Attachment_C_-_SPECIFICATIONS.pdf

PDF 225 KB Posted

Attached to
Robbin Rhoades On-Site Septic System Replacement Federal contract opportunity
Solicitation number
17-102-SOL-00049
Issued by
Department of Health and Human Services Indian Health Service

About this file

Attachment C-Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Robbin Rhoades On-Site Septic System Replacement, newest first.
File Type Posted
Amendment_0001.pdf PDF
Price_Schedule.pdf PDF
WD.pdf PDF
wh347.pdf PDF
RFQ.pdf PDF
Attachment_B_-_Design.pdf PDF
Attachment_A_-_Location_Map.pdf PDF
Attachment_D_-_Technical_Provisions.pdf PDF
WD.pdf PDF
Attachment_B_-_Design.pdf PDF
PO-15-B94I_Rhoades_OSS_Repair.rtf RTF text file
Attachment_D_-_Technical_Provsions.pdf PDF
Attachment_A_-_Location_Map.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Specific items of work to be provided shall be identified in the Bid Schedule and shall be as listed below.

Completed items of work shall be measured and paid for in accordance to the items listed below. All work shall be done in accordance with the Technical Provisions and Drawings. Payment shall be provided based on the actual quantities completed and shall represent full compensation under the contract. The price paid for the completed item of work shall include full compensation for furnishing all labor, materials, tools, equipment, site restoration and performing all work required by the provisions of the contract to furnish and install the item of work, complete in place. In all cases, the finished product shall be a complete, operational system or component. The price for the completed item of work shall include all applicable State, Federal, County, Tribal and local sales or other taxes and fees.

1. MOBILIZATION AND DEMOBILIZATION FOR SEWER CONSTRUCTION (LS)

Payment for transportation of equipment, material, and personnel to and from the job site location (regardless of trips required), required permits and fees, and all other necessary items to complete the work.

2. UNDERGROUND CLEANOUT (EA)

Payment for the underground cleanouts as specified in Technical Provision 10.07 shall be made at the contract unit price for the sizes listed based on the number of underground cleanouts installed.

Compensation shall include payment for excavation, backfilling and compaction, all pipe and fittings, concrete pad around the cleanout, and all other necessary items for a complete and operational installation. No payment shall be made for cleanouts installed above grade as part of the connection to existing house, or as part of drop manholes.

3. SOLID SEWER PIPE (LF)

Payment for solid sewer pipe as specified in Technical Provisions 11.0 and 15.0 shall be made at the contract unit price for the sizes of pipe listed based on the number of linear feet installed.

Compensation shall include payment for excavation, backfilling and compaction; all pipe and fittings;

connection of the solid sewer pipe to an existing sewer service line or curtain drain; testing; and all other necessary items for a complete and operational installation.

4. CURTAIN DRAIN (LF)

Payment for curtain drains as specified in Technical Provision 15.06 shall be made at the contract unit price for the sizes of pipe and total gravel depths listed based on the number of linear feet installed.

Compensation shall include payment for excavation, backfilling and compaction; all pipe and fittings, connections, gravel, filter fabric, rip-rap, and all other necessary items for a complete and operational installation.

5. SEPTIC TANK WITH EFFLUENT FILTER (EA)

Payment for septic tanks with effluent filters as specified in Technical Provision 11.0 shall be made at the contract unit price for the sizes listed based on the number of septic tanks installed. Compensation shall include payment for excavation, backfilling and compaction; septic tank, baffles, access risers, effluent filter, inspection ports as required, and all other necessary items for a complete and operational installation.

6. SEPTIC TANK WITH PUMP CHAMBER (EA)

Payment for pump chambers with effluent filters as specified in Technical Provision 12.0 shall be made at the contract unit price based on the number of complete pump chambers installed. Compensation shall include payment for excavation, backfilling and compaction; pump chamber, baffles, access manhole, risers and lid, pump, controls, floats, conduit, fused disconnect (when required), circuit breaker subpanel (when required), electrical wiring and connections, all piping, valves and fittings in the chamber, testing, and all other necessary items for a complete and operational installation.

7. SEWER TRANSPORT PIPE (LF)

Payment for solid sewer pipe connections from the dosing chamber to the drainfield manifold or sewer main as specified in Technical Provisions 12.0 shall be made at the contract unit price for the sizes of pipe listed based on the number of linear feet installed. Compensation shall include payment for excavation, backfilling, pipe and fittings, connections and other necessary items for a complete and operational installation.

8. LOW PRESSURE DOSED MOUND DRAINFIELD (LF)

Payment for a low pressure dosed mound drainfield as specified in Technical Provision 15.0 and detail drawings shall be made at the contract unit price based on a complete system. Compensation shall include payment for removal of existing chamber drainfield system, protection in place of existing and adjacent mound drainfield, imported ASTM C-33 Sand fill, gravel, filter fabric, distribution laterals, inspection ports, plowing, imported material, top soil, seeding, force main, valve box, cleanouts, fittings, final grading, sediment control, and all other necessary items needed for a complete and operational system.

9. ABANDON EXISTING SEPTIC TANK (EA)

Payment for abandonment of existing septic tanks as specified in Technical Provisions 10.0 and 11.10 shall be made at the contract unit price for the sizes listed based on the number of septic tanks abandoned. Compensation shall include payment for excavation, breaking into the tank, pumping the tank, disposal of the liquid and solids, filling the tank with borrow material, compaction, restoring the ground surface, and all other necessary items for a complete abandonment.