Solicitation_No._140R6018R0013.pdf
PDF 20 MB Posted
- Attached to
- EC - ECAO BARRIER PROJECT Federal contract opportunity
- Solicitation number
- 140R6018R0013
About this file
Solicitation No. 140R6018R0013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._0003.pdf | ||
| Amendment_No._0002.pdf | ||
| Amendment_No._0001.pdf | ||
| FedConnect File | — |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140R6018R0013
Eastern Colorado Area Office Active Vehicle Barrier Installations Colorado
U.S. Department of the Interior Bureau of Reclamation JUNE 2018 Great Plains Region
This page intentionally left blank
ACTIVE VEHICLE BARRIER INSTALLATIONS
Colorado
FOREWORD
Work under this solicitation is to be performed at four (4) Bureau of Reclamation, Eastern Colorado Area Office facilities located in Colorado:
1. Two barriers are located along Heeney Road near Green Mountain Dam, 30 miles northwest of Silverthorne, Colorado in Summit County.
2. Two barriers are located along Mt. Elbert Forebay Dam Road near Mount Elbert Forebay Dam, 14 miles southwest of Leadville, Colorado in Lake County.
3. Two barriers are located along Turquoise Lake Road (Lake County Road 4) near Sugar Loaf Dam, 5 miles west of Leadville, Colorado in Lake County.
4. Three barriers are located along S. Larimer County Road 31 near Carter Lake Dam, 11 miles southwest of Loveland, Colorado in Larimer County.
Principal components of work under these specifications:
1. Furnishing and installing active vehicle barriers along various roadways that access dam crests. Work includes installation of retaining walls, shoulder widening and drainage improvements.
2. Furnishing and installing new guide rail in the vicinity of active vehicle barriers.
The Government anticipates award of a firm fixed priced construction contract with an anticipated period of performance of 400 days.
POINT OF CONTACT
The point of contact is Contracting Officer Gerri Voto-Braun. All questions and correspondence concerning this solicitation shall be directed to her via email at gvotobraun@usbr.gov. To ensure all communication will be properly documented for record purposes, phone calls will not be accepted.
PROPOSAL CLOSING DATE
See Section “A”: “SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442” immediately following the “TABLE OF CONTENTS”
METHOD OF SUBMISSION OF PROPOSALS
See Section L of this Solicitation
Foreward - 1
TYPE OF CONTRACT
This requirement is solicited as a “Request for Proposal (RFP), Lowest Price Technically Acceptable, using the Federal Acquisition Regulation Sub Part 15, Contract by Negotiation Procedures. Results from this solicitation will be an anticipated award of a Firm Fixed Price Contract.
COMPETITION REQUIREMENTS
This acquisition is restricted to a Total Small Business set-aside.
RECLAMATION SAFETY AND HEALTH STANDARDS (2014) EDITION)
For information regarding the Bureau of Reclamation’s publication “RECLAMATION SAFETY AND HEALTH STANDARDS” (2014 Edition):
http://www.usbr.gov/ssle/safety/RSHS/rshs.html, which is applicable to work under the anticipated contract. See Clause WBR 1452.223-81 SAFETY AND HEALTH.
PRE PROPOSAL SITE VISITS
Pre-proposal organized site visits will be held as follows:
For the two (2) locations near Mt. Elbert Dam and Reservoir and the two (2) locations near Sugar Loaf Dam: The organized site visit is Tuesday, June 26th, 2018, at 8:00 AM MOUNTAIN (COLORADO) TIME ZONE. Participants shall meet at the Bureau of Reclamation’s Mt. Elbert Powerplant located at 5583 Highway 82, Twin Lakes CO 81251.
For the two (2) locations near the Green Mountain Dam: The organized site visit is Tuesday, June 26th, 2018, at 1:00 PM MOUNTAIN (COLORADO) TIME ZONE. Participants shall meet at the Bureau of Reclamation’s Green Mountain Powerplant located at 170 County Road 1813, Heeney CO 80498.
For the three (3) locations near Carter Lake Dam: The organized site visit is Wednesday, June 27th, 2018, at 8:00 AM MOUNTAIN (COLORADO) TIME ZONE. Participants shall meet at the Bureau of Reclamation’s Eastern Colorado Area Office, 11056 West County Road 18E, Loveland CO 80537
Prospective Offerors should make arrangement by contacting John Foreman at telephone number 970-962-4527. Attendees are to provide and wear safety boots, hard hats, and safety vests.
SAM: Effective July 29, 2012, any contractor interested in doing business with the Government must register in the System for Award Management (SAM) database, prior to award of a contract or agreement. SAM is a Federal Government owned and operated FREE website that consolidates the Central Contractor Registration (CCR), the Online Representations and Certifications Application (ORCA), and the excluded parties list system (EPLS). The contractor’s DUNS and Bradstreet number and banking information are required for registration.
Contractors may obtain information on registration and annual confirmation requirements via the SAM website at https://www.sam.gov/portal/public/sam or by the Federal Service Desk at telephone number 1-866-606-8220. The Contractor's DUNS and Bradstreet number and banking information are required for registration. Contractors may obtain information on registration and
FOREWARD - 2
FOREWARD - 3
annual confirmation requirements via the SAM website, which can be accessed at https://www.sam.gov/portal/public/sam, or by telephone at the Federal Service Desk at 1-866- 606-8220.
PAYMENTS: Payment requests for the anticipated contract must be submitted electronically through the U.S. Department of the Treasury’s Internet Payment Platform (IPP) System. The IPP website is https://www.ipp.gov. The contractor must use the IPP website to register, access, and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP production helpdesk via email at ippgroup@bos.frb.org or at telephone number 1-866-973-3131. If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor must submit a waiver request in writing to the contracting officer with their proposal.
Active Vehicle Barrier Installations Solicitation No. 140R6018R0013
This page intentionally left blank.
Active Vehicle Barrier Installations Specifications No. 60-C0674
Table of Contents 00 01 10 - 1
SECTION C - DESCRIPTION / SPECIFICATIONS
TABLE OF CONTENTS
SECTION A – SOLICITATION, OFFER and AWARD, Standard Form 1442
SECTION B – SCHEDULE
SECTION C -- SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 15 Forest Service Requirements 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor's On-Site Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 32 Temporary Safety Fence 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02 - EXISTING CONDITIONS
Not Used
DIVISION 03 - CONCRETE
03 30 00 Cast-In-Place Concrete
Table of Contents 00 01 10 - 2
DIVISION 04 - DIVISION 30
Not Used
DIVISION 31 - EARTHWORK
31 02 10 Water for Dust Abatement 31 11 00 Clearing and Grubbing 31 14 10 Stripping 31 23 10 Earthwork for Roadway Backfill and Compaction 31 23 11 Earthwork for Structures 31 37 10 Barrier Rock
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 10 Removal of Existing Pavement, Concrete Curb, Sidewalk, Driveway and/or Structures
32 12 22 Asphalt Concrete Pavement 32 92 20 Seeding and Soil Supplements
DIVISION 33 - UTILITIES
33 42 30 Corrugated Metal Pipe Culverts
DIVISION 34 - TRANSPORTATION
34 71 10 W-Beam Guardrails 34 71 15 Precast Concrete Vehicle Barriers 34 75 13 Active Vehicle Barrier
DIVISION 35 - DIVISION 51
Not Used
DIVISION 52 - DRAWINGS
52 00 00 Drawings
DIVISION 53
Not Used
SECTION D – PACKAGING AND MARKETING
Not Used
Table of Contents 00 01 10 - 3
SECTION E – INSPECTION AND ACCEPTANCE
E.1 Material and Workmanship…………………………………………………E-1 E.2 Inspection and Construction ………………………………………………. E-1 E.3 Warranty of Construction …………………………………………..……... E-2
SECTION F – DELIVERIES or PERFORMANCE F.1 Commencement, Prosecution, and Completion of Work ………………… F-1 F.2 Variation in Estimated Quantity……………………………………………F-1 F.3 Suspension of Work…........................…………………………………....... F-1
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 Authorities and Delegations ……………………………………………….. G-1 G.2 Electronic Invoicing and Payment Requirements – Invoice Processing
Platform (IPP) ……………………………………………………………... G-2 G.3 Notice to Contractors – Contractor Performance Assessment Reporting
System ……………………………………………………………………... G-2
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 Site Security ……………………………………………………………….. H-1
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
I.1 Clauses Incorporated by Reference………………………………………... I-1 I.2 Commercial and Government Entity Code Maintenance………………….. I-3 I.3 Basic Safeguarding of Covered Contractor Information Systems………..... I-4 I.4 Order of Precedence – Uniform Contract Format ………………………….I-5 I.5 Minimum Wages Under Executive Order 13658 …………………………..I-6 I.6 Estimate of Percentage of Recovered Material Content for EPA
Designated Items……………………………………………………………I-9 I.7 Buy American – Construction Materials ......................................... ……..... I-10 I.8 Bid Guarantee …………………………………………………………....... I-12 I.9 Additional Bond Security ………………………………………………..... I-13 I.10 Performance and Payment Bonds – Construction ………………………… I-13 I.11 Federal, State, and Local Taxes …………………………………………… I-15 I.12 Payments under Fixed-Price Construction Contracts……………………… I-15 I.13 Prompt Payment for Construction Contracts…….………………………… I-16 I.14 Performance of Work by the Contractor …………………………………...I-25 I.15 Differing Site Conditions …………………………………………………. I-25 I.16 Physical Data …………………………………………………………….... I-25 I.17 Accident Prevention ……………………………………………………….. I-26 I.18 Specifications and Drawings for Construction Alternate II ……………….. I-26 I.19 Changes …………………………………………………………………..... I-27 I.20 Authorized Deviations in Clauses ………………………………………..... I-28
Table of Contents 00 01 10 - 4
I.21 Restriction on Endorsements – Department of the Interior …………….…. I-29 I.22 Release of Claims – Department of the Interior …………………………... I-29 I.23 Examination of Records by the Department of the Interior ……………….. I-29 I.24 Liability Insurance – Department of the Interior ……………………...…... I-29 I.25 Incorporation of Technical Proposal ……………………………………..... I-30 I.26 Asbestos-Free Warranty………………………………………………….....I-30 I.27 Safety and Health – Bureau of Reclamation ……………………………I-30
I.28 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace – Bureau of Reclamation …….. I-31
I.29 Hazardous Substances …………………………………………………....... I-31 I.30 Nonconforming Hazardous Materials ……………………………………... I-31 I.31 Preservation, Packaging, Packing, Marking, and Labeling of
Hazardous Materials (HAZMAT) for Shipments …………………………. I-32 I.32 Certification of Representatives for Corporate Sureties—Bureau of Reclamation …………………………………………………………….. I-33 I.33 Equipment Ownership and Operating Expense – Bureau of
Reclamation ……………………………………………………………….. I-33 I.34 Payment for Mobilization and Preparatory Work – Alternative III ………. I-35
I.35 Payment for Technical Data ………………………………………………..I-37 I.36 Claims Accounting – Bureau of Reclamation …………………………….. I-37 I.37 Other Contracts (Deviation) ………………………………………...….…. I-38 I.38 Preservation of Cultural Resources-Bureau of Reclamation …………........ I-38 I.39 Security Requirements—Bureau of Reclamation ……………….………… I-40 I.40 Modification Proposals – Alternative IV ………………………………….. I-47
PART III – DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J – DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
General Decision Number CO180023, dated March 2, 2018 General Decision Number CO180024, dated January 5, 2018 Standard Form 24 – Bid Bond Past Performance Questionnaire Subcontracting Percentage Worksheet
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – REPRESENTATIONS, CERTIFICATIONS and OTHER STATEMENTS
OF OFFERORS
K.1 Annual Representations and Certifications ................................................... K-1 K.2 Information Regarding Responsibility Matters ………………………….... K-4 K.3 Certification Regarding Tax Matters …………………………………….... K-6
Active Vehicle Barrier Installations Solicitation No. 140R6018R0013
Table of Contents 00 01 10 - 5
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
L.1 System for Award Management ................................................................... L-1 L.2 Commercial and Government Entity Code Reporting................................... L-2 L.3 Alternative Line Item Proposal …………………………………………..... L-3 L.4 Availability of Specifications Listed in the GSA Index of Federal
Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 ……………………………………………………….... L-3
L.5 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST) ..........................................................................................L-4
L.6 Submission of Offers in the English Language ............................................ L-4 L.7 Submission of Offers in U.S. Currency ........................................................ L-4 L.8 Instructions to Offerors – Competitive Acquisition ..................................... L-4 L.9 Requirements for Certified Cost or Pricing Data and Data Other Than
Certified Cost or Pricing Data …………………………………………… L-9 L.10 Type of Contract …………………………………………………………... L-10 L.11 Construction Wage Rate Requirements—Secondary Site of the Work…… L-10 L.12 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction ……………………………….. L-10 L.13 Site Visit (Construction) Alternate I.............................................................. L-12 L.14 Preparation of Proposals – Construction........................................................L-12 L.15 Authorized Deviations in Provisions ………………………………….…... L-13 L.16 Notice of Buy American Requirement--Construction Materials...................L-13 L.17 Service of Protest -- Department of the Interior (Deviation) ..................... L-14
L.19 Source Evaluation and Selection Procedures – Bureau of Reclamation …...L-15 L.20 General Proposal Instructions – Bureau of Reclamation ………………...... L-18 L.21 Technical Proposal Instructions – Bureau of Reclamation ………………... L-19 L.22 Pricing Proposal Instructions – Bureau of Reclamation …………………... L-20 L.23 Notice of Proposed Partnering -- Bureau of Reclamation ..............................L-21 L.24 Instruction for Mobilization and Preparatory Work Schedule Line Item …. L-22
SECTION M – EVALUATION FACTORS FOR AWARD
M.1 Evaluation Factors for Award – Lowest Price Technically Acceptable Source Selection Process - Bureau of Reclamation ………………………….......M-1
M.2 Notice of World Trade Organization Government Procurement Agreement Evaluations—Bureau of Reclamation …………………….…….M-5
L.18 Use and Disclosure of Proposal Information - Department of the Interior.. L-14
Active Vehicle Barrier Installations Specification No. 60 C0674
This page is intentionally left blank.
PART I -- THE SCHEDULE
Ger i Voto-Braun
140R6018R0013
F.1
X x
(Price Schedule I CLINS 1-16, Price Schedule 2 CLINS 17-40, Price Schedule 3 CLINS 41-53, Price Schedule 4 CLINS 54-71)
See Continuation of SECTION B - Supplies or Services and P
Price Schedule B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
EASTERN COLORADO AREA OFFICE
ACTIVE VEHICLE BARRIER INSTALLATIONS
COLORADO
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE 1
2 Locations near Green Mountain Dam
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum of $
2 01 55 20 Traffic Control For the lump sum of $
3 03 30 00 Cast-In-Place Concrete 18 yd3 $ $
4 03 30 00 Drain Rock 3 yd3 $ $
5 31 23 10 Embankment In-Place 4 yd3 $ $
6 31 23 11 Excavation for Structures 88 yd3 $ $
Price Schedule B - 2
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
7 31 23 11 Backfill about Structures 50 yd3 $ $
8 31 23 11 Compact Backfill about Structures
50 yd3 $ $
9 31 23 11 Compact In-Situ Base 8 yd3 $ $
10 32 12 22 Aggregate Base 28 tons $ $
11 32 92 20 Seeding and Soil Supplements
For the lump sum of
12 34 71 10 Type 3 W-Beam 69 lf $ $
13 34 71 10 Nested Type 3 W-Beam 138 lf $ $
14 34 71 10 50’ End Anchorage, (Nonflared)
2 each $ $
15 34 71 10 Terminal Section 4 each $ $
16 34 75 13 Mobile Crash Beam Barrier 2 each $ $
TOTAL FOR PRICE SCHEDULE 1 $_________________
PRICE SCHEDULE 2
3 Locations near Carter Lake Dam
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
17 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum of $
18 01 55 20 Traffic Control For the lump sum of $
19 03 30 00 Cast-In-Place Concrete 12 yd3 $ $
20 31 23 10 Excavation for Roadways 22 yd3 $ $
21 31 23 10 Embankment In-Place 18 yd3 $ $
22 31 23 11 Excavation for Structures 48 yd3 $ $
23 31 23 11 Backfill About Structures 18 yd3 $ $
24 31 23 11 Compact Backfill about Structures
18 yd3 $ $
Price Schedule B - 3
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
25 31 23 11 Compact In-Situ Base 4 yd3 $ $
26 32 12 10 Saw Cutting 508 lf $ $
27 32 12 10 Asphalt Removal 114 yd2 $ $
28 32 12 22 Aggregate Base 69 tons $ $
29 32 12 22 Asphalt Concrete Patch 51 tons $ $
30 32 92 20 Seeding and Soil Supplements
For the lump sum of $
31 33 42 30 15-Inch Diameter Corrugated Metal Pipe Culverts
5 lf $ $
32 33 42 30 15-Inch Diameter Metal Flared End Sections
1 each $ $
33 34 71 10 Type 3 W-Beam 230 lf $ $
34 34 71 10 Nested Type 3 W-Beam 208 lf $ $
35 34 71 10 End Anchorage, (FLEAT 350)
5 each $ $
36 34 71 10 End Anchorage, (Type 3K)
1 each $ $
37 34 71 10 Transition Type 3J 1 each $ $
38 34 71 10 Terminal Section 1 each $ $
39 34 75 13 Mobile Crash Beam Barrier
3 each $ $
40 34 71 15 Precast Concrete Barriers 3 each $ $
TOTAL FOR PRICE SCHEDULE 2 $_________________
Price Schedule B - 4
PRICE SCHEDULE 3
2 Locations near Mt. Elbert Forebay Dam and Reservoir
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
41 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum of $
42 01 55 20 Traffic Control For the lump sum of $
43 03 30 00 Cast-In-Place Concrete 8 yd3 $ $
44 31 23 11 Excavation for Structures 24 yd3
45 31 23 11 Backfill about Structures 16 yd3
46 31 23 11 Compact Backfill about Structures
16 yd3 $ $
47 31 23 11 Compact In-Situ Base 2 yd3 $ $
48 31 37 10 Barrier Rock 140 tons $ $
49 32 12 10 Saw Cutting 27 lf $ $
50 32 12 10 Asphalt Removal 105 yd2 $ $
51 32 12 22 Aggregate Base 12 yd3
52 32 92 20 Seeding and Soil Supplements
For the lump sum of $
53 34 75 13 Permanent Crash Beam Barrier
1 each $ $
TOTAL FOR PRICE SCHEDULE 3 $_________________
PRICE SCHEDULE 4
2 Locations near Sugar Loaf Dam
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
54 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum of $
55 01 55 20 Traffic Control For the lump sum of $
56 03 30 00 Cast-In-Place Concrete 32 yd3 $ $
57 31 23 10 Excavation for Roadways 180 yd3 $ $
Price Schedule B - 5
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
58 31 23 10 Embankment In-Place 258 yd3 $ $
59 31 23 11 Excavation for Structures 100 yd3 $ $
60 31 23 11 Backfill about Structures 50 yd3 $ $
61 31 23 11 Compact Backfill about Structures
50 yd3 $ $
62 31 23 11 Compact In-Situ Base 9 yd3 $ $
63 32 12 22 Aggregate Base 95 tons $ $
64 32 92 20 Seeding and Soil Supplements
For the lump sum of $
65 34 71 10 Type 3 W-Beam 580 lf $ $
66 34 71 10 Nested Type 3 W-Beam 208 lf $ $
67 34 71 10 50’ End Anchorage, (Nonflared)
3 each $ $
68 34 71 10 End Anchorage, (FLEAT 350)
4 each $ $
69 34 71 10 Widening End Anchorage, (Flared)
1 each $ $
70 34 71 10 Terminal Section 2 each $ $
71 34 75 13 Mobile Crash Beam Barrier
2 each $ $
TOTAL FOR PRICE SCHEDULE 4 $_________________
Price Schedule B - 6
SUMMARY PRICE SCHEDULE TOTALS
9 Total Locations
Price Schedules Total Price per Schedule
Price Schedule 1 $
Price Schedule 2 $
Price Schedule 3 $
Price Schedule 4 $
TOTAL $_________________
END OF SUPPLIES OR SERVICES AND PRICES
Summary of Work 01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work under this solicitation is to be performed at four (4) Bureau of Reclamation, Eastern Colorado Area Office facilities located in Colorado:
1. Two barriers are located along Heeney Road near Green Mountain Dam, 30 miles northwest of Silverthorne, Colorado in Summit County.
2. Two barriers are located along Mt. Elbert Forebay Dam Road near Mount Elbert Forebay Dam, 14 miles southwest of Leadville, Colorado in Lake County.
3. Two barriers are located along Turquoise Lake Road (Lake County Road 4) near Sugar Loaf Dam, 5 miles west of Leadville, Colorado in Lake County.
4. Three barriers are located along S. Larimer County Road 31 near Carter Lake Dam, 11 miles southwest of Loveland, Colorado in Larimer County.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Furnishing and installing active vehicle barriers along various roadways that access dam crests. Work includes installation of retaining walls, shoulder widening and drainage improvements.
B. Furnishing and installing new guide rail in the vicinity of active vehicle barriers.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.
1.04 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 52:
Summary of Work 01 11 00 - 2
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
END OF SECTION
Use of Site 01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. Cleaning Manual-2012 Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2012 Edition Available online at: http://www.usbr.gov/mussels/prevention
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:
1. For each Contractor use site on Government land.
a. Show use location and extent of impact. Uses include but are not limited to the following:
1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.
2) Parking areas, temporary roads, and haul routes.
3) Utilities including air, power, and water lines; fire hydrants; and compressor station.
4) First-aid and medical facilities.
5) Areas for processing, storing, and disposing of waste materials from construction operations.
6) Temporary fences.
b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.
Use of Site 01 14 10 - 2
c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.
d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.
2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.
1.04 PROJECT CONDITIONS
A. Government land may be used for required construction facilities.
B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.
C. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of COR.
D. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.
E. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by COR.
F. All work is located along public roadways and will require traffic control plan approval from several county highway agencies prior to commencement of construction activities.
Refer to Section 01 55 20 – Traffic Control of these Specifications.
G. A 69kV buried, high voltage transmission line is located in the drainage ditch along the north side of Heeney Road at the Green Mountain Dam North Gate site Refer to Section 52 00 00 – Drawings for the approximate location. Field verify the line’s actual location and utilize additional safety precautions and utility protection while performing work at this location.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 CLEANING
A. Construction equipment:
1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.
Use of Site 01 14 10 - 3
2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in Cleaning Manual.
3. COR will inspect construction equipment following procedures described in Cleaning Manual before allowing equipment onsite.
3.02 RESTORATION
A. Restore Contractor use areas to pre-construction condition.
B. Restore temporary construction roads to original contours and make impassable to vehicular traffic when no longer required.
C. After completion of work, regrade and scarify Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate revegetation, provide proper drainage, and prevent erosion.
Use of Site 01 14 10 - 4
Active Vehicle Barriers Specifications No. 60-C0674
Forest Service Requirements 01 14 15 - 1
SECTION 01 14 15
FOREST SERVICE REQUIREMENTS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work, except as specified.
2. Contractor is responsible for restoration costs and repair of damage from unauthorized work in restricted areas,
1.02 PROJECT CONDITIONS
A. For operations performed on national forest land, comply with applicable rules and regulations of Secretary of Agriculture governing use and occupancy of national forests regarding disposal of timber; prevention and control of forest fires; sanitation; land occupancy for camps, storage yards, temporary roads, borrow areas for roads, and other construction-related operations and activities; and other rules and regulations which generally govern construction work performed on these lands.
B. Forest supervisor of the White River National Forest will be available for discussion with Contractor and prospective offerors regarding these rules and regulations.
1. Name and address of forest supervisor will be furnished by CO.
2. Make arrangements with forest supervisor in advance for these meetings.
3. Green Mountain Dam is in the White River National Forest.
C. Forest supervisor of the San Isabel National Forest will be available for discussion with Contractor and prospective offerors regarding these rules and regulations.
1. Name and address of forest supervisor will be furnished by CO.
2. Make arrangements with forest supervisor in advance for these meetings.
3. Sugar Loaf and Mt. Elbert Forebay are both in the San Isabel National Forest
D. Obtain from Forest Service, through CO, necessary permits and instructions which relate to use and occupancy of national forest lands and use of national forest products, except those timber sale and burning permits which are specifically mentioned below.
E. Contractor shall be responsible for restoration costs and damages resulting from unauthorized operations within restricted areas.
Active Vehicle Barriers Specifications No. 60-C0674
Forest Service Requirements 01 14 15 - 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 PREVENTION AND CONTROL OF FOREST FIRES
A. For purpose of fighting forest fires on or in vicinity of project which are not caused by Contractor or Contractor's employees and when requested by CO, place Contractor's employees and equipment temporarily at disposal of Forest Service.
1. Payment for such services will be made by Government at not less than current rate for firefighting services established by Forest Service in area concerned.
2. Employees and equipment furnished will be relieved from firefighting as soon as Forest Service finds that it is practicable to employ other labor and equipment adequate for protection of area.
3. An equitable adjustment in contract time will be made for this period.
3.02 TEMPORARY ACCESS ROADS
A. Except for those access roads and borrow areas specifically covered in these specifications, approval of CO shall be obtained in advance before locating additional access roads or borrow areas on national forest land. Mark proposed locations of access roads and borrow areas on the ground for approval by CO in advance of construction.
B. Temporary Access Roads:
1. To prevent excessive erosion, do not use grades in excess of 8 percent, except those which are approved in writing by CO.
2. Generally, back slopes of cut banks shall be stable and compatible with existing topography, except where rock is encountered and flatten and round such slopes into natural ground surface so far as practicable.
3. Install suitable devices and drainage structures in sufficient number to prevent accumulation of excessive water and erosion of the road surface, drainage ditches, and scarred areas.
Submittals 01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME)
1. ASME Y14.1-12 Decimal Inch Drawing Sheet Size and Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-14 United States National CAD Standards, Version 6
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236- 21, Specifications and Drawings for Construction.
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number and title, and RSN.
3. Measurement Units: US Customary Units.
C. Drawings:
1. Minimum Identification in Title Block:
a. Contract number and title.
b. Contractor’s or supplier’s title and drawing number.
Submittals 01 33 00 - 2
c. Date.
2. Provide space next to title block for review stamps.
3. Print Size: D size (22 inches by 34 inches).
4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.
a. Lettering shall be neat when drawing preparation with drafting equipment is allowed.
5. Government Format drawings:
a. Prepare drawings designated as “Government Format” in the specifications as follows:
1) Title block and sheet format:
a) As shown on Drawing 40-D-7102.
b) Government will provide specific title block information to be used.
2) Drawing format:
a) AUTOCAD, Version 2007 or later.
b) In accordance with NIBS NCS.
3) Government will provide an electronic AutoCAD template.
6. Final drawings:
a. Drawing format: AUTOCAD, Version 2007 or later.
b. Show as-built changes, including revision dates, made during installation.
Indicate changes by clouding.
c. Electronic files: On CD or DVD discs.
d. Government will provide an electronic AutoCAD template.
D. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
E. Certifications:
Submittals 01 33 00 - 3
1. Certifications by a registered professional: Signed and sealed by registered professional.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of Submittals.
1. Electronic submittals:
a. In Portable Document Format (PDF).
b. Include RSN transmittal letter.
c. Do not include Personally Identifiable Information (PII) in electronic submittals.
2. Submit electronic submittals via email or CD/DVD based on size:
a. The Government can receive e-mails up to 25 MB. However, e-mails over 10 MB should be considered extra large. E-mailing of electronic submittals exceeding 10 MB should only occur after transmittal of larger size e-mail has been verified.
b. Address e-mail of electronic submittals less than extra large size to:
1) sha-GPR-CONSTSVCS@usbr.gov
c. Include electronic submittals that are too large to e-mail with paper copy of submittal. These electronic submittals shall be on thumb drive.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
Submittals 01 33 00 - 4
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 28 days after receiving comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
F. Each submittal shall be submitted under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned to the Contractor for resubmittal.
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 21 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.
B. Time in Excess of Specified:
1. CO may extend contract completion date to allow additional time for completing work affected by excess review time:
a. Time extension will be to extent that excess review time caused delay to contract completion date.
b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending contract completion date.
2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to extent that:
a. Approval was required under contract, and.
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Submittal Response:
1. A response letter from the COR for each submittal will be sent to the Contractor indicating if the submittal is either approved, not approved, acceptable, not acceptable, or acknowledged receipt.
Submittals 01 33 00 - 5
a. Revise and resubmit submittals not approved or not acceptable.
b. Do not change designs without approval of the COR after drawings, documentation, and technical data have been approved.
1.07 TRANSMITTAL
A. Addresses for codes listed in Table 01 33 00A - List of Submittals:
1. Where the recipient is the Contracting Officer, address the transmittal letter to Bureau of Reclamation, Attention: GP-5000, P.O. Box 36900, Billings, MT 59107-6900. Physical address is 2021 4th Avenue North, Billings, MT 59101.
2. Where the recipient is the Contracting Officer’s Representative, address the transmittal letter to Bureau of Reclamation, Attention: GP-2600, P.O. Box 36900, Billings, MT 59107-6900. Physical address is 2021 4th Avenue North, Billings, MT 59101.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Submittals 01 33 00 - 6
Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, and COR indicated Contracting Officer’s Representative.
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
No. of sets to be sent to: **
CO COR
1 Bonds 52.228-15
Performance and Payment Bonds
Within 10 calendar days after award
CO 1 paper 0
2 Insurance-work on a Government Installation 1452.228-70
1) Written certification that the required insurance has been obtained
2) Current certification of insurance for each subcontractor
Before commencing on-site work CO 1 paper
1 paper
3 Liability Insurance 1452.228-70
Acceptable Certificate of Liability Insurance
Prior to commencement of work under the contract
CO 1 paper 0
4 Equal Opportunity 52.222-26
Information required by Executive Order
112246 (SF-100)
Within 30 days following award CO 1 paper 0
5 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10
Certification that executive compensation and subcontract awards were reported
Within 10 days of each report being submitted
CO 1 paper 0
6 Site Security
GP-7
List of all contractor and subcontractor employees
At least 10 days prior to arriving at worksite
COR 0 2 paper
7 Site Security
GP-7
List of all vehicles and equipment to be brought onsite
At least 10 days prior to arriving at worksite
COR 0 2 paper
8 Release of Claims 1452.204-70
Release of Claims (DI-137) against the Government
After completion of the work and prior to final payment
CO 1 paper 0
9 Labor Standards Data 52.222-11
1) List of subcontractors
2) Statement and Acknowledgement Form (SF-1413) for each subcontract
Within 14 days after preconstruction meeting
COR 1 paper 1 paper + 1 electronic
10 Payrolls 52.222-08
Copies of all payrolls
Weekly for each week of contract performance
CO 1 paper 2 paper
11 Schedules for Construction Contracts 52.236-15
Practicable schedule Within 5 days after preconstruction meeting or another period of time as determined by Contracting Officer
COR 1 paper 1 paper + 1 electronic
Submittals 01 33 00 - 7
Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, and COR indicated Contracting Officer’s Representative.
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
No. of sets to be sent to: **
CO COR
12 Schedules for Construction Contracts 52.236-15
Updated schedule showing actual progress
Monthly or as directed by the Contracting Officer
COR 1 paper 1 paper + 1 electronic
DIVISION 1 – General 01 14 10-1 Use of Site Land Use And
Landscape Rehabilitation Plan
At least 21 days before use of Government land
COR 0 1 paper + 1 electronic
01 35 10-1 Safety Data Sheets
Complete LHM And
SDS
At least 21 days before jobsite delivery of hazardous material
COR 0 1 paper + 1 electronic
01 35 10-2 Safety Data Sheets
Updated LHM And
SDS
At least 21 days before jobsite delivery of hazardous material not previously listed
COR 1 1 paper + 1 electronic
01 35 20-1 Safety and Health
Safety Program Submitted and accepted before commencing onsite work. See section 3 of RSHS
COR 1 1 paper + 1 electronic
01 35 20-2 Safety and Health
Monthly Accident Summary Report
First day of each month. See paragraph 3.8 of RSHS
COR 0 1 paper + 1 electronic
01 35 20-3 Safety and Health
Respirator User Documentation
At least 21 days before beginning on-site work
COR 0 2 paper
01 35 20-4 Safety and Health
Crane Operation Certificates
At least 21 days before beginning on-site work
COR 0 2 paper
01 35 20-5 Safety and Health
Exposure Assessment Form (if applicable)
Within 7 days of exposure COR 0 2 paper
01 35 20-6 Safety and Health
Other Training Certificates
At least 21 days before beginning on-site work
COR 0 2 paper
01 35 30-1 Contractor‘s Onsite Safety Personnel
Qualifications At least 21 days before beginning on-site work
COR 0 2 paper
01 35 30-2 Contractor’s Onsite Safety Personnel
Safety Inspection Reports
Submit to COR monthly COR 0 1 paper + 1 electronic
01 46 20-1 Testing Agency Services
Testing Agency Services Plan
At least 21 days before beginning on-site work
COR 0 1 paper + 1 electronic
01 55 00-1 Vehicular Access and Parking
Preconstruction Video
At least 21 days before beginning on-site work
COR 0 1 paper + 1 electronic
01 55 00-2 Vehicular Access and Parking
Post Construction Video
At least 21 days before leaving site.
COR 0 1 paper + 1 electronic
01 55 00-3 Vehicular Access and Parking
Private Land Usage (If Necessary)
At least 21 days before beginning on-site work.
COR 0 1 paper + 1
Submittals 01 33 00 - 8
Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, and COR indicated Contracting Officer’s Representative.
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
No. of sets to be sent to: **
CO COR
01 55 20-1 Traffic Control Right-Of-Way Permits
At least 21 days before affecting public traffic.
COR 0 1 paper + 1 electronic
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit(s)
At least 21 days before beginning on-site work.
COR 0 1 paper + 1 electronic
01 57 30-1 Water Pollution Control
Water Management Plan
At least 21 days before commencing construction activities
COR 0 1 paper + 1 electronic
01 57 30-2 Water Pollution Control
Spill Prevention, Control, and Countermeasure (SPCC) Plan
At least 21 days before delivery or storage of oil
COR 0 1 paper + 1 electronic
01 57 50-1 Tree and Plant Protection
Protection Plan At least 21 days before commencing on site construction work
COR 0 1 paper + 1 electronic
01 71 20-1 Surveying Surveying Plan At least 21 days before beginning survey work
COR 0 1 paper + 1 electronic
01 71 20-2 Surveying Resumes At least 21 days before beginning survey work; At least 28 days before personnel change
COR 0 2 paper
01 71 20-3 Surveying Accuracy Check Results
At least 21 days before beginning survey work
COR 0 1 paper + 1 electronic
01 71 20-4 Surveying Completed and Reduced Survey Notes
Within 2 days of completing and reducing notes
COR 0 1 paper + 1 electronic
01 71 20-5 Surveying Quantity Survey Notes and Computations
Accompanying progress payment requests
COR 0 1 paper + 1 electronic
01 71 20-6 Surveying Workday's Survey Notes
At conclusion of workday when requested by Government
COR 0 1 paper + 1 electronic
01 74 00-1 Cleaning and Waste Management
Waste Production and Disposal Plan
At least 28 days before starting onsite work
COR 0 1 paper + 1 electronic
01 74 00-2 Cleaning and Waste Management
Waste Production and Disposal Records
Within 7 days of waste disposal COR 0 1 paper + 1 electronic
01 74 00-3 Cleaning and Waste Management
Environmental Consultant Resume (if required)
At least 35 days before beginning environmental assessment
COR 0 2 paper
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment (if required)
Within 14 days of completion of work
COR 0 1 paper + 1 electronic
01 78 30-1 Project Record Documents
Final As-built Drawings
Within 21 days of completion of work
COR 0 1 paper + 1
DIVISION 3 – Concrete
Submittals 01 33 00 - 9
Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, and COR indicated Contracting Officer’s Representative.
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
No. of sets to be sent to: **
CO COR
03 30 00-1 Cast-In Place Concrete
Mix Design At least 21 days before starting onsite work
COR 0 1 paper + 1 electronic
DIVISION 31-Earthwork 31 23 10-1 Earthwork for
Roadway Backfill and Compaction
Test Results At least 21 days before starting onsite work for Laboratory Compaction
Within 7 days of completion for In-Place density tests
COR 0 1 paper + 1 electronic
1 paper + 1 electronic
31 23 10-2 Earthwork for Roadway Backfill and Compaction
Borrow Source At least 21 days before material delivery
COR 0 1 paper + 1 electronic
31 23 11-1 Earthwork for Structures
Test Results At least 21 days before starting onsite work
COR 0 1 paper + 1 electronic
31 23 11-1 Earthwork for Structures
Borrow Source At least 21 days before material delivery
COR 0 1 paper + 1 electronic
31 37 10-1 Barrier Rock Weight Tickets Upon material delivery COR 0 1 paper + 1 electronic
31 37 10-2 Barrier Rock Product Certification At least 21 days before starting onsite work
COR 0 1 paper + 1 electronic
DIVISION 32 – Exterior Improvements 32 12 22-1 Asphalt
Concrete Pavement
Mix Design Data At least 21 days before starting onsite work
COR 0 1 paper + 1 electronic
32 12 22-2 Asphalt Concrete Pavement
Certifications At least 21 days before starting onsite work
COR 0 1 paper + 1 electronic
32 92 20-1 Seeding and Soil Supplements
Seeding Plan At least 21 days before starting onsite work
COR 0 1 paper + 1 electronic
32 92 20-2 Seeding and Soil Supplements
Certifications At least 21 days before material delivery
COR 0 1 paper + 1 electronic
DIVISION 34 – Transportation 34 71 10-1 W-Beam
Guardrail Certifications At least 21 days before starting onsite work COR 0 1 paper + 1 electronic 34 75 13-1 Active Vehicle
Barrier Certifications At least 21 days before starting onsite work COR 0 1 paper + 1 electronic 34 75 13-2 Active Vehicle
Barrier Approval Drawings and Data
At least 21 days before starting onsite work
COR 0 1 paper + 1
Safety Data Sheets 01 35 10 - 1
SECTION 01 35 10
SAFETY DATA SHEETS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 DEFINITIONS
A. LHM: List of Hazardous Materials.
B. SDS: Safety Data Sheet.
1. Referred to as Material Safety Data Sheets in the clause at 52.223-3, Hazardous Material Identifications and Material Safety Data - Alternate 1.
1.03 APPLICATION
A. For the purposes of this contract, “delivered under this contract” in paragraph (b) of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1, includes:
1. Materials delivered to Government.
2. Materials incorporated into work.
3. Materials used by the Contractor during contract performance at the jobsite.
1.04 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 35 10-1, Complete LHM and SDS.
C. RSN 01 35 10-2, Updated LHM and SDS:
1. Comply with paragraph (e) of clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1.
1.05 DELIVERY
A. Do not deliver hazardous materials to jobsite which are not included on original or previously updated LHM and SDS before receipt of updated LHM and SDS by the COR.
Safety Data Sheets 01 35 10 - 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Safety and Health 01 35 20 - 1
SECTION 01 35 20
SAFETY AND HEALTH
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include the cost of complying with this section in the prices offered in the Price Schedules for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. RSHS Reclamation Safety and Health Standards including revisions posted at http://www.usbr.gov/ssle/safety/RSHS/rshs.html
2. FIST 1-1 (2012) Hazardous Energy Control Program available at: www.usbr.gov/power/data/fist_pub.html
B. Occupational Safety and Health Administration (OSHA)
1. 29 CFR Part 1910 Occupational Safety and Health Standards.
2. 29 CFR Part 1926 Safety and Health Regulations for Construction.
3. Available on the Internet at www.osha.gov.
C. American Conference of Governmental Industrial Hygienists (ACGIH), Threshold Limit Values (TLVs):
1. Available at www.acgih.org.
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 35 20-1, Safety Program:
1. Cover aspects of onsite and applicable off-site operations and activities associated with this contract.
a. Submit a comprehensive, job-specific safety and health program in accordance with Section 01 33 00 – Submittals and in accordance with the requirements of Section 3.3 of the Reclamation Safety and Health Standards (RSHS) and these specifications.
b. Follow the outline in Appendix B of the RSHS.
Safety and Health 01 35 20 - 2
c. The Safety Program will not be accepted for review by the COR unless it addresses, in order, lettered and numbered per Appendix B of the RSHS, a…