Amendment 0001.pdf

PDF 5 MB Posted

Attached to
Replace Metal & Flat Membrane Roofs at FCI Estill, SC Federal contract opportunity
Solicitation number
15BFA023B00000007
Issued by
Department of Justice Bureau of Prisons Field Acquisition Office

About this file

This document contains an amendment to a solicitation issued by the Federal Bureau of Prisons for a construction project to replace metal and flat membrane roofs at the Federal Correctional Institution in Estill, South Carolina. The amendment incorporates minutes and sign-in sheets from a pre-bid site visit, bidders' questions and agency responses, and pre-bid photographs. It also adds FAR clause 52.204-27 prohibiting the use of ByteDance covered applications in any resulting contract. Interested vendors must meet the small business size standard of $19 million for NAICS code 238160 to be eligible for award. The solicitation will be distributed solely through SAM.gov and all future updates issued through that site.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Metal & Flat Membrane Roofs at FCI Estill, SC, newest first.
File Type Posted
Abstract.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
2 - Solicitation 15BFA023B00000007.pdf PDF
1 - Instruction to Bidders.pdf PDF
7 - SF-24 Bid Bond Form (blank).pdf PDF
6 - Construction Wage Determination SC20230013 1-13-2023.pdf PDF
8 - Criminal History Check Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 50

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

06/07/2023

4. REQUISITION/PURCHASE REQUISITION NUMBER

15B30523PR000062

5. PROJECT NUMBER (If applicable)

23Z3AQ4

BFAOCODE

Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, TX 75051

Julie Bergami

(O) 202-598-6019 jbergami@bop.gov

6. ISSUED BY 15B305CODE

Federal Bureau of Prisons FCI Estill

100 PRISON ROAD

Estill, SC 29918

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

15BFA023B00000007

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

05/09/2023

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0001 is hereby issued to incorporate the following into Invitation for Bids 15BFA023B00000007:

1) Pre-Bid Site Visit Meeting Minutes and Sign-In Sheet (attached);

2) Bidders' questions with FBOP responses (attached);

3) Pre-bid Photographs (attached); and

4) Add FAR 52.204-27, Prohibition on a ByteDance Covered Application in the contract.

[End of Amendment 00001]

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Julie Bergami Contracting Officer

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

15BFA023B00000007/0001Page 1 of 18 bop01431 Highlight

15BFA023B00000007/0001Page 2 of 18

15BFA023B00000007/0001Page 3 of 18

15BFA023B00000007/0001Page 4 of 18

15BFA023B00000007/0001Page 5 of 18

15BFA023B00000007/0001Page 6 of 18

15BFA023B00000007/0001Page 7 of 18

15BFA023B00000007/0001Page 8 of 18

Question 1:

How many hours should subcontractors allowance for daily check-in/ out procedures?

BOP Response:

Clarification During regular working hours, the subcontractors need to plan to spend approximately 30 minutes each time, for check-in and check-out process.

Question 2:

Is this project phased?

This project will not be phased, however, the winning bidder can present and discuss strategies regarding scheduling at the Pre-Con meeting.

Question 3:

The scheduled fans on M-601 do not appear elsewhere in plans:

F-N-1, F-O-1, F-R-1, F-R-2, F-S-4, F-S-8, F-S-9, F-S-10, F-S-11, F-S-12 F-S-13, F-S-14, F-T-4

Please advise if revised AD sheets will be released noting fan locations.

The listed fans will not be replaced in this contract. The Contractor will remove the existing fans, perform the specified roof repairs of the fan curbs below, and then reinstall the existing fans.

Question 4:

During the job walk on 5/24, it was stated that 10 hour work days are permitted during times the facility is not occupied by inmates. It was later mentioned that working hours could be negotiable during times the prison is not occupied by inmates. Please confirm whether or not multiple shifts and/or 10+ hour workdays are possible provided the facility is not occupied?

Strategies for multiple shifts and 10+ hr. workdays while the Institution is not occupied with inmates is encouraged and can be presented and discussed with BOP staff at the Pre-Con meeting.

15BFA023B00000007/0001Page 9 of 18

Question 5:

Where will access be provided for equipment to load the roofs with material and equipment?

Access for equipment to place materials and tools on the roof will be granted though the rear gate of the institution during regular working hours. Space is available on the perimeter adjacent to the buildings for loading.

Question 6:

Where can dumpsters be staged within the fence line? Will there be a construction laydown area? If so, where?

Dumpster storage is located outside the secured area of the rear gate. While in use, dumpsters can be placed adjacent to the building where work is being performed for easier disposal of rubbish.

Question 7:

If the prison is vacant of inmates, can tools, materials and equipment be left within the secure fence line overnight?

No matter if inmates are present or not, the Contractor can leave tools within the secure fence overnight as long as they are secured in a lockable container, ie: job box, tool boxes, or trailer.

Question 8:

During the job walk on 5/24, it was stated that BOP may elect to populate portions of the prison during construction. If this is the case, workdays would be cut down from 10+ hour days to 7am- 3:30pm. Being this is a competitively bid project, there is no way for the bidders to know whether their productivity will be impacted based on a “what-if” scenario. Please confirm whether or not bidders are to include an allowance for a cut in productivity due to inmate move-in and define the allowance amount, or confirm that productivity inefficiencies are to be excluded and will be handled via change order when/if the facility is populated during construction.

BOP Response:

Clarification There is not a need for an allowance for a cut in available daily schedule. The performance period of 550 calendars is calculated to complete the project with regular working hours in a correctional environment. The potential for extended daily hours is being made available to encourage a mutually beneficial savings of time for both the Contractor and the Gov.

15BFA023B00000007/0001Page 10 of 18

Question 9:

The existing lightning protection on all roofs is in disarray and non-functional. The Scope of Work Summary on sheet G-002 states to install new lightning; however, there isn’t a design for lightning protection. Please provide plans and details of how the lightning protection system is to be installed.

As typical, lightning protection is designed by a lightning protection subcontractor and submitted to the BOP in the form of a shop drawing for review and approval prior to fabrication and installation.

Question 10:

The Scope of Work Summary on sheet G-002 states to completely tear off roof assemblies down to the roof deck. During the 5/24 job walk, it was observed that at Building D, Wing B, the metal deck is rusting and in needs of replacement (can be seen on sheet AD101 below). Please confirm whether or not metal decking should be replaced? How should this be handled at other buildings where the condition of roof deck is unknown? Does the BOP want to carry an allowance for roof deck replacement? If so, how much?

The roof in question has surface rust. The roof decks are not scheduled for replacement. As always, if there is a question in the field during demo, present your question in the form of an RFI for consideration.

Question 11:

Plans note removal of existing roof hatches by GC. Is GC to supply and install replacement roof hatches?

Yes.

Question 12:

Plans note removal of existing skylights by GC. Is GC to supply and install replacement skylights?

Yes.

15BFA023B00000007/0001Page 11 of 18

Question 13:

Please confirm gutter and downspouts are not in scope.

Gutters and downspouts are not in scope.

Question 14:

Please confirm if temporary security fencing running across roof tops of buildings B,C,D will be supplied and installed by GC. If GC is to provide, please confirm fencing requirements in these areas.

Temporary fencing is not anticipated to be required.

Question 15:

Please confirm what – if any – mechanical equipment is to be supplied and installed by owner on the mechanical equipment schedule.

Unless specifically mentioned in the drawings to be replaced, for mechanical equipment the Contractor will remove the existing equipment, perform the specified roof repairs of the curbs below, and then reinstall the existing equipment.

Question 16:

Rooftop mechanical equipment is currently operational. Please indicate if equipment can be deenergized and moved for equipment pans that need replacement.

BOP staff will de-energize equipment based on a schedule provided by the Contractor. The Contractor will remove and reinstall the existing mechanical equipment after roof work on the associated curbs.

Question 17:

The ridgeline at Building N, Sheet AD107, has broken glass windows. Please confirm if replacement of windows is within the scope of this contract? If so, please sizes and count.

Replacement of glass windows is not in the scope of contract.

15BFA023B00000007/0001Page 12 of 18

Question 18:

Will you be issuing a sign in sheet from the prebid?

The pre-bid site visit meeting minutes and sign-in sheet will be incorporated in the solicitation through a solicitation amendment.

Question 19:

Can we get a detail for the roof drain replacement to clarify if there is any piping involved/interior work required?

Roof drain work is anticipated to be typical (i.e. strainer baskets, etc.).

If an unusual or damaged area is observed during demo, submit a question in the form of an RFI for BOP consideration.

Question 20:

Note A13 on several drawings (A215, 216, 224,225,226) call out “See A203 for typical louver sizes”. There are sizes on A225. Please confirm the sizes given on A225 are correct.

The sizes given on A225 are correct.

Question 21:

Can we get a better photo of the exposed roof structure/framing on Buildings CC.5 and N?

See attached photos.

Question 22:

Who removes and reinstalls the fence and razor wire that go over the roof on Building BCD?

The Contractor will remove and replace the security fence and razor wire impacted by roofing work.

15BFA023B00000007/0001Page 13 of 18

Question 23:

Can we get a better scope for replacing the lights as called out on drawingA232, Note A46? (Is there any wiring involved or just fixture replacement? Spec. on fixtures, etc.)

No wiring work anticipated in the project. Contractor to install BOP provided lights where designated.

Question 24:

Can you confirm the schedule for prisoners to return to the facility?

(This may impact how the job is manned to possibly complete it before any prisoners get there.)

Please see response to question #8 above.

Question 25:

Since no prisoners are on site, can you confirm how long it will be for workers to check in/out for a workday?

Please see response to question #1 above.

Question 26:

Are we allowed to set up staging for the sloped roofs? If so are there any special requirements for security, since there are no prisoners on site?

Staging will be allowed. Security precautions stated in the project will not change with or without inmates present. Any questions about security for particular buildings or equipment can be discussed at the Pre-Con walk through, monthly meetings, or in RFI format.

Question 27:

Is there a deadline for submitting RFI’s?

RFIs, including confirming RFIs for the record will be accepted throughout the life of the project.

15BFA023B00000007/0001Page 14 of 18

Replace Metal and Flat Membrane Roofs FCI Estill – 23Z3AQ4

pg. 1

Pre-Bid Pictures

Building – CC.5 GYMNASIUM

15BFA023B00000007/0001Page 15 of 18

pg. 2

Building - CC.5 GYMNASIUM

15BFA023B00000007/0001Page 16 of 18

pg. 3

Building – N ACTIVE RECREATION

15BFA023B00000007/0001Page 17 of 18

pg. 4

Building – N ACTIVE RECRREATION