B01__Attach_J-05._CC_S49_SWPPP_Cover_Sheet.doc
DOC document 26 KB Posted
- Attached to
- Bad Nation Booster & Water Main Federal contract opportunity
- Solicitation number
- 17-161-R-00044
About this file
Storm Water Pollution Prevention Plan Cover
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B04__Government_Response_to_Ktr_Questions.docx | DOCX document | |
| B01__Attach_J-07._CC_S49_SWPPP_Modification_Form.doc | DOC document | |
| B01__Attach_J-02.__S49_Bad_Nation_Booster_Bid_Package_Final_5-19-2017_signed.pdf | ||
| B01__Attach_J-04._S49_Bad_Nation_Booster_Plans_Final_5-19-2017_signed.pdf | ||
| B01__Attach_J-03._S49_01270_Price_and_Payment_Final.doc | DOC document | |
| B01__Attach_J-01._Davis_Bacon_WD,_SD170001,_Dated_1-6-2017.docx | DOCX document | |
| B01__17-161-R-00044_SF1442-Revised.pdf | ||
| B01__Attach_J-06._CC_S49_Bad_Nation_WM_&_Booster_SWPPP.doc | DOC document | |
| B01__Attach_J-08._PAST_PERFORMANCE_SURVEY.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORM WATER POLLUTION PREVENTION PLAN
Great Plains Area Indian Health Service Sanitation Facilities Construction
Project AB-13-S49 Date: May 19, 2017 Project Name: Bad Nation Booster Pump Station and Water Main Project Location: Fort Thompson, Buffalo County, South Dakota on the Crow Creek Indian Reservation Project Engineer: IHS Engineer Name: Jason Petersen Address: 420 S. Garfield, Pierre, SD 57501
Telephone #: (605) 945-5432 Project Supervision: Pierre District Engineer
Name: Michael Boland, P.E.
Address: 420 S. Garfield, Pierre, SD 57501 Telephone #: (605) 945-5427 Project Description: Construction of the following sanitation facilities:
The scope of work includes the construction of approximately 13,292 feet of 6-inch water main, 686 feet of 4-inch water main, and 1,035 feet of 10-inch casing and appurtenances, a buried pre-packaged Bad Nation water booster station, SCADA controls and integration at the Bad Nation water storage tank, the Bad Nation booster station, the Fort Thompson elevated water storage tank, and the water treatment plant, abandonment of the existing water booster station as indicated in the specifications and shown on the plans.
Estimated construction time for the project (duration or dates): One hundred fifty (150) calendar days from contract Notice To Proceed date.