This document comprises multiple contract change notices for Contract Number MA190000000897, a state and local indefinite delivery vehicle awarded to Kunz Leigh & Associates Inc. by the State of Michigan Department of Technology, Management and Budget (DTMB) on behalf of the Michigan Department of Treasury. The contract, initially effective July 17, 2019, with an expiration date of July 17, 2024, includes five one-year option periods. The primary contractor is located at 28081 Southfield Road, Lathrup Village, Michigan 48076-2816, with primary contact Justin Shaulis at 517-803-3217.
The contract pertains to maintenance, operations, and enhancements development services for the Treasury Revenue Sharing and Personal Property Tax System (RS-PPT), which was deployed to production in two phases in 2021. Services include defect remediation, technical support related to hosting and deployment, and agile development of system enhancements organized in monthly sprints with quarterly releases. The contractor provides a team composition of 0.75 Business Analyst, 1 Lead Developer, and 0.25 Project Manager, with development velocity estimated between 25-35 user story points per sprint. The most recent change notice (Number 14, effective 9/16/26) exercises the fourth one-year option, adding $551,160 in funding and extending the contract expiration to July 17, 2028. The estimated aggregate contract value totals $5,834,776. Payment terms are Net 45 days upon acceptance of monthly sprint deliverables (SEM-0185), with monthly progress reports required. The contract prohibits travel expenses and limits work hours to eight hours per day, forty hours per week.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MICHIGAN PROCUREMENT
Department Technology, Management and Budget Central Procurement Services 320 S Walnut Street Lansing, MI 48933 P.O. Box 30026, Lansing, MI 48909
CONTRACT CHANGE NOTICE
Change Notice Number 14 to
Contract Number MA190000000897
C O
N
TR
AC
TO
R
KUNZ LEIGH & ASSOCIATES INC
28081 Southfield Road
Lathrup Village MI 48076-2816
Justin Shaulis
517-803-3217 j.shaulis@kunzleigh.com
CV0036059
ST
AT
E
Pr og ra m
M an ag er
Various Various
C on tr ac t Ad m in is tr at or Brandon Samuel DTMB
517-249-0439 samuelb@michigan.gov
CONTRACT SUMMARY
Revenue Sharing & Personal Property Tax System
INITIAL EFFECTIVE DATE
July 17, 2019
INITIAL EXPIRATION DATE
July 17, 2024
INITIAL AVAILABLE OPTIONS
5 - 1 Year
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
July 17, 2027
PAYMENT TERMS
Net 45
DELIVERY TIMEFRAME
ALTERNATE PAYMENT OPTIONS
P-Card Direct Voucher (PRC) Other
EXTENDED PURCHASING
Yes No
MINIMUM DELIVERY REQUIREMENTS
DESCRIPTION OF CHANGE NOTICE
OPTION LENGTH OF OPTION EXTENSION LENGTH OF EXTENSION REVISED EXP. DATE
July 17, 2028
CURRENT VALUE
$5,283,616.00
VALUE OF CHANGE NOTICE
$551,160.00
ESTIMATED AGGREGATE CONTRACT VALUE
$5,834,776.00
DESCRIPTION
Please note the Program Manager or Contract Administrator may have changed, and are reflected on this Change Notice.
Effective 9/16/26 this Contract is amended for:
Exercising 1-yr option, adding $551,600 along with attached SOW for continued M&O and Enhancements development plan to address maintenance and enhancement needs captured post-Go-Live for the Revenue Sharing & Personal Tax System.
All other terms, conditions, specifications, and pricing remain the same. Per contractor and agency agreement, DTMB Central Procurement Services approval, and State Administrative Board approval on 9/15/26.
CHANGE NOTICE NO. 14 TO CONTRACT NO. MA190000000897
Program Managers for
Multi-Agency and Statewide Contracts
AGENCY NAME PHONE EMAIL
TREA Evah Cole 517-256-5593 ColeE@michigan.gov
DTMB Lucy Pline 517-896-5103 plinel@michigan.gov
IT SOW CHANGE NOTICE
Required Intake Information
SOW Title: Treasury Revenue Sharing and Personal Property Tax System (RS-PPT)
Contractor Name: KUNZ LEIGH & ASSOCIATES INC
Contract Number: MA190000000897
Requesting Agency: Department of Treasury
Request Date: 08/26/2026
Completed by: Jerome Loongo
Contact Phone Email
Agency Program Manager: Evah Cole 517-335-7436 colee@michigan.gov
DTMB Program Manager: Lucy Pline 517-896-5103 plinel@michigan.gov
Contract Admin: Brandon Samuel 517-249-0439 Samuelb@michigan.gov
Contractor Contact: Justin Shaulis 517-803-3217 j.shaulis@kunzleigh.com
1. Background.
The Treasury Revenue Sharing and Personal Property Tax System (RS-PPT) is in Production. It was deployed to Production in 2 phases. Personal Property Tax functionality was deployed to Production on 08/16/2021, Revenue Sharing functionality was deployed to Production on 10/01/2021.
The application has been in production a few years and will continue maintenance and enhancements over the next year.
Change Notice (CN) #12 extended the project for maintenance operations and enhancements beginning on 10/01/2025 and is set to conclude on 9/30/2026.
2. SOW Objectives/Purpose.
The State is seeking a continued maintenance, operations, and enhancements development plan to address maintenance and enhancements needs captured post-Go-Live for the Revenue Sharing & Personal Property Tax System.
The period covered by this Change Notice starts on 10/1/26 and ends on 9/30/27.
A. Maintenance Plan
Defects will be addressed within Service Level Expectations outlined in the contract (171- 190000000897) and the Maintenance Plan (SEM-0301).
NOTE: Any identified Defect will be triaged by the Business Analyst (BA) and the Product Owner to determine the severity of the Defect. This effort will result in one of the following outcomes:
• RS-PPT will be deemed to be operating as designed and the Defect will be closed.
• The Defect may be converted into an Enhancement request.
• The Defect is considered a high impact to business and will be immediately put into the current Sprint and mitigated.
• This may also include a Hot-Fix deployment (an emergency release outside of planned releases).
• The Defect is considered a low impact to business and will be immediately put into the Backlog for prioritization.
B. Development Plan (Enhancements)
Contractor will continue to deliver the Revenue Sharing & Personal Property Tax (RS-PPT) system using the Scrum/Agile approach. This plan will be executed in four distinct phases, as defined below.
I. Discovery and Requirements Gathering
Joint Application Development sessions (JADs) will be scheduled as discovery sessions in which the Contractor team will work with Treasury business users and other stakeholders to review the Enhancement request and map requirements to those Enhancements to identify gaps. As executed throughout the RS-PPT Project, the Contractor team begins loading all the business, functional, and technical requirements into JIRA. JIRA provides functionality for:
• Reviewing and approving requirements, Epics, and User Stories.
• Tracking development and testing activities.
• Tracking Defects
• Linking User Stories to Requirements to provide detailed traceability information.
II. Backlog Grooming and Sprint Planning
Backlog grooming - the Product Owner with the Contractor BA and Lead Developer (Lead Dev), will establish the backlog and verify the highest priority items are at the top of the list. The effort will be recorded as Story Points from Discovery and Requirements Gathering Phase. Tickets identified as part of the Maintenance Plan will also be included in the Backlog for priority.
Sprint planning - the Product Owner with the KL&A BA and Lead Dev will conduct a Sprint Planning session in which they select as many of the highest priority User Stories (enhancements or bugs) possible for development within the month-long Sprint timeframe.
NOTE: Only Approved User Stories and Tickets will be placed in the Backlog and be eligible to be placed in a Development Sprint.
III. Development/Quality Assurance (QA) Testing, Sprint Review/Demo, and User Acceptance
Development/QA testing - Daily, the Lead Dev will record progress in JIRA. The developer unit tests the code before handing it off to the BA for functional and system integration testing. During this phase, the BA will also write user acceptance Test Cases based upon defined acceptance criteria.
Sprint review/demo - The Contractor project team will conduct a Sprint review meeting in which they demonstrate the new functionality developed during the Sprint. This provides an opportunity for Treasury feedback. Feedback within the scope of the approved User Story, depending upon the associated work, can be acted upon before the end of the Sprint, at the beginning of the next Sprint, or added to the backlog to be addressed at a later time. Any feedback requiring an increase to scope or change to the originating User Story requirement will be deferred for further evaluation by the Product Owner and BA.
User acceptance - either at the end of the Sprint or after a selected number of Sprints, the Contractor BA will work with appointed Treasury business users to execute user acceptance testing (UAT). Treasury testers will access the UAT Test Executions in JIRA.
JIRA provides traceability through a series of linkages from the Test Case to User Story, to Epic, to the original business, functional, and technical requirement, providing full traceability. Critical & Blocker Defects found during testing are hot-fixed into the Release scheduled to go to Production.
A. Business Specification Number B. Business Specification
C. Select if requirement is met by the Contractor with a Current capability, Configuration OR Customization
Web Administration Responsibilities – related to the hosting and deployment of the application Current capability
Database Administration Responsibilities – related to the hosting and deployment of the application Current capability
Other Technical support – related to hosting and deployment and modification of the application Current capability
3. Implementation Milestones, Deliverables, and Pricing.
Deliverables will not be considered complete until the Agency Project Manager formally accepts them. Deliverables for this project include:
• SEM-0185 upon the completion of each monthly sprint.
Contractor Composition and Responsibilities:
The Contractor team composition will begin with .75 Business Analyst, 1 Lead Developer, and .25 Project Manager. Per-Sprint development velocity is estimated between 25-35 User Story points (1 Lead Developer).
Contractor will provide the State 30 days’ notice and a transition plan if a resource is intended to be transitioned to a different project.
It is the State’s strong preference to maintain the same set of resources through the contract period.
The Contractor team is responsible for technical support (including Implementation support), defect remediation, as well as design and development of enhancements and testing support using a "capacity-based" approach. Because we are utilizing a capacity-based approach, Contractor will be able to adjust their team size up/down depending on the need of the project. The average KL&A team size measured throughout the life of this Change Notice should not deviate from the above proposed team. In the event capacity needs to be adjusted, the change control process will be followed to add/remove resource(s).
PROJECT CONTROL AND REPORTS:
A monthly progress report must be submitted to the Agency and DTMB Project Managers throughout the life of this project. This report may be submitted with the billing invoice. Each monthly progress report must contain the following:
1. Release schedule: Dates outlining the next release, including health check on progress towards target release dates.
2. Risks and Issues: Identification of risks or issues which could prevent the successful deploy at next target release date.
3. Accomplishments: Indicate what was worked on and what was completed during the current reporting period.
4. Funds: Indicate the amount of funds expended during the current reporting period, and the cumulative total to date for the project.
3.1. Implementation Table
Milestone Event Associated Milestone Deliverable(s) Milestone Date Implementation Fee
Sprint 1
MO+E6S1
(10/01/2026-10/31/2026)
Completed SEM-0185 11/01/2026 $45,930
Sprint 2
MO+E6S2
(11/01/2026-11/30/2026)
Completed SEM-0185 12/01/2026 $45,930
Sprint 3
MO+E6S3
(12/01/2026-12/31/2026)
Completed SEM-0185 01/01/2027 $45,930
Milestone Event Associated Milestone Deliverable(s) Milestone Date Implementation Fee
Sprint 4
MO+E6S4
(01/01/2027-01/31/2027)
Completed SEM-0185
02/01/2027 $45,930
Sprint 5
MO+E6S5
(02/01/2027-2/28/2027)
03/01/2027 $45,930
Sprint 6
MO+E6S6
(03/01/2027-03/31/2027)
04/01/2027 $45,930
Sprint 7
MO+E6S7
(04/01/2027-04/30/2027)
05/01/2027 $45,930
Sprint 8
MO+E6S8
(05/01/2027-05/31/2027)
Completed SEM-018
06/01/2027 $45,930
Milestone Event Associated Milestone Deliverable(s) Milestone Date Implementation Fee
Sprint 9
MO+E6S9
(06/01/2027-06/30/2027)
Completed SEM-0185 07/01/2027 $45,930
Sprint 10
MO+E6S10
(07/01/2027-07/31/2027)
08/01/2027 $45,930
Sprint 11
MO+E6S11
(08/01/2027-08/31/2027)
Completed SEM-0185 09/01/2027 $45,930
Sprint 12
MO+E6S12
(09/01/2027-09/30/2027)
Completed SEM-0185 10/01/2027 $45,930
*Contractor will invoice upon State Acceptance of Milestone Deliverable(s).
4. Total SOW Pricing.
Summary Table
Description Total
Operation maintenance Fees $ 551,160
Total SOW Amount $ 551,160
5. Other Information:
PROJECT PLAN:
October
1-Oct 2-Oct
Sprint Sprint MO+E6S1
5-Oct 6-Oct 7-Oct 8-Oct 9-Oct
Sprint Sprint Sprint Sprint Sprint MO+E6S1
12-Oct 13-Oct 14-Oct 15-Oct 16-Oct
19-Oct 20-Oct 21-Oct 22-Oct 23-Oct
26-Oct 27-Oct 28-Oct 29-Oct 30-Oct
November
2-Nov 3-Nov 4-Nov 5-Nov 6-Nov
Sprint Holiday Sprint Sprint Sprint MO+E6S2
9-Nov 10-Nov 11-Nov 12-Nov 13-Nov
Sprint Sprint Holiday Sprint Sprint MO+E6S2
16-Nov 17-Nov 18-Nov 19-Nov 20-Nov
Sprint Sprint Sprint Sprint Sprint MO+E6S2
23-Nov 24-Nov 25-Nov 26-Nov 27-Nov
Sprint Sprint Sprint Holiday Holiday MO+E6S2
30-Nov
Sprint
December
1-Dec 2-Dec 3-Dec 4-Dec Rlse #1
UAT
Sprint Sprint Rlse #1 Sprint MO+E6S3
7-Dec 8-Dec 9-Dec 10-Dec 11-Dec Rlse #1
Sprint Sprint Sprint Sprint Sprint MO+E6S3
14-Dec 15-Dec 16-Dec 17-Dec 18-Dec Rlse #1
Sprint Sprint Sprint Sprint Sprint MO+E6S3
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec Rlse #1
Sprint Sprint Sprint Holiday Holiday MO+E6S3
28-Dec 29-Dec 30-Dec 31-Dec Rlse #1
Sprint Sprint Sprint Holiday MO+E6S3
January
1-Jan Rlse #1
Holiday MO+E6S4
4-Jan 5-Jan 6-Jan 7-Jan 8-Jan
Sprint Sprint Sprint Deploy Rlse
#1 Sprint MO+E6S4
11-Jan 12-Jan 13-Jan 14-Jan 15-Jan
Sprint Sprint Sprint Sprint Sprint MO+E6S4
18-Jan 19-Jan 20-Jan 21-Jan 22-Jan
Holiday Sprint Sprint Sprint Sprint MO+E6S4
25-Jan 26-Jan 27-Jan 28-Jan 29-Jan
Sprint Sprint Sprint Sprint Sprint MO+E6S4
February
1-Feb 2-Feb 3-Feb 4-Feb 5-Feb
Sprint Sprint Sprint Sprint Sprint MO+E6S5
8-Feb 9-Feb 10-Feb 11-Feb 12-Feb
15-Feb 16-Feb 17-Feb 18-Feb 19-Feb
Holiday Sprint Sprint Sprint Sprint MO+E6S5
22-Feb 23-Feb 24-Feb 25-Feb 26-Feb
March
1-Mar 2-Mar 3-Mar 4-Mar 5-Mar Rlse #2
Sprint Sprint Sprint Rlse #2 Sprint MO+E6S6
8-Mar 9-Mar 10-Mar 11-Mar 12-Mar Rlse #2
Sprint Sprint Sprint Sprint Sprint MO+E6S6
15-Mar 16-Mar 17-Mar 18-Mar 19-Mar Rlse #2
22-Mar 23-Mar 24-Mar 25-Mar 26-Mar Rlse #2
29-Mar 30-Mar 31-Mar Rlse #2
Sprint Sprint Sprint MO+E6S6
April
1-Apr 2-Apr Rlse #2
Sprint Sprint MO+E6S7
5-Apr 6-Apr 7-Apr 8-Apr 9-Apr
#2 Sprint MO+E6S7
12-Apr 13-Apr 14-Apr 15-Apr 16-Apr
Sprint Sprint Sprint Sprint Sprint MO+E6S7
19-Apr 20-Apr 21-Apr 22-Apr 23-Apr
26-Apr 27-Apr 28-Apr 29-Apr 30-Apr
May
3-May 4-May 5-May 6-May 7-May
Sprint Sprint Sprint Sprint Sprint MO+E6S8
10-May 11-May 12-May 13-May 14-May
17-May 18-May 19-May 20-May 21-May
24-May 25-May 26-May 27-May 28-May
31-May
Holiday MO+E6S8
June
1-Jun 2-Jun 3-Jun 4-Jun Rlse #3
Sprint Sprint Rlse #3 Sprint MO+E6S9
7-Jun 8-Jun 9-Jun 10-Jun 11-Jun Rlse #3
Sprint Sprint Sprint Sprint Sprint MO+E6S9
14-Jun 15-Jun 16-Jun 17-Jun 18-Jun Rlse #3
Sprint Sprint Sprint Sprint Holiday MO+E6S9
21-Jun 22-Jun 23-Jun 24-Jun 25-Jun Rlse #3
Sprint Sprint Sprint Sprint Sprint MO+E6S9
28-Jun 29-Jun 30-Jun Rlse #3
Sprint Sprint Sprint MO+E6S9
July
1-Jul 2-Jul Rlse #3
Sprint Sprint MO+E6S10
5-Jul 6-Jul 7-Jul 8-Jul 9-Jul
Holiday Sprint Sprint Deploy Rlse
#3 Sprint MO+E6S10
12-Jul 13-Jul 14-Jul 15-Jul 16-Jul
Sprint Sprint Sprint Sprint Sprint MO+E6S10
19-Jul 20-Jul 21-Jul 22-Jul 23-Jul
26-Jul 27-Jul 28-Jul 29-Jul 30-Jul
August
2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
Sprint Sprint Sprint Sprint Sprint MO+E6S11
9-Aug 10-Aug 11-Aug 12-Aug 13-Aug
16-Aug 17-Aug 18-Aug 19-Aug 20-Aug
23-Aug 24-Aug 25-Aug 26-Aug 27-Aug
30-Aug 31-Aug
Sprint Sprint MO+E6S11
September
1-Sep 2-Sep 3-Sep Rlse #4
Sprint Rlse #4 Sprint MO+E6S12
6-Sep 7-Sep 8-Sep 9-Sep 10-Sep Rlse #4
Holiday Sprint Sprint Sprint Sprint MO+E6S12
13-Sep 14-Sep 15-Sep 16-Sep 17-Sep Rlse #4
Sprint Sprint Sprint Sprint Sprint MO+E6S12
20-Sep 21-Sep 22-Sep 23-Sep 24-Sep Rlse #4
Sprint Sprint Sprint Sprint Sprint MO+E6S12
27-Sep 28-Sep 29-Sep 30-Sep
#4
MO+E6S12
Central Procurement Services 320 S Walnut Street Lansing, MI 48933 P.O. Box 30026, Lansing, MI 48909
CONTRACT CHANGE NOTICE
Change Notice Number 13 to Contract Number MA190000000897
C O
N
TR
A C
TO
R
KUNZ LEIGH & ASSOCIATES INC
28081 Southfield Road
Lathrup Village MI 48076-2816
Justin Shaulis
517-803-3217 j.shaulis@kunzleigh.com
CV0036059
ST
A
TE
Pr og ra m
M an ag er
Various Various
C on tr ac t A dm in is tr at or Brandon Samuel DTMB
(517) 249-0439
SamuelB@michigan.gov
CONTRACT SUMMARY
Revenue Sharing & Personal Property Tax System
INITIAL EFFECTIVE DATE
July 17, 2019
INITIAL EXPIRATION DATE
July 17, 2024
INITIAL AVAILABLE OPTIONS
5 - 1 Year
EXPIRATION DATE
BEFORE
July 17, 2027
PAYMENT TERMS
Net 45
DELIVERY TIMEFRAME
ALTERNATE PAYMENT OPTIONS
P-Card Direct Voucher (PRC) Other
EXTENDED PURCHASING
Yes No
MINIMUM DELIVERY REQUIREMENTS
DESCRIPTION OF CHANGE NOTICE
OPTION LENGTH OF OPTION EXTENSION LENGTH OF EXTENSION
REVISED EXP. DATE
CURRENT VALUE
$5,283,616.00
VALUE OF CHANGE NOTICE
$0.00
ESTIMATED AGGREGATE CONTRACT VALUE
$5,283,616.00
Please note the Program Manager or Contract Administrator may have changed, and are reflected on this Change Notice.
Effective March 9, 2026, the Contract is amended. ADA Compliance within the Statement of Work is replaced in its entirety with the following:
ADA Compliance.
Accessibility Requirements.
The State is required to comply with the Americans with Disabilities Act of 1990 (ADA) and has adopted standards and procedures regarding accessibility requirements for websites, applications, content, and electronic documents. Due to a change in the law, the State is required to comply with specific accessibility standards for websites, applications, content and documents.
Starting 4/24/2026, throughout the Term, all websites, applications, software, content, and electronic documents, including but not limited to mobile applications, text, images, sounds, videos, controls, animations, links, and documents (including files in the following formats: PDF, word processing, presentation, and spreadsheet), created, provided, or made available by the Contractor under this Contract, must comply with WCAG 2.1 Level AA.
All other terms, conditions, specifications and pricing remain the same. Per contractor and agency agreement, and DTMB Central Procurement Services approval.
CHANGE NOTICE NO. 13 TO CONTRACT NO. MA190000000897
Program Managers for
Multi-Agency and Statewide Contracts
AGENCY NAME PHONE EMAIL
DTMB Roger Weyersberg 517-897-1478 WeyersbergR@michigan.go v
TREA Beth Spencer 517-636-6303 SpencerB1@michigan.gov
DTMB Koppsch-WoodsK 517-243-8786 koppsch-woodsk@michigan.gov
Central Procurement Services 320 S Walnut Street Lansing, MI 48933 P.O. Box 30026, Lansing, MI 48909
CONTRACT CHANGE NOTICE
CONTRACT SUMMARY
Revenue Sharing & Personal Property Tax System
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE INITIAL AVAILABLE OPTIONS EXPIRATION DATE
BEFORE
July 17, 2019 July 17, 2024 5 Months July 17, 2026
PAYMENT TERMS DELIVERY TIMEFRAME
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
MINIMUM DELIVERY REQUIREMENTS
P-Card Direct Voucher (PRC) Other Yes No
28081 Southfield Road
Lathrup Village MI 48076-2816
Justin Shaulis
517-803-3217 j.shaulis@kunzleigh.com
CV0036059
KUNZ LEIGH & ASSOCIATES INC
C O
N
TR
A C
TO
R
Patrick Russell
(517) 648-7767
DTMB
Various Various
RussellP2@michigan.gov
C ontract
A dm inistrator Program M anagerSTA
TE
Change Notice Number 12
Contract Number MA190000000897 to
DESCRIPTION OF CHANGE NOTICE
OPTION EXTENSIONLENGTH OF OPTION LENGTH OF EXTENSION REVISED EXP. DATE
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
1 Year July 17, 2027
$5,283,616.00 $551,160.00 $5,834,776.00
Effective 09/25/2025, the parties hereby agree to the attached Statement of Work for continued Maintenance, Operations, and Enhancements development plan to address maintenance and enhancement needs captured post-Go-Live for the Revenue Sharing & Personal Property Tax (RS-PPT) System. The period covered by this Change Notice (CN) starts on 10/1/25 and ends on 9/30/26.
In addition, the State will exercise the third option year with a revised expiration date is 7/17/2027. The total cost of this project is $551,160.
All other terms, conditions, specifications, and pricing remain the same. Per contractor and agency agreement, DTMB Central Procurement Services approval, and State Administrative Board approval on 09/25/2025.
AGENCY NAME PHONE EMAIL
TREA Beth Spencer 517-636-6303 SpencerB1@michigan.gov
DTMB Koppsch-WoodsK 517-243-8786 koppsch-woodsk@michigan.gov
DTMB Roger Weyersberg 517-897-1478 WeyersbergR@michigan.go v
Program Managers for
Multi-Agency and Statewide Contracts
CHANGE NOTICE NO. 12 TO CONTRACT NO. MA190000000897
CHANGE NOTICE NO. 12 TO CONTRACT NO. MA190000000897
Michigan.gov/MiProcurement
Version 2021-1 1 of 16
STATEMENT OF WORK -
IT CHANGE NOTICE
Project Title:
Treasury Revenue Sharing and Personal Property Tax System (RS-PPT)
Period of Coverage:
10/1/25 - 9/30/26
Requesting Department:
Michigan Department of Treasury
Date:
8/14/25
Agency Project Manager:
Evah Cole
Phone:
517-335-7436
DTMB Project Manager:
Roger Weyersberg
Phone:
517-897-1478
Brief description of services to be provided:
BACKGROUND:
RS-PPT is in Production. It was deployed to Production in 2 phases. Personal Property Tax functionality was deployed to Production on 08/16/2021, Revenue Sharing functionality was deployed to Production on 10/01/2021.
The application has been in production a few years and will continue maintenance and enhancements over the next year.
CN9 to extend the project for Maintenance Operations and Enhancements began on 10/01/2024 and is set to conclude on 09/30/2025.
PROJECT OBJECTIVE:
The State is seeking a continued Maintenance, Operations, and Enhancements development plan to address maintenance and enhancements needs captured post- Go-Live for the Revenue Sharing & Personal Property Tax (RS-PPT) System.
The period covered by this Change Notice (CN) starts on 10/1/25 and ends on 9/30/26.
Version 2021-1 2 of 16
1. Maintenance Plan
Defects will be addressed within Service Level Expectations outlined in the contract (171-190000000897) and the Maintenance Plan (SEM-0301).
NOTE: Any identified Defect will be triaged by the Business Analyst (BA) and the Product Owner to determine the severity of the Defect. This effort will result in one of the following outcomes:
• RS-PPT will be deemed to be operating as designed and the Defect will be closed
• The Defect may be converted into an Enhancement request
• The Defect is considered a high impact to business and will be immediately put into the current Sprint and mitigated
• This may also include a Hot-Fix deployment (an emergency release outside of planned releases)
• The Defect is considered a low impact to business and will be immediately put into the Backlog for prioritization.
2. Development Plan (Enhancements)
KL&A will continue to deliver the Revenue Sharing & Personal Property Tax (RS- PPT) system using the Scrum/Agile approach. This plan will be executed in four distinct phases, as defined below.
a. Discovery and Requirements Gathering
• JADs will be scheduled as discovery sessions in which the KL&A team will work with Treasury business users and other stakeholders to review the Enhancement request and map requirements to those Enhancements to identify gaps. As executed throughout the RS-PPT Project, the KL&A team begins loading all the business, functional, and technical requirements into JIRA. JIRA provides functionality for:
• Reviewing and approving requirements, Epics, and User Stories.
• Tracking development and testing activities.
• Tracking Defects
• Linking User Stories to Requirements to provide detailed traceability information.
b. Backlog Grooming and Sprint Planning Backlog grooming - the Product Owner with the KL&A BA and Lead Developer (Lead Dev), will establish the backlog and verify the highest priority items are at the top of the list. The effort will be recorded as Story Points from Discovery and Requirements Gathering Phase.
Tickets identified as part of the Maintenance Plan will also be included in the Backlog for priority.
Version 2021-1 3 of 16
Sprint planning - the Product Owner with the KL&A BA and Lead Dev will conduct a Sprint Planning session in which they select as many of the highest priority User Stories (enhancements or bugs) possible for development within the month-long Sprint timeframe.
NOTE: Only Approved User Stories and Tickets will be placed in the Backlog and be eligible to be placed in a Development Sprint.
c. Development/Quality Assurance (QA) Testing, Sprint Review/Demo, and User Acceptance
Development/QA testing - Daily, the Lead Dev will record progress in JIRA. The developer unit tests the code before handing it off to the BA for functional and system integration testing. During this phase, the BA will also write user acceptance Test Cases based upon defined acceptance criteria.
Sprint review/demo - The KL&A project team will conduct a Sprint review meeting in which they demonstrate the new functionality developed during the Sprint.
This provides an opportunity for Treasury feedback. Feedback within the scope of the approved User Story, depending upon the associated work, can be acted upon before the end of the Sprint, at the beginning of the next Sprint, or added to the backlog to be addressed at a later time. Any feedback requiring an increase to scope or change to the originating User Story requirement will be deferred for further evaluation by the Product Owner and BA.
User acceptance—either at the end of the Sprint or after a selected number of Sprints, the KL&A BA will work with appointed Treasury business users to execute user acceptance testing (UAT). Treasury testers will access the UAT Test Executions in JIRA. JIRA provides traceability through a series of linkages from the Test Case to User Story, to Epic, to the original business, functional, and technical requirement, providing full traceability. Critical & Blocker Defects found during testing are hot-fixed into the Release scheduled to go to Production.
Version 2021-1 4 of 16
d. Implementation
There are 4 quarterly releases of functionality in this plan. The estimated dates of releases are:
Release Number UAT Testing Start Production Deploy Date
Rlse #1 12/04/2025 01/08/2026
Rlse #2 03/05/2026 04/09/2026
Rlse #3 06/04/2026 07/09/2026
Rlse #4 09/03/2026 09/30/2026
Note this is a proposed release schedule which is subject to change. The number of releases in the upcoming year may increase/decrease depending on the business need. Based on an affirmative approval of the Release Document, KL&A will work with DTMB and Treasury to execute the Go-Live Plan.
TASKS:
Technical support is required to assist with the following tasks:
1. Web Administration Responsibilities – related to the hosting and deployment the application
2. Database administration Responsibilities – related to the hosting and deployment of the application
3. Other Technical support – related to hosting and deployment of the application
DELIVERABLES:
Deliverables will not be considered complete until the Agency Project Manager formally accepts them. Deliverables for this project include:
• SEM-0185 upon the completion of each monthly sprint.
KL&A team composition and responsibilities
The KL&A team composition will begin with .75 Business Analyst, 1 Lead Developer, and .25 Project Manager. Per-Sprint development velocity is estimated between 25- 35 User Story points (1 Lead DEV).
KL&A will provide the State 30 days’ notice and a transition plan if a resource is intended to be transitioned to a different project. It is the State’s strong preference to maintain the same set of resources through the contract period.
Version 2021-1 5 of 16
The proposed KL&A team is responsible for technical support (including Implementation support), defect remediation, as well as design and development of enhancements and testing support using a "capacity-based" approach. Because we are utilizing a capacity-based approach, KL&A will be able to adjust their team size up/down depending on the need of the project. The average KL&A team size measured throughout the life of this Change Notice should not deviate from the above proposed team. In the event capacity needs to be adjusted, the change control process will be followed to add/remove resource(s).
A monthly progress report must be submitted to the Agency and DTMB Project Managers throughout the life of this project. This report may be submitted with the billing invoice. Each monthly progress report must contain the following:
1. Release schedule: Dates outlining the next release, including health check on progress towards target release dates.
2. Risks and Issues: Identification of risks or issues which could prevent the successful deploy at next target release date. Michigan.gov/MiProcurement Version 2021-1 5 of 16
3. Accomplishments: Indicate what was worked on and what was completed during the current reporting period.
4. Funds: Indicate the amount of funds expended during the current reporting period, and the cumulative total to date for the project.
PAYMENT SCHEDULE:
Payment will be made on a satisfactory acceptance of each deliverable basis. DTMB will pay CONTRACTOR upon receipt of properly completed invoice(s) which shall be submitted to the billing address on the State issued purchase order not more often than monthly. DTMB Accounts Payable area will coordinate obtaining Agency and DTMB Project Manager approvals. All invoices should reflect actual work completed by payment date and must be approved by the Agency and DTMB Project Manager prior to payment.
The invoices shall describe and document to the State’s satisfaction a description of the work performed, the progress of the project, and fees. When expenses are invoiced, receipts will need to be provided along with a detailed breakdown of each type of expense.
Payment shall be considered timely if made by DTMB within forty-five (45) days after receipt of properly completed invoices.
Payable Description Invoice Amount Invoice Date
Sprint 1
MO+E5S1
$45,930
11/01/2025
Version 2021-1 6 of 16
(10/1/2025-10/31/2025)
Total
Sprint 2
MO+E5S2
(11/01/2025-11/30/2025)
12/01/2025
Sprint 3
MO+E5S3
(12/01/2025-12/31/2025)
01/01/2026
Sprint 4
MO+E5S4
(01/01/2026-01/31/2026)
02/01/2026
Sprint 5
MO+E5S5
(02/01/2026- 02/28/2026)
03/01/2026
Sprint 6
MO+E5S6
(03/01/2026- 03/31/2026)
04/01/2026
Sprint 7
MO+E5S7
(04/01/2026- 04/30/2026)
05/01/2026
Sprint 8
MO+E5S8
06/01/2026
Version 2021-1 7 of 16
(05/01/2026- 05/31/2026)
Sprint 9
MO+E5S9
(06/01/2026- 06/30/2026)
07/01/2026
Sprint 10
MO+E5S10
(07/01/2026- 07/31/2026)
08/01/2026
Sprint 11
MO+E5S11
(08/01/2026- 08/31/2026)
09/01/2026
Sprint 12
MO+E5S12
(09/01/2026- 09/30/2026)
10/01/2026
Grand Total $551,160
EXPENSES:
The State will NOT pay for any travel expenses, including hotel, mileage, meals, parking, etc.
PROJECT CONTACTS:
The designated Agency Project Manager is:
Evah Cole Department of Treasury Richard H Austin building 430 W. Allegan St.
Lansing, MI 48933
Version 2021-1 8 of 16
517-335-7436 colee@michigan.gov
The designated DTMB Program Manager is:
Roger Weyersberg II
DTMB
AS-Treasury Operations Center 2nd Floor 7285 Parsons Drive, Dimondale, MI 48821 517-896-5103 WeyersbergR@michigan.gov
LOCATION OF WHERE THE WORK IS TO BE PERFORMED:
Consultants will work at:
• Remotely (or)
• Kunz, Leigh & Associates – Okemos Office 2164 University Park Dr #200, Okemos, MI 48864
EXPECTED CONTRACTOR WORK HOURS AND CONDITIONS:
Work hours are not to exceed eight (8) hours a day, forty (40) hours a week. Normal working hours of 8:00 am to 5:00 pm are to be observed unless otherwise agreed to in writing.
No overtime will be permitted.
This purchase order is a release from Contract Number 190000000897. This purchase order, statement of work, and the terms and conditions of Contract Number 190000000897 constitute the entire agreement between the State and the Contractor.
1-Oct 2-Oct 3-Oct
Sprint Sprint Sprint MO+E5S1
6-Oct 7-Oct 8-Oct 9-Oct 10-Oct
Sprint Sprint Sprint Sprint Sprint MO+E5S1
Version 2021-1 9 of 16
13-Oct 14-Oct 15-Oct 16-Oct 17-Oct
20-Oct 21-Oct 22-Oct 23-Oct 24-Oct
27-Oct 28-Oct 29-Oct 30-Oct 31-Oct
3-Nov 4-Nov 5-Nov 6-Nov 7-Nov
Sprint Sprint Sprint Sprint Sprint MO+E5S2
10-Nov 11-Nov 12-Nov 13-Nov 14-Nov
Sprint Holiday Sprint Sprint Sprint MO+E5S2
17-Nov 18-Nov 19-Nov 20-Nov 21-Nov
Sprint Sprint Sprint Sprint Sprint MO+E5S2
24-Nov 25-Nov 26-Nov 27-Nov 28-Nov
Sprint Sprint Sprint Holiday Holiday MO+E5S2
1-Dec 2-Dec 3-Dec 4-Dec 5-Dec Rlse #1 UAT
Sprint Sprint Sprint Rlse #1 Sprint MO+E5S3
Version 2021-1 10 of 16
8-Dec 9-Dec 10-Dec 11-Dec 12-Dec Rlse #1 UAT
Sprint Sprint Sprint Sprint Sprint MO+E5S3
15-Dec 16-Dec 17-Dec 18-Dec 19-Dec Rlse #1 UAT
Sprint Sprint Sprint Sprint Sprint MO+E5S3
22-Dec 23-Dec 24-Dec 25-Dec 26-Dec Rlse #1 UAT
Sprint Sprint Holiday Holiday Sprint MO+E5S3
29-Dec 30-Dec 31-Dec Rlse #1 UAT
Sprint Sprint Holiday MO+E5S3
1-Jan 2-Jan Rlse #1 UAT
Holiday Sprint MO+E5S4
5-Jan 6-Jan 7-Jan 8-Jan 9-Jan
Sprint Sprint Sprint Deploy Rlse #1 Sprint MO+E5S4
12-Jan 13-Jan 14-Jan 15-Jan 16-Jan
Sprint Sprint Sprint Sprint Sprint MO+E5S4
19-Jan 20-Jan 21-Jan 22-Jan 23-Jan
Holiday Sprint Sprint Sprint Sprint MO+E5S4
Version 2021-1 11 of 16
26-Jan 27-Jan 28-Jan 29-Jan 30-Jan
Sprint Sprint Sprint Sprint Sprint MO+E5S4
2-Feb 3-Feb 4-Feb 5-Feb 6-Feb
Sprint Sprint Sprint Sprint Sprint MO+E5S5
9-Feb 10-Feb 11-Feb 12-Feb 13-Feb
16-Feb 17-Feb 18-Feb 19-Feb 20-Feb
Holiday Sprint Sprint Sprint Sprint MO+E5S5
23-Feb 24-Feb 25-Feb 26-Feb 27-Feb
2-Mar 3-Mar 4-Mar 5-Mar 6-Mar Rlse #2 UAT
Sprint Sprint Sprint Rlse #2 Sprint MO+E5S6
9-Mar 10-Mar 11-Mar 12-Mar 13-Mar Rlse #2 UAT
Sprint Sprint Sprint Sprint Sprint MO+E5S6
16-Mar 17-Mar 18-Mar 19-Mar 20-Mar Rlse #2 UAT
Version 2021-1 12 of 16
23-Mar 24-Mar 25-Mar 26-Mar 27-Mar Rlse #2 UAT
30-Mar 31-Mar Rlse #2 UAT
Sprint Sprint MO+E5S6
1-Apr 2-Apr 3-Apr Rlse #2 UAT
Sprint Sprint Sprint MO+E5S7
6-Apr 7-Apr 8-Apr 9-Apr 10-Apr
Sprint Sprint Sprint Deploy Rlse #2 Sprint MO+E5S7
13-Apr 14-Apr 15-Apr 16-Apr 17-Apr
Sprint Sprint Sprint Sprint Sprint MO+E5S7
20-Apr 21-Apr 22-Apr 23-Apr 24-Apr
Sprint Sprint Sprint Sprint Sprint MO+E5S7
27-Apr 28-Apr 29-Apr 30-Apr
Sprint Sprint Sprint Sprint MO+E5S7
Version 2021-1 13 of 16
1-May
Sprint MO+E5S8
4-May 5-May 6-May 7-May 8-May
Sprint Sprint Sprint Sprint Sprint MO+E5S8
11-May 12-May 13-May 14-May 15-May
18-May 19-May 20-May 21-May 22-May
25-May 26-May 27-May 28-May 29-May
Holiday Sprint Sprint Sprint Sprint MO+E5S8
1-Jun 2-Jun 3-Jun 4-Jun 5-Jun Rlse #3 UAT
Sprint Sprint Sprint Rlse #3 Sprint MO+E5S9
8-Jun 9-Jun 10-Jun 11-Jun 12-Jun Rlse #3 UAT
Sprint Sprint Sprint Sprint Sprint MO+E5S9
15-Jun 16-Jun 17-Jun 18-Jun 19-Jun Rlse #3 UAT
Sprint Sprint Sprint Sprint Holiday MO+E5S9
Version 2021-1 14 of 16
22-Jun 23-Jun 24-Jun 25-Jun 26-Jun Rlse #3 UAT
Sprint Sprint Sprint Sprint Sprint MO+E5S9
29-Jun 30-Jun Rlse #3 UAT
Sprint Sprint MO+E5S9
1-Jul 2-Jul 3-Jul Rlse #3 UAT
Sprint Sprint Holiday MO+E5S10
6-Jul 7-Jul 8-Jul 9-Jul 10-Jul
Sprint Sprint Sprint Deploy Rlse #3 Sprint MO+E5S10
13-Jul 14-Jul 15-Jul 16-Jul 17-Jul
Sprint Sprint Sprint Sprint Sprint MO+E5S10
20-Jul 21-Jul 22-Jul 23-Jul 24-Jul
27-Jul 28-Jul 29-Jul 30-Jul 31-Jul
3-Aug 4-Aug 5-Aug 6-Aug 7-Aug
Sprint Sprint Sprint Sprint Sprint MO+E5S11
Version 2021-1 15 of 16
10-Aug 11-Aug 12-Aug 13-Aug 14-Aug
17-Aug 18-Aug 19-Aug 20-Aug 21-Aug
24-Aug 25-Aug 26-Aug 27-Aug 28-Aug
31-Aug
Sprint MO+E5S11
1-Sep 2-Sep 3-Sep 4-Sep Rlse #4 UAT
Sprint Sprint Rlse #4 Sprint MO+E5S12
7-Sep 8-Sep 9-Sep 10-Sep 11-Sep Rlse #4 UAT
Holiday Sprint Sprint Sprint Sprint MO+E5S12
14-Sep 15-Sep 16-Sep 17-Sep 18-Sep Rlse #4 UAT
Sprint Sprint Sprint Sprint Sprint MO+E5S12
21-Sep 22-Sep 23-Sep 24-Sep 25-Sep Rlse #4 UAT
Sprint Sprint Sprint Sprint Sprint MO+E5S12
Version 2021-1 16 of 16
28-Sep 29-Sep 30-Sep
Sprint Sprint Deploy Rlse #4 MO+E5S12
STATE OF MICHIGAN
ENTERPRISE PROCUREMENT
Department of Technology, Management, and Budget 320 S. Walnut Street 2nd Floor Lansing, MI 48933
P.O. BOX 30026 LANSING, MICHIGAN 48909
CONTRACT CHANGE NOTICE
CONTRACT SUMMARY
Revenue Sharing & Personal Property Tax System
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE INITIAL AVAILABLE OPTIONS EXPIRATION DATE
BEFORE
July 17, 2019 July 17, 2024 5 - 12 Months July 17, 2026
PAYMENT TERMS DELIVERY TIMEFRAME
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
MINIMUM DELIVERY REQUIREMENTS
N/A
P-Card Direct Voucher (PRC) Other Yes No
28081 Southfield Road
Lathrup Village MI 48076-2816
Justin Shaulis
517-803-3217 j.shaulis@kunzleigh.com
CV0036059
KUNZ LEIGH & ASSOCIATES INC
C O
N
TR
A C
TO
R
Brandon Samuel
517-249-0439
DTMB
Various Various samuelb@michigan.gov
C ontract
A dm inistrator Program M anagerSTA
TE
N/ANet 45
Change Notice Number 11
Contract Number MA190000000897 to
DESCRIPTION OF CHANGE NOTICE
OPTION EXTENSIONLENGTH OF OPTION LENGTH OF EXTENSION REVISED EXP. DATE
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$5,283,616.00 $0.00 $5,283,616.00
DESCRIPTION
Effective 6/10/2025, please note that the Program Manager has changed to Roger Weyersberg.
DTMB Kim Koppsch-Woods 517-243-8786 koppsch-woodsk@michigan.gov
DTMB Roger Weyersberg 517-897-1478 WeyersbergR@michigan.go v
Program Managers for
Multi-Agency and Statewide Contracts
CHANGE NOTICE NO. 11 TO CONTRACT NO. MA190000000897
Department of Technology, Management, and Budget 320 S. Walnut Street 2nd Floor Lansing, MI 48933
P.O. BOX 30026 LANSING, MICHIGAN 48909
CONTRACT CHANGE NOTICE
CONTRACT SUMMARY
Revenue Sharing & Personal Property Tax System
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE INITIAL AVAILABLE OPTIONS EXPIRATION DATE
BEFORE
July 17, 2019 July 17, 2024 5 - 12 Months July 17, 2026
PAYMENT TERMS DELIVERY TIMEFRAME
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
MINIMUM DELIVERY REQUIREMENTS
N/A
P-Card Direct Voucher (PRC) Other Yes No
28081 Southfield Road
Lathrup Village MI 48076-2816
Justin Shaulis
517-803-3217 j.shaulis@kunzleigh.com
CV0036059
KUNZ LEIGH & ASSOCIATES INC
C O
N
TR
A C
TO
R
Brandon Samuel
517-249-0439
DTMB
Various Various samuelb@michigan.gov
C ontract
A dm inistrator Program M anagerSTA
TE
N/ANet 45
Change Notice Number 10
Contract Number MA190000000897 to
DESCRIPTION OF CHANGE NOTICE
OPTION EXTENSIONLENGTH OF OPTION LENGTH OF EXTENSION REVISED EXP. DATE
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$5,255,066.00 $28,550.00 $5,283,616.00
DESCRIPTION
Effective May 19, 2025, the following amendment is incorporated into this Contract per attachment statement of work (SOW) with additional funding of $28,550.
DTMB Thomas Potts 5176365098 PottsT1@michigan.gov
DTMB Kim Koppsch-Woods 517-243-8786 koppsch-woodsk@michigan.gov
Program Managers for
CHANGE NOTICE NO. 10 TO CONTRACT NO. MA190000000897
Version 2021-1 1 of 5
STATEMENT OF WORK -
IT CHANGE NOTICE
Project Title:
Revenue Sharing Web Discovery
Period of Coverage:
5/12/2025 – 7/31/2025
Requesting Department:
Treasury
Date:
5/9/2025
Agency Program Manager:
Evah Cole
Phone:
517-335-7436
DTMB Program Manager:
Lucy Pline
Phone:
517-896-5103
Brief description of services to be provided:
Statement of work is being provided to engage Kunz Leigh and Associates in a Sprint 0 discovery session to gather high level details and formal requirement gathering to support a full estimate from the vendor for the Revenue Sharing Website rewrite effort.
BACKGROUND:
The State of Michigan (State), through the Michigan Department of Technology, Management, and Budget (DTMB), and the Michigan Department of Treasury (Treasury) are seeking a modernization of the Revenue Sharing Web system. The processes to publish data are a time-consuming pain point for both Treasury and DTMB. Treasury would like to leverage the Revenue Sharing and Personal Property Tax (RS-PPT) system as an integrated data repository and enhance RS-PPT to streamline the estimation process. Treasury also seeks user experience improvements to the web portal and increased presentation options.
PROJECT OBJECTIVE:
Before Revenue Sharing Web can be re-written a discovery to understand the current system, the pain points, the needs, and vision of Treasury and DTMB are required. The objective of this project is for DTMB and Treasury to engage Kunz, Leigh & Associates to provide discovery services to determine system requirements.
SCOPE OF WORK:
Work includes documenting process flows, documenting user needs, defining and documenting requirements, identifying integrations, facilitating discovery sessions, and developing a statement of work for implementation of Revenue Sharing Web rewrite, enhancements to RS-PPT, and a customer portal. This work reflects the requirement
Version 2021-1 2 of 5 gathering effort associated with the proposed project and is designed to reduce risk associated with future change notices.
TASKS:
Technical support is required to assist with the following tasks:
• State of Michigan will explain how the current system works.
• State of Michigan will review and sign off on requirements and design
• Contractor will provide deliverables.
DELIVERABLES:
Deliverables will not be considered complete until the Agency Program Manager and DTMB Program Manager have formally accepted them. Deliverables for this project include:
• System requirements, including:
o Process flow charts.
o Documented user needs.
o Screen Mockups.
o Integrations identified
• KL&A facilitated discovery sessions, in which requirements for the system will be discussed and refined.
• Statement of work for development and implementation, including:
o Pricing for the Revenue Share Web rewrite, RS-PPT enhancements, and a Customer Portal o Pricing should be delivered in a split pricing format based on functionality, to allow Treasury to select the functionality that will be implemented in the final system.
ACCEPTANCE CRITERIA:
Office of Revenue and Tax Analysis (ORTA) sign-off on requirements specifications.
Successful delivery of the items identified in the Deliverables section above.
Version 2021-1 3 of 5
A bi-weekly progress report must be submitted to the Agency and DTMB Project Managers throughout the life of this project. This report may be submitted with the billing invoice. Each bi-weekly progress report must contain the following:
1. Accomplishments: Indicate what was worked on and what was completed during the current reporting period.
2. Funds: Indicate the amount of funds expended during the current reporting period, and the cumulative total to date for the project.
PAYMENT SCHEDULE:
Payment will be made on a Satisfactory acceptance of each Milestone basis. DTMB will pay CONTRACTOR upon receipt of properly completed invoice(s) which shall be submitted to the billing address on the State issued purchase order not more often than monthly. DTMB Accounts Payable area will coordinate obtaining Agency and DTMB Program Manager approvals. All invoices should reflect actual work completed by payment date and must be approved by the Agency and DTMB Program Managers prior to payment. The invoices shall describe and document to the State’s satisfaction a description of the work performed, the progress of the project, and fees. When expenses are invoiced, receipts will need to be provided along with a detailed breakdown of each type of expense.
Milestone Milestone Duration Cost Project Initiation & Functional Overview 1 week $4,250 Discovery Sessions 5 weeks (1 per week) $17,650 Requirements Review, Update, and Approval
2 weeks $6,650
Total $28,550
Payment shall be considered timely if made by DTMB within forty-five (45) days after receipt of properly completed invoices.
EXPENSES:
The State will NOT pay for any travel expenses, including hotel, mileage, meals, parking, etc.
PROJECT CONTACTS:
The designated Agency Program Manager is:
Name: Evah Cole
Version 2021-1 4 of 5
Department: Treasury Area: ORTA Building/Floor: Austin Building, 2nd floor Address: 430 W Allegan City/State/Zip: Lansing, MI 48933 Phone Number: 517-335-7436 Email Address: ColeE@michigan.gov
The designated DTMB Program Manager is:
Name: Lucy Pline Department: DTMB Area: AS-Treasury Building/Floor: Ops Center, 2nd floor Address: 7285 Parsons Drive City/State/Zip: Dimondale, MI 48821 Phone Number: 517-896-5103 Email Address: plinel@michigan.gov
AGENCY & DTMB RESPONSIBILITIES:
• Provide subject matter experts for requirements validation.
• Provide subject matter experts for interfaces to State agency systems.
• Review and approve deliverables.
• Review and approve invoices.
• DTMB to provide a Project Manager
LOCATION OF WHERE THE WORK IS TO BE PERFORMED:
Consultants will work at:
• Kunz, Leigh & Associates in Okemos, MI.
EXPECTED CONTRACTOR WORK HOURS AND CONDITIONS:
Work hours are not to exceed eight (8) hours a day, forty (40) hours a week. Normal working hours of 8:00 am to 5:00 pm are to be observed unless otherwise agreed to in writing.
No overtime will be permitted.
Version 2021-1 5 of 5
Milestones:
Start Date Duration Project Kickoff Within 30 days of contractor receiving purchase order
1 day
Project Initiation & Functional Overview
Monday following Kickoff
1 week
Discovery Sessions Monday following Initiation
5 weeks
Requirements Review, Update, and Approval
Monday following Discovery Sessions
2 weeks
Department of Technology, Management, and Budget 320 S. Walnut Street 2nd Floor Lansing, MI 48933
P.O. BOX 30026 LANSING, MICHIGAN 48909
CONTRACT CHANGE NOTICE
CONTRACT SUMMARY
Revenue Sharing & Personal Property Tax System
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE INITIAL AVAILABLE OPTIONS EXPIRATION DATE
BEFORE
July 17, 2019 July 17, 2024 5 - 12 Months July 17, 2025
PAYMENT TERMS DELIVERY TIMEFRAME
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
MINIMUM DELIVERY REQUIREMENTS
P-Card Direct Voucher (PRC) Other Yes No
28081 Southfield Road
Lathrup Village MI 48076-2816
Justin Shaulis
517-803-3217 j.shaulis@kunzleigh.com
CV0036059
KUNZ LEIGH & ASSOCIATES INC
C O
N
TR
A C
TO
R
Brandon Samuel
517-249-0439
DTMB
Various Various samuelb@michigan.gov
C ontract
A dm inistrator Program M anagerSTA
TE
Change Notice Number 9 to
Contract Number 190000000897
DESCRIPTION OF CHANGE NOTICE
OPTION EXTENSIONLENGTH OF OPTION LENGTH OF EXTENSION REVISED EXP. DATE
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
12 Months July 17, 2026
$5,255,066.00 $0.00 $5,255,066.00
Effective 10/1/2024, the following amendment is incorporated into this Contract per attached statement of work (SOW). The total cost is $551,160.00, however, enough funding is on the contract. Therefore additional funding does not need to be added.
This change includes continued Maintenance, Operations, and Enhancements development plan to address maintenance and enhancement needs captured post-Go-Live for the Revenue Sharing & Personal Property Tax (RS-PPT) System.
Additionally, the State is exercising the second option year. The revised contract expiration date is 07/17/2026.
Please note the Contract Administrator has been changed to Brandon Samuel.
DTMB Kim Koppsch-Woods 517-243-8786 koppsch-woodsk@michigan.gov
DTMB Thomas Potts 517-636-5098 PottsT1@michigan.gov
Program Managers for
CHANGE NOTICE NO. 9 TO CONTRACT NO. 190000000897
Version 2021-1 1 of 16
STATEMENT OF WORK -
IT CHANGE NOTICE
Project Title:
Treasury Revenue Sharing and Personal Property Tax System (RS-PPT)
Period of Coverage:
10/1/24 - 9/30/25
Requesting Department:
Michigan Department of Treasury
Date:
10/18/2024
Agency Project Manager:
Evah Cole
Phone:
517-335-7436
DTMB Project Manager:
Lucy Pline
Phone:
517-896-5103
Brief description of services to be provided:
BACKGROUND:
RS-PPT is in Production. It was deployed to Production in 2 phases. Personal Property Tax functionality was deployed to Production on 08/16/2021 and Revenue Sharing functionality was deployed to Production on 10/01/2021.
The application has been in production a few years and will continue maintenance and enhancements over the next year.
CN7 to extend the project for Maintenance Operations and Enhancements began on 10/01/2023 and is set to conclude on 09/30/2024.
PROJECT OBJECTIVE:
development plan to address maintenance and enhancements needs captured post-Go- Live for the Revenue Sharing & Personal Property Tax (RS-PPT) System.
The period covered by this Change Notice (CN) starts on 10/1/24 and ends on 9/30/25.
SCOPE OF WORK:
1. Maintenance Plan
Defects will be addressed within Service Level Expectations outlined in the contract (171-190000000897) and the Maintenance Plan (SEM-0301).
Version 2021-1 2 of 16
NOTE: Any identified Defect will be triaged by the Business Analyst (BA) and the Product Owner to determine the severity of the Defect. This effort will result in one of the following outcomes:
• RS-PPT will be deemed to be operating as designed and the Defect will be closed
i. The Defect may be converted into an Enhancement request
• The Defect is considered a high impact to business and will be immediately put into the current Sprint and mitigated
i. This may also include a Hot-Fix deployment (an emergency release outside of planned releases)
• The Defect is considered a low impact to business and will be immediately put into the Backlog for prioritization.
2. Development Plan (Enhancements)
KL&A will continue to deliver the Revenue Sharing & Personal Property Tax (RS- PPT) system using the Scrum/Agile approach. This plan will be executed in four distinct phases, as defined below.
a. Discovery and Requirements Gathering
JADs will be scheduled as discovery sessions in which the KL&A team will work with Treasury business users and other stakeholders to review the Enhancement request and map requirements to those Enhancements to identify gaps. As executed throughout the RS-PPT Project, the KL&A team begins loading all the business, functional, and technical requirements into JIRA. JIRA provides functionality for:
• Reviewing and approving requirements, Epics, and User Stories.
• Tracking development and testing activities.
• Tracking Defects
• Linking User Stories to Requirements to provide detailed traceability information.
b. Backlog Grooming and Sprint Planning Backlog grooming - the Product Owner with the KL&A BA and Lead Developer (Lead Dev), will establish the backlog and verify the highest priority items are at the top of the list. The effort will be recorded as Story Points from Discovery and Requirements Gathering Phase. Tickets identified in Section 3 of this plan will also be included in the Backlog for priority.
Sprint planning - the Product Owner with the KL&A BA and Lead Dev will conduct a Sprint Planning session in which they select as many of the highest priority User Stories (enhancements or bugs) possible for development within the month-long Sprint timeframe.
Version 2021-1 3 of 16
NOTE: Only Approved User Stories and Tickets will be placed in the Backlog and be eligible to be placed in a Development Sprint.
c. Development/Quality Assurance (QA) Testing, Sprint Review/Demo, and
User Acceptance
Development/QA testing - Daily, the Lead Dev will record progress in JIRA. The developer unit tests the code before handing it off to the BA for functional and system integration testing. During this phase, the BA will also write user acceptance Test Cases based upon defined acceptance criteria.
Sprint review/demo - The KL&A project team will conduct a Sprint review meeting in which they demonstrate the new functionality developed during the Sprint.
This provides an opportunity for Treasury feedback. Feedback within the scope of the approved User Story, depending upon the associated work, can be acted upon before the end of the Sprint, at the…