Example_Cost_Breakdown.docx

DOCX document 22 KB Posted

Attached to
Replace E-Unit Inmate Housing Roof Federal contract opportunity
Solicitation number
15B41520Q00000008
Issued by
Department of Justice Bureau of Prisons Federal Correctional Institution Waseca

About this file

This document provides cost summary templates for a prime contractor and subcontractors to use in responding to solicitation number RFPP04081700001 to repair a powerhouse roof. The templates require line item details on labor, equipment, materials, overhead, profit, and total costs for the prime contractor's own work and each subcontractor's work. A final cost summary template combines totals from the prime and any subcontractors. The solicitation instructs respondents to complete all templates and blocks including the solicitation number and project title.

Sample Cost Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Replace E-Unit Inmate Housing Roof, newest first.
File Type Posted
15B41520Q00000008 Pre-Bid Site Visit Meeting.pdf PDF
E-Unit_Roof_Drawings.pdf PDF
RFQ_15B41520Q00000008.pdf PDF
BP_A0660_Criminal_History_Check.pdf PDF
Instructions_to_Offerors_15B41520Q00000008.pdf PDF
E-Unit_Roof_Specifications.pdf PDF
Wage_Determination_MN_20190100.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST SUMMARY SPREADSHEETS

In accordance with Federal Acquisition Regulation (FAR) 15.4 the objective of proposal analysis is to ensure the final agreed to price is fair and reasonable. The complexity and magnitude of each acquisition determines the level of analysis required, thus cost analysis may be used to evaluate cost realism and the reasonableness of individual cost elements.

Your proposal must be accompanied by the attached documents as applicable:

A. The first document is for your firm as the prime contractor. This breakdown is only for the work the prime will perform with its own forces (i.e., without subcontractors).

B. The second document is for subcontractor work only. This document should be completed for each subcontractor.

C. The third document is the Final Cost Summary. This will include all charges from you as the prime and all subcontractors. All numbers must coincide with the previous documents monetarily.

A few notes:

*You may add additional lines if needed.

*Ensure you include your proposed percentages (%) in the lower blocks

PRIME CONTRACTOR COST SUMMARY

SOLICITATION NUMBER:

RFPP04081700001

PROJECT TITLE:

Repair Powerhouse Roof

#
DESCRIPTION
UOM

(hours/feet/each, etc.)

QTY
LABOR $

PER HOUR

EQUIPMENT $

PER UNIT

MATERIALS $

PER UNIT

LINE ITEM TOTALS $

[insert labor position]
[hours]
[#]
[$]
-
-
$

[insert equipment]

[#]
-
[$]
-
$

[insert material]

[#]
-
-
[$]
$
NOTE: Profit is only charged by either the Prime or Subcontractor(s) respectively for the actual segment(s) of the work they complete with their own forces. In other words, the Prime may include profit on the work it performs by itself (without subcontractors) and the Subcontractor(s) may include profit on the work they perform themselves (without lower tier subcontractors).
SUBTOTAL:
$
OVERHEAD (0%):
$
PROFIT (0%):
$
TOTAL:
$

SUBCONTRACTOR COST SUMMARY

SOLICITATION NUMBER: RFPP04081700001

SUBCONTRACTOR NAME:

PROJECT TITLE: Repair Powerhouse Roof

#
DESCRIPTION
UOM

(hours/feet/each, etc.)

QTY
LABOR $

PER HOUR

EQUIPMENT $

PER UNIT

MATERIALS $

PER UNIT

LINE ITEM TOTALS $

[insert labor position]
[hours]
[#]
[$]
-
-
$
[insert equipment]
[each]
[#]
-
[$]
-
$
[insert material]
[each/feet/etc.]
[#]
-
-
[$]
$
NOTE: Profit is only charged by either the Prime or Subcontractor(s) respectively for the actual segment(s) of the work they complete with their own forces. In other words, the Prime may include profit on the work it performs by itself (without subcontractors) and the Subcontractor(s) may include profit on the work they perform themselves (without lower tier subcontractors).
SUBTOTAL:
$
OVERHEAD (0%):
$
PROFIT (0%):
$
TOTAL:
$

FINAL COST SUMMARY

SOLICITATION NUMBER: RFPP04081700001

PROJECT TITLE: Repair Powerhouse Roof

INDIVIDUAL TOTALS $

A1
SUBCONTRACTOR:

(COMPANY NAME HERE)

A2
SUBCONTRACTOR:

(COMPANY NAME HERE)

A3
SUBCONTRACTOR:

(COMPANY NAME HERE)

B

SUBTOTAL (A1+A2+A3):
$
C
PRIME CONTRACTOR:

(TYPE NAME HERE)

D

SUBTOTAL (B+C):
$

E

INSURANCE (0% of D)
$

F

SUBTOTAL (D+E)
$

G

BOND (0% of F):
$
GRAND TOTAL (F+G):
$

PLEASE COMPLETE THE FOLLOWING:

COLLECTIVE COST ANALYSIS SUMMARY

MATERIAL S

LABOR

EQUIPMENT

INDIRECT EXPENSES – Prime (Overhead, Profit)

INDIRECT EXPENSES – Subcontractor(s) (Overhead & Profit)

SUBTOTAL COST

GENERAL AND ADMINISTRATIVE

(Bond, Insurance)

NET TOTAL

ENSURE YOU COMPLETE ALL BLOCKS TO INCLUDE SOLICITATION NUMBER AND PROJECT TITLE.

File details come from the government source that posted it. Updated .