Attachment C Sample QASP.docx

DOCX document 52 KB Posted

Attached to
Deep Packet Capture & Inspection Federal contract opportunity
Solicitation number
19AQMM20Q0128
Issued by
Department of State Office of Acquisition Management

About this file

This document contains a sample Quality Assurance Surveillance Plan (QASP) for a federal solicitation seeking Deep Packet Capture and Inspection services. The QASP outlines performance standards and acceptable quality levels for help desk support, asset management, and end user services. Key performance indicators include call response times, first contact resolution, customer satisfaction ratings, and timelines for resolving incidents and fulfilling service requests. The plan describes surveillance methods for monitoring contractor performance and addresses corrective actions, reporting, and reviews. Acceptable quality levels are defined for each performance standard, and contractors will be evaluated monthly based on these metrics. Liquidated damages may apply if performance fails to meet requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Deep Packet Capture & Inspection, newest first.
File Type Posted
RFQ 19AQMM20Q0128-A0001 Deep Packet Capture.pdf PDF
19AQMM20Q0128 QandAs.pdf PDF
Attachment A - PWS.pdf PDF
Attachment B - Evaluation Criteria.pdf PDF
Bidders DD254.pdf PDF
19AQMM20Q0128.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ Attachment

Deep Packet Capture and Inspection

SAMPLE QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

(for RFQ Information Purposes Only)

SBU - CONTRACTING AND ACQUISITIONS

SBU - CONTRACTING AND ACQUISITIONS

TABLE OF CONTENTS

1INTRODUCTION
1.1Purpose
1.2Performance Management Approach
1.3Performance Management Strategy
2ROLES AND RESPONSIBILITIES
2.1The Contracting Officer
2.2The Contracting Officer’s Technical Representative
3IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4METHODOLOGIES TO MONITOR PERFORMANCE
4.1Surveillance Techniques
4.2Customer Feedback
4.3Acceptable Quality Levels
5QUALITY ASSURANCE DOCUMENTATION
5.1The Performance Management Feedback Loop
5.2Monitoring Forms
6ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1Determining Performance
6.2Reporting
6.3Reviews and Resolution

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS). This plan sets forth the procedures and guidelines the program office will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received. This QASP defines metrics of key interest to the program office in order to partner with the vendor to identify the appropriate performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is measured, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the program office to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health or Department policy. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The Government shall use past performance reporting in public forums as an incentive for the Contractor to perform satisfactorily or better. Additionally, the Firm-Fixed-Price (FFP) and Not-to-Exceed (NTE) structured line items incentivize the contractor to perform the duties required in the PWS within the originally quoted budget, as the Government is not liable for Contractor overruns using this structure.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the contracting officer's representative (COR), contracting officer's technical representative (COR), quality assurance representative (QAR), government task lead or program manager (PM) and the contractor. The CO will designate one full-time COR and GTL as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

Assigned CO:Katherine Vultaggio
Organization or Agency:Department of State

A/OPE/AQM

Telephone:703-312-3676
Email:Vultaggiokl@state.gov

2.2 The Contracting Officer’s Representative

The contracting officer’s representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

Assigned COR:

Telephone:

Email:

2.3 Contractor Representatives

a.) Contractor’s Name b.) Contractor’s Name

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS. Performance standards define desired services. The Government performs surveillance to determine if the Contractor exceeds, meets or fails to meet these standards. The Performance Work Statement (PWS) includes the following list of performance standards. The Government shall use these standards to determine Contractor’s level of performance. The Government shall compare the Contractor’s performance to the Acceptable Quality Level (AQL) that is established in the PWS.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are (include those that apply):

· Random monitoring, which shall be performed by the COR and or COR designated inspector.

· 100% Inspection – Each month, the COR and or COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.

· Periodic Inspection – COR/COR typically performs the periodic inspection on a monthly basis.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR or GTL, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR/COR. The COR/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality level (AQL) examples, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed. As the nature of our workload may shift, so may these metrics and deliverables. In this case there may be new metrics designed with a partnership between the Government and the contractor.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the COR, QA, GTL or PM, will be reported and will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.

5.2.1 The COR will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

6.2.1 At the end of each month, a written report will be provided, assembled by the Performance, Technology and Training Team, for the contractor summarizing the overall results of the quality assurance surveillance of the contractor’s performance. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and or performance standards, including cost, technical, and or scheduling objectives. The following ratings shall be used:

Exceptional:
Performance significantly exceeds Task Order requirements to the Government’s benefit.
Outstanding:
Performance exceeds Task Order requirements.
Satisfactory:
Performance meets contractual requirements.
Marginal:
Performance meets most contractual requirements, but fails to meet some minor contractual requirements.
Unsatisfactory:
Performance does not meet the majority of contractual requirements.

a.) Acceptable Performance.

The Government shall document positive performance.

b.) Unacceptable performance.

When unacceptable performance occurs, the COR shall inform the Contractor and the Contracting Officer. Notice to the Contractor will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file. When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the Contractor's Program Manager or on-site representative. A copy of all CDRs shall be forwarded to the Contracting Officer and maintained in the official contract file. A CDR template is attached to this QASP.

The Contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the Contractor has to present this corrective action plan to the COR. The Government shall review the Contractor's Corrective Action Plan to determine acceptability. Any CDRs may become a part of the supporting documentation for Task Order payment withholdings, fixed fee reductions, or other actions deemed applicable by the CO.

6.3 Reviews and Resolution

6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the GTL or PM and other government personnel as deemed necessary to discuss performance evaluation. The COR or GTL will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with COR or GTL as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· Issues arising from the performance monitoring processes

6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

The COR, GTL, or PM and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO/ACO.

The following are EXAMPLES ONLY, and not actual targets/metrics

6.3.3 PERFORMANCE REQUIREMENTS SUMMARY

Tier 1

Data Requirement
Description
Call Service Level
Graphic depiction of the achieved call service level in relation to performance metric.
Call Abandonment Rate
Graphic depiction of the percentage of abandoned calls, during hours of operation, in relation to performance metric.
Customer Satisfaction Rate
Graphic depiction of the customer satisfaction rate in relation to performance metric per tier and LOB.
Quality Monitoring
Graphic depiction of the quality monitoring rate in relation to performance metric.
Adequate staff during scheduled hours
Graphic depiction of the actual percentage in relation to performance metric.
THE PROGRAM OFFICE CSC Procedures for alternative contact channels (Email/phone)
Graphic depiction of the percentage in relation to performance metric.
Issue Response Time based on priority level
Graphic depiction of the response rate and associated priority in relation to performance metric.
Problem resolution on first contact
Graphic depiction of the incidents of incorrectly escalated tickets in relation to performance metric.
Problem Resolution to completion
Graphic depiction of the incidents pertaining to incorrect follow up in relation to performance metric.

Tier 1 SLOs/KPIs

Desired Outcomes
Required Service
Performance Standard
Acceptable Quality Level (AQL)
Monitoring Method
Customers calling the service desk shall be able to contact a support staff member from 7:00 a.m. ET to 7:30 p.m ET., M-F.
The service desk shall be adequately staffed to handle calls.
Analysts report to work on time 99% of the time according to the schedule.
Analysts report to work on time 99% of the time according to the schedule.
Review of Alcatel Genesys phone logs with log in and log out data.
Customers calling the service desk shall not have to wait a long time to have their call answered.
The Service Desk Personnel answer calls within 30 seconds or less.
Analysts handle 80% of calls within 30 seconds or less.
Analysts handle 80% of calls within 30 seconds or less.
Review of Alcatel Genesys data on a daily, weekly, and monthly basis.
Customers calling the service desk shall not have to wait a long time to have their call answered.
The Service Desk Personnel answer 80% of calls within 30 seconds or less to ensure customers do not hang up before receiving service.
Less than 5% of calls are abandoned as calculated in the Alcatel Genesys system.
Less than 5% of calls are abandoned as calculated in the Alcatel Genesys system.
Review of Alcatel Genesys data on a daily, weekly, and monthly basis.
Service Desk Personnel will process all contact channels according to THE PROGRAM OFFICE CSC procedures.
Service Desk Personnel will process alternative contact channels (email, fax, chat, remote desktop, walk-in, etc) along with telephone calls.
No more than 3 incidents of incorrect procedures followed each month.
No more than 3 incidents of incorrect procedures followed each month.
The CSC will perform ticket analysis along with the regular quality monitoring program for compliance.
Service Desk Personnel will respond to issues timely (these standards are subject to change)
Analysts must respond to customer contacts based on priority level within established timeframes by creating or editing a BMC Remedy ticket.
98% of responses are created within:

Priority 1 = 15 minutes Priority 2 – 2 hours Priority 3 – 8 hours Priority 4 – 24 hours 98% of responses are created within:

Priority 1 = 15 minutes Priority 2 – 2 hours Priority 3 – 8 hours Priority 4 – 24 hours The CSC will review regular reports produced from the BMC Remedy tool with response rates.

Service desk personnel resolve issues on first contact when possible.
Service desk personnel review appropriate knowledge documents and resolve all contact types applicable at the first contact
No more than 2 incidents of incorrectly escalated tickets per month.
No more than 2 incidents of incorrectly escalated tickets per month.
The CSC will use the quality monitoring forms and regular ticket analysis to evaluate.
Service desk personnel complete all after contact work.
Service desk personnel follow all processes and procedures to complete a contact.
No more than 3 incidents of incorrect follow-up per month.
No more than 3 incidents of incorrect follow-up per month.
The CSC will use the quality monitoring forms and regular ticket analysis to evaluate
Service desk personnel are courteous and efficient.
Personnel handling contacts, regardless of channel, shall be courteous and shall accurately and efficiently log in all incoming calls.
No more than 2 complaints are made per month regarding courtesy and/or lost/late messages.
No more than 2 complaints are made per month regarding courtesy and/or lost/late messages.
The CSC will perform quality monitoring by listening to calls and sitting with analysts to ensure compliance.
Service Desk personnel are courteous and efficient.
Personnel handling contacts, regardless of channel, shall be courteous and resolve and escalate all incidents in a timely manner.
Personnel will receive an overall score of 90% on the quality monitoring forms.
Personnel will receive an overall score of 90% on the quality monitoring forms.
The CSC will review scored quality monitoring forms for compliance.
Service Desk personnel provide high quality, efficient and friendly customer service.
Personnel will be courteous, friendly and efficient and support the reputation of the THE PROGRAM OFFICE service provider.
Personnel will receive an overall score of 87% or higher on customer feedback surveys.
Personnel will receive an overall score of 87% or higher on customer feedback surveys.
The CSC will review scored survey forms for compliance.
Service Desk personnel will produce high quality work as evidenced by following all procedures and processes.
Personnel follow all THE PROGRAM OFFICE CSC procedures and processes
No more than 3 incidents of incorrect procedures followed each month.
No more than 3 incidents of incorrect procedures followed each month.
The CSC will perform ticket analysis along with the regular quality monitoring program for compliance.

Tier 2

Data Requirement
Description

Amount of tickets assigned per Technician per Month

Amount of service Requests per Technician per Month

Average Incident Work Time
Total work time per Technician averaged from the first to the last day of a month, quarter, biannual, yearly.
Percentage of total tickets handled by desktop support
Percentage of all tickets in remedy which enter the desktop ticket queue

Number of tickets resolved per desktop support technician

Average number of tickets resolved by one desktop support technician in a month:
[Total number of tickets resolved in a month ÷ Total FTE (defined as 40 hours/week)]
Average time to resolve a desktop support ticket: Request and Incidents
average assignment duration a ticket stayed with a desktop agent since the ticket created could be created and assigned to multiple groups in between
Percentage of tickets escalated to another department or level:
[Number of tickets escalated to a department or level outside of desktop support ÷ Total number of tickets received by desktop support]

Amount of time desktop support tickets spend in the queue:

· Incidents

· Service Requests Break out of Incidents and Service requests available upon government completion of Service Request workflows

Percentage of tickets covered by an SLA/OLA that meet the specified goal or target:

· Incidents

· Service Requests Break out of Incidents and Service requests available upon government completion of Service Request workflows

Tickets per Seat per Month

· Incidents

· Service Requests Break out of Incidents and Service requests available upon government completion of Service Request workflows

Additional Metrics requested based on future availability

Incident First Contact Resolution Rate incidents in the desktop queue
Once Business Services Metric (BSM) analytics is implemented

Percentage of tickets sent to desktop support that could have been resolved by the support center (level 1)

[Number of desktop support tickets that could have been resolved by the support center ÷ Total number of tickets received by the desktop support team]

We will require completion of IT categorization cleanup project and Remedy configuration changes.

Mean Time to Resolve Incidents
Upon availability of BMC Analytics as well as desktop service managers need to define service catalog for MTTR benchmark
Mean Time to Fulfill Service Requests
Upon availability BMC Analytics as well as desktop service managers need to define service catalog for MTTR benchmark

Target Tier 2 SLOs

The metrics identified by an asterisk may or may not be currently measurable to the degree that the THE PROGRAM OFFICE requires and the THE PROGRAM OFFICE expects to partner with the contract provider to be able to develop and deliver these in a timely manner for reporting and continual improvement.

Tier 2 Target SLOs

Average time to respond (includes only typical tickets, not urgent or high-priority tickets): Incident
*4 Hours
80%
Average time to respond (includes only typical tickets, not urgent or high-priority tickets): Service Request
*4 Hours
80%
Percentage of tickets resolved on the first attempt by the technician – Incident
50%
80%
Percentage of tickets resolved on the first attempt by the technician - Service Request
50%
80%
Amount of time desktop support tickets spend in the queue – Incident
*10 Days
80%
Amount of time desktop support tickets spend in the queue - Service Request
*15 Days
80%

Average desktop support customer satisfaction rating

87%

Additional SLOs made available upon government system changes, anticipate having the ability to measure these within Option Year 1 or 2. Upon system ability to provide reporting on these metrics, the contractor would be expected to meet the below SLOs.

Software Installation

Request
Service Measure
Performance Target
SLO Performance
Desktop/Laptop Operating System (including service packs and non- critical security patches)
Elapsed Time to Deploy
• As agreed per project plan

• Critical 2 business days

• Non-Critical: Per scheduled Software Release 95.0%

Desktop Management Software
Elapsed Time to Deploy
• As agreed per project plan

• Critical; 3 business days

• Non-Critical: Per scheduled Software Release 95.0%

Modal Software
Elapsed Time to Deploy
• As agreed per project plan

• Criticals; 5 business days

• Non-Critical: Per scheduled Software Release 95.0%

Service/Security Patches and Antivirus Updates
Elapsed Time to Update to Target Population for Each Deployment
• 1 Calendar day Measured from approval for deployment by the Government, or on scheduled release date (as

approved by the Government) to successful deployment for End-Users who connect to the Network during the specified time frame 98%

Formula
Number of instances within Performance Target + Total number of instances during Measurement Interval = "Percent (%) Attained"
Measurement Interval
Measure Monthly
Reporting Period
Report Monthly
Measurement Method
SLO these reporting will be made available through Remedy analytics once appropriate Remedy work flows are established

Proposed Asset Tracking Service Levels, Accomplished by adding Owning organizational data in active directory fields and pulling reports for active/retired machines

Asset Accuracy
Service Measure
Performance Target
SLO
Accuracy of Data in Asset Tracking Database
Accuracy percentage of each data element per asset as verified by audit
●Serial Number
●Location
●Configuration
●Asset Status
●Responsible Owner Organization
●95% per asset per data element
●100% updated within 1 business day
●95% for assets with Tags or Items with Serial Numbers
●90% for Peripherals

Install, Moves, Adds and Changes- Devices and Peripherals- Defined as an Installation, Move, Add or Change of any hardware or approved user software included within the scope of End-User Management Services.

Request
Service Measure
Performance Target
SLO Performance %
Standard request, up to 10 users
Elapsed Time to Deploy
Within 5 business days of request
95.0%
Urgent request or Expedited request
Elapsed Time to Deploy
Within 3 business days of request
95.0%
Office moves or more than 10 users in a single request
Date and Time Scheduled
Within 5 business days or as agreed by Government on case- by-case
95.0%
Formula
Number of instances within Performance Target + Total number of instances during Measurement Interval =

"Percent (%) Attained"

Measurement Interval
Measure Monthly
Reporting Period
Report Monthly
Measurement Method
SLO these reporting will be available through Remedy once appropriate Remedy work flows are established in the service request catalog

Proposed Client Satisfaction (Touch Survey)

Client Satisfaction
Service Measure
Performance Target
SLO
Ticket Closure Satisfaction
Touch Survey Overall Satisfaction Rate
All end-users submitting responses to Ticket Closure Satisfaction Surveys shall rate at least 87% satisfaction score.
Formula
Sum of survey results from all surveys received within survey period I Total number of participants responding to Ticket Closure Survey
Measurement Interval
Measure Monthly / Report Monthly
Measurement Tool
THE PROGRAM OFFICE End User Survey

CONTRACT DISCREPANCY REPORT (CDR)

Contract Number: <insert number>

TO: (Contractor’s Program Manager or on-site representative) <insert name>

FROM: (Name of COTR/COR) <insert name>

Date and time observed discrepancy:

DISCREPANCY OR PROBLEM:

<Describe in detail. Identify any attachments.>

Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this CDR. >

Prepared by: <Enter COTR/COR’s name>

______________________________________________________
Signature – Contracting Officer’s RepresentativeDate

Received by:

Signature – Contractor’s Program Manager or on-site representative Date

The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in Contractor’s performance.

File details come from the government source that posted it. Updated .