Questions and Answers RFQ.pdf
PDF 401 KB Posted
- Attached to
- Residence Landscape Project Federal contract opportunity
- Solicitation number
- 19EC75-23-Q-0011
- Issued by
- Department of State US Embassy Quito
About this file
This document contains the questions and answers from a pre-proposal meeting for federal contract opportunity number 19EC75-23-Q-0011 to provide landscape services at the U.S. Embassy in Quito, Ecuador. The key project details include connecting new irrigation and electrical systems to existing infrastructure, locating the pump room near water fixtures, and using pavers with void surfaces for the pond. Bidders must follow the species and quantities outlined in the scope of work. Vehicles will be allowed to enter the site starting September 8, 2023. The budget for the project is between $100,000 to $250,000. Prior phases were completed by EGARCO EGAS ARGUELLO CIA. LTDA. and CONSTRUCTORA SHUKRAM S.A.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19 ASP-02 Landscape Existing Trees Layout.pdf | ||
| 21 ASP-04 Decorative Water Mirror and Ponds Layout.pdf.pdf | ||
| 337105_Underground_Ducts_and_Raceways.pdf | ||
| 22 ASP-05 Decorative Water Mirror Layout.pdf.pdf | ||
| 265600_Exterior_Lighting.pdf | ||
| Questions and Answers RFQ.pdf | ||
| SF-1449.pdf | ||
| Letter RFQ.pdf | ||
| RFQ CMR LANDSCAPE IMPROVEMENT PHASE 3 07102023.docx | DOCX document | |
| SCAN0202.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENSITIVE BUT UNCLASSIFIED
PRE-PROPOSAL MEETING
QUESTION & ANSWERS – Q&As
CMR LANDSCAPE PHASE 3
RFQ NO. 19EC75-23-Q-0011
The Embassy of the United States of America in Quito, Ecuador conducted a pre-proposal meeting and site visit on July 14, 2023, at 9:00 a.m., on the above referenced solicitation. Four firms participated.
-JARDIN EXPRESS S.A.
-EGARCO EGAS ARGUELLO CIA. LTDA.
-PAMELA DOMENICA PROANO NARANJO
-LC ARQUITECTOS
The questions and answers below are responsive to the inquiries received. Prospective offerors had the opportunity to submit questions to the Embassy regarding this solicitation, until July 21, 2023.
Questions and answers will be available in the following link:
https://sam.gov/opp/d5664ec0b53c4652b01c1f6ebf0fa23e/view
QUESTION NO. 1
Please confirm that the playground mesh needs to be removed from the site.
ANSWER.
Yes, confirmed.
QUESTION NO. 2
Please confirm if we will be connecting the electrical and irrigation system to the current installations.
ANSWER
Yes, confirmed.
QUESTION NO. 3
Please confirm where the pump room will be located and if possible, provide design and detail drawings of the pond and waterfall, especially drawing ASP-05.
Pump room will be located around the zone of the water fixtures. Final location will be defined during pre-construction phase. Drawing ASP-05 is attached to this document.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fsam.gov%2Fopp%2Fd5664ec0b53c4652b01c1f6ebf0fa23e%2Fview&data=05%7C01%7CRoseroC%40state.gov%7C91cfad9f50384c4f7cfa08db8717461c%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638252306262467727%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=oKBvXn%2BTBdbLjgxk%2BFW7ck2a8xmwiFNM4n4PXiBUZ80%3D&reserved=0
QUESTION NO. 4.
Please provide autocad architectural drawings, structural designs, and sanitary drawings for this phase because the PDF file is blurry. Please provide drawing APS-02.
Autocad drawings are provided, as well as drawing APS-02.
QUESTION NO. 5
If coconut mulch is no longer available, please provide alternative material to replace it.
Contractor may propose a similar material.
QUESTION NO. 6
Please confirm that the contractor will be able to choose which zone to start with, to avoid damage on phase 3 progress.
Contractor may propose the work sequence.
QUESTION NO. 7
Please confirm specifications for the ecological paving stones item requested for phase 3.
Pavers with void surfaces to allow rainwater to drain to the soil. Contractor may propose.
QUESTION NO. 8
Please confirm if geotextile membrane will be used for final finish or if a different finish will be considered for the pond and confirm geotextile color to check availability.
Check attached drawing ASP-05 or AutoCAD file.
QUESTION NO. 9
Please confirm if vehicles and concrete truck will be allowed to enter.
Yes. Mixers and others will be allowed to enter beginning on or about September 8, 2023.
QUESTION NO. 10
In the Scope of Work, of the RFQ: CRM Landscape Improvement Phase 3, as of 07/10/202, there are some charts of the species and quantities required by zones. Do these quantities can be modified?
No. Please follow instructions of the SOW.
QUESTION NO. 11
In the Scope of Work, of the RFQ: CRM Landscape Improvement Phase 3, as of 07/10/202, is mentioned that autocad files are included in the bidding package; however, pdf files have included. Could you please send us AutoCad files?
The AutoCAD drawing is attached to this document.
QUESTION NO. 12
Is potable water required for the font? Where is the connection of water? Could you please send the technical specifications for the fonts?
Contractar shall connect to the closest water line near the pool area.
QUESTION NO. 13
Could you please provide the exterior lighting specifications since attachment 2 of RFQ mentions floor lighting specifications while the Scope of work mentions bollard style lighting.
The exterior lighting specifications will be attached to this document.
QUESTION NO. 14
In the Playground area, is it part of the scope to remove the existing shrubbery and fencing?
Yes. Please refer to question No. 1.
QUESTION NO. 15
Is the lighting and irrigation electrical connection panel part of the SOW?
No. Connect to the existing (after ongoing projects end) irrigation and exterior lighting systems is included in this SOW.
QUESTION NO. 16
In Attachment 2-specifications-there is furniture and lighting. Is it part of the scope to relocate the furniture?
This relocation is not part of this project.
QUESTION NO. 17
Regarding the size of the trees, could you please provide the sizes of the ARI02?
Consider same specifications of ARI03.
QUESTION NO. 18
How much is the budget for this project/notice ID?
Between $100,000.00 – $250,000.
QUESTION NO. 19
Who was the company that performed the previous stages (phase 1 and phase 2) at the embassy?
Phase 1: EGARCO EGAS ARGUELLO CIA. LTDA.
Phase 2: CONSTRUCTORA SHUKRAM S.A.
QUESTION NO. 20
I am located in Melbourne, Fl with a local subcontractor in Quito, Ecuador. I see you are requiring Defense base act insurance. I am not sending American workers. Do I need DBA insurance for me, even when I probably won't be at the construction site?
See Section 1 – The Schedule, item 16.3
16.3 DEFENSE BASE ACT (DBA) INSURANCE
16.3.1 DBA insurance is required for all United States citizens or residents and individuals hired in the United States, regardless of citizenship for any construction and services for U. S. overseas contracts over US$10,000.00. Only the countries listed currently on the Department of Labor’s
(DOL) Active DBA Waivers are not required to have DBA insurance for Host Country Nationals
(HCNs) and Third Country Nationals (TCNs) working overseas. (See website for country waivers: https://www.dol.gov/owcp/dlhwc/dbawaivers/dbawaivers.htm).
QUESTION NO. 21
If you are requiring DBA insurance, do you require American workers to be sent to the embassy?
or can you work with the local subcontractor?
You may hire a local subcontractor.
https://www.dol.gov/owcp/dlhwc/dbawaivers/dbawaivers.htm
QUESTION NO. 22
I see you require General liability. The General liability from the USA won't cover the embassy in South America. Is there any specific insurance standard you required similar to general liability for the subcontractor?
See Section 1 – The Schedule, item 15.0 Insurance
Note: Auto CAD files are not supported by the SAM platform. All drawings are included in PDF form. However, if an Auto CAD file is required, please make a request by email to quitoprocurement@state.gov .
mailto:quitoprocurement@state.gov