02a_CDRLs_Exhibit_A_3_Aug_16_as_posted.pdf

PDF 397 KB Posted

Attached to
EELV Phase 1A GPS III Launch Services (FA8811-16-R-0006) Federal contract opportunity
Solicitation number
16-084
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

02a Exhibit A - CDRLS

View the file

Other files for this federal contract opportunity

Other files attached to EELV Phase 1A GPS III Launch Services (FA8811-16-R-0006), newest first.
File Type Posted
08_Evaluation_Criteria_3_Aug_16_as_posted.pdf PDF
02c_CDRLs_Exhibit_C_3_Aug_16_as_posted.pdf PDF
03_PWS_3_Aug_16_as_posted.pdf PDF
02b_CDRLs_Exhibit_B_3_Aug_16_as_posted.pdf PDF
05_Small_Business_Plan_3_Aug_16_as_posted.pdf PDF
10_Government_Property_3_Aug_16_as_posted.pdf PDF
11_Payment_Plan_3_Aug_16_as_posted.pdf PDF
07_Instructions_to_Offerors_3_Aug_16_as_posted.pdf PDF
09_Mission_Requirements_Annex_Cover_Sheet_3_Aug_16_as_posted.pdf PDF
04_DD_254_3_Aug_16_as_posted.pdf PDF
01_Model_Contract_FA8811-16-R-0006_3_Aug_16_as_posted.pdf PDF
06_Acceptance_Criteria_3_Aug_16_as_posted.pdf PDF
03_PWS_GPS_III_14_Jun_16.pdf PDF
02c_CDRLs_(GPSIII)_Exhibit_C_14_Jun_16.pdf PDF
10_Government_Property_Cover_Sheet_14_Jun_16.pdf PDF
01_Model_Contract_14_Jun_16.pdf PDF
07_Instructions_to_Offerors_GPS_III_14_June_16.pdf PDF
08_Evaluation_Criteria_GPS_III_14_Jun_16.pdf PDF
11_Payment_Plan_GPS_III_14_Jun_16.pdf PDF
05_Small_Business_Plan_14_Jun_16.pdf PDF
06_Acceptance_Criteria_14_Jun_16.pdf PDF
02b_CDRLs_(GPSIII)_Exhibit_B__14_Jun_16.pdf PDF
Blank_CRM.xlsx XLSX spreadsheet
02a_CDRLs_(GPSIII)_Exhibit_A__14_Jun_16.pdf PDF
04_DD_254_14_Jun_16.pdf PDF
09_Mission_Requirements_Annex_Cover_Sheet_14_Jun_16.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

TO

FA8811-16-R-0006

EVOLVED EXPENDABLE LAUNCH VEHICLE (EELV)

PHASE 1A

CONTRACT DATA REQUIREMENTS LIST (CDRLs)

3 August 2016

Department of the Air Force

Space and Missile Systems Center

Launch Systems Enterprise Directorate

Los Angeles Air Force Base, California

CDRL General Instructions CDRL Address List CDRL Distribution List CDRLs

CDRL GENERAL INSTRUCTIONS

CONTRACT DATA REQUIREMENTS LIST (CDRL)

A list of data requirements authorized for this specific procurement and made a part of this contract. The contractual method is the use of Department of Defense Form (DD Form) 1423s, Contract Data Requirement List (CDRL), which specifies the data which is required to be delivered to the government. For the purpose of this agreement, the “contract” applies for each Launch Vehicle Service order.

DATA ITEM NUMBER

If the Contract is awarded multiple Launch Vehicle Service orders, the Contractor shall use a sequential double alpha, single numeric number scheme. For example, Order 1 will have CDRLs AA01-AA11, AB01-AB20, and AC01; and Order 2 will have CDRLs BA01-BA11, BB01-BB20, and BC01.

DATA ITEM DESCRIPTIONS (DIDs) The DID is a specification for the preparation of data. The DIDs listed on the CDRLs were selected from the Department of Defense (DoD) Index of Specifications and Standards (DoDISS) listed on the Acquisition Streamlining and Standardization Information System (ASSIST).

DID TAILORING

DID tailoring is made to either relax format requirements or to tailor the DID to be in consonance with the source document tailoring contained in the Performance Work Statement (PWS). Since contract data requirements are normally a by-product of some contract task, if the requirements of the DID are in conflict with the tailored application of the source document as reflected in the PWS, the latter takes precedence.

DATA DELIVERY DATES

For Soft Copies, delivery of data is to be construed as the date data is available in the contractors’ data management system and electronic notification is sent to addressees.

For Hard Copies, delivery of data is to be construed as “On Dock” dates at destination. Provision of a 3-day postage handling period from postmark at contractor's facility to “On-Dock” delivery at destination meets this requirement, unless otherwise stated in CDRL. The date of government signature at destination, if courier service is used, is to be construed as the “On Dock” date. It shall be the contractor's responsibility to ensure data delivery prior to end of business on the due date if a courier service is used in lieu of the U.S. Postal Service.

If due date falls on weekend or government holiday, data shall be due on the next scheduled government workday.

DD FORM 250 REQUIREMENTS

Block 7 of the CDRL will indicate whether inspection and acceptance of the data by DD Form 250 is required.

“Draft” copies submitted for advance approval and “Preliminary” copies submitted are exempt from the DD Form 250 requirements.

ADDITIONS TO DISTRIBUTION

If an addressee is added to distribution, or distribution quantities have been increased to an existing addressee, initial submittal to new addressee shall include the basic document and revisions as appropriate.

COMMUNICATIONS

Any correspondence related to requests for data delivery deviations, amendments, additions, or deletions shall be addressed to the Procuring Contracting Office (PCO) with an information copy to the government Data Management Officer (DMO).

For those data items where “LT” (Letter of Transmittal) is indicated in Block 7 of the CDRL, the Contractor shall utilize a Letter of Transmittal (LOT). Each copy submitted shall have a LOT attached. In addition, the contractor shall furnish one copy of each LOT (without data) to the government DMO. Change pages shall indicate updates by a bar in the margin adjacent to the change and encompassing all changed portions.

CDRL ADDRESS LIST AND DATA DISTRIBUTION LIST

The Address List provides the complete mailing address for each addressee and a mailing code.

The Data Distribution List provides information regarding quantities for shipment (normally in Blocks 14 and 15 of the CDRL) to each mailing code. Quantity of Hard deliverables and Soft deliverables will be indicated to the left and right of the “/”, respectively. See CDRL for possible additional format or delivery instructions.

DATA APPROVALS

While all data are subject to government approval, selected data will require advanced approval. Per block 8 in the CDRL instructions, deliverables are either marked as "N/A" to denote that approval is not required; and, "A" to denote that approval is required by the Government. Data requiring approval “A” will be reviewed as follows. Initial or draft CDRL submittals shall be reviewed by the Government to transmit feedback to the Contractor as required; and, and will not require government approval. Updates to “A” CDRLs will also be reviewed by the Government to transmit feedback to the Contractor as required; and the government may determine that these updates require approval as directed by the PCO. All final data submissions for “A” CDRLs shall require approval by the Government. The approving authority shall be the PCO. Delivery of the Final data shall be submitted within 30 CD after receipt of government approval of Draft unless otherwise stated on CDRL.

CODES USED ON THE CDRL

The following codes may be used as described below.

a. Block 7: DD Form 250 requirements

CODE WHEN USED

LT Letter of Transmittal only

b. Block 8: Approval code

CODE WHEN USED

A Approval is required by the government.

N/A Approval is not required.

c. Block 10: Frequency

CODE (Limit to five characters)

DAILY Daily WEKLY Weekly BI-WE Each 2 weeks MTHLY Monthly BI-MO Each 2 months QRTLY Quarterly ANNLY Annually SEMIA Each 6 months OTIME One time ONE/R One time, & revisions R/ASR Revisions as required *ASREQ As required DFDEL Deferred delivery DFORD Deferred ordering ONE/P 1-time preliminary draft 2TIME Two separate submittals

*When ASREQ is used in items 10, 11, 12 or 13, an explanation of the requirement must be entered in item 16.

d. Blocks 12 and 13: Date of 1st and Subsequent Submissions

SDA = Government APPROVAL CDR = Critical Design Review CA = Contract Award IPR = In Process Review CO = Change Order FCA = Functional Configuration Audit SA = Supplemental Agreement PCA = Physical Configuration Audit

SRR = System Requirements Review FLT = Flight Test Review SDR = System Design Review CD = Calendar Days PDR = Preliminary Design Review WD = Working Days EOC = End of Contract ATP = Authority to Proceed ILC = Initial Launch DACA = Days After Contract Award*

* For this agreement, Contract Award is the same as Launch Vehicle Services Order

ELECTRONIC DISTRIBUTION

CDRLs shall be delivered on the contractors’ data management system(s). The contractor shall enable remote access to these systems by all SPO personnel (Air Force, Aerospace, Systems Engineering and Integration (SE&I), and Systems Engineering and Technical Assistance (SETA)) subject to applicable terms on this contract. An index of addressees to be allowed access to or to be notified of CDRL availability will be provided by government DMO via e-mail notification for contractor’s implementation. Access Lists will be updated, as required, without modification to the contract. The contractor shall use an acceptable electronic format that is compatible with existing government systems, unless a precise format is specified in the CDRL.

CDRL ADDRESS LIST

1. HQ Space & Missile Systems Center (AFSPC) LE

Launch Systems Directorate 483 North Aviation Blvd.

Los Angeles AFB El Segundo, CA 90245-2808 smc.lrdm@us.af.mil

a. LEE, Bldg. 271 B3-405 (Data Management Office, DMO)

b. LEE

c. LEP

d. LEK

e. LEG

f. LES NOTE: Submit Hard Copies to 1.a. for distribution, if applicable

2. HQ Space & Missile Systems Center (AFSPC) SAF/SL

Attn: SAF/SL, Bldg. A5 483 North Aviation Blvd.

Los Angeles AFB El Segundo, CA 90245-2808

3. 30th Launch Group 30 LCG

4th Space Launch Squadron Directorate of Engineering Attn: Data Desk 1515 Iceland Ave., Suite 222 Bldg. 8500 Vandenberg AFB, CA 93437-5321

4. 45 LCG / 45 LCSS 45 LCG

Attn: Data Library 15270 Samuel C. Phillips Parkway (CCAFS) Building 1645 Patrick AFB, FL 32925-2009

5. Defense Cost and Resource Center (DCARC) DCARC

201 12th Street South Suite 220 Arlington, VA 22202

(703) 601-4850

6. DCMA, TBD DCMA

7. NRO Operations Squadron NOPS

401 Discoverer Ave. Ste 32 Schriever AFB, CO 80912 NOPS_Launch@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A001 Data Accession List (DAL) 4 AUTHORITY (Data Acquisition Document No.)

5 CONTRACT REFERENCE 6 REQUIRING OFFICE

DI-MGMT-81453A/T Performance Work Statement, Para 3.1.3 SMC/LEE

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT MTHLY 30 DACA b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

SUBMISSION

a ADDRESSEE

FINAL

N/A N/A MTHLY Draft Reg Repro

16 REMARKS See Distribution List

1. (BLK 4):

a. Data Accession List (DAL) will be cumulative.

b. List is not to include data generated by other CDRLs on contract.

c. The DAL shall contain pointers (links) to the contractor’s electronic data systems file names or document location in the online database.

2. (BLK 13): Technical data shall be added to the online dataset within 10WD after release

3. The Government will review each submission and provide feedback within 30 CD to the maximum extent possible.

15 TOTAL 1

G PREPARED BY H DATE I APPROVED BY J DATE

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A002 Cost Data Summary Report (DD Form 1921)

DI-FNCL-81565C/T Performance Work Statement, Para 3.1.4 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT BLK 16 BLK 16 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

N/A BLK 16 BLK 16 Draft Reg Repro

16 REMARKS See Distribution List

1. (BLK 4):

a. Prepare in accordance with the CAIG Chair approved Cost and Software Reporting (CSDR) Plan provision, the WBS Data Dictionary, and the Contract Cost Data Reporting (CCDR) Manual (DoD 5000.4 M-1). Use the latest revisions of the CSDR Plan and the WBS Dictionary. The CCDR Manual is available from the Defense Cost and resource Center (DCARC) website at http://dcarc.cape.osd.mil/

b. The responsible DoD office for receiving and storing all CCDR related formats is:

Defense Cost and Resource Center (DCARC)

201 12th Street South

Suite 220

Arlington, CA 22202

c. Prepare CCDR data in electronic format in accordance with the detailed instructions contained in Data Item Description DI-FNCL-81565C. The required file format is Microsoft Excel compatible spreadsheet. PDF format is not acceptable. These reports must be submitted by report upload to the DCARC’s secure website. The DCARC website contains information about delivery methods and submission instructions.

d. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to DCARC and SMC/LEP. If the subcontractor agrees, a copy of the report may be provided concurrently to the prime or higher tier contractor.

e. Contractor shall identify major subcontractor names, values, and corresponding WBS elements in the remarks sections of the DD Form 1921.

2. (BLK 10, 11, 12 & 13): Please reference the latest approved CSDR Plan provided by DCARC for current submission events and due dates.

15 TOTAL

Electronically Generated PAGE 1 OF 1 PAGES

COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR

PROGRAM

a. NAME: EELV - Evolved Expendable Launch Vehicle

b. PHASE/MILESTONE c. PRIME MISSION

PRODUCT

2. WBS SYSTEM

TYPE

3.

SUBMISSIO

N TYPE

4. CURRENT

SUBMISSION

DATE

(YYYYMMDD)

5. LAST

APPROVED PLAN

DATE

(YYYYMMDD) Pre-A B X C-FRP Launch Vehicle System Launch Vehicle System X INITIAL

A C-LRIP O&S CHANG

E

20150814 20140512

6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)

6b. TELEPHONE NUMBER (Include

Area Code)

6c. FAX NUMBER (Include Area Code)

6d. E-MAIL ADDRESS

SMC/LEP Cost Chief 483 N. Aviation Blvd

Los Angeles AFB El Segundo, CA 90245

310-653-4715 310-653-3151 roy.bryson@us.af mil

7. PLAN TYPE 8. PREPARING

ORGANIZATI

ON

9a. CONTRACTOR

NAME/ADDRESS

9b. CONTRACT

NUMBER

9c.

APPROPRIATION

10. APPROVED

PLAN NUMBER

PROGRAM X CONTRACT

(PRIME)

i.

PERFORMING

ORGANIZATIO

N

ii. DIVISION FA811-16-C-000X

(TBD)

RDT&E AF-05-C-C14

CONTRACT

(SUB)

AF SMC/LE

Program Control

TBD TBD X PROCUREME

NT

O&M

11. WBS ELEMENT CODE 12.

WBS REPORTING ELEMENTS

13. REPORTS REQUIRED

(X if applicable)

DD 1921-3

(CBDR):

X

a. PROGRAM/

CONTRACT/

SUBCONTRA

CT

b.

CONTRACT/

SUBCONTRA

CT

a. CWBS

DICTIONAR

Y

b. DD

(CDSR

c. DD 1921-

(FCHR)

d. DD 1921-2

(PCR)

e. DD 1921-4

(CSR)

f. SRDR

FORMAT

S

1.0 1.0 Launch Vehicle System (GPS III) X X X

1.1 1.1 Mission Integration X X

1.1.1 1.1.1 Mission Standard Integration X X

1.1.2 1.1.2 Mission Unique Integration X X

1.2 1.2 Mission Assurance X X X

1.3 1.3 Supplier Readiness X X

1.4 1.4 Mission Unique Development/Design X X

1.5 1.5 System Engineering, Integration, Test, Program Management

X X X

1.5.1 1.5.1 Program Management X X X

1.5.2 1.5.2 System Engineering X X X

1.5.3 1.5.3 Factory Support X X X

1.5.4 1.5.4 Special Studies X X X

1.6 1.6 Transportation X X

1.7 1.7 Launch Operations X X X

1.7.1 1.7.1 Launch Support X X X

1.7.1.1 1.7.1.1 Launch Crew (mate, checkout, launch) X X

1.7.1.2 1.7.1.2 P/L Encapsulation X X

1.7.2 1.7.2 Launch Operations SEPM X X X

1.7.2.1 1.7.2.1 Launch Operations Program Management X X X

1.7.2.2 1.7.2.2 Launch Operations System Engineering X X X

1.7.3 1.7.3 Site Maintenance X X X

1.7.3.1 1.7.3.1 Sustainment Propellants X X

1.7.3.2 1.7.3.2 Other Maintenance X X

1.7.4 1.7.4 Base Support X X X

1.7.5 1.7.5 Range Operations Services X X X

1.7.6 1.7.6 Propellants (Vehicle) X X X

1.8 1.8 Launch Vehicle X X X

1.8.1 1.8.1 Propulsion X X X

1.8.1.1 1.8.1.1 Booster Engine X X X

1.8.1.2 1.8.1.2 Upper Stage Engine X X X

1.8.1.3 1.8.1.3 Solid Rocket Motors X X X

1.8.2 1.8.2 Payload Accommodations X X

1.8.2.1 1.8.2.1 Payload Fairing X X X

1.8.2.2 1.8.2.2 Payload Attach Fitting (Adapter) X X X

1.8.2.3 1.8.2.3 Mission Unique Hardware X X X

1.8.3 1.8.3 Core Vehicle X X X

1.8.3.1 1.8.3.1 Booster Structure X X X

1.8.3.2 1.8.3.2 Intertank Adapter & Skirts X X X

1.8.3.3 1.8.3.3 Aft Transition Structure X X X

1.8.3.4 1.8.3.4 Heat Shield X X X

1.8.4 1.8.4 Upper Stage X X X

1.8.4.1 1.8.4.1 Upper Stage Structure X X X

1.8.4.2 1.8.4.2 Interstage Adapters, Stub Adapters, Forward Adapters

X X X

1.8.5 1.8.5 Mission Assurance Instrumentation X X X

1.8.6 1.8.6 Guidance and Control (Avionics) X X X

1.8.7 1.8.7 Integration, Assembly, Test & Checkout (IAT&C) X X X

1.9 1.9 Training X X

1.10 1.10 Other X X

Subtotal Cost X

Reporting Contractor G&A X

Reporting Contractor Undistributed Budget X

Reporting Contractor Management Reserve X

Reporting Contractor FCCM X

Total Cost X

Reporting Contractor Profit/Loss or Fee X

Total Price X

DD FORM 2794, MAY 2011 PREVIOUS

EDITION IS

OBSOLETE

14. CSDR SUBMISSION DATES

a.

b.

FORM(S)

c.

EVENT

d. AS OF

DATE

e. DUE DATE

(YYYYMMDD) (YYYYMMDD)

1 CWBS Dictionary Initial CWBS Submission 20161130 20170131

2 1921, 1921-1 Initial Report - Initial Cost Report (GPS III) 20161130 20170131

3 1921, 1921-1 Final Cost Report (GPS III) 20161130 20181030

15. REMARKS

NON-RECURRING/RECURRING DEFINITIONS:

There are no refinements or expansions to these definitions warranted.

COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES:

Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.

1921-3 CONTRACTOR BUSINESS DATA REPORT:

a. The Contractor Business Data Report is prepared by and for the business entity (e,g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government, if applicable.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. An alternative to completing 1921-3 is complete Blocks 1 through 11, on Page 1 (Sections A - F are not required) and REMARKS section must include "Headcount by Department" on a monthly basis.

SPECIAL INSTRUCTIONS: (1) Only provide an initial report (which will only have initial at completion estimates), end of year reports as applicable and a final report (when actual costs are known) given the period of performance for the contract.

(2) On the 1921-1s for 1.2 (Mission Assurance), 1.5 (System, Engineering, Integration, Test, Program Management), and 1.7 (Launch Operations), describe in detail the mapping or allocation approach. If an allocation approach is used, use the 1921-1 Non-Recurring category to either identify the enterprise's total (common) costs and hours for the period in that specific WBS element or provide the total company headcount on a monthly basis for the departments utilized in the performance of 1.2 (Mission Assurance), 1.5 (System, Engineering, Integration, Test, Program Management), and 1.7 (Launch Operations). (This total enterprise (common) cost will NOT be included in the cost of this launch) and the 1921-1 Recurring category to list the costs and hours attributed to this specific mission (common share and unique) for the period in that specific WBS element. Alternatively, provide the data and document the mapping/allocation procedure in a supplemental excel table or other suitable format.

(3) Use the notes section in the form(s) to document your assumptions, allocations, mappings, etc.

(4) For WBS 1.10 "Other" category, specifically define what these costs are in Remarks' section.

DD FORM 2794 (PAGE 2), MAY 2011 PREVIOUS EDITION IS OBSOLETE

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A003 Functional Cost-Hour Report (DD Form 1921-1)

DI-FNCL-81566C/T Performance Work Statement, Para 3.1.4 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT BLK 16 BLK 16 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (BLK 4):

a. Prepare in accordance with the CAIG Chair approved Cost and Software Reporting (CSDR) Plan provision, the WBS Data Dictionary, and the Contract Cost Data Reporting (CCDR) Manual (DoD 5000.4 M-1). Use the latest revisions of the CSDR Plan and the WBS Dictionary. The CCDR Manual is available from the Defense Cost and resource Center (DCARC) website at http://dcarc.cape.osd.mil/

b. The responsible DoD office for receiving and storing all CCDR related formats is:

Defense Cost and Resource Center (DCARC)

201 12th Street South

Suite 220

Arlington, CA 22202

c. Prepare CCDR data in electronic format in accordance with the detailed instructions contained in Data Item Description DI-FNCL-81566C. The required file format is Microsoft Excel compatible spreadsheet. PDF format is not acceptable. These reports must be submitted by report upload to the DCARC’s secure website. The DCARC website contains information about delivery methods and submission instructions.

d. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to DCARC and SMC/LEP. If the subcontractor agrees, a copy of the report may be provided concurrently to the prime or higher tier contractor.

e. Contractor shall identify major subcontractor names, values, and corresponding WBS elements in the remarks sections of the DD Form 1921.

2. (BLK 10, 11, 12 & 13): Please reference the latest approved CSDR Plan provided by DCARC for current submission events and due dates.

15 TOTAL 1

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A004 Contractor Business Data Report (DD Form 1921-3) 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-FNCL-81765B/T Performance Work Statement, Para 3.1.4 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT BLK 16 BLK 16 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (BLK 4):

a. Prepare in accordance with the CAIG Chair approved Cost and Software Reporting (CSDR) Plan provision, the WBS Data Dictionary, and the Contract Cost Data Reporting (CCDR) Manual (DoD 5000.4 M-1). Use the latest revisions of the CSDR Plan and the WBS Dictionary. The CCDR Manual is available from the Defense Cost and resource Center (DCARC) website at http://dcarc.cape.osd.mil/

b. The responsible DoD office for receiving and storing all CCDR related formats is:

Defense Cost and Resource Center (DCARC)

201 12th Street South

Suite 220

Arlington, CA 22202

c. Prepare Contractor Business Data Report (CBDR) data in electronic format in accordance with the detailed instructions contained in Data Item Description DI-FNCL-81565B. The required file format is Microsoft Excel compatible spreadsheet. PDF format is not acceptable. These reports must be submitted by report upload to the DCARC’s secure website. The DCARC website contains information about delivery methods and submission instructions.

d. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to DCARC and SMC/LEP. If the subcontractor agrees, a copy of the report may be provided concurrently to the prime or higher tier contractor.

e. Contractor shall identify major subcontractor names, values, and corresponding WBS elements in the remarks sections of the DD Form 1921.

2. (BLK 10, 11, 13 & 13): Please reference the latest approved CSDR Plan provided by DCARC for current submission events and due dates.

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A005 Contractor Work Breakdown Structure (CWBS) 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-MGMT-81334D/T Performance Work Statement, Para 3.1.4 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT BLK 16 BLK 16 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

A BLK 16 BLK 16 Draft Reg Repro

16 REMARKS See Distribution List

1. (BLK 4):

a. Prepare in accordance with the Contract Cost Data Reporting (CCDR) Manual (DoD 5000.4-M-

1) and the guidance in Military Standard 881C,”Work Breakdown Structures for Defense Material Items’, Appendix J (T), “Launch Vehicle Systems work Breakdown Structure and Definitions. The CCDR Manual is available at the DCARC website http://dcarc cape.osd.mil/

b. The responsible DoD office for receiving and storing all CCDR related formats is:

Defense Cost and Resource Center (DCARC)

201 12th Street South

Suite 220

Arlington, CA 22202

c. Prepare CCDR data in electronic format in accordance with the detailed instructions contained in Data Item Description DI-MGMT-81334D. The required file format is Microsoft Excel compatible spreadsheet. PDF format is not acceptable. Microsoft Word is an acceptable format for submission of the CWBS Dictionary. These reports must be submitted by report upload to the DCARC’s secure website. The DCARC website contains information about delivery methods and submission instructions.

d. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to DCARC and SMC/LEP.

e. The CWBS shall include up to Level 4 of indenture. Contractor shall provide reporting for Levels 1 through 4 of the Program WBS. Any differences between the CWBS and Program WBS shall be identified.

2. (BLK 10, 11, 12 & 13):

a. CWBS and CWBS Dictionary date of first submission is 30 CD after Contract Award.

b. Subsequent submissions 30 CD after Fiscal Year end (Sep 30).

c. Please reference the latest approved CSDR plan provided by DCARC for current submission events and due dates.

d. Any redlines to the CWBS dictionary after first submittal shall be provided to SMC/LEP monthly for Government review and DCARC coordination.

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A006 Integrated Program Management Report (IPMR) Integrated Master Schedule 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-MGMT-81861A/T Performance Work Statement, Para 3.1.4 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT MTHLY BLK 16 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

A BLK 16 BLK 16 Draft Reg Repro

16 REMARKS See Distribution List

1. (BLK 4):

a. Only the following DID sections and their sub-sections (omitting references to Formats 1-5 or 7) are applicable: 1.3, 1.5, 2.1.1, 2.1.1.2, 2.2.5, 2.3, 2.5.1, 2.6.1, 2.7, 3.6.7, and 3.7 as tailored below and exclude 6.2.1.1.6.

b. 2.1.1 Electronic Submission of Data Add the following: The IMS shall be submitted electronically using the contractor’s schedule tool and only in a pdf file format when specifically requested by the Government.

c. 2.2.5 Native Schedule Format Add the following: The IMS shall be created using a network capable scheduling software application of the contractor’s choice. The IMS shall be configured to allow sorting and filtering by key events and to allow filtering for various views; for example, top level summary view, mid-level summary view, critical path for each mission and a complete detail view.

d. 2.6.1 Submission Requirements. Replace with: Format 6 shall be submitted to the procuring activity no later than 14 federal working days after contractor’s month end close.

e. 3.6.7.1 Critical/Driving Paths Delete all references to Driving Paths in the title and body of the requirement.

f. 3.7.1 IMS Requirements Delete all references to the Integrated Master Plan (IMP). An IMP is not required.

g. 3.7.1.1.1 Production Contract IMS Add the following: Production key events/milestones shall be incorporated at the summary level and networked to their associated activities within the IMS.

The interrelationships/interdependencies shall be identified with sufficient detailed activities through the use of network logic that provide a clear picture of the mission's progress from ATP through contract completion.

h. 3.7.1.3 IMS Content Elements 2nd bullet – Replace with: The IMS shall have traceability to WBS and Performance Work Statement.

i. 3.7.1.3.4.3 Scope Planning Add the following: Planning packages shall be detailed planned into discrete work packages, or apportioned tasks (as appropriate) no later than one accounting period prior to the schedule start of the planning package. Planning package plans shall reflect the manner in which the work is to be performed.

j. 3.7.1.3.5.3 Duration Add the following: Discrete/measureable activities shall be baselined in accordance with the contractor’s System Description Document. Where durations are longer than 44 working days, rationale shall be provided within the IMS.

Electronically Generated PAGE 1 OF 2 PAGES

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP X TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

16 REMARKS

k. 3.7.1.3.5.8 Driving Path – Delete

l. 3.7.1.3.5.9 Critical Path Add the following: Each mission’s critical path shall show clear network logic through the launch operation schedule of activities. The launch operations data shall be provided to the Government using existing contractor schedule and format on a monthly basis. At the mission level, the critical path follows the standard definition (a critical path being the longest contiguous path through the network) flow from mission ATP through launch providing a clear network of logic of all tasks along the critical path. As a mission progresses, the critical path shall also include activities that have negative float. Where critical path is not calculated based on the longest path, but based on risk and development of known delivery problems, the critical path shall explain the deviation from the standard derived critical path.

m. 3.7.1.3.5.10 Current Schedule Add the following: Reporting thresholds shall be consistent with the most recent DCMA 14 Point Assessment metrics.

n. 3.7.1.3.5.15 External Dependencies Add the following: A network schedule for each mission shall clearly identify activities, product hand-offs and deliverables from external interfaces, from the lowest level of contract tasks/activities up to the summary level schedule activities and milestones. The determination of external significant and critical interfaces to be identified within the IMS requires agreement among the contractor(s) and Government and is documented accordingly.

o. Delete 3.7 1 3.6 Schedule Risk Assessment (SRA)

p. Delete 3.7 1 3.6 1 – 3.7 1 3.6 5

q. 3.7.1.3.7.2 Required traceability Replace with: The WBS must be traceable for all discrete work in the IMS. Traceability may be met with a field in the IMS or via other means as long as discrete work reconciles.

r. Delete 3.7 1 3.7 3 Item 4) Earned Value Technique (EVT), Item 6) Critical Paths and Driving Paths. Delete all references to Driving Paths in the title and body of the requirement.

s. 3.7.1.3.9 Retention of Historical Performance- Remove "and the three-point estimates that were used before the task/activity started”.

t. 3.7.2.1 Schedule Visibility Task (SVT)- Deleted

2. (BLK 11) The contractor’s month end close.

3. (BLK 12) First submission of initial draft shall be 30 DACA (Milestone #1) for Government review. Contractor shall submit the updated IMS for Government approval (Milestone #2)

4. (BLK 13) Electronic copy shall be submitted NLT 14 federal working days after contractor’s month end close.

5. (BLK 14) All IMS related forms must be electronically submitted to the central repository at the DCARC website at https://service.dcarc.cape.osd.mil/DCARCPortal/site/login.asox

6. The Government will review each submission and provide feedback within 30 CD to the maximum extent possible.

Electronically Generated PAGE 2 OF 2 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A X TDP TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A007 Training Materials Launch System Familiarization Course

4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE

DI-ILSS-80872/T Performance Work Statement, Para 3.1.10 SMC/LEG

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT ASREQ 60 DACA b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

A N/A BLK 16 Draft Reg Repro

16 REMARKS See Distribution List

1. (BLK 4):

a. Replace 10.1 with “10.1 Format. The material provided shall be in the contractor’s own format.

The material shall be printable on standard size paper, e.g. 8 ½ x 11 or A4; foldouts are allowed.”

b. Delete 10.1.1

c. Replace 10.2 with “10.2 Contents. The Launch System Familiarization Course training materials shall consist of text, supplemental written and audio-visual material used to support the Launch Vehicle Familiarization class.”

d. Replace 10.2.1 with

“10.2.1 The Launch System hardware, software and ground interface sections shall include the following elements:

A. Overall review of hardware or software element function and construction

B. Basic performance requirements and interfaces

C. Qualification approach

D. Fault tolerance

E. Test questions for the student

F. Change summary showing changes to the material between versions”

e. Delete 10.2.1.1 – 10.2.1.7

f. Replace 10.2.2 with

“10.2.2 Required Material. The Launch System Familiarization Course training materials shall address the following elements (as appropriate for the Launch Service provided):

1. Launch System Hardware and Software

a. Booster

i. Structure

1. Propellant Tanks

2. Primary Transition Structure

3. Heat Shields

Electronically Generated PAGE 1 OF 3 PAGES

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A X TDP TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

16 REMARKS

4. Propellant Feed Subsystems

5. Avionics Structure

6. Fairings

ii. Booster Systems

1. Booster Tank Pressurization

2. Propellant Level Control Systems

3. Propellant Utilization System

4. Propellant Depletion System

5. Retro-Rockets

6. Separation and Ordnance Systems

iii. Booster Propulsion

1. Main engine

2. Main engine hydraulics

iv. SRB Propulsion

1. Solid Rocket Booster

2. Strap-On Attach Hardware

3. CCB/SRB Umbilicals

b. Upper Stage

i. Structure

1. Tanks

2. Avionics Panels

ii. Upper Stage System

1. Propellant Level System

2. Propellant Utilization System

3. Pressurization and Venting System

4. Helium System

5. Reaction Control Thrusters

iii. Upper Stage Engine

c. Payload Fairings and Payload Adapters

d. Avionics and Electrical Systems

i. Electrical Power Subsystem (EPS)

ii. Guidance, Navigation, and Control (GNC) Subsystem

1. Navigation Unit

2. Flight Software

3. Remote Command and Control Units

iii. Ordnance Control Units

iv. Batteries

v. Data Acquisition System (DAS) Telemetry Data Transmission System (TDTS)

vi. Tracking System

vii. Flight Termination System (FTS)

Electronically Generated PAGE 2 OF 3 PAGES

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A X TDP TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

16 REMARKS

2. Ground Systems

a. Ground Command, Control Communications

b. Launch Mount and Umbilical System

c. Range Interface

d. Facility systems and capabilities

e. Launch site critical ground mechanical, structural and fluid/gas systems

f. Ground electrical systems

3. Launch Vehicle Processing

a. Manufacturing Facility

b. Factory Checkout and Test

c. Transportation

d. Receive and Inspection, Checkout and Test

e. Integrated Systems Test

f. Payload processing and Integration

g. Launch Vehicle and Facility Walkdown process

h. Launch Countdown and Launch

4. Launch Vehicle System and Systems Engineering

a. Mission Profiles and Vehicle Capability

b. Requirements and Verification

c. Standard analyses performed by all disciplines during each mission integration cycle

i. Analysis Scope

ii. Tools Utilized

d. Risk Identification, Tracking, and Resolution criteria/process

e. Types of Contractor Work Authorization Documents

5. Contractor organizational structure, roles and responsibilities”

2. (BLKs 12): Initial submittal (draft) training materials shall be delivered NLT 60 DACA. The level of detail covered by the FAM Course training materials shall be provided by the Contractor in the initial submittal, and approved by the Government for the final CDRL submittal prior to conducting the FAM Course. Final training materials shall be delivered 15 CD following receipt of Government comments. All FAM Course training materials shall be finalized and approved by the Government prior to the FAM Course.

3. (BLKs 13): Updates to the written training materials shall be submitted to reflect the latest United States Government certified/approved launch system configuration.

4. The Government will review each submission and provide feedback within 30 CD to the maximum extent possible.

Electronically Generated PAGE 3 OF 3 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP X TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A008 Program Protection Implementation Plan (PPIP) 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-ADMN-81306 Performance Work Statement, Para 3.1.11 SMC/LEE

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT ASREQ BLK 16 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (BLK 4):10.1 Content Requirements

a. 10.1.a Replace with “Description detailing how the PPIP aligns with the Government PPP methodology and the defined Program Protection schedule activities/events. Description shall also addresses implementation of Government Program Protection contractual direction

(PWS).”

b. Add “10.1.d Definitions of contractor Criticality Analysis methods to further define Government PPP Critical Components (CC) detail. CC detail must be provided down to the point where the contractor loses configuration management control of the CC internal components (e.g. COTS hardware). Criticality Analysis results should be provided as modifications/additions to Government PPP content.”

c. Add “10.1.e Definition of contractor identified vulnerabilities and Program Protection incidents and how/when they are reported to the Government.”

d. Add “10.1.f Definition of contractor identified vulnerabilities and Program Protection incidents and how/when they are reported to the Government. Also, describe methods to ensure accountability of all Critical Program Information (CPI) handled by the contractor.”

e. Add “10.1.g For Supply Chain Risk Management countermeasures aspects; provide a detailed set of supplier information for all CCs and components that handle CPI. A supplier can either be a Manufacturer (e.g. Original Equipment Manufacturer) or a Vendor (sells Manufacturer components). If CCs are purchased from a Vendor, the Manufacturer information must also be provided. Required supplier details include: CC supplied, company name, address, website, type (Manufacturer or Vendor), and CAGE code. These details should be specific to where the component being acquired/manufactured.”

2. (BLK 8): Approval shall be by Contracts letter.

3. (BLK 10, 12, and 13):

a. Draft PPIP shall be submitted 30 CD after receipt of the EELV Program Protection Plan (PPP) with the contractor-specific annex.

b. Final PPIP shall be submitted 30 CD after receipt of Government comments to the Draft PPIP.

c. Updates shall be submitted as significant revision to the PPP are made or the PCO may require an update if the PPP is significantly revised.

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

9001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

EELV FA8811-16-R-0006

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A009 As Designed Configuration List (ADCL) Launch Vehicle Configuration

4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE

DI-CMAN-81516/T Performance Work Statement, Para 3.2.4. SMC/LEE

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT QTLY 60 DACA b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

A N/A ASREQ Draft Reg Repro

16 REMARKS See Distribution List

1. (BLK 4):

a. Replace 1.0 with the following: “As Designed Configuration List (ADCL).”

b. Replace 3.1 with the following:

“The list shows the as-designed launch vehicle configuration and critical ground support equipment specific to the launch service delivered under the contract.”

c. Replace 3.2 with the following:

“The ADCL will be used by the Government to monitor configuration changes to the launch vehicle baseline prior to the construction of hardware for the launch vehicle.”

d. Replace 10.2.1 with the following:

“10.2.1 Part name, part number and revision, next higher assembly part number, software part number and revision as applicable for each serial-number-controlled, assembly, subassembly, part or component as designed in the launch vehicle configuration. The initial ADCL submitted 60 DACA shall reflect the as-proposed launch vehicle configuration with any configuration changes that occurred to the launch vehicle design following ATP. The initial ADCL submission shall establish the format for the ADCL to ensure that all required elements are included; and, establish the as designed configuration of the vehicle expected to be flown. The ADCL at L-12 months shall include all planned or proposed modifications to the launch vehicle configuration design to be implemented prior to flight.”

2. (BLK 13): Revisions to the ADCL shall be formally submitted to the Government at least once a quarter following ATP up to L-12 months as follows: 60 DACA (Milestone #2), 180 DACA (Milestone #4), 240 DACA (Milestone #5), L-12 (Milestone #6); and the vehicle configuration from the most recent flight from L-11 months to L+2 months for fleet insight as follows: L-6 (Milestone #7), L-3 (Milestone #8), L-2 (Milestone #9), and L+2 (Milestone #10).

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average…

This is the start of the file's text. The full file is on GovTribe.