This statement of work describes electrical components required for new wells to produce additional water for delivery to Mexico. The Bureau of Reclamation seeks to procure motor control center panels, rail mount meters and displays, and related components. Specifications require horizontal and vertical busing, modular compartments, plug-in circuit breaker units, and soft starter integration. The supplier must transport products according to manufacturer instructions and deliver to the Yuma Area Office by July 2023. Submittals are due within five days of award, including drawings, manuals, and test reports.
The related solicitation is for Yuma Area Office electrical components from the Department of Interior Bureau of Reclamation. Offerors should reference solicitation number 140R3023Q0010 when responding with pricing by June 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Specifications_Sheet_5_18_23_0003.pdf | ||
| Sol_140R3023Q0010_Amd_0003.pdf | ||
| Sol_140R3023Q0010_Amd_0002.pdf | ||
| Attachment_1_-_MCC_Specifications_Sheet_0001.pdf | ||
| Attachment_4_-_Provisions_0001.pdf | ||
| Sol_140R3023Q0010_Amd_0001.pdf | ||
| 140R3023Q0010_-_Attachment_1_-_Specifications.pdf | ||
| Sol_140R3023Q0010.pdf | ||
| 140R3023Q0010_-_Attachment_2_-Clauses_and_Provisions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #3
STATEMENT OF WORK FOR
MCC Electrical Panels and Rail
Mount Meter and Remote Display
INTRODUCTION
The Yuma Area Office (YAO) within the Bureau of Reclamation (Reclamation) currently operates four high-capacity production well systems in the Yuma area. The well fields have been established under various congressional acts to control groundwater levels and meet contractual obligations with various water districts for draining the Association Lands, provide return flows for delivery and water to Mexico to meet treaty obligations, and to provide return flow credits for the various water districts. In order to meet current and future commitments, new and replacement wells will be needed on a regular basis.
Reclamation needs the flexibility to have new and replacement wells designed and drilled using current industry standards and meeting Arizona State Requirements.
PROJECT OBJECTIVE
The objective of this purchase requisition is to receive and install materials to establish new wells to produce an additional 25,000-acre feet of low-salinity water that will be conveyed North to the Colorado River and delivered to Mexico, thereby conserving like amounts in Lake Mead.
The 25,000 AF is in addition to the 25,000 AF that is to be produced by the 242 Wellfield.
SPECIFICATIONS
General
MCC Electrical Panels and Rail Mount Meter and Remote DisplayProvide Motor Control Center (MCC) described in these Specifications.
Panels and Rail Mount Meter and Remote Display should come with a warranty.
Horizontal Ground Bus continuous along the length of the MCC. Provide vertical ground bus in each vertical section which connects to the horizontal ground bus.
See attached specification sheetProvide quantity and ratings of components indicated on the attached specification sheet. Provide additional components not listed on the specification sheet as necessary for a complete motor control center and to meet the requirements in these Specifications.
Provide compression lug at each end of the ground bus connect the ground bus to plant ground system with stranded bare-copper cable.
Formatted: Tab stops: 0.5", Left + Not at 0.57"
Formatted: Indent: Left: 1"
Formatted: Indent: Left: 1"
Formatted: Font: (Default) Arial
Provide all internal wiring and cable connections to connect and power devices located in the motor control center
Provide horizontal and vertical wireways.
Compartments
MCC designed with modular removable compartments.
Provide each operating compartment unit with equipment, as required, mounted in an individual cell.
Bucket unit assembly, except main circuit breakers and auxiliary control devices, is to be drawn out type removable from the front, without rear access or disturbing other bucket units in the motor control center assembly.
Ensure all draw-out type bucket unit assemblies have a positive guide rail system to ensure connection alignment to the vertical bus.
Provide spare spaces with screwed-on front cover plates.
Circuit Breaker Compartments
General:
Modular plug-in type.
Designed to contain all components in one metal housing.
Make connection between plug-in unit and vertical bus with plug-in power stabs.
Designed to prevent insertion or removal from motor control center unless unit door and disconnect devices are open.
Includes the following minimum components.
Molded Case Circuit Breaker(s).
Disconnect Device Handle(s).
Accessory components as required.
Mounting
Plug-in unit supported and guided by removable unit support pan.
Support pan capable of being moved to a different location without tools.
Formatted: Indent: Left: 1", First line: 0"
Soft Starter Compartment
General:
Soft Starter sized for connected motor.
Provide terminal blocks for external soft starter control connections.
Mounted inside motor control center.
Display and programming interface accessible from outside the motor control center.
Make all required control power connections.
Construction
Connect vertical sections to form a rigid lineup.
Provide terminal blocks for all external wire connections.
Provide wire markers on both ends of each conductor with conductor designation and conductor destination.
Factory Acceptance Test
Provide manufacturer’s standard factory acceptance inspections and tests.
SHIPPING AND DELIVERY OF MATERIALS
The supplier shall transport and handle products in accordance with the manufacturer’s instructions.
Inspect shipments prior to shipment to ensure products comply with requirements, quantities are correct, and that they are undamaged.
All items shall be delivered to the Bureau of Reclamation Yuma Area Office.
Deliver address: Yuma Area Office, 7301 Calle Agua Salada, Yuma, AZ 85364.
Warehouse deliveries are Monday thru Thursday 7am to 4pm.
Point of contact for deliveries is Larry Arnold. He can be reached at 928-343-8525 or larnold@usbr.gov.
SUBMITTAL REQUIREMENTS
General – The Contractor shall furnish all materials to the Government, in accordance with this paragraph and the requirements in the provisions, clauses, and paragraphs of this solicitation.
The word ‘submittals’ shall be interpreted to include drawings, data, manuals, certifications, samples, and other items furnished by the Contractor for approval, informational, or other purposes.
Within five (5) days of contract award, the Contractor will furnish a final fully generated set of complete MCC drawings, including MCC equipment ratings, MCC’s schematics for all compartments and devices included with the MCC, connection diagrams for all wiring connections and compartments included with the MCC,’s front, top and bottom view layout drawings, compartment layout, anchorage drawing showing anchor points, and equipment and bill of materials (BOM) for MCC components of the motor control centers in order for Reclamation to complete the final electrical design.
Within five (5) days of completion of testing activities, the Contractor will furnish certified test reports documenting test or inspection activities completed.