This document is a set of Questions and Answers from a Site Visit for National Park Service RFQ 140P8324R0013 to Replace Heat Pump HVAC at the NPS maintenance building in Kimberly, OR.

The key details are:

  • The onsite point of contact is Aaron Bougie and the administrative point of contact is John Flatt, the Contracting Officer.
  • All electrical disconnections, alterations, and reconnections will be performed by the contractor.
  • The office space square footage is 1,353 square feet.
  • This RFQ is for the replacement of the heat pump HVAC system at the NPS maintenance building in Kimberly, OR.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Heat Pump HVAC, NPS Kimberly OR, newest first.
File Type Posted
Sol_140P8324R0013_Amd_0001.pdf PDF
Sol_140P8324R0013.pdf PDF
Wage_Determination_Kimberly_OR.pdf PDF
Statement_of_Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Questions and Answers National Park Service

RFQ 140P8324R0013

Replace Heat Pump HVAC

140P8324R0013

Site Visit Questions and Answers

1. Q: Who is the point of contact for any questions?

A: The onsite point of contact will be Aaron Bougie, aaron_bougie@nps.gov The administrative point of contact for questions about the solicitation, award or contract is John Flatt john_flatt@nps.gov. Aaron will be the designated COR responsible for inspection and acceptance of the work. John is the

Contracting Officer.

2. Q: Do you have someone onsite with the NPS that will be doing the electrical work? Disconnecting old electrical and making new connections?

A: No. All alterations, disconnections and reconnections to electrical and ducting will be performed by the contractor.

3. Q: What is the office space square footage?

A: 1,353

The following additional photographs were taken.

John Flatt 6/3/2024

Contracting Officer