Abstract.pdf

PDF 174 KB Posted

Attached to
MCC CHICAGO - REPLACE ROOFTOP REC
Solicitation number
15B40121B00000001
Issued by

About this file

This document is an Abstract of Offers for a construction project solicitation issued by the Department of Justice Bureau of Prisons Field Acquisition Office. The solicitation seeks to replace the rooftop at the MCC Chicago facility and received six offers by the closing date of June 30, 2021. Offerors were required to submit bid bonds ranging from 20% of proposed pricing. The government estimate for the project was $358,503. Proposed pricing ranged from $314,442 to $435,000. The apparent successful offerors were Penns Contracting, Inc. at $358,503 and SYTE Corp. at $435,000 based on meeting the requirements of the solicitation and providing the lowest priced offers. The contracting officer will award a firm fixed-price construction contract to one of the offerors by September 30, 2021 to complete the rooftop replacement.

View the file

Other files

File Type Posted
6 - SF-24 Bid Bond Form (blank).pdf PDF
1 - Instruction to Bidders.pdf PDF
5 - Construction Wage Rates.pdf PDF
7 - Criminal History Check Form.pdf PDF
2 - Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

FIELD ACQUISITION OFFICE

US ARMED FORCES RESERVE COMPLEX

346 MARINE FORCES DRIVE

GRAND PRAIRIE, TX 75051

MCC CHICAGO - REPLACE ROOFTOP REC

1 REPLACE ROOFTOP REC JB1 0.00 435,000.00435,000.00 358,503.00 358,503.00

15B40121B00000001 1 2

JEFF KERCHEVAL, CONTRACTING OFFICER

Penns Contracting, Inc. SYTE Corp.

Bid Bond - 20% Bid Bond - 20%

00001 00001

06/30/202105/21/2021

06/30/2021

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

15B40121B00000001

MCC CHICAGO - REPLACE

ROOFTOP REC

Bid Bond - 20% Bid Bond - 20%

00001 00001

1 JB 314,442.00 314,442.00 324,077.00 324,077.00

2 2

3 4 5 6

Accel Construction Services Group, LLC

Golf Acquisition Group, LLC

2021-06-30T14:22:07-0500
JEFFREY KERCHEVAL

File details come from the government source that posted it. Updated .