140R3022R0025_RFP.pdf
PDF 1013 KB Posted
- Attached to
- PARKING GARAGE AIR CONDITIONING UNIT REPLACEMENT Federal contract opportunity
- Solicitation number
- 140R3022R0025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R3022R0025_P00003_0003.pdf | ||
| Sol_140R3022R0025_Amd_0003.pdf | ||
| Attachment_2a_-_Drawing_45-D-17472_0003.pdf | ||
| 140R3022R0025_P00002_0002.pdf | ||
| Attachment_5_-_Questions_and_Answers_0002.pdf | ||
| Sol_140R3022R0025_Amd_0002.pdf | ||
| Sol_140R3022R0025_Amd_0001.pdf | ||
| Attachment_4_-_PPQ.pdf | ||
| Attachment_1_-_SOW_VC_Restroom.pdf | ||
| Sol_140R3022R0025.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_2_-_Drawing_45-D-17318.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.: 140R3022R00025
CONTRACT NO.: TBD
Parking Garage AC Unit Replacement – Hoover
SET ASIDE: 100% Small Business
U.S. Department of the Interior Bureau of Reclamation Interior Region 8: Lower Colorado Basin Boulder City, Nevada FY2022
Document No.
140R3022R00025
Document Title Parking Garage AC Unit Replacement – Hoover
THIS PAGE INTENTIONALLY LEFT BLANK
TOC Document No.
140R3022R0025
Document Title i
FOREWORD
The Bureau of Reclamation (BOR), Interior Region 8: Lower Colorado-Basin, Lower Colorado Dams Office (LCDO), has a requirement to replace the air conditioning unit in the visitor center parking garage restrooms.
This is a firm fixed priced contract. This procurement involves both supply and construction work. The principal features of work to be performed for this project, in accordance with Attachment 1 – Statement of Work are as follows (Please see Attachment 1 for more detailed information):
• Duct Cleaning of the existing Duct work
• Removal and disposal of the existing AC units
• Install variable speed, multi position air handler; Rheem RH2V6024STANJA or equivalent
• Install Rheem Classic Two-Stage Heat Pump Model RP1660AJ1NA or equivalent
• Install a programmable thermostat
• Install new 12” X 12” Duct to fit through 13” X 13” wall and floor openings.
• Contractor must commission the system for proper operations and rectify all issues.
The work is located at Hoover Dam visitor center parking garage. Hoover Dam and the visitor center parking garage is approximately 8 miles northeast of Boulder City, Nevada, and 32 miles from Las Vegas in Clark County, Nevada and Mojave County, Arizona.
This acquisition is being procured under Federal Acquisition Regulations Part 15.101, Best Value Continuum. Offerors are cautioned to carefully review the offer submission requirements contained in Section L and the evaluation criteria and standards contained in Section M. In order to be considered qualified for this work, offerors must fully address all evaluation factors. Reference Section L, for instructions and Section M, paragraph M.2 for evaluation factors and acceptability standards. The Government anticipates making award without discussions.
SET-ASIDE: This solicitation is set-aside 100% for Small Business.
NAICS: The North American Industry Classification System (NAICS) code for this acquisition is 238220, Plumbing, Heating, and Air-Conditioning Contractors, which has a small business size standard of $16.5 Million dollars.
MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction Projects, the estimated magnitude of this order will range between $25,000.00 and $150,000.00.
SITE VISIT: See Section L.8, FAR 52.236-27 Site Visit (Construction) for information regarding the organized site visit.
A site visit will be scheduled for July 26, 2022 at 8:00am, PST (Local Time). Please contact Ms. Larissa Bell at Lrbell@usbr.gov no later than Monday, July 25, 2022, if you plan to attend. Upon receiving an RSVP, prospective vendors will receive an email with the exact location on where to meet. Attendance of the site visit is not mandatory. Offerors will not be able to access the site on their own. Failure by prospective offerors to inspect the site will not relieve prospective offerors from the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the contract requirements.
WRITTEN QUESTIONS: Requesting Clarification. Offerors may submit written questions requesting clarification of solicitation requirements. All questions shall be received no later than Friday, July 29, 2022, at 2:00 p.m. Pacific Time. Questions received after that date will not be entertained. ONLY WRITTEN QUESTIONS WILL RECEIVE A RESPONSE. Each question submitted shall contain the following information: document name, document date, specific page, paragraph, clause or other definitive citation for which clarification is requested. All questions shall be submitted electronically via email to Ms. Larissa Bell at LRBell@usbr.gov. Answers will be provided to only questions submitted in writing, and all answers will be provided in an amendment through the Contracting Opportunities on mailto:Lrbell@usbr.gov
Document Title ii website beta.sam.gov.
OFFER SUBMISSION: See solicitation Section L.13, 1452.215-81 ALT II, General Proposal Instructions- -Bureau of Reclamation, which specifies the number of copies of each proposal volume to be furnished with the Offeror's proposal.
For the Date and Time of Offer Submission, See Standard Form (SF) 1442.
OTHER NOTES TO OFFERORS:
For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health Standards" (2009 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause WBR 1452.223-81 Safety and Health.
Document Title iii
FOREWORD
TABLE OF CONTENTS i-ii
SECTION A -- Solicitation/Contract Form A-1
SECTION B -- Supplies or Services and Prices B-1
B.1 Requirements B-1 B.2 Price Schedule B-2
SECTION C -- Descriptions/Specifications/Statement of Work C-1
C.1 Statement of Work/Specifications/Work Statement C-1
SECTION D -- Packaging and Marking (There are no clauses in this section) D-1
SECTION E -- Inspection and Acceptance E-1
E.1 Clauses Incorporated By Reference E-1
SECTION F -- Deliveries or Performance F-1
F.1 Clauses Incorporated By Reference F-1 F.2 Commencement, Prosecution and Completion of Work F-1
SECTION G -- Contract Administration Data G-1
G.1 Authorities and Delegations--Department of the Interior G-1 G.2 Postaward Conference--Bureau of Reclamation G-2 G.3 Electronic Invoicing and Payment Requirements – Invoice Payment Platform (IPP) G-2 G.4 Government Administration Personnel G-3
SECTION H -- Special Contract Requirements H-1
H.1
Contractor Performance Assessment Reporting System H-1
SECTION I -- Contract Clauses I-1 I.1 Clauses Incorporated By Reference I-1 I.2 Terms and Conditions-Simplified Acquisitions I-4 I.3 I.4
Updates of Publicly Available Information Regarding Responsibility Matters Equal Opportunity for Veterans
I-7 I-8
I.5 Equal Opportunity for Workers with Disabilities I-8 I.6 Buy American--Construction Materials I-8 I.7 Alternative Payment Protections I-11 I.8 Providing Accelerated Payment to Small Business Subcontractors (Deviation) I-11 I.9 Authorized Deviations in Clauses I-12 I.10 Restrictions on Endorsements--Department of the Interior I-12 I.11 Release of Claims--Department of the Interior I-12 I.12 Liability Insurance--Department of the Interior I-12 I.13 Prohibition Against Use of Lead-Based Paint-Department of Interior I-13 I.14 Asbestos-Free Warranty-Bureau of Reclamation I-13 I.15 Safety And Health--Bureau Of Reclamation I-13 I.16 Protecting Federal Employees And The Public From Exposure To Tobacco Smoke
In The Federal Workplace -- Bureau Of Reclamation I-14
I.17 Payment For Mobilization And Preparatory Work (JUN 2020)--Bureau Of Reclamation
I-14
I.18 Claims Accounting -- Bureau Of Reclamation I-15 I.19 Other Contracts (Deviation) I-15 I.20 Preservation of Cultural Resources –Bureau of Reclamation I-16 I.21 Security Requirements – Bureau of Reclamation I-17 I.22 Modification Proposals – Bureau of Reclamation I-21
Document Title iv
I.23 Safety Data Submittal Requirements – Bureau of Reclamation – Lower Colorado
Region
I-21
SECTION J -- List of Attachments J-1
J.1 Applicability of Documents J-1 J.2 List of Contract Documents J-1
SECTION K -- Representations, Certifications and Other Statements of Offerors K-1
K.1 Solicitation Provisions Incorporated By Reference K-1 K.2 Annual Representations and Certifications K-1 K.3
K.4
Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment Certification Regarding Responsibility Matters
K-4
K-6
K.5 Representation by Corporation Regarding Delinquent Tax Liability or a Felony Conviction Under any Federal Law
K-8
K.6 Small Business Program Representations K-9
SECTION L -- Instructions, Conditions and Notices to Offerors L-1
L.1 Solicitation Provisions Incorporated By Reference L-1 L.2 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 L-1
L.3 Type of Contract L-4 L.4 Construction Wage Rate Requirements--Secondary Site of Work L-4 L.5 Notice of Requirement for Affirmative Action to Ensure Equal Employment
Opportunity for Construction L-4
L.6 Notice of Buy American Requirement--Construction Materials L-5 L.7 Service Protest – Department of Interior L-6 L.8 Site Visit (Construction) (Feb 1995) - Alternate I (Feb 1995) L-6 L.9 Authorized Deviations In Provisions L-7 L.10 Notice of Intent to Acquire Metric Products and -Department of the Interior
Services-Bureau of Reclamation L-7
L.11 Use and Disclosure of Proposal Information L-8 L.12 Proposal Instructions-Bureau of Reclamation L-9 L.13 Evaluation Factors for Award – Quality Predominance – Bureau of Reclamation L-11 L.14 Evaluation Factors for Award – Cost or Price Predominance – Bureau of
Reclamation L-13
L.15 Service of Protest Department of the Interior (Jul 1996) (DEVIATION) L-14 L.16 Notice of Proposed Partnering-Bureau of Reclamation L-15
SECTION M -- Evaluation Factors for Award M-1
M.1 Solicitation Provisions Incorporated By Reference M-1 M.2 Evaluation Factors for Award -- Quality and Cost/Price Approximately Equal-
Bureau of Reclamation M-1
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040578253
Bureau of Reclamation
Lower Colorado Region
Regional Office 500 Fir Street
R30
Boulder City NV 89005
Larissa Bell 7022938528
1x 07/20/2022
140R3022R0025
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
PROJECT NAME: 140R3022R0025 Hoover Transformer 4th Floor NV and AZ Dam Elevator
Barrier for the Lower Colorado Basin Hoover Dam
Set Aside: 100% for Small Business
NAICS: The North American Industry Classification System (NAICS) code for this acquisition is 238220, Plumbing, Heating, and Air-Conditioning Contractors, which has a small business size standard of $16.5 Million dollars.
This solicitation is issued in accordance with FAR Part 13.106-2 and FAR 15.101, Best Value Continuum.
MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition
Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction Projects, the estimated magnitude of this order will range between $25,000.00 and $150,000.00.
The Government intends to award Firm Fixed Price (FFP) construction contract from this solicitation.
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
0 60 calendar days and complete it within ________________ ________________ calendar days after receiving
08/05/2022
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Lower Colorado Region
Regional Office 500 Fir Street
R30
Boulder City NV 89005
Aimee Amador
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R3022R0025
Period of Performance: From the date of award of contract, approximate award date is August 15, 2022 and performance ending December 31, 2021.
(Dates will be entered by Contracting Office at the time of award.)
Legacy Doc #: BOR
Delivery: 12/31/2022
Delivery Location Code: 0004506041
See Award
99999 US
Period of Performance: 08/15/2022 to 12/31/2022
00010 AC Unit and ducting Installation
Product/Service Code: N041
Product/Service Description: INSTALLATION OF
EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND
AIR CIRCULATING EQUIPMENT
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Part I-Section A Solicitation/ Contract Form
Document No.
140R3022R0025
Document Title
A-2
Part I-Section C Descriptions and Specifications
Document No.
140R3022R0025
Document Title
B-1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
B.1 REQUIREMENTS
(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
(b) Offerors are cautioned to carefully review the proposal submission requirements contained in Section L. Failure to comply with these requirements may result in an offer being determined technically unacceptable.
(c) Offers will be considered for award on the schedule in Paragraph B.2, but no offer will be considered for award for only a part of the schedules or a part of any single schedule. Offers for only a part of the schedules or parts of a single schedule may be determined technically unacceptable.
(d) Offers will be considered on any single schedule or any combination of schedules; however, no offers will be considered for only a part of a single schedule.
(e) Offerors shall complete the schedule(s) in Section B and furnish any additional information required in Section B, as applicable.
(f) The quantities stated in the Schedule(s), other than those identified as "lump sum," are estimated quantities for comparison of offers, and except as provided in the clause “Variation in Estimated Quantity,” no claim shall be made against the Government for variations in the quantities stated.
(g) IMPORTANT NOTE: The requirement for submission of a bid guarantee and performance and payment bonds is only applicable to offers in excess of $100,000.
Specifications
Document No.
140R3022R0025
Document Title
B-2
Item No.
Work or Material Estimated
Quantities
Unit Unit Price Extended Amount
*001 Clean existing duct work 1 Lump Sum
*002 Removal of old AC unit 1 Lump Sum
*003 Installation of new AC Unit 1 Lump Sum
*004 Installation of new duct work from wall to floor openings
1 Lump Sum
Total for Schedule $
SECTION C – DESCRIPTIONS AND SPECIFICATIONS
B.2 PRICE SCHEDULE
Specifications
Document No.
140R3022R0025
Document Title
B-3
C.1 STATEMENT OF WORK/SPECIFICATIONS/WORK STATEMENT
The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities (except as otherwise specified) to perform the requirement specified in the Statement of Work/Specifications contained in Attachment No. 1 of this solicitation/contract.
Part I-Section D Packaging and Marking
Document No.
140R3022R0025
Document Title
D-1
SECTION D – PACKAGING AND MARKING
(There are no clauses in this section.)
Part I-Section D Packaging and Marking
Document No.
140R3022R0025
Document Title
D-2
Part I-Section E Inspection and Acceptance
Document No.
140R3022R0025
Document Title
E-1
SECTION E -- INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulations (FAR) clauses - https://www.acquisition.gov/?q=browsefar;
Department of the Interior Acquisition Regulations (DIAR) clauses - http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl In addition, the clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-1;
DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date 52.246-12 Inspection of Construction AUG 1996 https://www.acquisition.gov/?q=browsefar http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl
Part I-Section E Inspection and Acceptance
Document No.
140R3022R0025
Document Title
E-2
Part I-Section F Deliveries or Performance
Document No.
140R3022R0025
Document Title
F-1
SECTION F -- DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulations (FAR) clauses - https://www.acquisition.gov/?q=browsefar;
Department of the Interior Acquisition Regulations (DIAR) clauses - http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl.
In addition, the clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-1;
DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70; and
The following referenced clauses are hereby incorporated into and made a part of this contract.
52.242-14 Suspension of Work APR 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK
APR 1984
The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days from receipt of Notice to Proceed.
The time stated for completion shall include final cleanup of the premises.
(End of Clause) https://www.acquisition.gov/?q=browsefar http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl
Part I-Section F Deliveries or Performance
Document No.
140R3022R0025
Document Title
F-2
Part I-Section G Contract Administration Data
Document No.
140R3022R0025
Document Title
G-1
SECTION G -- CONTRACT ADMINISTRATION DATA
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF
THE INTERIOR
SEP 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
Administration Data
Document No.
140R3022R0025
Document Title
G-2
G.2 1452.242-80 POSTAWARD CONFERENCE--BUREAU OF
RECLAMATION
MAR 2022
(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held at [insert the location of the meeting].
(c) The contracting officer and the contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.
(d) The contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.
(End of clause)
G.3 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE
PROCESSING PLATFORM (IPP)
APR 2013
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1) Copy of Contractor’s generated Invoice – Courtesy copy the Contract Specialist.
2) Subcontractor/Supplier Payment Summary
3) Any additional documentation to substantiate each progress payment request and as required by the Contracting Officer’s Representative or Contracting Officer.
FAR 32.905(b) outlines a Proper Invoice to include:
1. Name & address of the Contractor. 2. Invoice date & number. 3. Contract number, contract line item number and, if applicable, the order number. 4. Description, quantity, unit of measure, unit price and extended price of the items delivered. 5. Shipping number and date of shipment including the bill of lading number and weight of shipment if shipped on Government bill of lading. 6. Terms of any discount for prompt payment offered. 7. Name and address of official to whom payment is to be sent. 8. Name, title, and phone number of person to notify in event of defective invoice. 9. Any other information or documentation required by the contract.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment https://www.ipp.gov/
Administration Data
Document No.
140R3022R0025
Document Title
G-3 can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP tor submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4 GOVERNMENT ADMINISTRATION PERSONNEL
The contracting office representative responsible for overall administration of this contract is:
Contracting Officer:
Aimee Amador, Contracting Officer (LCB-10300) Bureau of Reclamation P.O Box 61470 Boulder City, NV 89005 Phone No.: 702-293-8431 E-mail: aamador@usbr.gov
The Contract Specialist who is responsible for overall administration of this contract is:
Larissa Bell, Contract Specialist (LCB-10302) Bureau of Reclamation P.O. Box 61470
Boulder City, NV 89006-1470 Phone No.: 702-293-8528 Facsimile No.: 702-293-8332 E-Mail: lrbell@usbr.gov
(End of Text) mailto:ippgroup@bos.frb.org mailto:aamador@usbr.gov mailto:lrbell@usbr.gov
Administration Data
Document No.
140R3022R0025
Document Title
G-4
Part I-Section H Special Contract Requirements
Document No.
140R3022R0025
Document Title
H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM DEC 2015
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The
Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO).
Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6. The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of Notice) https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/
Part I-Section H Special Contract Requirements
Document No.
140R3022R0025
Document Title
H-2
This page left intentionally blank.
Part II-Section I Contract Clauses
Document No.
140R3022R0025
Document Title
I-1
SECTION I -- CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these addresses:
Federal Acquisition Regulations (FAR) clauses - https://www.acquisition.gov/?q=browsefar;
Department of the Interior Acquisition Regulations (DIAR) clauses - http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl.
In addition, the clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-1;
DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70; and
The following referenced clauses are hereby incorporated into and made a part of this contract.
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions on Subcontractor Sales to the Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-13 Contractor Code of Business Ethics and Conduct NOV 2021 52.203-17 Contractor Employee Whistleblower Rights and Requirement To
Inform Employees of Whistleblower Rights
JUN 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-14 Service Contract Reporting Requirements OCT 2016 52.204-19 Incorporation by Reference of Representations and Certifications DEC 2014 52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities
NOV 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015 52.210-1 Market Research NOV 2021 52.215-2 Audit and Records--Negotiation JUN 2020 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
JUN 2020
https://www.acquisition.gov/?q=browsefar http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl http://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl
Document No.
140R3022R0025
Document Title
I-2
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications NOV 2021 52.215-21 Alt
IV
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data--Modifications (Oct 2010) - Alternate IV (Oct 2010)
NOV 2021
52.219-6 Notice of Total Small Business Set-Aside (Alternate I)
(DEVIATION 2019-01 ),
NOV 2020
52.219-14 Limitations On Subcontracting (DEVIATION 2019-01) SEP 2021 52.219-28 Post-Award Small Business Program Rerepresentation SEP 2021 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards--Overtime
Compensation
MAR 2018
52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination--Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEPT 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-34 Project Labor Agreement MAY 2010 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.222-55 Minimum Wages Under Executive Order 13658 JAN 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts
SEP 2013
52.223-3 Alt I Hazardous Material Identification and Material Safety Data (Jan 1997) - Alternate I (Jul 1995)
FEB 2021
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-15 Energy Efficiency in Energy Consuming Products MAY 2020 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and
Construction Contracts
AUG 2018
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright
Infringement
JUN 2020
52.227-4 Patent Indemnity--Construction Contracts DEC 2007 52.227-14 Rights in Data-General MAY 2014 52.229-3 Federal, State, And Local Taxes FEB 2013 52.232-5 Payments Under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017
Document No.
140R3022R0025
Document Title
I-3
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
NOV 2021
52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991) MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Alt I Specifications and Drawings for Construction – Alternate I (APR
1984)
FEB 1997
52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.243-4 Changes JUN 2007 52.243-6 Change Order Accounting APR 1984 52.246-21 Warranty of Construction MAR 1994 52.247-21 Contractor Liability for Personal Injury and/or Property Damage APR 1984 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price)
(Apr 2012) - Alternate I (Sep 1996)
APR 2012
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991
Document No.
140R3022R0025
Document Title
I-4
I.2 52.213.04 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS
(OTHER THAN COMMERCIAL PRODUCTS AND
COMMERCIAL ITEMS)
JAN 2022
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub.
L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).
(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(vi) 52.222-26, Equal Opportunity (Sept 2016) (E.O.11246).
(vii) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(viii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C.3553).
(ix) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub.L.108-77, 108-78 (19 U.S.C. 3805 note)).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JAN 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (NOV 2021).
(vii) 52.233-1, Disputes (MAY 2014).
(viii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (JAN 2022). (ix) 52.253-1, Computer Generated Forms (JAN 1991).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).
(ii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2022) (E.O.13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in FAR
2.101 on the date of award of this contract).
(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) (41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).
(iv) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C.4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(v) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) (29 U.S.C.793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, “United States” includes the 50 States, the
Document No.
140R3022R0025
Document Title
I-5
District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)
(vi) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C.4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(vii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(viii) (A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter78 and E.O 13627) (Applies to all solicitations and contracts).
(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(ix) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.))).
(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O.
13423) (Applies to services performed on Federal facilities).
(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).
(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP)) will be-
(A) Delivered;
(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;
(C) Furnished by the Contractor for use by the Government; or
(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).
(xv) 52.223-20, Aerosols (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).
(xvi) 52.223-21, Foams (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.
(xvii) 52.225-1, Buy American-Supplies (NOV 2021) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in FAR 2.101 on the date of award of this contract, and the acquisition-
(A) Is set aside for small business concerns; or
(B) Cannot be set aside for small business concerns (see 19.502-2) and does not exceed $25,000).
(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).
Document No.
140R3022R0025
Document Title
I-6
(xix) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2013)(Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).
(xx) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and…