This document is a Quality Assurance Surveillance Plan (QASP) for Washington Monument security door maintenance services provided to the National Park Service's National Mall & Memorial Parks division.
The QASP establishes procedures for monitoring contractor performance against defined quality and performance standards. The contractor is responsible for maintaining a quality control program, establishing security clearances within specified timeframes, and providing monthly invoicing with required documentation through IPP.gov. Key performance requirements include: quarterly preventative maintenance of security doors and control systems with a 90% acceptable quality level (AQL); urgent repairs with one-hour response time and 90% AQL; non-urgent repairs requiring response within one hour to schedule site visits within three days, also with 90% AQL; and quality control program establishment within 15 days of award with 100% AQL. All invoicing, security checks, and deliverables require 100% compliance. The government's Contracting Officer Representative (COR) will monitor performance through documentation review (including monthly reporting and photographic materials), periodic inspections (up to three per year, virtual or in-person), and customer complaint investigations. Monthly written reports will be prepared by the COR summarizing surveillance results using Quality Assurance Monitoring Forms and Customer Complaint Investigation Forms. Performance incentives include positive CPARS reports and contract continuation for meeting standards, with negative consequences including cure notices and contract termination for failures to meet requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8526Q0073_Amd_0001.pdf | ||
| Sol_140P8526Q0073.pdf | ||
| B08_Attachment_5-SCA_Wage_Determination.pdf | ||
| B08_Attachment_2-Performance_Work_Statement.pdf | ||
| B08_Attachment_1-WAMO_Price_Schedule.xlsx | XLSX spreadsheet | |
| B08_Attachment_3-Task_Order_Maintenance.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
WASHINGTON MONUMENT (WAMO)
SECURITY DOOR MAINTENANCE
For the National Park Service
National Mall & Memorial Parks
Contents
1.0 INTRODUCTION
1.1 PURPOSE
1.2 PERFORMANCE MANAGEMENT APPROACH
1.3 PERFORMANCE MANAGEMENT STRATEGY
2.0 ROLES AND RESPONSIBILITIES
2.1 Contracting Officer
2.2 Contracting Officer Representative
3.0 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
4.0 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5.0 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution
6.4 List of Attachments
ATTACHMENT A2 – PERFORMANCE REQUIREMENTS SUMMARY
ATTACHMENT A3 – QUALITY ASSURANCE MONITORING FORM
ATTACHMENT A4 – CUSTOMER COMPLAINT INVESTIGATION
1.0 INTRODUCTION
This quality assurance surveillance plan (QASP) sets forth the procedures and guidelines the National Park Service (NPS), National Mall & Memorial Parks (NAMA) will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 PURPOSE
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources employed. The QASP provides a means for evaluating whether the contractor is meeting required performance standards.
This QASP defines the roles and responsibilities of all members of the project team, identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance (QA) documentation requirements, and describes the analysis of the QA monitoring results.
1.2 PERFORMANCE MANAGEMENT APPROACH
This QASP will define the performance management approach taken by the NPS NAMA to monitor the contractor’s performance to ensure realization of performance standards.
Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether the contractor is achieving acceptable performance.
1.3 PERFORMANCE MANAGEMENT STRATEGY
The contractor is responsible for the quality of all work performed and shall measure quality through the contractor’s quality control (QC) program. QC is the output of work and includes all work performed regardless of whether the work is performed by direct employees, contractor employees, other teaming partners or subcontractors.
The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against performance standards. The contractor is responsible for making required changes in processes and practices to ensure effective performance management.
2.0 ROLES AND RESPONSIBILITIES
2.1 Contracting Officer
The contracting officer (CO) is responsible for compliance and administration, and for resolving any differences between the observations documented by the NPS/NAMA contracting officer’s representative (COR) and the contractor. The CO will designate a COR as a government authority for performance management.
2.2 Contracting Officer Representative
The contracting officer’s representative (COR), designated in writing by the CO to act as his or her authorized representative, assists in administering the contract. COR’s limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. The COR shall refer any changes that the contractor deems may affect price, terms, or conditions to the CO for action. The COR is responsible for completing the QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Attachment A3 includes the Quality Assurance Monitoring Form.
3.0 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
The required performance standards and/or quality levels are included in Attachment A2, “Performance Requirements Summary.”
4.0 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
To minimize the performance management burden, the government’s evaluation of contractor performance (when appropriate) shall use simplified surveillance methods. The primary methods of surveillance are:
Documentation - Monitoring performed by the COR and to include photographic and written materials provided by the contractor. Includes monthly reporting review.
Each service the COR shall review the generated documentation and enter summary results into the Quality Assurance Monitoring Forms
Periodic Inspection – The COR will perform up to three (3) inspections per year, virtual and/or in-person.
4.2 Customer Feedback
The contractor shall establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and is measurable through customer complaints and surveys.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor. Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Any customer complaints will be investigated by the COR using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment A4.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment A2, Performance Requirements Summary Table for contractor performance, are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls.
5.0 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
Communication of expected outcomes initiates the performance management feedback loop.
Attachment A2 expresses the performance standards expected of the contractor, and the performance monitoring techniques used to assess performance.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments A3 and A4. The forms, when completed, will document the government’s assessment of the contractor’s performance to ensure achieving the required results.
The COR will retain a copy of all completed QA surveillance forms.
6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS
6.1 Determining Performance
Government shall use the monitoring methods cited to determine whether the contractor has met performance standards, service levels, and AQLs. If the contractor has not met the minimum requirements, the government may request the contractor develop a corrective action plan to show how, and by what date, it intends to bring performance up to required levels.
6.2 Reporting
At the end of each month, the COR will prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachments A3 and A4), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards including customer satisfaction regarding Task Order cost/technical/scheduling performance.
6.3 Reviews and Resolution
The COR may require the contractor’s project manager or designated alternate, to meet with the CO and other government personnel as deemed necessary to discuss a performance evaluation.
The CO or COR will define a frequency of in-depth reviews with the contractor, however, if the need arises, the contractor will meet with the CO or COR as often as required or per the contractor’s request. The agenda of the reviews may include performance assessment data, issues and concerns of both parties, the projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis, recommendations for improved efficiency and/or effectiveness, and issues arising from the performance monitoring process.
The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and contractor should jointly formulate tactical and long-term courses of action.
Decisions regarding changes to metrics, thresholds, or service levels require clear documentation. A modification can incorporate changes to service, procedures, and metrics.
6.4 List of Attachments
Attachment A2 – Performance Requirements Summary
Attachment A3 – Quality Assurance Monitoring Form
Attachment A4 – Customer Complaint Investigation Form
ATTACHMENT A2 – PERFORMANCE REQUIREMENTS SUMMARY
Task / Critical Subtask
Quality/Performance Standard
Acceptable Quality Levels
Surveillance Method
Incentive
Quality Control Program (PWS 1.6.1)
Contractor to establish within 15 days of award and provide to COR for approval.
100% Submitted, reviewed, and accepted by COR
Positive: Contractor and COR will have an easy-to-follow program to ensure quality of performance; work is completed correctly the first time: Positive CPARS report
Negative: Inability to positively track performance; Work is being redone over; Negative CPARS report; Cure Notice;
Termination of Contract
Security Checks
(PWS 1.6.5)
Contractor submits paperwork and required documents for checks.
100% Submitted, reviewed, and accepted by COR
Positive: work is allowed to commence; positive CPARS report
Negative: work is delayed and the contractor is not performing the work; CPARS report; Cure Notice; Termination of Contract
Invoicing
(PWS 1.6.15-
1.6.15.1.7)
Invoices are submitted monthly or after a repair order with the correct information and attachments in IPP.gov
100% Submitted, reviewed, and accepted by COR
Positive: Authorization by the COR is on time and payments are not delayed; work is reported and archived correctly;
positive CPARS report
Negative: invoices will be rejected if data is incorrect;
negative CPARS report; Cure Notice; Termination of Contract
Quarterly Maintenance
(PWS 5)
Provide quarterly preventative maintenance to the security doors, control system and related systems and features.
Preventative maintenance services will be scheduled quarterly with the COR and the
USPP.
90% COR will inspect either physically, with a designee, or by verbal communication with contractor
Positive: work is completed and the equipment is maintained for the public keeping with the Park Service mission; positive CPARS report
Negative: Equipment failures and closures of site causing the contractor to be recalled performing work again by CO:
negative CPARS report; Cure Notice; Termination of Contract
Urgent Repairs
(PWS 5.2-5.2.2)
Contractor responds to notification of urgent service calls within one hour. Work is performed to correct issue
90% COR will be in contact with contractor by email, phone, or in person
Positive: Site is made safe and operational for the public quickly; positive CPARS report
Negative: Equipment failures and closures of site causing the contractor to be recalled performing work again by CO:
negative CPARS report; Cure Notice; Termination of Contract
Non-urgent Repairs
(PWS 5.3-5.3.3)
The Contractor shall respond to phone calls or emails within 1 hour to schedule site visits within 3 days. Work is performed to correct issue
90% COR will be in contact with contractor by email, phone, or in person
Positive: Site is made safe and operational for the public quickly; positive CPARS report
Negative: Equipment failures and closures of site causing the contractor to be recalled performing work again by CO:
negative CPARS report; Cure Notice; Termination of Contract
Deliverables & Reports (PWS 5.4-5.4.2)
Contractor provides schedule and description of maintenance within 15 days of award.
Reports are provided with invoices
100% Submitted, reviewed, and accepted by COR
Positive: Authorization by the COR is on time and payments are not delayed; work is reported and archived correctly;
positive CPARS report
Negative: invoices will be rejected if data is incorrect;
negative CPARS report; Cure Notice; Termination of Contract
ATTACHMENT A3 – QUALITY ASSURANCE MONITORING FORM
CONTRACT OR TASK ORDER:
TEAM LEAD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Inspection 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
ANALYSIS OF RESULTS:
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
ATTACHMENT A4 – CUSTOMER COMPLAINT INVESTIGATION
CONTRACTOR: _______________________________________________________________
CONTRACT/TASK ORDER NUMBER: ______________________________________________
DATE/TIME COMPLAINT RECEIVED: ___________________________ ________ AM / PM
SOURCE OF COMPLAINT: ___________________________________________ (NAME)
__________________________________________ (ORGANIZATION)
__________________________________________ (PHONE NUMBER)
__________________________________________ (EMAIL ADDRESS)
NATURE OF COMPLAINT:
RESULTS OF COMPLAINT INVESTIGATION:
DATE/TIME SERVICE PROVIDER INFORMED OF COMPLAINT:
___________________ AM / PM
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER:
RECEIVED AND VALIDATED BY: ____________________________________________________________________________
PREPARED BY: ___________________________________
DATE: _________________________________________
| Quality Assurance Surveillance Plan (QASP) |
| 1.0 INTRODUCTION |
| 1.1 PURPOSE |
| 1.2 PERFORMANCE MANAGEMENT APPROACH |
| 1.3 PERFORMANCE MANAGEMENT STRATEGY |
| 2.0 ROLES AND RESPONSIBILITIES |
| 2.1 Contracting Officer |
| 2.2 Contracting Officer Representative |
| 3.0 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS |
| 4.0 METHODOLOGIES TO MONITOR PERFORMANCE |
| 4.1 Surveillance Techniques |
| 4.2 Customer Feedback |
| 4.3 Acceptable Quality Levels |
| 5.0 QUALITY ASSURANCE DOCUMENTATION |
| 5.1 The Performance Management Feedback Loop |
| 5.2 Monitoring Forms |
| 6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS |
| 6.1 Determining Performance |
| 6.2 Reporting |
| 6.3 Reviews and Resolution |
| 6.4 List of Attachments |
| ATTACHMENT A2 – PERFORMANCE REQUIREMENTS SUMMARY |
| ATTACHMENT A3 – QUALITY ASSURANCE MONITORING FORM |