This solicitation seeks bids for a firm-fixed-price construction contract to replace metal and flat membrane roofs at the Federal Correctional Institution in Estill, South Carolina. The project consists of furnishing all equipment, materials, and labor for complete roof replacement. The Federal Bureau of Prisons is the contracting agency, with an estimated budget over $10 million. This is a 100% small business set-aside for NAICS code 238160, with a size standard of $19 million. Interested vendors must be registered in the System for Award Management and meet the small business criteria. The response deadline is not provided, though the period of performance is 550 calendar days.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Metal & Flat Membrane Roofs at FCI Estill, SC, newest first.
File Type Posted
Abstract.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
6 - Construction Wage Determination SC20230013 1-13-2023.pdf PDF
8 - Criminal History Check Form.pdf PDF
2 - Solicitation 15BFA023B00000007.pdf PDF
1 - Instruction to Bidders.pdf PDF
7 - SF-24 Bid Bond Form (blank).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 6

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

06/26/2023

4. REQUISITION/PURCHASE REQUISITION NUMBER

15B30523PR000062

5. PROJECT NUMBER (If applicable)

BFAOCODE

Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, TX 75051

Julie Bergami

(O) 202-598-6019 jbergami@bop.gov

6. ISSUED BY 15B305CODE

Federal Bureau of Prisons FCI Estill

100 PRISON ROAD

Estill, SC 29918

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

15BFA023B00000007

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

05/09/2023

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0004 is hereby issued to incorporate responses to additional bidders' questions.

End of Amendment 0004

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Julie Bergami Contracting Officer

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

15BFA023B00000007/0004 Page 1 of 6 bop01431 Highlight

Question 28:

Is the low-slope membrane roof sections fully tapered? It doesn't specify if it is fully tapered, but in Section 075423-6, Part 2.4 (Roof Insulation) Subsection B, it calls out for a 2" Base Layer under the upper layer of polyiso insulation. This is leading me to think that the entire system is to be fully tapered, but I just need some clarification.

BOP Response: Clarification See each roof plan label and each roof detail label for specific roof type per building as shown in the drawing.

Question 29:

In regard to the roof hatch detail, the Spec calls out for a "Galvanized steel sheet roof hatch, with an R-Value of 12". I've been talking with some roof hatch companies, and they are saying that that spec is not possible to achieve, because of the hatch's R-Value of 12, and galvanized steel. The only way to get the R-Value of 12, and be thermally insulated is for the hatch to be Aluminum. Could you clarify if the spec is worded correctly?

Roof hatch submittal requirements are covered in Section 077200 in specification. Roof hatch fabricated from mill finish aluminum material with thermal insulation is acceptable to comply with thermal performance.

Question 30:

Is a superintendent the only full-�me onsite supervision required?

Will a safety office or QC manager be required as well?

See Section 014000 Quality Requirements, page 014000-3 in specifications.

Question 31:

The period of performance is 550 calendar days per this solicita�on.

The solicita�on also references 81 calendar days for security clearances built into this POP. In other words, is actual construc�on �me 469 calendar days?

See page 8 of the solicitation, clause FAO-0009(a). “The contractor should be aware that the time required for security clearances to be completed may vary.”

15BFA023B00000007/0004 Page 2 of 6

Question 32:

Where should GC list the ‘Contractor’s Op�on’ (ex: note 13/ A-112) in the lump sum price of this proposal?

See Instructions to Bidders and page 4 of solicitation.

Question 33:

How many weather days are factored into the 550 calendar days for period of performance?

Standard annual weather days for that region.

Question 34:

Are we able to use Past Performance Questionnaires from prior bid submissions?

Yes

Question 35:

Was the designer’s intent is to have a ¼”/ft slope with R=20 (plus ½”/ft crickets) on all flat roofs?

BOP Response: Clarification type per building as shown in the drawing.

Question 36:

From the drawings & details provided, it’s very difficult to tell which roofs are structurally flat and which are structurally sloped. Are you able to clarify which roofs are structurally flat or sloped?

type per building as shown in the drawing. Refer also to Building Sections indicating (graphically) where sloped structure occurs.

15BFA023B00000007/0004 Page 3 of 6

Question 37:

Is a ground loop required?

See Section 264113 - Lightning Protection for Structures

Question 38:

Is there an exis�ng ground loop?

Question 39:

Can we reuse the exis�ng downleads/ ground loop/ground rods or is everything new?

Question 40:

Can the new system be run exposed on the roofs or must it be concealed?

See response to Question 9 in Amendment 0001.

Question 41:

Are there any exis�ng drawings for the exis�ng lightning protec�on system?

See response to Question 9 in Amendment 0001.

15BFA023B00000007/0004 Page 4 of 6

Question 42:

Can we get a week or two postponement?

See Amendment 0002 and Amendment 0003.

Question 43:

All standing seam metal roofing details reference existing metal deck in place, and that contractor is to install new R-Value 20 insulation over metal deck, however, in all photos of the jobs current condition, there does not seem to be a deck in place. There is also no Division 5 in the spec's indicating to install one.

BOP Response: Clarification See response to Question 10 in Amendment 0001.

Question 44:

Are the rooftop mechanical units being replaced? The drawings state that various rooftop mechanical systems are to be replaced. (EG:

drawing AD-123, note 8; Key Note A32 on A section of drawings;

Keynote A15 on drawing A-117).

BOP Response: Clarification See response to Question 15 in Amendment 0001.

Question 45:

Are the exhaust fans listed as keynote A32 separate from the fans scheduled on page M601?

No, see response to Question 3 in Amendment 0001.

Question 46:

If mechanical equipment is being replaced, does BOP have a schedule of equipment that we can have?

See response to Question 15 in Amendment 0001.

15BFA023B00000007/0004 Page 5 of 6

Question 47:

The drawings and specs call for the replacement of the skylights. Is there a schedule that includes the sizing for each skylight and type of skylight?

See Section 086200 – Unit Skylights in specifications.