130-Ton Crane Rentals
Solicitation number
140R1725Q0030
Issued by

About this file

This is Amendment 0001 to solicitation 140R1725Q0030 issued by the Bureau of Reclamation's Pacific Northwest Region Grand Coulee Acquisition Group. The amendment addresses two questions regarding crane requirements for rental services at the Grand Coulee Power Office (GCPO) NWPP Tailrace.

The amendment clarifies that rental cranes will not need to traverse public roads during the rental period, so the rough terrain requirement remains. For the second question about crane specifications, GCPO will review submitted crane specifications based on two primary considerations: 1) Adequate rope length for placement of stoplogs with boom tip elevation 50' above the NWPP Tailrace to full placement position 150' below, and 2) Adequate winch torque to lift loads from storage, rotate 14 degrees, and place stoplogs with ~6" clearance. The period of performance is February 24, 2025 to June 23, 2025. Technical evaluation will consider delivery timeline and whether both cranes are the same make and model.

View the file

Other files

File Type Posted
Sol_140R1725Q0030_Amd_0002.pdf PDF
Sol_140R1725Q0030.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R1725Q0030 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Grand Coulee WA 99133

R17

Hwy 155, PO Box 620 Grand Coulee Acquisition Group Pacific Northwest Region Bureau of Reclamation

01/31/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/31/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to answer two questions.

Question 1. Contractor was informed that there is no Rough Terrain Crane that is legal to drive on a highway. Will there be an amendment published removing that bullet point (the fourth underneath REQUIREMENTS)?

Answer 1: The location of need for crane employment is at multiple locations of the GCPO

NWPP Tailrace. GCPO anticipates no need for the rental crane(s) to traverse public roads during the rental period. There is no need to remove bullet point.

Question 2. Also, only newer model 130-ton cranes have the spec listed in the thirteenth

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Terry Mest

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1725Q0030/0001 bullet point...Is it alright if the cranes are older and do not match that spec/have that particular winch?

Answer 2: GCPO will review the specifications of any specific crane submitted for adequacy in ability to perform the required lift(s)

The two primary considerations for the tandem lift are:

A. Adequate rope length for placement of the load (Stoplogs) with the boom Tip elevation 50' above the NWPP Tailrace to full placement position of the stoplogs on draft tube exits 150' below the NWPP tailrace elevation.

B. Adequate winch torque of the crane to lift the load from a storage rack 1' below the tailrace elevation to above the elevation of the tailrace, rotate 14 degrees, and place the stoplog in the draft tube rails for lowering it

150' into the in-service position. At the point in the lift sequence for the crane to rotate the stoplog and traverse the load from storage rack to employment rails, the bottom of the load

(stoplog) needs ~6" of clearance above the tailrace deck and the bulk of the rope on the crane will be on the winch. Thus, the outermost wrap winch torque must be adequate to wind the rope and lift the load.

All other term and conditions remain the same.

The technically evaluation will include evaluating on how soon the cranes can be delivered and if both cranes are the same make and model.

Period of Performance: 02/24/2025 to 06/23/2025