Attachment_5_-_Questions_and_Answers_0002.pdf
PDF 92 KB Posted
- Attached to
- PARKING GARAGE AIR CONDITIONING UNIT REPLACEMENT Federal contract opportunity
- Solicitation number
- 140R3022R0025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R3022R0025_P00003_0003.pdf | ||
| Sol_140R3022R0025_Amd_0003.pdf | ||
| Attachment_2a_-_Drawing_45-D-17472_0003.pdf | ||
| 140R3022R0025_P00002_0002.pdf | ||
| Sol_140R3022R0025_Amd_0002.pdf | ||
| Sol_140R3022R0025_Amd_0001.pdf | ||
| Attachment_4_-_PPQ.pdf | ||
| Attachment_1_-_SOW_VC_Restroom.pdf | ||
| Sol_140R3022R0025.pdf | ||
| 140R3022R0025_RFP.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_2_-_Drawing_45-D-17318.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140R3022R0025 – Hoover Parking Garage AC Replacement
Questions
• Please confirm that BR exhaust fans are not being replaced?
o Exhaust fans will not be replaced.
• Will the BR’s be closed during construction?
o Yes.
• Will we be working during normal working hours?
o Yes. The site will be available from 8 AM to 6 PM Monday to Friday.
• If we remove and install stairs and/or install additional anchors to hang new unit in the attic. Will pull tests be required? If so, will this be the cost of the contractor?
o Pull tests are not required per the statement of work. If tests are conducted this will be a cost to the contractor.
• It was noted that existing 90’s were damaged on existing ducting, thus needing to be replaced. This will require much of the ceiling to be removed. Is the ceiling drywall? Or plaster?
o The ceiling is drywall.
• Will we need to paint just patched areas of ceiling? Or the entire ceiling to provide an even color?
o The repaired and painted areas so that there is no discontinuity between the repaired section and the existing sections. If this can be accomplished with patches, this will be allowed.
• Can a hazard report be provided for drywall/plater/chalking?
o Hazardous materials will be tested for and the results will be provided before construction.
• Condenser location: we will need to mobilize equipment to lift the new condenser to the designated area. We will need to do this work outside of the elevators. Will we be able to block this area off during regular hours? Or will this need to be done after hours?
o Elevators must be fully accessible between 0800 and 1830 daily. We have the ability to close the dam at 1800.
• Will a 2” filter be required for the new unit?
o Yes, a 2” filter that is compatible with the air handler.
• It was noticed that numerous rocks recently fell from the rain in the area of the new condenser, is a rock screen desired?
o A rock sheet is not specified in the statement of work.
• Is there power running to the area of the new condenser? Or will we need to run new power to the existing panel?
o Yes, there is power. It runs off of 208V.
140R3022R0025 – Hoover Parking Garage AC Replacement
• Will contractors be required to wear masks during construction?
o Not outside. Inside, the contractors will need to wear a mask depending on if
Southern Nevada is in a high covid risk alert.
• Is the Buyer open to adequately sized ductless mini splits properly vented for each bathroom?
o No.
• If mini splits are not any option, will contractor be allowed to cut into ceiling sheet rock larger than an attic access door? Will Buyer allow removal of ceiling sufficient for contractor to preform installation?
o Yes. The contractor is responsible for patching and painting the ceiling after installation per the statement of work.
• Can solicitation due date be extended until July 15, 2022, given responses to questions will come close to due date?
o July 15, 2022 has passed. Site visit was on July 26, 2022. Due date will be extended accordingly based on length of time to receive answers.