follows:

ATTN: Customs & Shipping (CONTRACT 19GE50-20-C-XXXX) to be completed by the Contractor Items shall be marked as “Diplomatic Cargo”.

D.1.1 Material Shipping/Customs Clearance

Material Shipping/Customs Clearance Materials for the Video Surveillance Cameras and Towers shall be shipped to:

U.S. Embassy Georgetown 100 Young and Dukes Streets, Kingston Georgetown Guyana

D.1.2 Free Entry of Goods

To obtain a free entry for the goods the contractor shall provide the COR with the following documentation twenty (20) days prior to the arrival of goods:

- Detailed description of goods (including number of crates)

- Approximate weight

- Approximate value of goods

- Mode of shipment

The Contractor shall provide an Advance Notice to the U.S. Embassy shipping office twenty (20) calender days before any shipment is to be made.

D.1.3 Customs Clearance and Delivery

The Contractor shall estimate a reasonable number of days for custom clearances and delivery. Should the con-tractor fail to provide any required paperwork for the custom clearance process to the U.S. Embassy Geor-getown shipping office and the custom clearances procedure is delayed, the contractor shall be required to pay any additional costs occurred (storage fees).

Section E- Inspection and Acceptance

52.246-12 Inspection of Construction (Aug 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not-

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract re-quirement, nor is the inspector authorized to change any term or condition of the specification without the Con-tracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reas-onably needed for performing such safe and convenient inspections and tests as may be required by the Con-tracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appro-priate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may-

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by re-moving it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

E.1 INSPECTION OF CONSTRUCTION

The Contractor is required to maintain an adequate inspection system that ensures all contractual obligations are meet under the terms and conditions of the contract. The Contractor must maintain inspection records and make them readily available to the Government upon request of the Contracting Officer or the Contracting Officer's Representative (COR), in accordance with FAR 52.246-12.

E.2 SUBSTANTIAL COMPLETION

Please see the following definitions below:

E.2.1 Substantial Completion The stage in the progress of the work as determined and certified by the Contracting Officer or Contracting Of-ficer’s Representative (COR) in writing to the Contractor, on which the work or a portion thereof designated by the Government is sufficiently complete and satisfactory, in accordance with the requirements of the Contract Documents, that it may be occupied or utilized for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

(1) Do not interfere with the intended occupancy or utilization of the work, and;

(2) Can be completed or corrected within the time period required for final completion.

E.2.2 Date of Substantial Completion Inspection The date determined by the Contracting Officer or Contracting Officer’s Representative (COR) of which sub-stantial completion of the work has been achieved.

E.2.3 Request for Substantial Completion Inspection The Contractor shall give the COR at least 15 days advance written notice of the date the work will be substan-tially completed and ready for inspection and tests. The inspection and tests will be started not later than the date specified in the aforesaid notice unless the COR determines that the work is not ready for inspection and so informs the Contractor.

E.2.4 Use and Possesion upon Substantial Completion The Government shall have the right to take possession of and use the work upon substantial completion there-

of. Upon notice by the Contractor that the work is substantially complete and verification thereof on the basis of an inspection by the COR and any required tests, the COR shall furnish the Contractor a Certificate of Substan-tial Completion, accompanied by the Schedule of Defects enumerating items of work remaining to be per-formed, completed or corrected before final completion and acceptance. However, failure of the COR to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract.

The Government's possession or use upon substantial completion shall not be deemed an acceptance of any work under the contract.

E.3 USE OF EQUIPMENT BY THE GOVERNMENT

The following sections below describe the use of equipment by the Government in performance of the contract requirements.

E.3.1 Right to Use The Government may take over and operate, with Government employees, such equipment as is necessary for heating or cooling such areas of the building as require the service, and other equipment such as elevators, elec-trical, plumbing and mechanical systems, as soon as the installation is sufficiently complete to permit opera-tion.

E.3.2 Notice The COR will advise the Contractor in writing, prior to the use of the equipment, which items of equipment will be operated, and the date and time such operation shall begin.

E.3.3 Effect on Warranties The COR will advise the Contractor in writing, prior to the use of the equipment, which items of equipment will be operated, and the date and time such operation shall begin.

E.4 QUALITY ASSURANCE AND CONTROL

A principal factor of performance on a project is the Contractor’s control of the quality of workmanship. The Contractor shall establish and maintain a project-specific Quality Management Program (QMP) which defines and implements a quality system. The quality system is a documented organizational process which describes responsibilities, procedures, and resources for providing quality control and quality assurance on a project. Ef-fectiveness of the QMP is achieved through adequate planning, forceful direction, and checking in the sense of measurement and evaluation. The QMP applies to the control of quality throughout all areas of contract per-formance.

E.4.1 Quality Management Program The Contractor’s QMP shall be Facility Management Office (COR)-approved to provide employees, consult-ants, and/or joint-venture partners with established, uniform procedures for production of project data and docu-ments throughout the construction process. Principal functions of the QMP are the following:

E.4.1.1 Quality Control (QC) Operational techniques and activities that are used to fulfill requirements for construction quality.

E.4.1.2 Quality Assurance (QA) Documentation of planned and systematic actions required to provide confidence that construction services provided are based on project requirements and satisfy stated requirements for quality.

E.4.2 Audits After award of the Contract The Government may perform audits of the Contractor’s QMP to periodically assess conformance with the

QMP in accordance with the provisions of Section E of the contract. Disapproval of the program, or major por-tions, may be cause for a delay in progress of the project’s development or, in some cases, withholding accept-ance of the Contractor’s performed services. The Government may examine the Contractor’s existing quality system prior to award of this contract as part of a pre-contract assessment, in order to determine the ability of the Contractor to satisfy the “quality” requirements of this contract.

E.4.3 Agreement on Quality Assurance The Contractor shall develop a clear understanding with all his consultants on quality assurance matters for which the contractor are responsible, and the quality assurance program of the contractor shall be integrated with that of the Contractor of record.

E.4.4 QMP Submittal Requirements The QMP shall be structured and developed to include the following minimum requirements:

E.4.4.1 Organizational Structure The Contractor shall define and submit a QMP organizational structure within 15 days of contract award, including charts and a description of responsibilities of key persons who will perform the services. Persons responsible for interface with the Government, including the security manager and QMP Manager must be identified. A separate list should also include all team members, in-cluding consultants with telephone and email addresses.

In addition to the submittal of a Quality Management Plan within fifteen (15) calendar days after con- tract award, the Contractor shall also submit a preliminary Quality Management Program as part of their proposal (See L.5.5.3 (E)).

E.4.4.2 Quality Policy The Contractor shall have a stated corporate quality policy. This policy shall be consistent with the Contractor’s quality policy in the QMP. Necessary measures shall be taken by the Contractor to en-sure that the corporate quality policy is understood, implemented, and maintained by all employees of the Contractor and the Contractor’s subcontractors.

E.4.4.3 Building Standards Construction must comply with the building codes and standards as detailed within the project drawings and specifications in addition to conforming to each volume, as applicable, of the 2009 International Code Council body of codes. Inconsistencies among codes and standards shall be brought in writing to the attention of the COR. The COR will resolve any inconsistencies.

E.4.4.4 Other Procedures Other procedures shall address construction management, procurement activities, construction management, quality records, and audits.

E.4.4.5 Security and Communications Interface The Contractor’s QMP shall provide for integration of security and communications requirements into the project.

E.4.4.6 Checking, Coordinating, and Integrating Drawings Quality Control procedures shall be established to ensure individual drawings and other documentation have been checked and that all documentation, including that of the supporting disciplines (e.g., civil, structural, mechanical, electrical) have been coordinated and integrated. Deficiencies, ambi-guities, conflicts, and inconsistencies shall be corrected prior to construction. Similar procedures shall be established to ensure that work in place complies with code requirements without the need for the USG to identify defects and initiate corrective action.

E.4.4.7 Document Control The QMP shall ensure that documents, including subsequent changes, will be reviewed for ad-equacy, approved for release by authorized personnel, and properly conveyed to the Government.

Persons responsible for reviewing, approving, and releasing new and revised documents shall be identified.

E.4.4.8 Reserved

E.4.4.9 Corrective Action The QMP shall clearly define responsibilities and procedures for corrective action in the event that deficiencies in D/B services or resulting deliverables are found to exist.

E.4.5 QMP Reporting The Contractor shall prepare a sample Quality Assurance (QA) Report to be submitted as part of the solicitation package this sample report shall be updated and submitted with 15 calendar days from contract award. This re-port shall identify the QMP procedures used to review drawings and data for these submissions identifying steps taken to coordinate all drawings and documents provided by the Government and shall show contractors co-ordination with the subcontractors. The report shall include:

1. QC Status of the project include evidence of QC effort by inclusion of notes, comments, dialogue and dis-cussion among and between disciplines of QC input and adjudication;

2. Significant Program Problems and their solutions/corrective actions;

3. Organization and Key Personnel Changes to be submitted within 5 working days in advance of the pro-posed change;

4. Certification of completion of QMP procedures and submission completeness;

5. Construction Documents Compliance Letter for the construction works

E.5 FINAL COMPLETION AND ACCEPTANCE

The following sections below describe the terms and conditions for the final completion and acceptance of con-struction services.

E.5.1 Definitions The "Final completion and acceptance" means the stage in the progress of the work as determined by the COR and confirmed in writing to the Contractor, on which all work required under the contract has been completed in a satisfactory manner in accordance with the requirements thereof, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.

The "date of final completion and acceptance" means the date determined by the COR as of which final comple-tion of the work has been achieved, as indicated by written notice to the Contractor.

E.5.2 Request for Final Inspection and Tests The Contractor shall give the COR at least 15 days advance written notice of the date the work will be fully completed and ready for final inspection and tests. Final inspection and tests will be started not later than the date specified in the aforesaid notice unless the COR determines that the work is not ready for final inspection and so informs the Contractor.

E.5.3 Final Acceptance Upon (a) satisfactory completion of all required tests, (b) verification by the COR on the basis of a final inspec-tion that all items listed in the Schedule of Defects have been completed or corrected and that the work is fi-nally complete, subject to the discovery of defects after final completion, and (c) submittal by the Contractor of all documents including contractor close-out documents, and other items required upon completion of the work, in- cluding a final request for payment, and if the COR is satisfied that the work under the contract is complete and the contract has been fully performed, with the exception of continuing obligations there under, the COR shall issue to the Contractor a notice of final acceptance and process final payment as required by the contract.

Section F- Deliveries or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .