Sol_140R3022R0025_Amd_0003.pdf
PDF 118 KB Posted
- Attached to
- PARKING GARAGE AIR CONDITIONING UNIT REPLACEMENT Federal contract opportunity
- Solicitation number
- 140R3022R0025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R3022R0025_P00003_0003.pdf | ||
| Attachment_2a_-_Drawing_45-D-17472_0003.pdf | ||
| 140R3022R0025_P00002_0002.pdf | ||
| Attachment_5_-_Questions_and_Answers_0002.pdf | ||
| Sol_140R3022R0025_Amd_0002.pdf | ||
| Sol_140R3022R0025_Amd_0001.pdf | ||
| Attachment_4_-_PPQ.pdf | ||
| Attachment_1_-_SOW_VC_Restroom.pdf | ||
| Sol_140R3022R0025.pdf | ||
| 140R3022R0025_RFP.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_2_-_Drawing_45-D-17318.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R3022R0025 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boulder City NV 89005
R30
500 Fir Street Regional Office Lower Colorado Region Bureau of Reclamation
07/20/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/20/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT NAME: Parking Garage AC Unit Replacement - Hoover for the Lower Colorado Basin
Hoover Dam
Period of Performance: 08/15/2022 to 12/31/2022
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Aimee Amador
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PROJECT NAME: Parking Garage AC Unit Replacement - Hoover for the Lower Colorado Basin Hoover Dam
Amendment 03: The purpose of this amendment is to include the correct drawing and remove the incorrect one.
A. Attachment 2a - Drawing 45-D-17472 has been included and Attachment 2 - Drawing 45-D-17318 is not to be used .
B. The quote due date is changed from August 16, 2022, at 3:00pm (1500), PST to August 17, 2022, at 3:00pm (1500), PST.
C. All other terms and conditions remain unchanged.
Please review amendment 03 and provide a quote based on the information provided.
File details come from the government source that posted it. Updated .