Amendment_No__0002_to_140R2022B0003_0002.pdf
PDF 2 MB Posted
- Attached to
- Floating Dock Replacement at New Melones Lake
- Solicitation number
- 140R2022B0003
About this file
This is an amendment to a solicitation for floating dock replacement services at New Melones Lake. The Department of the Interior Bureau of Reclamation is seeking to replace floating docks through a competitive procurement under solicitation number 140R2022B0003. The amendment provides additional instructions to offerors and adjusts submission dates but does not otherwise modify the required products or services, which include removing existing docks and installing new modular floating docks to specifications provided. Offerors must submit proposals by the amended due date of [date redacted] for evaluation and contract award, with work to be completed by [date redacted].
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
������������������������������������� !��"��"�#�������������������������������������������������#��$����������#������������#����!����#��#��!���#���������$��������� ��������!$������#���#��������������!�������������������������$���#�%��&'()*+,�-&�.-*+�'/01-2),34,5,16�6-��,�+,/,(7,3�'6�68,�9)'/,�3,:(41'6,3�&-+�68,�+,/,(96�-&�-&&,+:�9+(-+�6-�68,�8-*+�'13�3'6,�:9,/(&(,3�5'.�+,:*)6�(1�+,;,/6(-1�-&�.-*+�-&&,+%��(�����<�#�$����������������������$�����#���������"���������#��!#������$�������=��$�������"�����������������!����#��#��!���#���������$��������=��#�<����������!����#��#��!���#���������$���������������#���#��������������!����������������������������=��������#����<����#��#��������������"���$#�������������������%
>?@A?BCDEF�GH�IJK
JL�KIK
| K���GFEE?MC�N?OP� | FFB�QL�K�J | ||
| �RSTSUSFD�FV�H@WXSUSESFD�>CATS@CU | CMSFD?Y�ZVVS@C[S\L]?@SVS@� | CMSFD�XAC?X�FV� | C@Y?B?ESFD �Ĵ�_̂ |
àb�cdef�ecgh�ijkl�mnnkegf�ci�hioepeqmceij�ip�qijcrmqcfsirogrfb��ec�hioepegf�cdg�qijcrmqcsirogr�jib�mf�ogfqretgo�ej�ecgh�̀ubvw%�'//-*16(14�'13�'99+-9+('6(-1�3'6'�xyz�{|}~�{|�� ���������������%�����������=�(�����������v�=�����#��$#���"-���#���$�������� !��"��#��������������������������#��#����������$#�����������������������������!�����������#�����������=�����������������!!� ��"���������������������!����"6������<���$���#�����!������������������������������#������(����v�%��6�����$#����������������������#�#����������-���#�`̀b�cdef�ecgh�ijkl�mnnkegf�ci�mhgjohgjcf�ip�fikeqecmceijf&'/()(6.�/-3,�/-3,� v��%�3'6,3�x����y�������v�'%�5-3(&(/'6(-1�-&�/-16+'/6�-+3,+�1-%��%�3'6,3�x����y��������'%�'5,135,16�-&�:-)(/(6'6(-1�1-%
/-3,� �%�1'5,�'13�'33+,::�-&�/-16+'/6-+�x�������{||�����~���������|������y�����|�
�%�'35(1(:6,+,3��.�xyz����|{������y�|����/-3,� %�(::*,3��. 9'4,���-&��9'4,:�%�+,¡*(:(6(-1�9*+/8':,�+,¡%�1-%¢%�,&&,/6(7,�3'6,w%�'5,135,16�5-3(&(/'6(-1��1-%� �%�9+-;,/6�1-%�xyz��££¤���¥¤|�v%��/-16+'/6�(3�/-3,mhgjohgjc�ip�fikeqecmceijshioepeqmceij�ip�qijcrmqc
/8,/0�-1, '%�68(:�/8'14,�-+3,+�(:�(::*,3�9*+:*'16�6-��x�£|��z���~���{������68,�/8'14,:�:,6�&-+68�(1�(6,5�v��'+,�5'3,�(1�68,�/-16+'/6�%�68,�'�-7,�1*5�,+,3�/-16+'/6�-+3,+�(:�5-3(&(,3�6-�+,&),/6�68,�'35(1(:6+'6(7,�/8'14,:�x�~����������¦|�����£����¦��zz��|��/%�68(:�:*99),5,16')�'4+,,5,16�(:�,16,+,3�(16-�9*+:*'16�6-�'*68-+(6.�-&�3%�-68,+�x�£|��z����£|��z�����z�������������~���{������££{�£{�������������|������:,6�&-+68�(1�(6,5�v�=�9*+:*'16�6-�68,�'*68-+(6.�-&�&'+��¢%v�¢���% gb�ehnircmjc§ /���#����#� ������� ���#�̈$�#��������"����������$���������#��$#�����������������������������������������$��"�������%�-+3,+�1-%�(1�(6,5�v�'% v�%�3,:/+(96(-1�-&�'5,135,16�5-3(&(/'6(-1�x©{¦���ª|��¥��«�¬��|�������|����¦������¤~���¦���¤�������������{�����~¥®|�������|{�̄�|{|�z|���¥¤|��°CM?@O�RF@�±²��Z ³́C�>FYS@SE?ESFD�@SEC\�SD�µYF@¶�IH�?µFTCP�·YF?ESDM�RF@¶� ÇY?@CBCDE�?E�¹Cº�[CYFDCU�°?¶C�SUĆACµO�?BCD\C\»]XA̧FUC²�³́C�̧XA̧FUC�FV�ÉSU�?BCD\BCDE�SU�EF²��¼�½D@FA̧FA?EC�ÉC�?EE?@́C\�¾XCUESFDU�¿HDUºCAUP� ¼�SD@FA̧FA?EC�ÉC�?EE?@́C\�>C@ESFDU�H�¿�·P�?D\��¼�½D@FA̧FA?EC�ÉC�?EE?@́C\�>SECÀSUSE�?EECD\CCU�YSUE»³́C�\?EC�?D\�ESBC�VFA�AC@CŞE�FV�FVVCAU�SU�́CACµO�Á¹GÂH¹ÃQR�?D\�ACB?SDU�ÄXDC��P�
P�?E�²���̧B�]?@SVS@�³SBC»³́C�FVVCAFA�BXUE�?@¶DFºYC\MC�ÉSU�?BCD\BCDE�µO�UXµBSEESDM�?�USMDC\�@F̧O�FV�ÉSU�>·���?YFDMºSÉ�ÉCSA�̧AF̧FU?Y» v '%�1'5,��'13�6(6),�-&�/-16+'/6(14�-&&(/,+�x��£|��{�£{����v�'%�1'5,�'13�6(6),�-&�:(41,+�x��£|��{�£{���� v�/%�3'6,�:(41,3 v �%�*1(6,3�:6'6,:�-&�'5,+(/'�v��%�/-16+'/6-+�-&&,+-+ v /%�3'6,�:(41,3x��¦���~{|��z�£|{�����~���{�ª|�������¦�� x��¦���~{|��z�����{�����¦�©zz��|{� FU?D?�ÅFXUCVMF?AÆS :6'13'+3�&-+5�¢���+,7%�vv�w�v �9#���#��������4:'�&'+�����/&+���¢%w�¢9#�<��$����������$�$���!� ,����������#�<�������#���=��!!���#����������������������������$�����#���#���������(�����'��#�v�'=������#�����#������"��=�#�������$�����"�����������$!!���#�������������%
Amendment No. 0002 Solicitation No. 140R2022B0003
Floating Dock Replacement at New Melones Lake
Pre-bid Questions and Answers
Question 1: Materials are taking longer to get due to C-19 and other shipping issues. Is there a possibility that 90-day window from award to completion could be extended?
Response 1: Yes, it’s been extended to 180 days from 90 days. Please see the attached revised
Sections A&F.
Question 2: The water levels are low and dropping at the lake. One of the ramps is already out of the water and will not see use again until next year at best. Can we please clarify where the docks should be placed if they cannot immediately be put into service upon delivery due to very low water levels?
Response 2: If the ramp is not in the water at the time of delivery, the dock should be placed on the ramp, attached to the cables and chocked in place. The dock will be placed into service when the water level returns to normal.
SOLICITATION, OFFER, 1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
ANDAWARD 140R2022B0003 [l<JsEALED BID (IFB)
(Construction, Alteration, or Repair) □ NEGOTIATED (RFP)
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
R20
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO
Bureau of Reclamation
California Great Basin Office
1 I 3
Bureau of Reclamation
Mid-Pacific Region
Regional Office
Division of Acquisition Services
2800 Cottage Way, Room E-1815
Sacramento CA 95825-1898
2800 Cottage Way, Room E-1815, Federal Bldg
Sacramento, CA 95825 - 1898
9. FOR ► a. NAME
INFORMATION
CALL: Rosana Yousefgoarj i
SOLICITATION
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
916-978-5004
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
A. Title : Floating Dock Replacement at New Melones Lake
B. Work Site Location : The work is located at U.S. Bureau of Reclamation, New
Melones Lake, California.
C. Estimated Price Range : $500,000.00 to $1,000,000.00.
D. Set-aside Information : This requirement is restricted to Total Small Business concerns. FAR Clause 52.219-6 - Notice of Total Small Business Set Aside applies to this requirement. NAIC S Code : 237990 ( Siz e Standard $39.5 Million )
11. The Contractor shall begin performance 7
□ award, [l<J notice to proceed. The perfonnance period is calendar days and complete it within 18 0
[l<Jmandatory □negotiable. (See Section F
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
IBJYES □ NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perfonn the work required are due at the place specified in Item 8 by calendar days after receiving
12b. CALENDAR DAYS
1300 (hour) local time
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offerer's name and address, the solicitation number, and the date and time offers are due .
b. An offer guarantee IB] is, Dis not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 90
NSN 7540-01-155-3212
calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R2022B0003
NAME OF OFFEROR OR CONTRACTOR
ITEM NO.
(A)
00010
SUPPLIES/SERVICES
(B)
Legacy Doc #: BOR
Delivery: 180 Days After Notice to Proceed
Floating Dock Replacement at New Melones Lake
(Price Schedule CLIN 1)
See Following Continuation Page
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR ALTERATION
OF OTHER NON-BUILDING FACILITIES
NSN 7540-01-152-8067
QUANTITY UNIT
(C) (D)
UNIT PRICE
(E)
PAGE
OF
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR /48 CFRl 53. 110
Solicitation No. 140R2022B0003
Amendment No. 0002
F-1
SECTION F - DELIVERIES OR PERFORMANCE
Clause
Title
Date
52.242-14
Suspension of Work
APR 1984
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND APR 1984
COMPLETION OF WORK
The Contractor shall be required to
(a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 180 calendar days after the date the
Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
New Melones Lake
Boat Dock Site Visit
05/03/2022
1. Doug’s DockWorks, Doug Lucas
2. RX3 Communications, Steve Johnson
3. Stephens Construction, Damien Stephens
4. Mountain Methods, Lindsay Tague & Jim Uhl
5. Distinctive Metals, Darrin Mills
6. Water Ventures, Jason Plaza (Did NOT make it today)
05/11/2022
1. Water Ventures, Maarten Voogd
File details come from the government source that posted it. Updated .