1750009QALI.pdf

PDF 75 KB Posted

Attached to
F-15 Canopy Remover Federal contract opportunity
Solicitation number
FA821320R3030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines quality assurance requirements for a federal contract to produce unspecified parts for the Department of Defense. It identifies inspection points the contractor must include in work orders for critical flight items. Mandatory steps include stamps or signatures on manufacturing and test documentation. Witnessing of 50% of production lots and verification of stamps are also required. Additional inspection points may be imposed as necessary. The related solicitation seeks a canopy remover for the F-15 aircraft in a sole source award to Rockwell Collins with a response date not provided.

View the file

Other files for this federal contract opportunity

Other files attached to F-15 Canopy Remover, newest first.
File Type Posted
0004 Amended Solicitation_FA821320R3030.pdf PDF
CADPADItemMarkingInstruction.pdf PDF
QALIF15CRCdual.pdf PDF
EDL.pdf PDF
AIR SPEC.pdf PDF
01 Amended Solicitation_FA821320R3030.pdf PDF
REPSHIP11Mar14.pdf PDF
Ammo Data Card.pdf PDF
JQR003616048.pdf PDF
CDRLs.pdf PDF
ItemDescription.pdf PDF
SPI.pdf PDF
SOWSPI.pdf PDF
JQR012029195.pdf PDF
JQR003493938.pdf PDF
CDRLS_002.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: FD2020-17-50009
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: IDIQ
DODIC: SEE PARTS TABLE

SEE PARTS TABLE

S TABLE

undefined: V
undefined_2: M
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: M
undefined_8: M
undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Explosive Weight

2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.

3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Project Engineer

2016-08-31T06:15:51-0600
MONK.DAVID.B.1257530864
Text46: 31 Aug 2016
Text49:
Type name_1:
Type name_4:
Part Number: SEE PARTS TABLE
Noun:

File details come from the government source that posted it. Updated .