147-25pricing.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Competitive Selection OH|DOT14725-2
- Contract number
- DOT14725-2
- Issued by
- Ohio
About this file
This document is a state-level pricing contract (Contract No. 147-25) for sign installation and removal services issued by the Ohio Department of Transportation (ODOT). The contract is awarded to MADEX CONSTRUCTION CO. as a multiple award contract, allowing vendors to submit pricing for various sign installation, support, and removal items across different groups and specifications.
The contract is comprehensively structured into 15 distinct groups covering ground-mounted support installations, sign erection, sign removals, maintenance of traffic, and mobilization. Pricing is provided for standard and rush completion options, with unit prices ranging from $50 to $7,500 depending on the specific service and complexity. The contract covers various support types including U-channel, pipe, structural beam, and solid wood supports, with additional services for sign attachment, erection of ODOT-furnished signs, and traffic maintenance. Each group includes specific line items with detailed unit pricing, and the contract appears to be designed to provide flexible, standardized pricing for transportation infrastructure sign-related work across Ohio transportation districts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 147-25spec.pdf | ||
| Affirmation_and_Disclosure__34_.pdf | ||
| Signature__38_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Standard Wage Pricing
147-25 SIGN INSTALLATION, SIGN REMOVAL
| Vendor Name | MADEX CONSTRUCTION CO. | ||||
| This is a multiple award contract. Vendors may submit pricing for any of the items and locations below. Bidders should submit descriptive literature in accordance with Section 7 of the Specifications and Requirements for items bid. All pricing submitted shall be effective for the entire duration of the contract. | |||||
| Group 1 - Furnish and Install Ground Mounted Post | |||||
| Items 1-4 & 1-5: Furnish and install ground mounted yielding square post support in anchor base foundation in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard Construction Drawings TC-41.20, TC-42.10 and TC-42.20. Unit bid price includes furnishing and installation of anchor base. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 1-1 | Furnish and Install Ground Mounted Support, No. 3 Post, U-channel | Foot | Standard | $50.00 | |
| Rush | $60.00 | ||||
| 1-2 | Furnish and Install Ground Mounted Support, No. 4 Post, Piggyback U-channel | Foot | Standard | $60.00 | |
| Rush | $70.00 | ||||
| 1-3 | Furnish and Install Ground Mounted Support, No. 6 Post, Piggyback U-channel | Foot | Standard | $70.00 | |
| Rush | $80.00 | ||||
| 1-4 | Furnish and Install Ground Mounted Support, No. 3 Post, Square | Foot | Standard | $65.00 | |
| Rush | $75.00 | ||||
| 1-5 | Furnish and Install Ground Mounted Support, No. 4 Post, Square | Foot | Standard | $70.00 | |
| Rush | $75.00 |
| Group 2 - Furnish and Install Ground Mounted Pipe Support | |||||
| Group 2 Items: Furnish and install ground mounted pipe support in concrete foundation in accordance with Item 630 of the ODOT Construction and Material Specifications, Standard Construction Drawings TC-42.10 and TC-42.20, and Plan Insert Sheet 204115. Furnish and install slip base connection when specified on the purchase order. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 2-1 | Furnish and Install Ground Mounted Pipe Support Foundation | Each | Standard | $70.00 | |
| Rush | $75.00 | ||||
| 2-2 | Furnish and Install Ground Mounted Support, Pipe | Foot | Standard | $70.00 | |
| Rush | $75.00 | ||||
| 2-3 | Furnish and Install Triangular Slip Base Connection | Each | Standard | $2,500.00 | |
| Rush | $2,500.00 |
| Group 3 - Furnish and Install Ground Mounted Structural Beam Support | |||||
| Group 3 Items: Furnish and install ground mounted structural beam support in concrete foundation in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard Construction Drawings TC-41.10, TC-42.10 and TC-42.20. Furnish and install slip base connection when specified on the purchase order. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 3-1 | Furnish and Install Ground Mounted Structural Beam Support Foundation, S4x7.7 | Each | Standard | $2,500.00 | |
| Rush | $2,750.00 | ||||
| 3-2 | Furnish and Install Ground Mounted Structural Beam Support, S4x7.7 | Foot | Standard | $100.00 | |
| Rush | $110.00 | ||||
| 3-3 | Furnish and Install Breakaway Structural Beam Connection, S4x7.7 | Each | Standard | $2,000.00 | |
| Rush | $2,000.00 | ||||
| 3-4 | Furnish and Install Ground Mounted Structural Beam Support Foundation, W6x9 | Each | Standard | $3,000.00 | |
| Rush | $3,250.00 | ||||
| 3-5 | Furnish and Install Ground Mounted Structural Beam Support, W6x9 | Foot | Standard | $125.00 | |
| Rush | $135.00 | ||||
| 3-6 | Furnish and Install Breakaway Structural Beam Connection, W6x9 | Each | Standard | $2,500.00 | |
| Rush | $2,500.00 | ||||
| 3-7 | Furnish and Install Ground Mounted Structural Beam Support Foundation, W10x12 | Each | Standard | $3,500.00 | |
| Rush | $3,750.00 | ||||
| 3-8 | Furnish and Install Ground Mounted Structural Beam Support, W10x12 | Foot | Standard | $150.00 | |
| Rush | $160.00 | ||||
| 3-9 | Furnish and Install Breakaway Structural Beam Connection, W10x12 | Each | Standard | $3,000.00 | |
| Rush | $3,000.00 | ||||
| 3-10 | Furnish and Install Ground Mounted Structural Beam Support Foundation, W8x18 | Each | Standard | $5,000.00 | |
| Rush | $5,250.00 | ||||
| 3-11 | Furnish and Install Ground Mounted Structural Beam Support, W8x18 | Foot | Standard | $175.00 | |
| Rush | $185.00 | ||||
| 3-12 | Furnish and Install Breakaway Structural Beam Connection, W8x18 | Each | Standard | $3,500.00 | |
| Rush | $3,500.00 | ||||
| 3-13 | Furnish and Install Ground Mounted Structural Beam Support Foundation, W10x22 | Each | Standard | $6,000.00 | |
| Rush | $6,250.00 | ||||
| 3-14 | Furnish and Install Ground Mounted Structural Beam Support, W10x22 | Foot | Standard | $200.00 | |
| Rush | $210.00 | ||||
| 3-15 | Furnish and Install Breakaway Structural Beam Connection, W10x22 | Each | Standard | $4,000.00 | |
| Rush | $4,000.00 | ||||
| 3-16 | Furnish and Install Ground Mounted Structural Beam Support Foundation, W12x30 | Each | Standard | $7,000.00 | |
| Rush | $7,250.00 | ||||
| 3-17 | Furnish and Install Ground Mounted Structural Beam Support, W12x30 | Foot | Standard | $225.00 | |
| Rush | $235.00 | ||||
| 3-18 | Furnish and Install Breakaway Structural Beam Connection, W12x30 | Each | Standard | $4,500.00 | |
| Rush | $4,500.00 |
| Group 4 - Furnish and Install Ground Mounted Solid Wood Support | |||||
| Group 4 Items: Furnish and install ground mounted solid wood support in accordance with Item 630 of the ODOT Construction and Material Specifications and Traffic Engineering Manual Section 221-5 and Figure 298-26. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 4-1 | Furnish and Install Ground Mounted Support, Solid Wood 4x4 (nominal) | Foot | Standard | $50.00 | |
| Rush | $60.00 | ||||
| 4-2 | Furnish and Install Ground Mounted Support, Solid Wood 4x6 (nominal) | Foot | Standard | $55.00 | |
| Rush | $65.00 | ||||
| 4-3 | Furnish and Install Ground Mounted Support, Solid Wood 6x6 (nominal) | Foot | Standard | $60.00 | |
| Rush | $65.00 | ||||
| 4-4 | Furnish and Install Ground Mounted Support, Solid Wood 6x8 (nominal) | Foot | Standard | $65.00 | |
| Rush | $70.00 |
| Group 5 - Erect ODOT-furnished sign or sign assembly on Ground Mounted Support | |||||
| Group 5 Items: Erect ODOT-furnished flat sheet or extrusheet sign or plaque on ground mounted post, pipe or structural beam support in accordance with Item 630 of the ODOT Construction and Material Specifications, Standard Construction Drawings TC-41.20, TC-51.11 and TC-51.12, and Plan Insert Sheet 204115. Unit bid price includes picking up the sign or plaque at the ODOT District Office or other location within the District as specified on the purchase order, and transporting to the work site. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 5-1 | Sign Erected, Flat Sheet, on Ground Mounted Support (standard) | Square | |||
| Foot | Standard | $50.00 | |||
| Rush | $55.00 | ||||
| 5-2 | Sign Erected, Extrusheet, on Ground Mounted Support | Square | |||
| Foot | Standard | $50.00 | |||
| Rush | $55.00 |
| Group 6 - Erect ODOT-furnished sign or sign assembly on Overhead Support | |||||
| Group 6 Items: Erect ODOT-furnished flat sheet or extrusheet sign or plaque on rigid or span wire overhead support in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard Construction Drawings TC-17.11, TC-51.11 and TC-51.12. Unit bid price includes picking up the sign or plaque at the ODOT District Office or other location within the District as specified on the purchase order, and transporting to the work site. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 6-1 | Sign Erected, Flat Sheet, on Overhead Span Wire Support | Square | |||
| Foot | Standard | $100.00 | |||
| Rush | $100.00 | ||||
| 6-2 | Sign Erected, Flat Sheet, on Rigid Overhead Support | Square | |||
| Foot | Standard | $100.00 | |||
| Rush | $100.00 | ||||
| 6-3 | Sign Erected, Extrusheet, on Rigid Overhead Support | Square | |||
| Foot | Standard | $100.00 | |||
| Rush | $100.00 |
| Group 7 - Erect ODOT-furnished sign assembly on breakaway support | |||||
| Group 7 Item: Furnish and install breakaway support and foundation in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard Construction Drawings HL-10.13, HL-20.11, and TC-87.10. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 7-1 | Sign Assembly Erected, RRFB, on Breakaway Support | Foot | Standard | $250.00 | |
| Rush | $250.00 | ||||
| 7-2 | Sign Assembly Erected, School Flasher, on Breakaway Support | Foot | Standard | $250.00 | |
| Rush | $250.00 | ||||
| 7-3 | Sign Assembly Erected, LED enhanced solar powered sign assembly, on Breakaway Support | Foot | Standard | $250.00 | |
| Rush | $250.00 | ||||
| 7-4 | Sign Assembly Erected, Solar Powered LED Beacon Sign assembly, on Breakaway Support | Foot | Standard | $250.00 | |
| Rush | $250.00 | ||||
| 7-5 | Sign Assembly Erected, Speed Feedback Sign assembly, on Breakaway Support | Foot | Standard | $250.00 | |
| Rush | $250.00 | ||||
| 7-6 | Sign Assembly Erected,Solar Powered Sequential Flashing Chevron Sign assembly, on Breakaway Support | Foot | Standard | $250.00 | |
| Rush | $250.00 | ||||
| 7-7 | Sign Assembly Erected, Hard-Wired Sequential Flashing Chevron Sign assembly, on Breakaway Support | Foot | Standard | $250.00 | |
| Rush | $250.00 |
| Group 8 - Furnish and Install Sign Attachment Assembly | |||||
| Group 8 Item: Furnish and install sign attachment assembly in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard Construction Drawing TC-22.20. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 8-1 | Furnish and Install Sign Attachment Assembly | Each | Standard | $1,000.00 | |
| Rush | $1,000.00 |
| Group 9 - Remove and Dispose Flat Sheet or Extrusheet Sign | |||||
| Group 9 Items: Removal and disposal of ground mounted and overhead mounted signs are in accordance with Item 630 of the ODOT Construction and Material Specifications. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 9-1 | Remove and Dispose Sign, Flat Sheet, On Ground Mounted Support | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 9-2 | Remove and Dispose Sign, Extrusheet, On Ground Mounted Support | Each | Standard | 550 | |
| Rush | 550 | ||||
| 9-3 | Remove and Dispose Sign, Extrusheet, On Overhead Support | Each | Standard | 1000 | |
| Rush | 1000 |
| Group 10 - Remove and Dispose Ground Mounted Post | |||||
| Group 10 Items: Removal and disposal of ground mounted sign support posts are in accordance with Item 630 of the ODOT Construction and Material Specifications. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 10-1 | Remove and Dispose of Ground Mounted Support, No. 3 Post, U-channel or Square | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 10-2 | Remove and Dispose of Ground Mounted Support, No. 4 Post, Piggyback U-channel or Square | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 10-3 | Remove and Dispose of Ground Mounted Support, No. 6 Post, Piggyback U-channel or Square | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 10-4 | Remove and Dispose of Ground Mounted Support, No. 6 Post, Piggyback U-channel or Square | Each | Standard | $500.00 | |
| Rush | $500.00 |
| Group 11 - Remove and Dispose Ground Mounted Pipe Support | |||||
| Group 11 Items: Removal and disposal of ground mounted pipe supports are in accordance with Item 630 of the ODOT Construction and Material Specifications. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 11-1 | Remove and Dispose Ground Mounted Pipe Support Foundation | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 11-2 | Remove and Dispose Ground Mounted Support, Pipe | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 11-3 | Remove and Dispose Triangular Slip Base Connection | Each | Standard | $500.00 | |
| Rush | $500.00 |
| Group 12 - Remove and Dispose Ground Mounted Structural Beam Support | |||||
| Group 12 Items: Removal and disposal of ground mounted structural beam supports are in accordance with Item 630 of the ODOT Construction and Material Specifications. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 12-1 | Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, S4x7.7 | Each | Standard | $1,000.00 | |
| Rush | $1,000.00 | ||||
| 12-2 | Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W6x9 | Each | Standard | $1,000.00 | |
| Rush | $1,000.00 | ||||
| 12-3 | Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W10x12 | Each | Standard | $1,000.00 | |
| Rush | $1,000.00 | ||||
| 12-4 | Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W8x18 | Each | Standard | $1,000.00 | |
| Rush | $1,000.00 | ||||
| 12-5 | Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W10x22 | Each | Standard | $1,000.00 | |
| Rush | $1,000.00 | ||||
| 12-6 | Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W12x30 | Each | Standard | $1,000.00 | |
| Rush | $1,000.00 |
| Group 13 - Remove and Dispose Ground Mounted Solid Wood Support | |||||
| Group 13 Items: Removal and disposal of solid wood supports are in accordance with Item 630 of the ODOT Construction and Material Specifications. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 13-1 | Remove and Dispose Ground Mounted Support, Solid Wood 4x4 (nominal) | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 13-2 | Remove and Dispose Ground Mounted Support, Solid Wood 4x6 (nominal) | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 13-3 | Remove and Dispose Ground Mounted Support, Solid Wood 6x6 (nominal) | Each | Standard | $500.00 | |
| Rush | $500.00 | ||||
| 13-4 | Remove and Dispose Ground Mounted Support, Solid Wood 6x8 (nominal) | Each | Standard | $500.00 | |
| Rush | $500.00 |
| Group 14 - Maintenance of Traffic and Mobilization | |||||
| Group 14 Items: Maintain traffic in accordance with Item 614 of the ODOT Construction and Material Specifications, the Maintenance of Traffic Standard Drawings, the 2012 Ohio Manual of Uniform Traffic Control Devices, and the District Permitted Lane Closure schedule. Payment will be for each set-up required to complete the work. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 14-1 | Maintenance of Traffic, One Lane Closure on a Two Lane Highway | Each | Standard | $7,500.00 | |
| Rush | $7,500.00 | ||||
| 14-2 | Maintenance of Traffic, One Lane Closure on a Four Lane Undivided Highway | Each | Standard | $7,500.00 | |
| Rush | $7,500.00 | ||||
| 14-3 | Maintenance of Traffic, One Lane Closure on a Four Lane or Greater Divided Highway | Each | Standard | $7,500.00 | |
| Rush | $7,500.00 | ||||
| 14-4 | Maintenance of Traffic, Shoulder Closure on Any Highway | Each | Standard | $6,500.00 | |
| Rush | $6,500.00 | ||||
| 14-5 | Maintenance of Traffic, Two Lane Closure on a Four Lane or Greater Divided Highway | Each | Standard | $8,500.00 | |
| Rush | $8,500.00 | ||||
| 14-6 | Law Enforcement Officer | Hour | Standard | $125.00 | |
| Rush | $125.00 | ||||
| 14-7 | Portable Changeable Message Sign (PCMS) | Each | Standard | $2,000.00 | |
| Rush | $2,000.00 |
| Group 15 - Mobilization | |||||
| Group 15 Items: Mobilization will be included in each purchase order. Each mobilization includes up to a maximum of ten sites per District per purchase order. | |||||
| Item | |||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price | |
| 15-1 | Mobilization | Each | Standard | $10,000.00 | |
| Rush | $10,000.00 |