1. AmistadStoplogs_REV-PricingSheet.pdf
PDF 99 KB Posted
- Attached to
- Stop Log Repairs Amistad Dam Federal contract opportunity
- Solicitation number
- 191BWC20R0007
About this file
This pricing sheet outlines line items for condition assessment, repairs, and rehabilitation of stoplogs and lifting beams at the Amistad Dam. Key requirements include condition assessment and report of stoplogs, lifting beam, and slots; cleaning and repainting of 12,000 square feet of surface area; visual inspection and non-destructive testing of 6,400 lineal feet of stoplog welding and 200 lineal feet of lifting beam welding; inspection of stoplog and lifting beam nuts and bolts; replacement of stoplog seal assemblies; repair or replacement of lifting beam rollers and brackets; replacement of corrosion resisting steel facings; and repair of stoplog and lifting beam welding and nuts/bolts. Pricing is requested for each line item on a unit price basis. The related federal contract opportunity seeks condition assessment, painting and repairs on stoplogs and lifting beam at Amistad Dam, to be performed by the United States Section of the International Boundary and Water Commission. Work will be carried out through task orders over approximately 75 days.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 9.2.2020.pdf | ||
| 4. Lfting Beam.pdf | ||
| 3. Questions and Answers.pdf | ||
| 2. PWS-Amistad StoplogsV5_Aug2020.pdf | ||
| 5. Tainter Gate stop log .pdf | ||
| Att 1. PWS-Amistad Stoplogs.pdf | ||
| Att 3. Amistad Dam Bulkhead Drawings.pdf | ||
| 191BWC20R0007.pdf | ||
| Att 5. TX20200186 01.05.2020.pdf | ||
| Att 2. QASP_Amistad Stoplogs.pdf | ||
| Att 4. 15-5303 Rev 14 06.03.2020.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet 20204222004 – Amistad Dam Stoplog Rehabilitation Project
Line Item No Description Quantity Unit Unit Price Total Cost Remarks
1 Condition Assessment including report and any inspection not itemized in other CLINs 1 EA
Condition Assessment of all stoplogs, the lifting beam and the slots where the stoplogs are lowered.
2 Painting 12,000 SF Cleaning and repainting are required regardless of condition. Total Area
3 Stop Logs Welding Visual Inspection and
NDT 6,400 LF
This is required regardless of condition. (~800 Ft per Stop Log)
4 Lifting Beam Welding Visual Inspection and NDT 200 LF This is required regardless of condition.
5 Inspection of Stop Logs Nuts/Bolts 1,000 EA This is required regardless of condition. One thousand total for all 8 stoplogs.
6 Inspection of Lifting Beam Nuts/Bolts 60 EA This is required regardless of condition.
7 Stoplog Seal Assembly Replacement of J-bulb (hollow bulb) Neoprene seals 64 LF This is required regardless of condition. Total for 8 Stoplogs
8 Stoplog Seal Assembly Replacement of 3 ¾” x ¾” Strip Neoprene Seals 400 LF
This is required regardless of condition. Total for 8 Stop Logs
Repair and/ or replacement of Lift Beam Rollers including replacement of the rollers, and other hardware.
12 EA This is required regardless of condition. Six on each side.
10 Welding repair to the brackets attached to the Lift Beam 3 EA
This number will be used as part of the basis for award.
Actual number depends on condition assessment
Pricing Sheet 20204222004 – Amistad Dam Stoplog Rehabilitation Project
Line Item No Description Quantity Unit Unit Price Total Cost Remarks
11 Replacement of 4’ X 2” x 5/8” Corrosion Resisting steel facing. 16 FT
This number will be used as part of the basis for award.
Actual number depends on condition assessment
12 Replacement of 50’ X 3” x 3/8” Corrosion Resisting Steel facing 100 FT
This number will be used as part of the basis for award.
Actual number depends on condition assessment
13 Repair to stop Logs Welding (total for 8) 400 LF
This number will be used as part of the basis for award.
Actual number depends on condition assessment
14 Repair to Lifting Beam Welding 50 LF
This number will be used as part of the basis for award.
Actual number depends on condition assessment
15 Repair and/ or replacement of Stop Logs Nuts/Bolts 50 EA
This number will be used as part of the basis for award.
Actual number depends on condition assessment
16 Repair and/ or replacement of Lifting Beam Nuts/Bolts 20 EA
This number will be used as part of the basis for award.
Actual number depends on condition assessment
17 Travel Expense per day 75 DAY
Work for the project will be carried out on a task order basis. Contractor shall quote on all items.
File details come from the government source that posted it. Updated .