Questions and Answers.pdf

PDF 408 KB Posted

Attached to
FCC Allenwood Replace Food Service Floor FCI
Solicitation number
15B20121Q00000014
Issued by

View the file

Other files

File Type Posted
SF30 Amend 0001 - 15B20121Q00000014.pdf PDF
Pre-Bid Meeting Minutes.pdf PDF
PA20210069 07_02_2021.pdf PDF
Map to Facilities Double-Wide.pdf PDF
BP_A0660 NCIC Check.pdf PDF
Drawing Floor Area.pdf PDF
Department of Justice Residency Form.pdf PDF
PA20210069 06_04_2021.pdf PDF
SF1442 Solicitation Document.pdf PDF
Work Area Photos.pdf PDF
SOW.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers – 15B20121Q000000014

1. Can as built plan of this section be provided that shows the number location and length of the expansion joints?

Once the contract is awarded the company may review any files that we may have.

We cannot release this information for use outside the Institution.

2. How many linear feet of base or identify on drawing areas needing base?

The base will run along the entire length of the Kitchen area, Bakery area, Pot& Pan washing and Corridor areas where the flooring will be replaced. The linear feet is approx. 500 linear feet and will need to be field verified by the contractor.

3. Approximately, maximum length of time seams have been in a state of failure?

Approximately 1 year

4. Brand name Protectall manufacturer’s installation instructions call for epoxy to be used as the adhesive. As such, is this truly an install of Protectall with epoxy adhesive requiring extremely aggressive take up?

Yes

File details come from the government source that posted it. Updated .