About this file
Amendment 01 to RFP providing Site Visit information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Fire_Alarm_Testing_-_07-17.pdf | ||
| Wall_and_Partition_Plan.DWG | DWG drawing | |
| DIMPLAN.DWG | DWG drawing | |
| Floorplan.DWG | DWG drawing | |
| Drawings_-_Fort_Hall_Service_Unit.pdf | ||
| Fire_Alarm_Testing_-_01-18.pdf | ||
| Fire_Alarm_Testing_-_10-17.pdf | ||
| Fire_Alarm_Testing_-_04-18.pdf | ||
| B05_Amendment_0002_Final.pdf | ||
| B01_Attachment_4_Maps.docx | DOCX document | |
| B01_Attachment_02_Drawings.pdf | ||
| B01_RFP_18-102-SOL-00031_Final.pdf | ||
| B01_Attachment_1_Wage_Determination_ID180021.pdf | ||
| B01_Attachment_3_ILSM.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
The purpose of this Amendment is to:
1. Update Provision L.8 to change the site visit to Tuesday July 24, 2018 at 11:00 AM Local Time.
Indian Health Service Dept. of Engineering Services - Seattle 701 Fifth Ave #1650 Seattle, WA 98104
18-102-SOL-00031
1 2
07/11/2018
07/10/2018
Solicitation #: 18‐102‐SOL‐00031 Amendment 0001
SUMMARY OF CHANGES
1. Provision L.8. FAR 52.236‐27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I is revised to the following:
(a) The clauses at 52.236‐2, Differing Site Conditions, and 52.236‐3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for – Tuesday July 24, 2018 at 11:00am local time
(c) Participants will meet at –
Not‐tsoo Gah‐nee Indian Health Center
33 North Mission Road
Fort Hall, ID 83203
** Individual requests for site visits will not be granted.
It is required that all attendees CONFIRM ATTENDANCE to the site visit, by notifying Matthew Phelps via email of their plan to attend, no less than twenty‐four (24) hours prior to the site visit day. Due to the rural location of the project site, the site visit is being held based on confirmed attendance. SHOULD THERE BE NO CONFIRMED ATTENDANCE, THE SITE VISIT WILL BE CANCELLED. Failure to provide confirmation of attendance may result in not having Government personnel available to support attendees who show up without previous confirmation of attendance. The Government is in no way responsible for any costs incurred by attendees who go to the project site without confirming attendance as directed.
It is recommended that you ensure by email that your confirmation of attendance to the site is received by the POC prior to attending. While attendance to the site visit is not mandatory, offerors are urged to inspect the site where work is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent, such information is reasonably obtainable. Offerors should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof.
Failure to do so shall not relieve Offerors from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government shall assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the solicitation, the specifications, or related documents.
Questions concerning the project must be put into writing and submitted via email to Matthew Phelps, Contract Specialist, at matthew.phelps@ihs.gov by Tuesday July 31, 2018.