15E040.01 Sewer LS N FM Replacement Washington St Project Manual_8-10-26 (1).pdf

PDF 3 MB Posted

Attached to
Sewer Lift Station "N" Force Main Replacement Along Washington St.
Solicitation number
15E040.01
Issued by
Orleans Parish, Louisiana

About this file

This is a project manual and bidding document for the Ouachita Parish Police Jury in Louisiana for the Sewer Lift Station "N" Force Main Replacement project along Washington Street from New Natchitoches Road to Edwards Road in West Monroe. The project, numbered 15E040.01 and managed by engineer Lazenby & Associates, Inc., involves installation of a 24-inch high-density polyethylene sewer force main via directional bore to replace an existing 18-inch ductile iron force main, along with force main tie-ins, abandonment of the existing main with flowable fill, and associated work. A pre-bid conference is scheduled for 10:00 a.m. on Tuesday, October 20, 2026, at Lazenby & Associates' office located at 2000 North 7th Street, West Monroe, Louisiana. Sealed bids must be received by 2:00 p.m. on Thursday, October 29, 2026, at the Ouachita Parish Police Jury office at 100 Bry Street, Monroe, Louisiana. The bid documents are available from the engineer for a deposit of $50.00 plus shipping and mailing costs, with refunds provided upon return of documents in good condition within ten days of bid opening. The contract will be awarded on a unit price basis to the lowest responsible bidder. Work must achieve substantial completion within 240 days after the contract times commence and final completion within 285 days, with liquidated damages set at $400.00 per day for delays beyond the substantial completion date and $400.00 per day for delays beyond the final completion date.

Each bid must be accompanied by a cashier's check, certified check, or bid bond equal to five percent of the total bid amount payable to the Ouachita Parish Police Jury. The successful bidder must submit executed copies of the Non-Collusion Declaration, Attestation Clause, E-Verify Affidavit, and Firearm Certification within ten days of bid opening. Performance and payment bonds are required for the full contract amount in accordance with the General Conditions. Retainage will be held at ten percent for contract amounts less than $500,000 and five percent for amounts $500,000 or greater, with progress payments made monthly based on work completed. Monthly progress payments will be made during performance, with a final payment following substantial completion and a 45-day lien period upon submission of a No Lien Certificate. The contract documents specify that the work must comply with all applicable federal, state, and local laws and regulations, and the owner reserves the right to reject any or all bids. Electronic bids are accepted via www.bidnetdirect.com prior to the bid closing time.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents 00 01 10 - 1

SECTION 00 01 10

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 01 – Title Page

SECTION 00 01 10 – Table of Contents

SECTION 00 11 13 – Advertisement for Bids

SECTION 00 21 13 – Instructions to Bidders

SECTION 00 41 43 – Bid Form (Louisiana Uniform Public Work Bid Form)

SECTION 00 43 13 – Bid Bond

SECTION 00 51 00 – Notice of Award

SECTION 00 52 43 – Agreement Form - Unit Price

SECTION 00 55 00 – Notice to Proceed

SECTION 00 61 13 – Performance Bond

SECTION 00 61 14 – Payment Bond

SECTION 00 61 15 – Non-Collusion Declaration

SECTION 00 61 16 – Attestation Clause

SECTION 00 61 17 – E-Verify Affidavit

SECTION 00 61 18 – Firearm Certification

SECTION 00 72 00 – General Conditions

SECTION 00 73 00 – Supplementary Conditions

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 11 00 – Summary of Work

SECTION 01 30 00 – Administrative Requirements

SECTION 01 32 13 – Construction Sequence

SECTION 01 35 13 – Special Project Procedures

SECTION 01 35 43 – Environmental Protection Requirements

SECTION 01 42 19 – Reference Standards

SECTION 01 50 00 – Temporary Facilities and Controls

SECTION 01 60 00 – Product Requirements

DIVISION 02 – EXISTING CONDITIONS

SECTION 02 41 00 – Demolition

DIVISION 03 – CONCRETE

SECTION 03 30 00 – Cast-In-Place Concrete

DIVISION 31 – EARTHWORK

SECTION 31 23 17 – Trenching Excavation and Backfill

SECTION 31 23 24 – Flowable Fill

SECTION 31 25 13 – Temporary Erosion and Sedimentation Control

Table of Contents 00 01 10 - 2

DIVISION 32 – EXTERIOR IMPROVEMENTS

SECTION 32 61 13 – Miscellaneous Work and Cleanup

DIVISION 33 – UTILITIES

SECTION 33 01 38 – Maintenance of Flow in Existing Sewers

SECTION 33 05 13 – Precast Concrete Manholes and Structures

SECTION 33 05 24 – Utility Horizontal Directional Drilling

SECTION 33 34 00 – Sanitary Utility Sewerage Force Mains

END OF SECTION

Advertisement for Bids 00 11 13 - 1

DOCUMENT 00 11 13

ADVERTISEMENT FOR BIDS

SEALED BIDS will be received in the office of the Ouachita Parish Police Jury at 100 Bry Street, Monroe, Louisiana, on or before 2:00 PM, Thursday, October 29, 2026, and that the same will be opened, read aloud and tabulated in the office of Ouachita Parish Police Jury, at 2:00 PM, Thursday, October 29, 2026, and submitted to the Ouachita Parish Police Jury at its next scheduled meeting, for the purpose of furnishing the following:

Sewer Lift Station “N” Force Main Replacement Along Washington St. from New Natchitoches Rd. to Edwards Rd.

Ouachita Parish Police Jury L&A, Inc. Project No. 15E040.01

A Pre-Bid Conference will be held at the office of Lazenby & Associates, Inc., located at 2000 North 7th Street, West Monroe, LA 71291 at ten (10:00) o’clock A.M. local time, on Tuesday, October 20, 2026.

The Plans, Specifications and Contract Documents shall be examined and procured at the office of the Engineer, Lazenby & Associates, Inc., Consulting Engineers & Land Surveyors, 2000 North Seventh Street, West Monroe, Louisiana 71291. A deposit of Fifty and No/100 Dollars ($50.00) plus shipping and mailing costs will be required for each set of documents. In accordance with R.S. 38:2212(D), deposits on the first set of documents furnished to bona fide prime bidders will be fully refunded upon return of the documents; deposits on any additional sets will be refunded less the actual costs of reproduction. Refunds will be made upon return of the documents in good condition within ten days after receipt of bids.

Each bid shall be accompanied by a cashier's check, certified check or acceptable Bid Bond payable to Ouachita Parish Police Jury in the amount not less than five percent (5%) of the total bid amount as a guarantee that, if awarded the Contract, the Bidder will promptly enter into a contract and execute such bonds as may be required.

Each bid shall also be accompanied by a Corporate Resolution or written evidence of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5). Electronic bids will be received via www.bidnetdirect.com prior to bid closing time.

The successful bidder must submit executed copies of the Non-Collusion Declaration, Attestation Clause, E-Verify Affidavit and Firearm Certification within ten (10) days of the bid opening. These items may be submitted with the bid.

The successful Bidder shall be required to furnish a Performance Bond for the full amount of the Contract in accordance with Article 5 of the General Conditions. In addition, the successful Bidder shall be required to furnish a Labor and Material Payment Bond for the Contract in accordance with Article 5 of the General Conditions.

The Owner reserves the right to reject any or all bids, as provided for in LA R.S. 38:2214(B).

The engineer of record classifies the project as Municipal and Public Works Construction in accordance with LA R.S. 37:2156.1.

September 21, 2026 OWNER: Ouachita Parish Police Jury Date

BY: /s/ Shane Smiley Publication Dates: Shane Smiley, President October 1, 2026, October 8, 2026, & October 15, 2026

Instructions to Bidders 00 21 13 - 1

SECTION 00 21 13

INSTRUCTIONS TO BIDDERS

ARTICLE 1 - DEFINED TERMS

1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof:

A. Bidder--The individual or entity who submits a Bid directly to OWNER.

B. Issuing Office--The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.

C. Successful Bidder--The lowest responsible Bidder submitting a responsive Bid to whom OWNER (on the basis of OWNER’s evaluation as hereinafter provided) makes an award.

ARTICLE 2 - COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the Advertisement or Invitation to Bid may be obtained from the Issuing Office.

2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.

ARTICLE 3 - QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, within five days of OWNER’s request Bidder shall submit written evidence such as financial data, previous experience, present commitments, and evidence of authority to conduct business in the jurisdiction where the Project is located.

ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND

SITE

4.01 Subsurface and Physical Conditions

A. The Supplementary Conditions identify:

1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents.

00 21 13 - 2

2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in paragraph 4.01.A will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.02 of the General Conditions has been identified and established in paragraph 4.02 of the Supplementary Conditions.

Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.

4.02 Underground Facilities

A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground Facilities, including OWNER, or others.

4.03 Hazardous Environmental Condition

A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.06 of the General Conditions has been identified and established in paragraph 4.06 of the Supplementary Conditions.

Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General Conditions.

4.05 On request, OWNER will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.06 Reference is made to Article 7 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the Site by OWNER or others (such as utilities and other prime contractors) that relates to the Work for which a Bid is to be submitted. On request, OWNER will

00 21 13 - 3 provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.

4.07 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, including any Addenda and the other related data identified in the Bidding Documents;

B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, or performance of the Work;

D. carefully study all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and carefully study all reports and drawings of a Hazardous Environmental Condition, if any, at the Site which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions;

E. obtain and carefully study (or assume responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;

F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;

I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by ENGINEER is acceptable to Bidder; and

J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.

4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly

00 21 13 - 4 required by the Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

ARTICLE 5 - PRE-BID CONFERENCE

5.01 The Pre-Bid Conference will be held at ten (10:00) o’clock A.M. on Tuesday, October 20, 2026 at the office of Lazenby & Associates, Inc., located at 2000 North 7th Street, West Monroe, LA 71291.

ARTICLE 6 - SITE AND OTHER AREAS

6.01 The Site is identified in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents.

ARTICLE 7 - INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by OWNER or ENGINEER.

ARTICLE 8 - BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of 5 % of Bidder’s maximum Bid price and in the form of a certified or bank check or a Bid Bond, on the form attached, issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the General Conditions.

8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.

00 21 13 - 5

8.03 Bid security of other Bidders whom OWNER believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.

ARTICLE 9 - CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be (a) Substantially Completed and (b) also completed and ready for final payment are set forth in the Agreement.

ARTICLE 10 - LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.

ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and may be supplemented in the General Requirements.

ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to OWNER in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to OWNER a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.

12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the General Conditions.

12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom CONTRACTOR has reasonable objection.

00 21 13 - 6

ARTICLE 13 - PREPARATION OF BID

13.01 The Bid form is included with the Bidding Documents. Additional copies may be obtained from

ENGINEER.

13.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the Bid signed. A Bid price shall be indicated for each Bid item listed therein, or the words “No Bid,” “No Charge,” or “Not Applicable” entered.

13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.

13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.

13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown below the signature.

13.06 A Bid by an individual shall show the Bidder’s name and official address.

13.07 A Bid by a joint venture shall be executed by each member of the joint venture in the manner indicated on the Bid form. The official address of the joint venture must be shown below the signature.

13.08 All names shall be typed or printed in ink below the signatures.

13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid form.

13.10 The address and telephone number for communications regarding the Bid shall be shown.

13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder’s state contractor license number for the state of the Project, if any, shall also be shown on the Bid form.

ARTICLE 14 - BASIS OF BID; EVALUATION OF BIDS

14.01 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.

B. The total of all estimated prices will be determined as the sum of the products of the estimated quantity of each item and the unit price Bid for the item. The final quantities and Contract Price will be determined in accordance with paragraph 11.03 of the General Conditions.

00 21 13 - 7

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.

14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in paragraph 11.02 of the General Conditions.

ARTICLE 15 - SUBMITTAL OF BID

15.01 Each prospective Bidder is furnished one copy of the Bidding Documents with one separate unbound copy each of the Bid form, and, if required, the Bid Bond. The unbound copy of the Bid form is to be completed and submitted with the Bid security.

15.02 In accordance with LA R.S. 38:2212, bidders shall submit with their bids the following documents:

Bid Security or Bid Bond; Acknowledgement of Addenda; Base Bid; Alternates; Signature of Bidder;

Name, Title, and Address of Bidder; Name of Firm or Joint Venture; Corporate Resolution or written evidence of the authority of the person signing the bid; and Louisiana Contractor’s License Number. All other required information and documentation, including the Attestation Affidavit and the E-Verification form, shall be submitted by the apparent low bidder within ten days after the date bids are opened.

15.03 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the advertisement or invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder and CONTRACTOR’s license number and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to Ouachita Parish Police Jury, c/o Lazenby & Associates, 2000 North 7th Street, West Monroe, Louisiana 71291.

ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.

16.02 If within 48 hours after Bids are opened any Bidder files a duly signed written notice with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is re-bid, that Bidder will be disqualified from further bidding on the Work.

ARTICLE 17 - OPENING OF BIDS

17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

00 21 13 - 8

ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid form, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 - AWARD OF CONTRACT

19.01 OWNER reserves the right to reject any or all Bids, including without limitation, nonconforming, non-responsive, unbalanced, or conditional Bids in accordance with the Public Bid Law. OWNER further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible or in accordance with the Public Bid Law. OWNER may also reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder. OWNER also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.

19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.

19.03 In evaluating Bids, OWNER will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.

19.04 In evaluating Bidders, OWNER will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.

19.05 OWNER may conduct such investigations as OWNER deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.

19.06 If the Contract is to be awarded, OWNER will award the Contract to the Bidder whose Bid is in the best interests of the Project.

00 21 13 - 9

ARTICLE 20 - CONTRACT SECURITY AND INSURANCE

20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth OWNER’s requirements as to performance and payment Bonds and insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by such Bonds.

ARTICLE 21 - SIGNING OF AGREEMENT

21.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER. Within ten days thereafter, OWNER shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.

LOUISIANA UNIFORM PUBLIC WORK BID FORM

TO: Ouachita Parish Police Jury

100 Bry Street Monroe, LA 71201

BID FOR: Sewer Lift Station “N” Force Main Replacement Washington St. – New Natchitoches to Edwards West Monroe, Louisiana

The undersigned bidder hereby declares and represents that she/he: a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: Lazenby & Associates, Inc.

and dated: February 4, 2026

Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the

Designer has assigned to each of the addenda that the Bidder is acknowledging) __________________________________________ .

TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid”

* but not alternates) the sum of:

Dollars ($ )

ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.

Alternate No. 1(Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

N/A Dollars ($ )

Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

NAME OF BIDDER:

ADDRESS OF BIDDER:

LOUISIANA CONTRACTOR’S LICENSE NUMBER:

NAME OF AUTHORIZED SIGNATORY OF BIDDER:

TITLE OF AUTHORIZED SIGNATORY OF BIDDER:

SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:

DATE: _______________________

THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA

UNIFORM PUBLIC WORK BID FORM:

* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.

** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).

BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA R.S. 38:2218(A) attached to and made a part of this bid.

TO: Ouachita Parish Police Jury BID FOR: Sewer Lift Station "N" Force Main Replacement 100 Bry Street Washington St. - New Natchitoches to Edwards Monroe, LA 71201 West Monroe, Louisiana

L&A, Inc. Project No. 15E040.01 (Owner to provide name and address of owner) ( Owner to provide name of project and other identifying information)

UNIT PRICES: This form shall be used for any and all work required by the Bidding Documents and described as unit prices. Amounts shall be stated in figures and only in figures.

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Wording for “DESCRIPTION” is to be provided by the Owner.

All quantities are estimated. The contractor will be paid based upon actual quantities as verified by the Owner.

7 150

REF. NO. QUANTITY

6 2,523

REF. NO. QUANTITY

5 1

2 2,565

REF. NO. QUANTITY

UNIT OF MEASURE UNIT PRICE

Lump Sum

UNIT PRICE FORM

LOUISIANA UNIFORM PUBLIC WORK BID FORM

Mobilization

REF. NO.

DESCRIPTION: Force Main Tie-In, Complete - 24" HDPE to Existing 24" PVC (North End)

DESCRIPTION:

DESCRIPTION: HDPE Pipe (24" Diameter) (DR11) (Directional Bore)

UNIT PRICE EXTENSION (Quantity times Unit Price)

UNIT PRICE EXTENSION (Quantity times Unit Price)QUANTITY

100%

QUANTITYREF. NO. UNIT OF MEASURE

Linear Foot

UNIT PRICE

UNIT PRICE EXTENSION (Quantity times Unit Price)UNIT OF MEASURE UNIT PRICE

Each

DESCRIPTION: Doghouse Sewer Manhole

DESCRIPTION: Force Main Tie-In, Complete - 24" HDPE to Doghouse Manhole (South End)

UNIT PRICE EXTENSION (Quantity times Unit Price)UNIT OF MEASURE UNIT PRICE

Each

REF. NO. QUANTITY

4 1

UNIT PRICE EXTENSION (Quantity times Unit Price)UNIT OF MEASURE UNIT PRICE

Each

DESCRIPTION: Traffic Maintenance Aggregate

DESCRIPTION: Fill Existing 18" Ductile Iron Force Main with Flowable Fill & Abandon in Place

UNIT PRICE EXTENSION (Quantity times Unit Price)UNIT OF MEASURE UNIT PRICE

Linear Foot

REF. NO. QUANTITY

UNIT PRICE EXTENSION (Quantity times Unit Price)UNIT OF MEASURE UNIT PRICE

Ton

DESCRIPTION: Temporary Sign & Barricades

UNIT PRICE EXTENSION (Quantity times Unit Price)UNIT OF MEASURE UNIT PRICE

Lump Sum

REF. NO. QUANTITY

8 100%

TO: Ouachita Parish Police Jury BID FOR: Sewer Lift Station "N" Force Main Replacement 100 Bry Street Washington St. - New Natchitoches to Edwards Monroe, LA 71201 West Monroe, Louisiana

L&A, Inc. Project No. 15E040.01 (Owner to provide name and address of owner) ( Owner to provide name of project and other identifying information)

UNIT PRICES: This form shall be used for any and all work required by the Bidding Documents and described as unit prices. Amounts shall be stated in figures and only in figures.

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Base Bid or Alt. #

Wording for “DESCRIPTION” is to be provided by the Owner.

All quantities are estimated. The contractor will be paid based upon actual quantities as verified by the Owner.

REF. NO. QUANTITY UNIT OF MEASURE UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:

DESCRIPTION:

REF. NO. QUANTITY UNIT OF MEASURE UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

REF. NO. QUANTITY UNIT OF MEASURE UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:

DESCRIPTION:

REF. NO. QUANTITY UNIT OF MEASURE UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

REF. NO. QUANTITY UNIT OF MEASURE UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:

DESCRIPTION:

REF. NO. QUANTITY UNIT OF MEASURE UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

REF. NO. QUANTITY UNIT OF MEASURE UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

10 100% Lump Sum

DESCRIPTION: Final Clean-Up and Erosion Control

LOUISIANA UNIFORM PUBLIC WORK BID FORM

UNIT PRICE FORM

DESCRIPTION: Temporary Traffic Control

REF. NO. QUANTITY UNIT OF MEASURE UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

9 100% Lump Sum

Bid Bond

00 43 13 - 1

SECTION 00 43 13

BID BOND

BIDDER (Name and Address):

SURETY (Name and Address of Principal Place of Business):

OWNER (Name and Address):

100 Bry Street Monroe, LA 71201

BID

BID DUE DATE:

PROJECT (Brief Description Including Location):

Sewer Lift Station “N” Force Main Replacement Washington St. – New Natchitoches to Edwards Ouachita Parish, Louisiana

BOND

BOND NUMBER:

DATE (Not later than Bid due date):

PENAL SUM:

(Words) (Figures)

IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal) Bidder's Name and Corporate Seal Surety's Name and Corporate Seal

By: By:

Signature and Title Signature and Title (Attach Power of Attorney)

Attest: Attest:

Signature and Title Signature and Title

Note: (1) Above addresses are to be used for giving required notice.

(2) Any singular reference to Bidder, Surety, OWNER or other party shall be considered plural where applicable.

Bid Bond

00 43 13 - 2

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to OWNER upon default of Bidder the penal sum set forth on the face of this Bond.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1. OWNER accepts Bidder's Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents, or

3.2. All Bids are rejected by OWNER, or

3.3. OWNER fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power or Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term "Bid" as used herein includes a Bid, offer or proposal as applicable.

SECTION 00 51 00

NOTICE OF AWARD

TO:

ADDRESS:

PROJECT: Sewer Lift Station “N” Force Main Replacement, Washington St. – New Natchitoches to Edwards

You are notified that your Bid dated , 2025 for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract.

The Contract Price of your Contract is Dollars ($ ). This Contract Price is as determined from Unit Prices submitted in your Bid for the various construction items.

Six (6) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Two (2) sets of the Drawings will be delivered separately or otherwise made available to you immediately.

You must comply with the following conditions precedent within 15 days of the date you receive this Notice of Award:

1. Deliver to the OWNER six (6) fully executed counterparts of the Contract Documents.

2. Deliver with the executed Contract Documents the Contract security (Bonds) as specified in the

Instructions to Bidders (Article 20), General Conditions (paragraph 5.01) and Supplementary Conditions (paragraph SC-5.01.B).

3. Return and acknowledged copy of this Notice of Award to the OWNER.

Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid in default, to annul this Notice of Award and to declare your Bid security forfeited. Within ten days after you comply with the above conditions, the OWNER will return to you one fully executed counterpart of the Contract Documents.

Dated this day of , 2025.

OWNER:

BY: Shane Smiley

TITLE: President

ACCEPTANCE OF NOTICE

Receipt of the NOTICE OF AWARD is hereby acknowledged by , on this the day of , 2025.

BY:

NAME:

TITLE:

Agreement Form – Unit Price 00 52 43 - 1

SECTION 00 52 43

AGREEMENT FORM – UNIT PRICE

THIS AGREEMENT is by and between Ouachita Parish Police Jury

(hereinafter called OWNER) and

(hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:

ARTICLE 1 - WORK

1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:

Installation of a 24” HDPE sewer force main by directional bore to replace an existing 18” ductile iron sewer force main, force main tie-ins, fill existing ductile iron force main with flowable fill & abandon in place, and associated work located along Washington St. from New Natchitoches Rd. to Edwards Rd., Ouachita Parish, Louisiana.

ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows:

Sewer Lift Station “N” Force Main Replacement Washington St. – New Natchitoches to Edwards Ouachita Parish Police Jury Ouachita Parish, Louisiana

ARTICLE 3 - ENGINEER

3.01 The Project has been designed by:

Lazenby & Associates, Inc.

2000 North 7th Street West Monroe, LA 71291 who is hereinafter called ENGINEER and who is to act as OWNER’s representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.

00 52 43 - 2

ARTICLE 4 - CONTRACT TIMES

4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.

4.02 Days to Achieve Substantial Completion and Final Payment

A. The Work will be substantially completed within 240 days after the date when the Contract Times commence to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 285 days after the date when the Contract Times commence to run.

4.03 Liquidated Damages

A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $400.00 for each day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $400.00 for each day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.

ARTICLE 5 - CONTRACT PRICE

5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 5.01.A below:

A. For all Work, at the prices stated in CONTRACTOR’s Bid, attached hereto as an exhibit.

00 52 43 - 3

ARTICLE 6 - PAYMENT PROCEDURES

6.01 Submittal and Processing of Payments

A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions.

6.02 Progress Payments; Retainage

A. OWNER shall make monthly progress payments on account of the Contract Price on the basis of CONTRACTOR’s Applications for Payment during performance of the Work as provided in paragraphs 6.02.A.1 and 6.02.A.2 below. All such payments will be measured by the schedule of values established in paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements:

1. Prior to Substantial Completion, progress payments will be made in an amount equal to the work completed, less the aggregate of payments previously made, less retainage as shown below, and less such amounts as ENGINEER may determine or OWNER may withhold, in accordance with paragraph 14.02 of the General Conditions:

a. Retainage withheld shall be ten percent (10%) for contract amounts of less than five-hundred thousand dollars ($500,000.00).

b. Retainage withheld shall be five percent (5%) for contract amounts of five-hundred thousand dollars ($500,000.00) or more.

2. Upon Substantial Completion, OWNER shall pay an amount sufficient to increase total payments to CONTRACTOR to 100 % of the Work completed, less retainage, and less such amounts as ENGINEER shall determine in accordance with paragraph 14.02.B.5 of the General Conditions and less 100 % of ENGINEER’s estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial Completion.

6.03 Final Payment

A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General Conditions, and at the end of the 45-day lien period, CONTRACTOR shall furnish ENGINEER with a No Lien Certificate and OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.07.

00 52 43 - 4

ARTICLE 7 - CONTRACTOR’S REPRESENTATIONS

7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:

A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.

B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.

D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto

E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.

F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as…