Purpose_and_Schedule_and_PWS_Attachment_0002.pdf

PDF 589 KB Posted

Attached to
AVC Crowley Reach Utility Locating Services
Solicitation number
140R4022Q0036
Issued by

About this file

This solicitation is for utility locating services along approximately 16 miles of the Crowley Reach segment of the Arkansas Valley Conduit project in Pueblo and Crowley counties, Colorado. The services include Phase I underground utility investigations to Quality Level B, above ground utility investigations, and select Quality Level A utility locates. Offerors must provide unit pricing for 25 tasks covering various rights-of-way and parcels. The performance work statement outlines the required tasks, deliverables, performance standards, and quality levels. Key deliverables include a contract schedule, monthly progress reports, utility data files, and test hole documentation. The Bureau of Reclamation is the contracting agency, with responses due by July 7, 2022. The selected contractor must adhere to safety and data standards and obtain required permissions to access properties.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R4022Q0036 Amendment 0002

The purpose of this amendment is to:

1. Incorporate revised Price Schedule.

2. Incorporate revised Performance Work Statement 06.27.2022.

3. Closing date remains unchanged from 07.07.2022 at 2 PM (MDT).

Attachment:

1. Revised Price Schedule

2. Revised Performance Work Statement 06.27.2022

PRICE SCHEDULE

The table below summarizes the tasks included in this contract. Offerors shall complete the pricing information in this table in full. If not completed in full, the proposal will be considered non-responsive.

Tasks defined in this PWS, but not included in the table shall be priced into other tasks/CLINs.

Summary of Tasks and Price Schedule

CLIN

PWS

Section Description Unit Unit Price Qty. Total Price

1 3.3.1 CO-96 ROW, West Terminus to MM 78 For the lump sum of: $

2 3.3.1 CO-96 ROW, MM 78 to MM

For the lump sum of: $

3 3.3.1 CO-96 ROW, MM 79 to MM

For the lump sum of: $

4 3.3.1 CO-96 ROW, MM 80 to MM

For the lump sum of: $

5 3.3.1 CO-96 ROW, MM 81 to MM

For the lump sum of: $

6 3.3.1 CO-96 ROW, MM 82 to MM

For the lump sum of: $

7 3.3.1 CO-96 ROW, MM 83 to MM

For the lump sum of: $

8 3.3.1 CO-96 ROW, MM 84 to MM

For the lump sum of: $

9 3.3.1 CO-96 ROW, MM 85 to MM

For the lump sum of: $

10 3.3.1 CO-96 ROW, MM 86 to MM

For the lump sum of: $

11 3.3.1 CO-96 ROW, MM 87 to MM

For the lump sum of: $

12 3.3.1 CO-96 ROW, MM 88 to MM

For the lump sum of: $

13 3.3.1 CO-96 ROW, MM 89 to MM

For the lump sum of: $

14 3.3.1 CO-96 ROW, MM 90 to MM

For the lump sum of: $

15 3.3.1 CO-96 ROW, MM 91 to MM

For the lump sum of: $

16 3.3.1 CO-96 ROW, MM 92 to MM

For the lump sum of: $

17 3.3.2 Railroad ROW at Highway

Crossing For the lump sum of: $

CLIN

PWS

Section Description Unit Unit Price Qty. Total Price

18 3.3.3 Pueblo County Parcel No.

2001000003 For the lump sum of: $

19 3.3.4 Pueblo County Parcel No.

1000000123 For the lump sum of: $

20 3.3.5 CO-167 ROW For the lump sum of: $

21 3.3.6 Crowley County Parcel No.

10800101 For the lump sum of: $

22 3.3.7 Crowley County Parcel No.

10700008 For the lump sum of: $

23 3.3.8 Crowley County Parcel No.

10800557 For the lump sum of: $

24 3.3.9 Crowley County Parcel No.

10802062 For the lump sum of: $

25 3.3.10 Railroad ROW Parallel to CO-

96 from MM 92 to MM 93 For the lump sum of: $

26 3.4 Above Ground Utility

Investigation For the lump sum of: $

27 3.5 QLA Utility Locates Ea. $ 250* $

* This is the maximum quantity. QLA located will be performed as needed and paid based on the actual quantity approved and performed.

AVC Crowley Reach Utility Locating Services Solicitation #140R4022Q0036

PERFORMANCE WORK STATEMENT (PWS)

Fryingpan-Arkansas Project

Arkansas Valley Conduit (AVC)

Crowley Reach Utility Locating Services (06.27.2022)

1.0 SCOPE

1.1 OBJECTIVE

1.2 BACKGROUND

1.3 GENERAL SCOPE BOUNDARIES

1.4 DEFINITIONS AND TERMS

2.0 REFERENCES

3.0 TASKS

3.1 POST-AWARD CONFERENCE

3.2 CONTRACT COMPLETION SCHEDULE

3.3 PERMITS AND PERMISSIONS TO ENTER

3.4 PHASE I

3.5 ABOVE GROUND UTILITY INVESTIGATION

3.6 PHASE II (QLA LOCATES)

3.7 PROGRESS REPORTING

4.0 PERFORMANCE REQUIREMENTS

4.1 QUALITY LEVEL D (QLD) REQUIREMENTS

4.2 QUALITY LEVEL C (QLC) REQUIREMENTS

4.3 QUALITY LEVEL B (QLB) REQUIREMENTS

4.4 QUALITY LEVEL A (QLA) REQUIREMENTS

4.5 GEOSPATIAL DATA REQUIREMENTS

4.6 TRAFFIC CONTROL

4.7 SAFETY AND HEALTH REQUIREMENTS

4.8 SECURITY AND ACCESS REQUIREMENTS

5.0 SUBMITTALS

5.1 UTILITY DATA DELIVERABLES

1.0 SCOPE

1.1 OBJECTIVE

The objective of this contract is to acquire contractor services to provide above and below ground utility investigation and locating services. This work will support final design of approximately 16 miles of water conveyance pipeline and a water treatment facility located in Pueblo and Crowley counties in Colorado.

1.2 BACKGROUND

The U.S. Bureau of Reclamation (Reclamation) is the largest wholesaler of water in the country. Reclamation brings water to more than 31 million people and provides one out of five western farmers with irrigation water for 10 million acres of farmland that produce 60% of the nation's vegetables and 25% of its fruits and nuts.

The Arkansas Valley Conduit (AVC) is a major infrastructure project that upon completion will convey a reliable municipal and industrial water supply from Pueblo

Reservoir to 40 communities serving a projected future population of 50,000 people in southeastern Colorado. The service area includes water providers in Bent, Crowley, Kiowa, Otero, Prowers, and Pueblo counties. When completed, the AVC will supply as much as 7,500 acre-feet annually to these communities.

These areas are dependent on groundwater supplies that are in many cases contaminated by naturally occurring radionuclides such as radium and uranium, or by direct influence of surface water that contains harmful microorganisms and pollutants. These communities increasingly face expensive alternative remedies such as reverse-osmosis, ion exchange, filtration, and bottled water. A reliable source of clean, safe water is needed for the area’s health and welfare.

The Crowley Reach (CR) is the second major segment of AVC pipe starting at the end of the Boone Reach (BR) and following Colorado State Highway 96 (CO-96) east for approximately 16 miles – including a branch to a regulating tank site about a half mile north of CO-96. See reference maps in Appendix A.

More information on Reclamation and the AVC Project can be found online at www.usbr.gov and www.usbr.gov/gp/ecao/avc/.

1.3 GENERAL SCOPE BOUNDARIES

The scope of this contract covers the entire CR pipe alignment corridor, the regulating tank site, and some additional areas included for design flexibility. Maps in Appendix A provide the approximate alignment and locations. The scope is further defined in Section

3.

If the Contractor is uncertain at any time of the intended contract scope, they shall stop work and notify the COR to obtain clarification and direction.

http://www.usbr.gov/ http://www.usbr.gov/gp/ecao/avc/

1.4 DEFINITIONS AND TERMS

See Appendix B for a list of acronyms and abbreviations used in this document.

Working days: Days counted as number of weekdays (Monday – Friday) minus recognized Federal Holidays. Recognized Federal Holidays can be found here:

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

Acceptable Quality Level (AQL): The number of defects or maximum percentage of defects that may occur before the Government will affect the price computation system in accordance with the Performance Requirements Summary Table and the Inspection of

Services Clause. An AQL does not allow a contractor to knowingly offer defective services, but limits reduced payments to circumstances in which defective performance results in a measurable reduction in the value of services rendered.

Contractor: The individual, partnership, company, or corporation responsible for the duties and responsibilities under the contract. The term also covers requirements for any subcontractor. The Contractor is ultimately responsible for ensuring that all subcontractors comply with the terms and conditions of the contract.

Required Submittal Number (RSN): Refers to a deliverable required from the

Contractor and references to the required submittals table in Section 5.0.

ASCE 38: The standard for defining the quality of an underground facility location as defined in the current edition of the American Society of Civil Engineers' "Standard

Guideline for the Collection and Depiction of Existing Subsurface Utility Data (CI/ASCE

38-02)".

Subsurface Utility Engineering (SUE): A branch of engineering practice that involves managing certain risks associated with utility mapping at appropriate quality levels, utility coordination, utility relocation design and coordination, utility condition assessment, communication of utility data to concerned parties, utility relocation cost estimates, implementation of utility accommodation policies, and utility design.

Utility Quality Level: A professional opinion of the quality and reliability of utility information. Such reliability is determined by the means and methods of the professional.

Utility Quality Level A (QLA): Generally, QLA indicates the precise horizontal and vertical location of utilities obtained by the actual exposure and subsequent measurement of subsurface utilities, usually at a specific point.

Utility Quality Level B (QLB): Generally, QLB indicates information obtained through the application of appropriate surface geophysical methods to determine the existence and approximate horizontal position of subsurface utilities.

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/

Utility Quality Level C (QLC): Generally, QLC indicates information obtained by surveying and plotting visible above-ground utility features and by using professional judgment in correlating such information to QLD information.

Utility Quality Level D (QLD): Generally, QLD indicates information derived from existing records and oral recollections.

2.0 REFERENCES

Table 1: References

No. Title and Edition Date Source

CI/ASCE 38-02 (ASCE 38),

“Standard Guideline for the Collection and Depiction of Existing Subsurface

Utility Data”

American Society of Civil

Engineers (ASCE)

Colorado State Senate Bill 18-167

(SB 18-167)

Signed into law

5/25/2018

Colorado State

Legislature https://leg.colorado.gov/si tes/default/files/document s/2018A/bills/2018a_167_ enr.pdf

Engineering and O&M Guidelines for

Crossings April 2008

Bureau of Reclamation https://www.usbr.gov/gp/ mtao/canal_crossing_guid ance.pdf

Reclamation Safety and Health

Standards (RSHS)

Varies based on section – see

URL for current versions

Bureau of Reclamation https://www.usbr.gov/safe ty/rshs/index.html

3.0 TASKS

3.1 POST-AWARD CONFERENCE

The Government will hold a post award conference within 10 calendar days after award of the contract and prior to the beginning of any field work. The purpose of the post-award conference will be to review the contract, the work to be performed, established safety requirements and procedures, and to clarify the work areas.

This task is not priced separately – costs associated with this task shall be included in prices offered in the Price Schedule for other items of work.

3.2 CONTRACT COMPLETION SCHEDULE

Offerors are required to submit a tentative completion schedule with their proposals.

After award, the Contractor shall work with Reclamation to agree upon a completion schedule. This completion schedule shall be submitted as RSN 1 and contain the following at a minimum:

• Start and finish date for major tasks.

• Deadlines for submittals.

• Anticipated dates and locations for field work.

The schedule submitted as RSN 1 shall be based on task durations no longer than what was included in the proposal unless specifically approved by the COR. Offerors should assume that they will be strictly held to the durations contained in their proposals.

This task is not priced separately – costs associated with this task shall be included in prices offered in the Price Schedule for other items of work.

3.3 PERMITS AND PERMISSIONS TO ENTER

The Contractor shall be responsible for obtaining all necessary permits and permissions to enter (PTEs) required to complete the scope of work. The Contractor is responsible for compliance with permits and PTEs necessary to perform the contract scope of work.

This task is not priced separately – costs associated with this task shall be included in prices offered in the Price Schedule for other items of work.

3.4 PHASE I

The Contractor shall complete subsurface (underground) utility investigations/locates which meet all requirements of SB 18-167 for the entire defined contract corridor (NOT just the proposed excavation area as stated in SB 18-167). All subsurface utility investigations/locates shall comply with and meet the applicable standards set forth in

ASCE 38-02.

The Contractor shall achieve ASCE 38-02 utility quality level B on all subsurface utilities within the defined corridors unless a reasonable rationale by a licensed professional engineer (PE) is given for not doing so. This rationale shall be documented along with the associated utility data. This documentation shall include the name and license information of the approving PE as defined by SB 18-167.

For purposes of pricing and invoicing/payment, this task is broken up into 25 sub-tasks.

The requirements for each sub-task are the same and differ only in spatial extents. The spatial extent of each sub-task is defined by the provided maps, GIS Shapefile, and descriptions below.

3.4.1 CO-96 ROW

The CO-96 ROW is broken into 16 sub-tasks based on highway mile markers.

The scope of these tasks covers the entire highway ROW between the indicated mile markers but does not include any adjacent private parcels or railroad ROWs.

The first sub-task begins 1,700 feet west of MM 77. The subsequent sub-tasks each begin and end at mile markers.

3.4.2 Railroad ROW at Highway Crossing

At the railroad crossing between CO-96 MM 85 and MM 86, the scope shall include the entire railroad right-of-way extending 250 feet in either direction from the highway centerline. This task does not include any adjacent private parcels.

3.4.3 Pueblo County Parcel No. 2001000003

The portion of Pueblo County parcel no. 2001000003 north of CO-96 and west of

CO-96 MM 86. Note that this parcel appears to be noncontiguous based on

Pueblo County assessor data.

3.4.4 Pueblo County Parcel No. 1000000123

The portion of Pueblo County parcel no. 1000000123 north of CO-96.

3.4.5 CO-167 ROW

The entire highway right-of-way for CO-167 from the intersection with CO-96 and extending 500 feet south.

3.4.6 Crowley County Parcel No. 10800101

Portion of Crowley County parcel no. 10800101 north of CO-96. This parcel may have been subdivided or otherwise modified after Reclamation collected parcel boundary and ownership data. If this is found to be the case, then the scope shall be defined as the following areas within Township 22 South, Range 59 West of

Crowley County (not to include highway or railroad ROWs):

• NW¼ of the NW¼ of Section 3

• NE¼ of the NW¼ of Section 3

• NE¼ of Section 3

• NW¼ of the NW¼ of Section 2

• SW¼ of the NW¼ of Section 2

• NW¼ of the SW¼ of Section 2

• SW¼ of the SW¼ of Section 2

• SE¼ of the SW¼ of Section 3

• SW¼ of the SE¼ of Section 3

• NE¼ of the NW¼ of Section 10 (north of highway/railroad ROW only)

• NW¼ of the NE¼ of Section 10 (north of highway/railroad ROW only)

• NE¼ of the NE¼ of Section 10 (north of highway/railroad ROW only)

• NW¼ of the NW¼ of Section 11 (north of highway/railroad ROW only)

3.4.7 Crowley County Parcel No. 10700008

Easternmost 80 acres of Crowley County parcel no. 10700008. This parcel may have been subdivided or otherwise modified after Reclamation collected parcel boundary and ownership data. If this is found to be the case, then the scope shall be defined as the following areas within Township 22 South, Range 59 West of

Crowley County:

• NW¼ of the SE¼ of Section 3

• NE¼ of the SE¼ of Section 3

3.4.8 Crowley County Parcel No. 10800557

The entirety of Crowley County parcel no. 10800557.

3.4.9 Crowley County Parcel No. 10802062

Portion of Crowley County parcel no. 10802062 north of CO-96.

3.4.10 Railroad ROW Parallel to CO-96 from MM 92 to MM 93

The entire railroad ROW which parallels CO-96 from CO-96 MM 92 to MM 93.

3.5 ABOVE GROUND UTILITY INVESTIGATION

The Contractor shall locate, identify, and map all overhead utilities within the defined contract corridor. Guy cable anchor points shall be included as applicable. Information to be provided for overhead utilities shall include, at a minimum:

• Northing Coordinate (to nearest 0.1 foot)

• Easting Coordinate (to nearest 0.1 foot)

• Ground Elevation (to nearest 0.1 foot)

• Temperature at the time of measurement (°F)

• Utility Type (i.e., electric, telephone, etc.)

• Height above ground (to nearest 0.1 feet)

• Kilovolts (kV) if electric

• Utility owner (if known)

• Notes (e.g., There are three identical utilities running parallel with approx. 3‐ft of separation from each.)

3.6 PHASE II (QLA LOCATES)

Following receipt of Phase I data, Reclamation will identify specific locations for QLA utility locates. The Contractor shall achieve ASCE 38-02 utility quality level A for each of the identified locations.

3.7 PROGRESS REPORTING

These tasks are not priced separately – costs associated with these tasks shall be included in prices offered in the Price Schedule for other items of work.

3.7.1 Monthly Written Progress Report

The Contractor shall provide a written monthly overall contract progress report.

These reports shall be delivered electronically to the COR by the 15th day of each month for the previous month’s work (i.e. the report covering progress as of the last day of May is due by June 15th). These reports shall have the following sections, at a minimum:

• Executive Summary

• Introduction

• Contract Status

• Subcontract Status(es)

• Project Study Area(s)

• Current and Near-Term Objectives

• Schedule Progress by Task

• Schedule (in both table and Gantt Chart format)

• Issues/Areas of Concern and Recommended Actions

• Safety

• Financial Progress

• Copy of Invoice(s)

The Contractor may propose an alternative progress report format/structure. Any proposed change shall be approved by the COR prior to implementation.

3.7.2 Status Meetings

The Contractor shall host and run status meetings on at least a monthly basis to discuss contract progress. The COR will provide a list of Reclamation attendees to be invited. These meetings shall take place via teleconference on Microsoft

Teams unless another method (e.g. in person, phone conference, Zoom) is approved by the COR. Cancellation of a status meeting (such as for holidays or other scheduling conflicts) or a change in meeting frequency shall be approved by the COR.

The Contractor shall distribute a meeting agenda at least two (2) working days prior to each status meeting. The Contractor shall distribute detailed meeting minutes within five (5) working days after each status meeting.

3.7.3 Other Meetings and Reporting

The Contractor or Reclamation may request other ad hoc meetings or reporting as needed.

4.0 PERFORMANCE REQUIREMENTS

Table 2: Performance Requirements Summary Table (PRST)

PWS

Section

Task Description Performance

Indicator Performance

Standard Minimum

AQL

3.4

Perform Phase I underground utility investigation within the identified corridors for each

CLIN/task

Attempt to achieve

QLB for all underground facilities

Compliance with SB

18-167 and ASCE

38-02

100%*

3.5

Perform above ground utility investigation within the identified corridors

Above ground utilities identified

Compliance with requirements in

Section 3.4

100%*

3.6

Perform Phase II utility locates at each selected location

Locates performed at selected sites

Compliance with

ASCE 38-02

100%*

3.7 Progress reporting

On-time submittal of monthly written progress reports

Submitted to COR by 15th day of each month

No more than one late report per year

Completeness of progress reports

Reports contain all required information as described in

Section 3.7

100%

* 100% minimum AQL is intended to apply only to the performance standard – it is not meant to imply that the Contractor is assuring 100% of subsurface utilities are located.

4.1 QUALITY LEVEL D (QLD) REQUIREMENTS

4.1.1 Records and Information Research

Conduct appropriate investigations (e.g., owner records, Reclamation records, County records, personal interviews, visual inspections, Colorado Public Service

Commission, Colorado 811 Design Ticket, etc.), to help identify utility owners that may have facilities within the project limits or that may be affected by the project.

A list of all utilities contacted during records research and a list of all discovered utilities within the project limits are required final deliverables.

4.1.2 Records Collection

Collect applicable utility records (e.g., utility owner base maps, “as-built” or record drawings, permit records, field notes, geographic information system data, oral histories, etc.).

Utility records collected are required final deliverables.

4.1.3 Records Review

Review records for evidence or indication of additional available records, duplicate or conflicting information, and the need for clarification.

4.2 QUALITY LEVEL C (QLC) REQUIREMENTS

QLC includes all requirements of QLD in additional the following requirements. There is no prescribed order in which QLD and QLC tasks must be performed.

4.2.1 Identification of Surface Utility Features

Identify surface features/ appurtenances of subsurface utilities, from project topographic data (if available) and from field observations.

4.2.2 Surveys

Survey surface features of subsurface utility facilities or systems, if such features have not already been surveyed. Verify survey data for accuracy and completeness, if previously surveyed.

4.2.3 Correlation, Interpretation, and Resolution of Discrepancies

Exercise professional judgment to correlate data from different sources and to resolve conflicting information.

Update electronic files and/or other documents to reflect the integration of QLD and QLC information.

Recommend follow-up investigations (e.g., additional surveys, consultation with utility owners, etc.) as required to further resolve discrepancies.

Amend the indicated quality level of depicted information, as required.

4.3 QUALITY LEVEL B (QLB) REQUIREMENTS

QLB includes all requirements of QLC in additional the following requirements. There is no prescribed order in which QLD, QLC, and QLB tasks must be performed.

4.3.1 Line Detection and Marking

Apply appropriate surface geophysical method(s) to search for and detect subsurface utilities within the project limits, and/or to trace a utility line or system. Contacting Colorado 811 to obtain QLB locations is not an approved method.

Mark the indications of utilities on the ground surface, for subsequent survey, based on the interpretation of data. Utilize marking paint and flags for the marking of utilities. Care shall be taken in areas of decorative pavers, landscaped areas, private property, etc. when marking utilities. Use of less intrusive methods such as keel, chalk, flags, etc. should be considered in sensitive areas.

As an alternative to the physical marking of lines, with COR approval, utilize other means of data collection, storage, retrieval, and reduction, which enables the correlation of surface geophysical data to the project’s survey control.

4.3.2 Surveys

Survey all markings that indicate the presence of a subsurface utility.

Reference surveys to the project’s survey control (reference Project Control

Points Plan drawing included with solicitation).

Record depth information as indicated by the detection method. This information is for reference only and the Contractor will not be held accountable for its accuracy.

4.3.3 Correlation, Interpretation, Presentation of Data, and Resolution of Discrepancies

Exercise professional judgment to correlate data from different sources and resolve conflicting information.

Prepare AutoCAD DWG file containing horizontal utility depictions reflecting the integration of QLD, QLC, and QLB information. The DWG file containing horizontal utility depictions is a required final deliverable.

Recommend follow-up investigations (e.g., additional surveys, consultation with utility owners, etc.) as required to further resolve discrepancies.

Amend the indicated quality level of depicted information, as required.

4.4 QUALITY LEVEL A (QLA) REQUIREMENTS

QLA includes all requirements of QLB in additional the following requirements. There is no prescribed order in which QLD, QLC, QLB, and QLA tasks must be performed.

4.4.1 Selection of Test Hole Locations

Reclamation will provide a list of locations requiring QLA data. As requested, the Contractor shall assist with the selection of QLA locations prior to performing test hole investigations. The Contractor may recommend alternate test hole locations, based on site or other conditions, as appropriate. Alternate test hole locations must be approved by the COR.

4.4.2 Excavation

Comply with all applicable local municipality codes and Colorado 811 laws when performing excavation at utility test hole sites.

Obtain roadway owner approval/permit prior to test hole excavation within paved areas. Indicate the proposed test hole locations, as well as the proposed size of pavement cut, when obtaining roadway owners approval.

Use minimally intrusive excavation techniques that ensure the safety of the excavation, minimizes the risk to highway infrastructure, preserves the integrity of the utility line to be measured and other lines which may be encountered during excavation.

Furnish and install reference mark (e.g., P.K. nail, peg, steel pin, wood hub, etc.)

directly above the centerline of the facility.

4.4.3 Recording

Prepare a field test hole datasheet for each test hole. At a minimum, the test hole datasheet shall include the following utility information:

• General project information

• Test hole number

• Owner/operator

• Type (water, electric, gas, telecom, etc.)

• Size - outside diameter of pipe or width of duct banks and configuration of non- encased multi-conduit systems

• Material composition

• Cross section sketch o Utility o Existing surface o Type of reference mark used o Location of reference mark o Top of utility depth to reference mark

• Plan view o General vicinity o Test hole location with three witness ties

The field test hole datasheet is a required deliverable.

Take digital photos of the completed test hole with the utility visibly shown.

Identify picture(s) with test hole number within picture and within the file name.

Pictures shall be provided within the final deliverable.

4.4.4 Survey

Reference surveys to the project’s survey control (reference Project Control

Points Plan drawing included with solicitation).

Locate test hole reference mark. Locate existing surface grade over the utility at the test hole, if the existing surface grade is different than the reference mark.

4.4.5 Site Restoration

Replace bedding material around exposed facility in accordance with facility owner’s specifications or as otherwise approved.

Backfill and compact the excavation in a manner acceptable to the roadway owner. If approved, re-use excavated material with appropriate moisture/density control.

Provide permanent pavement restoration within the limits of the original cut using materials, compaction, and pavement thickness acceptable to the roadway owner.

Restore disturbed area to pre-existing conditions for excavations in unpaved areas.

4.4.6 Correlation, Interpretation, Presentation of Data, and Resolution of Discrepancies

Exercise professional judgment to correlate data from different sources and to resolve conflicting information.

Update QLB AutoCAD DWG file identifying test hole locations. Amend the indicated quality level of depicted information, as appropriate. The updated QLB

AutoCAD DWG file identifying test hole locations is a required final deliverable.

Recommend follow-up investigations (e.g., additional surveys, consultation with utility owners, etc.) as required to further resolve discrepancies.

Create a Microsoft Excel file tabulating the test hole and survey data. At a minimum, this sheet shall include the following utility information:

• General project information

• Test hole number

• Owner/operator

• Type (water, electric, gas, telecom, etc.)

• Size - outside diameter of pipe or outside dimensions of enclosed duct banks and configuration of non-encased multi-conduit systems

• Material composition

• Top of utility elevation

• Ground elevation at test hole

• Northing

• Easting

4.5 GEOSPATIAL DATA REQUIREMENTS

The Contractor shall provide all electronic geospatial data in the projected coordinate system:

• NAD_1983_StatePlane_Colorado_South_FIPS_0503_Feet o Projection: Lambert_Conformal_Conic o False_Easting: 3000000.00031608 o False_Northing: 999999.99999600 o Central_Meridian: −105.50000000 o Standard_Parallel_1: 37.23333333 o Standard_Parallel_2: 38.43333333 o Latitude_Of_Origin: 36.66666667 o Linear Unit: Feet_US

The standard vertical datum is NAVD88.

4.6 TRAFFIC CONTROL

The Contractor is responsible for coordinating and providing any necessary traffic control measures to ensure compliance with the appropriate jurisdiction(s).

4.7 SAFETY AND HEALTH REQUIREMENTS

The Contractor shall be solely responsible for occupational safety and health compliance and the safety and health of its employees, contractors, and subcontractors. The

Contractor shall adhere to all applicable Federal, state, and local laws, regulations and standards relating to occupational safety and health, including, but not limited to, Reclamation Safety and Health (RSHS), Occupational Safety and Health Administration

(OSHA) regulations and all applicable best practices and consensus codes related to occupational safety and health. The Contractor shall take prompt corrective action whenever violations of Safety Codes are discovered, without prompting or oversight by

Reclamation. The Contractor shall conduct their own periodic jobsite assessments to verify compliance with Safety Codes and shall provide written reports of each jobsite assessment that includes findings, corrective actions, dates and other relevant information to Reclamation upon request, to demonstrate compliance with the terms and conditions of this contract.

4.8 SECURITY AND ACCESS REQUIREMENTS

The Contractor shall not have unsupervised access to restricted areas during performance of this contract. Contractor employees will not need to obtain Government-issued

Personal Identity Verification (PIV) cards for performance of this contract.

5.0 SUBMITTALS

The Contractor shall comply with all applicable Federal Acquisitions Regulations (FAR) and

Reclamation Directives and Standards (D&S) project management regulations and guidelines.

For convenience, essential submittals from the Contractor are listed below to ensure quality and safe work under the contract. However, all submittals, reporting requirements, and compliance portions of the contract clauses shall apply whether they have or have not been indicated below.

The exact means of “secure digital final delivery” shall be agreed upon by the COR and

Contractor. It shall be the responsibility of the Contractor to provide the means of file transfer.

Potential options could be a File Transfer Protocol (FTP) service or physical delivery via portable hard drive or USB drive.

Table 3: Required Submittals

RSN

PWS

Section Submittals Required

Due Date or Delivery Time

Delivery Method

Recipient(s)

1 3.2 Contract completion schedule

10 working days after post-award conference

Emailed

Adobe PDF

COR

2 3.4 Phase I utility data

Per approved contract completion schedule

Secure digital file delivery

COR

3 3.5 Above ground utility data

Per approved contract completion schedule

Secure digital file delivery

COR

4 3.6 Phase II utility data

Per approved contract completion schedule

Secure digital file delivery

COR

5 3.7 Monthly Written Progress

Reports

Monthly by the 15th day of each month for the previous month’s work

Emailed

Adobe PDF

COR

6 3.7 Status Meetings - Agenda

At least two (2) working days prior to scheduled meeting

Emailed

Adobe PDF

All meeting attendees

7 3.7 Status Meetings –

Meeting Minutes

Withing five (5) working days after each meeting.

Emailed

Adobe PDF

All meeting attendees

5.1 UTILITY DATA DELIVERABLES

Final utility data deliverables shall include the following items at a minimum. The

Contractor may propose an alternative structure and content, but shall not implement any changes without approval from the COR.

• Portfolio file(s) containing the following items (as applicable to each Phase):

o Administration Section

▪ Project location map(s)

▪ Correspondence related to the project

▪ A project report detailing methods, equipment used, list of deliverables submitted and other pertinent information that will benefit project design staff. The report will contain language certifying the project was completed under the direct supervision of a licensed professional civil engineer registered in the State of

Colorado and that proper QA/QC was performed ensuring the deliverables are accurate. This certification will be dated, signed, and sealed by the supervising licensed professional civil engineer.

o Research Section

▪ A list of all utilities contacted during records research

▪ A list of all utilities discovered within the project limits

▪ Utility location maps collected o All utility data in both AutoCAD and GIS compatible files

▪ GIS files shall be compatible with ArcGIS Pro version 2.8 or later.

o PDF file containing all field test hole datasheets o Microsoft Excel file tabulating test hole and survey data

AVC Boone Reach Utility Locating Services Solicitation #140R4022Q0036

A1

Appendix A – Reference Maps

Figure 1: Overall AVC Project Map

A2

Figure 2: Crowley Reach Extent

Approximate start of Crowley Reach

Approximate end of Crowley Reach

Approximate Regulating Tank Site Location

B1

Appendix B – Acronyms & Abbreviations

AQL Acceptable Quality Level

ASCE American Society of Civil Engineers

AVC Arkansas Valley Conduit

BR Boone Reach

BR-1 Boone Reach Contract 1

BR-2 Boone Reach Contract 2

CDOT Colorado Department of Transportation

CLIN Contract Line Item Number

CO Contracting Officer

COR Contracting Officer’s Representative

D&S Reclamation Directives and Standards

DF Dechloramination Facility

DOI Department of the Interior

DWG AutoCAD software file format

FAR Federal Acquisitions Regulations

FTP File Transfer Protocol

GFM Government-Furnished Material

GIS Geographic Information System

MM ## Mile Marker ##

NTP Notice to Proceed

O&M Operations and Maintenance

OSHA Occupational Safety and Health Administration

PDF Adobe software file format

PIV Personal Identity Verification

PTE Permission to Enter (agreement)

PWS Performance Work Statement

Reclamation U.S. Bureau of Reclamation

RFP Request for Proposal

ROW Right-of-Way

RSHS Reclamation Safety and Health Standards

RSN Required Submittal Number

SB Senate Bill

SH ## State Highway ##

SUE Subsurface Utility Engineering

URL Uniform Resource Locator (i.e. web address)

US ## U.S. Highway ##

File details come from the government source that posted it. Updated .