Amendment_No._0002.pdf

PDF 2 MB Posted

Attached to
EC - ECAO BARRIER PROJECT Federal contract opportunity
Solicitation number
140R6018R0013
Issued by
Department of the Interior Bureau of Reclamation

About this file

Amendment No. 0002

View the file

Other files for this federal contract opportunity

Other files attached to EC - ECAO BARRIER PROJECT, newest first.
File Type Posted
Amendment_No._0003.pdf PDF
Amendment_No._0001.pdf PDF
Solicitation_No._140R6018R0013.pdf PDF
FedConnect File —

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R6018R0013 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

07/31/20180002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/14/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Eastern Colorado Area Office Active Vehicle Barrier Installations, Colorado

See attachment for changes incorporated by this amendment:

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gerri Voto-Braun

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation No. 140R6018R0013 Amendment No. 0002

Description of Changes

1. In Part I – The Schedule, Section C – Specifications, Section 52 00 00 – Drawings, remove Sheet No.

24, Drawing No. 245-600-60036 and substitute therefor the attached revised, same-numbered drawing.

2. In Part III – List of Documents, Exhibits and Other Attachments, Section J – List of Documents, Exhibit and Other Attachments, remove General Decision CO180023, dated March 2, 2018 and substitute therefor the attached General Decision CO180023, dated July 13, 2018.

Acknowledgement See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids, (See Block 10 of the Standard Form 1442).

Receipt of Proposals The date and hour for receipt of proposals remains the same; 3:00 PM on August 8, 2018 MDT.

Third Party If you have provided a copy of this solicitation to another company or person, please forward this amendment accordingly.

2 1/2"

8"

5'-0"

1'-6"

3/4" Ø Weep holes

@ 2'-0" o.c. -

3" from bottom of wall, slope to drain

1'-0" min.

6'-0"

7'-8"

#4 @ 12" each way

1" Drain rock

2'-11"

Existing 69kV Transmission line

1'-6"

2'-6"

1'-0"

Pre-cast concrete block

Shear key

8"

8'-0"

Finished grade

#4 @ 12" each way

3" clr

1'-0"

1'-0"

1'-6"

8"

8"

8" 8'-8" 8"

10'-0"

6'-0"

4"

4"

4"

4"

B

B

3/4" Ø Drain hole, typ.

each corner

1'-6"

1'-6"

11'-4"

2'-4" 6'-8" 2'-4"

6'-8"

2'-4"

4'-4"

A

A

N o s h e a r k e y

Full depth shear key

N o s h e a r k e y

T a p e r e d s h e a r k e y

T a p e r e d s h e a r k y

Pre-cast concrete block

Pre-cast concrete block

8" 5'-4"

8"

Existing grade

#4 @ 12" each way, centered in wall

#4 @ 12" each way, mid-depth

Backfill w/aggregate base material

1'-0" min.

Varies

8"

Compacted in-situ base

1'-6" 1'-6"

Pre-cast concrete block

1'-0"

1'-0" 2'-0" 1'-0"

4'-0"

1'-0"

#4 x @ 18"

#4 x @ 18"

(10)-#4, Horiz, as indicated

1'-6"

S l o p t o f l o w l i n e

S l o p t o f l o w l i n e

1'-6"

8"

6"

1'-6"

Match trough invert with existing upstream/downstream ditch invert

4'-0"

6'-0"

C C

M a t c h t r o u g h i n v e r t w i t h e x i s t i n g u p s t r e a m d o w n s t r e a m d i t c h i n v e r t

1'-6"

1'-6"

4"

6"

8"

Asphalt

Aggregate base

Compacted in-situ base

A L W

A Y S

T H

I N

K

S A F E T Y

SHEET

P L O

T T E D

B Y

C A

F I L E N

A M

E

D A T E

A N

D

T I M

E

P L O

T T E D

C

S Y S T E M

D

C

B

A

D

C

B

A

B U

R E

U

O

F

R E C L A M

A T I O

N

U S

D

E P A R T M

E N

T

O

F

T H

E

I N

T E R I O

R

Managing

LAR M TA IOCE N

W in theWa estter

C

L O

R A D

O B

G

T H

O M

P S O

N

P R O

J E C T

G R E

N

M

U

N T A

I N

T E N

A N

C E

A N

D

S E R V I C E

A R E A

F A C I L I T I E S

N O

R

D

S O

U

G

T E S

BARRIER GATE

CAST-IN-PLACE CONCRETE

PLANS AND SECTIONS

BILLINGS, MT

245-600-60036

2017-06-16

A u t o C

R l s

R D

D

W G

J U

N E

C W

A L S H

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER -

ND.SKINNER

LMAnderson

D.KELSCH

Skinner, Norris D (Dave) P.E.

Bone, Gary W P.E.

Engineer

CONCRETE RETAINING WALL

PLAN VIEW

2' 4'

1'0

CONCRETE FOUNDATION

PLAN VIEW

2' 4'

1'0

1' 2'

CONCRETE RETAINING WALL

SECTION A-A

1' 2'0

CONCRETE TROUGH

SECTION C-C

CONCRETE TROUGH

PLAN VIEW

2' 4'

1'0

1' 2'0

CONCRETE FOUNDATION

SECTION B-B

LEGEND

NOTES

1. Compact in-situ base material below structures to 95% standard proctor. Provide min. 8" depth of compaction.

2. Compact backfill around structures to 90% standard proctor.

3. 3/4" Chamfered edges to be cast at all exposed edges.

4. See Drawing 40-D-6263 for concrete reinforcement minimum requirements.

5. See Site Plans for footing elevations and wall elevation where varies.

Pre-cast concrete block

Cast in place concrete

1" Drain rock

Aggregate base material

Compacted in-situ base

Compacted backfill

Existing undisturbed earth

0.5% Slope

REFERENCE DRAWINGS

GREEN MOUNTAIN DAM - NORTH GATE

BARRIER GATE 245-600-60034

GREEN MOUNTAIN DAM - SOUTH GATE

BARRIER GATE 245-600-60035

CARTER LAKE DAM - NORTHERN GATE 1

BARRIER GATE 245-600-60037

CARTER LAKE DAM - NORTHERN GATE 2

BARRIER GATE 245-600-60038

CARTER LAKE DAM - SOUTHERN GATE

BARRIER GATE 245-600-60039

Compacted in-situ base

Earthwork payline

Note: For plan view paylines on concrete retaining wall see DWG. 60034

ASPHALT CONCRETE

TYPICAL SECTION

1' 2'0

R E V

N

O

B o n e

G a r y

W

P E

M I N

O R

L I N

E

W

O R K

A N

D

N

O T E

C H

A N

G E S

R E V

N

O

B o n e

G a r y

W

E

M O

D I F I

T C

T T E R N

S

T C H

R el ea se d

General Decision Number: CO180023 07/13/2018 CO23

Superseded General Decision Number: CO20170023

State: Colorado

Construction Type: Highway

Counties: Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Rio Blanco, Routt and Summit Counties in Colorado.

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 02/09/2018 2 03/02/2018 3 07/13/2018

* CARP9901-009 05/01/2018

Rates Fringes

CARPENTER (Excludes Form Work)...$ 25.50 9.47

ELEC0068-017 03/01/2011

SUMMIT COUNTY

Rates Fringes

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 26.42 4.75%+8.68 Zone 2......................$ 29.42 4.75%+8.68

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following

Page 1 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3 https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3 addresses in each of the following cities:

Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.

ELEC0111-004 03/01/2013

Rates Fringes

ELECTRICIAN (Boom Truck Operator)........................$ 21.71 8.66

ENGI0009-013 05/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR:

(3)- Drill Rig Caisson (smaller than Watson 2500 and similar)................$ 27.60 10.10 (5)-Drill Rig Caisson (Watson 2500 similar or larger).....................$ 27.92 10.10

IRON0024-006 11/01/2017

Garfield County Only

Rates Fringes

Ironworkers:.....................$ 27.45 27.76 Structural

SUCO2011-008 09/15/2011

Rates Fringes

CARPENTER (Form Work Only) Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit.......$ 15.92 5.38 Garfield....................$ 19.55 4.09

CEMENT MASON/CONCRETE FINISHER

Eagle.......................$ 17.59 2.85 Garfield....................$ 17.27 2.16 Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt...............$ 18.23 2.85 Summit......................$ 15.55 2.85

ELECTRICIAN

Excludes Traffic Signalization...............$ 28.06 8.76 Traffic Signalization Electrician

Page 2 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3

Eagle, Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..$ 28.24 8.52 Traffic Signalization Groundsman Eagle, Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..$ 15.93 4.01 Summit.....................$ 16.75 4.10

GUARDRAIL INSTALLER

Eagle.......................$ 12.78 3.46 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit.......$ 12.78 3.31

HIGHWAY/PARKING LOT STRIPING:

Truck Driver (Line Striping Truck)...........................$ 14.60 3.49

HIGHWAY/PARKING LOT

STRIPING:Painter Eagle.......................$ 13.85 3.07 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summitt......$ 13.97 3.07

IRONWORKER, REINFORCING

(Excludes Guardrail Installation)....................$ 16.94 6.77

IRONWORKER, STRUCTURAL

(Excludes Guardrail Installation)....................$ 22.22 6.01

LABORER

Asphalt Raker Eagle......................$ 16.36 3.26 Garfield...................$ 18.66 3.53 Grand......................$ 17.90 3.02 Jackson, Lake, Moffat, Routt......................$ 17.75 3.75 Pitkin.....................$ 17.50 3.75 Rio Blanco.................$ 18.97 3.75 Summit.....................$ 16.77 3.26 Common or General Eagle, Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco. Routt, Summitt.$ 12.44 3.53 Grand......................$ 19.14 3.53 Concrete Saw (Hand Held)....$ 16.00 6.14 Landscape and irrigation Eagle......................$ 14.84 3.16 Landscape and Irrigation Garfield, Grand, Jackson, Lake, Moffatt, Rio Blanco, Routt..............$ 13.54 3.16 Pitkin.....................$ 14.16 3.16 Summit.....................$ 13.09 3.16 Mason Tender-

Page 3 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3

Cement/Concrete Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summitt.$ 12.44 3.10 Garfield...................$ 14.87 3.10 Traffic Control (Flagger)...$ 9.42 3.21 Traffic Control (Sets Up/Moves Barrels, Cones, Install Signs, Arrow Boards and Place Stationary Flags)(Excludes Flaggers) Eagle, Garfield, Grand, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 12.39 3.20 Jackson....................$ 12.93 3.22

PAINTER (Spray Only) Eagle.......................$ 17.49 3.52 Garfield, Grand. Jackson, lake, Moffatt, Pitkin, Rio Blanco, Routt...............$ 17.54 3.52 Summit......................$ 19.96 3.52

POWER EQUIPMENT OPERATOR:

Asphalt Laydown Eagle, Summit..............$ 22.67 8.72 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Routt......................$ 24.09 7.93 Rio Blanco.................$ 23.67 9.22 Asphalt Paver...............$ 22.67 8.72 Asphalt Plant...............$ 19.27 4.47 Asphalt Roller Eagle......................$ 23.01 8.72 Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit......$ 23.15 8.07 Grand......................$ 22.67 8.72 Asphalt Spreader............$ 25.61 6.96 Backhoe/Trackhoe Eagle......................$ 22.56 7.02 Garfield...................$ 19.40 4.42 Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..............$ 22.92 6.15 Summit.....................$ 24.30 5.75 Bobcat/Skid Loader Eagle......................$ 18.25 4.32 Garfield...................$ 24.63 0.00 Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..............$ 21.04 5.18 Summit.....................$ 19.77 4.28 Broom/Sweeper Eagle......................$ 23.35 7.78 Garfield, Jackson, Lake, Moffatt, Pitkin, Routt.....$ 21.92 7.66 Grand......................$ 21.67 8.22 Rio Blanco.................$ 21.66 0.00

Page 4 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3

Summit.....................$ 22.67 8.72 Bulldozer...................$ 26.78 7.05 Chipper.....................$ 22.04 8.26 Crane.......................$ 23.82 9.22 Drill.......................$ 20.84 2.66 Forklift....................$ 18.30 5.01 Grade Checker...............$ 23.82 9.22 Grader/Blade................$ 23.05 6.45 Guardrail/Post Driver.......$ 16.07 4.41 Loader (Front End) Eagle......................$ 24.98 7.55 Garfield...................$ 21.93 9.22 Grand, Pitkin..............$ 22.67 8.72 Jackson, Lake, Moffatt, Routt......................$ 24.07 7.92 Rio Blanco.................$ 23.67 9.22 Summit.....................$ 25.88 7.01 Mechanic Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 23.31 3.93 Garfield...................$ 19.80 4.20 Oiler Eagle......................$ 23.82 7.62 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 24.04 7.77 Roller/Compactor (Dirt and Grade Compaction) Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Routt..............$ 22.72 5.98 Rio Blanco.................$ 23.67 9.22 Summit.....................$ 24.38 6.11 Rotomill Eagle......................$ 18.86 4.41 Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..............$ 20.70 4.41 Grand......................$ 23.48 4.41 Summit.....................$ 16.28 4.41 Scraper.....................$ 20.60 7.99 Screed Eagle......................$ 17.04 3.98 Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Summit.............$ 23.76 5.05 Grand......................$ 23.29 4.05 Tractor.....................$ 15.08 2.95

TRUCK DRIVER

Distributor Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Routt, Summit......$ 19.07 4.35 Rio Blanco.................$ 15.80 5.27 Dump Truck Eagle......................$ 16.17 3.83 Garfield...................$ 16.29 3.83 Grand, Jackson, Lake, Page 5 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3

Moffatt, Routt.............$ 17.79 4.02 Pitkin.....................$ 20.13 4.15 Rio Blanco.................$ 17.26 4.63 Summit.....................$ 15.27 5.27 Lowboy Truck Eagle......................$ 18.89 4.56 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 18.43 4.56 Mechanic....................$ 17.79 3.51 Multi-Purpose Specialty & Hoisting Truck..............$ 14.60 3.49 Pickup and Pilot Car........$ 14.04 3.49 Semi........................$ 20.72 0.00 Water Truck Eagle......................$ 23.05 2.90 Garfield...................$ 21.00 5.88 Grand......................$ 21.19 3.01 Jackson, Lake, Moffatt, Ptikin, Routt, Summit......$ 20.39 3.43 Rio Blanco.................$ 17.25 3.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular

Page 6 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3 rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

Page 7 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

Page 8 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3

END OF GENERAL DECISION

Page 9 of 9https://www.wdol.gov/wdol/scafiles/davisbacon/CO23.dvb?v=3

This page intentionally left blank

245-600-60036 (1).pdf
Sheets and Views
22 x 34

File details come from the government source that posted it.