Amendment_No._0003.pdf

PDF 118 KB Posted

Attached to
EC - ECAO BARRIER PROJECT Federal contract opportunity
Solicitation number
140R6018R0013
Issued by
Department of the Interior Bureau of Reclamation

About this file

Amendment No. 0003

View the file

Other files for this federal contract opportunity

Other files attached to EC - ECAO BARRIER PROJECT, newest first.
File Type Posted
Amendment_No._0002.pdf PDF
Amendment_No._0001.pdf PDF
Solicitation_No._140R6018R0013.pdf PDF
FedConnect File —

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R6018R0013 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

08/03/20180003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/14/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Eastern Colorado Area Office Active Vehicle Barrier Installations, Colorado

See attachment for changes incorporated by this amendment.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gerri Voto-Braun

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation No. 140R6018R0013 Amendment No. 0003

Description of Changes –There are no technical changes incorporated by this amendment. This amendment provides the questions and answers submitted by prospective contractors. These are provided for information only.

Acknowledgement See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids, (See Block 10 of the Standard Form 1442).

Receipt of Proposals The date and hour for receipt of proposals is hereby extended to 3:00 PM on August 10, 2018 MDT.

Third Party If you have provided a copy of this solicitation to another company or person, please forward this amendment accordingly.

Solicitation No. 140R6018R0013 – Eastern Colorado Area Office – Active Vehicle Barrier Installations

Prospective Contractor Questions and Answers

General Questions

1. Schedule B Quantities for Mobile Barrier. Plans show 3 mobile barriers at Carter Lake Dam, and 2 mobile barriers at Green Mountain Dam which does not align with Bid Schedule quantities. Please confirm quantities.

Reference Amendment 001, quantities for Mobile Crash Beam Barriers as shown in Section B, Price Schedules 1, 2 and 4 are correct.

2. RSN 01 71 20-5 Requires Quantity Survey Notes and Computations requires a licensed surveyor to perform surveys and computations of work performed during each progress payment period. Due to the fact that the quantities are so small at each site, it seems that the requirement to involve a licensed surveyor in each computation is an unnecessary expense. In order for a surveyor to determine quantities, multiple mobilizations will be required for each bid item at each site. It is our opinion based upon previous similar projects that field measurements confirmed by on site contractor and Government staff in combination with material receiving tickets can adequately quantify quantities without the additional expense of a licensed surveyor. Please advise if the Government is willing to modify this requirement in order to decrease costs and simplify the progress billing procedure.

Surveys to support pay requests shall be performed in accordance with specifications Section 017120.

3. Has coordination already taken place between land owners/stake holders regarding this project? Are there any permit requirements that the contractor should be aware of, particularly those with potential cost and schedule impacts?

Reclamation has notified and coordinated with pertinent County Public Works Departments, County Sheriff’s offices, and U.S Forest Service representatives from the White River and San Isabel National Forests. Reference specifications Section 011415 for contractor coordination requirements with U.S Forest Service representatives.

Reference specifications Section 015520 for contractor requirements to obtain applicable county right-of-way permits.

4. For both types of crash barricade, the Specifications include the following requirements: “Lockable in the open and closed position” (34 75 13 2.01 A 1. e.) and “Lockable in the closed position” (34 75 13 2.01 B (4)). Are there specific lock types or locking mechanisms that the Government will require?

The locks are barrier specific locking equipment based on manufacture provided equipment/recommendations.

Mt Elbert

5. Who is responsible for removing the foundations of the existing gates and to what elevation?

The Government will remove the existing gates at the Mt. Elbert Forebay Dam. The concrete foundations may be left in-place.

6. Is there an available staging area?

Contractor may use the Mt. Elbert Forebay Dam road for staging.

7. For estimating purposes, please clarify if the contractor should include costs to reroute the communications line shown in the plans. If so, please provide details.

Exact location of the buried communication line is unknown. Reference specifications Section 015610, Article

1.03 for Contractor requirements to field locate and protect existing utilities. Reference specifications Section 015610, Article 1.01, for pricing these requirements.

8. Are there any weight restrictions on top of the earth dam?

It is not anticipated that contractor activities would exceed weight restrictions, but would be dependent on contractor’s planned means and methods.

Sugar Loaf

9. Would it be possible to more clearly define the limits of work?

Solicitation No. 140R6018R0013 – Eastern Colorado Area Office – Active Vehicle Barrier Installations

Prospective Contractor Questions and Answers

Reference drawing 382-600-60028 for finished ground limit shown in cross sections.

10. Surfacing in turnaround is not defined.

The existing material from hillside cut is to be reused to construct the turnaround slope. See specifications Section 312310, Articles 2.01 and 3.05.

11. Who is the land owner at this location? Will any other agencies need to be coordinated with for access or permits? Have the other agencies been notified of this work?

Work on the right abutment is on Reclamation property. Work near the left abutment on County Road 4 is on San Isabel National Forest land. Reclamation has notified and coordinated with pertinent County Public Works Departments, County Sheriff’s offices, and U.S Forest Service representatives from the White River and San Isabel National Forests. Reference specifications Section 011415 for contractor coordination requirements with U.S Forest Service representatives. Reference specifications Section 015520 for contractor requirements to obtain applicable county right-of-way permits.

Green Mountain

12. Can the Government confirm if the existing fiber optic conduits are likely to be in the way on the West footing of the Northern barrier?

Exact location of the fiber optic conduits is unknown. Reference specifications Section 015610, Article 1.03, for Contractor requirements to field locate and protect existing utilities

Carter Lake

13. Based upon the proposed layout of the Southernmost, it appears that if this gate is raised vertically it will likely hit existing overhead cables. Were the overhead cables accounted for in the design? When this gate is open horizontally it may interfere with anchor cables for existing power pole. Were the power pole anchor cables accounted for in the design?

The overhead cables were considered during the design process. This gate will not be operated vertically, only horizontally. The guy wire anchor cable is at ground level where shown on the drawing under the gate arm and should not interfere with the gate operation.