Vendor__Questions____Answers_0001.pdf
PDF 9 MB Posted
- Attached to
- Historical Structure Report, Wilderness Structures Federal contract opportunity
- Solicitation number
- 140P8321Q0073
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8321Q0073_Amd_0001.pdf | ||
| Attachment_B_DOL_Wage_Determination.pdf | ||
| Sol_140P8321Q0073.pdf | ||
| Attachment_C_Forms_to_Return_with_Quote.docx | DOCX document | |
| Attachment_A__Statement_of_Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ # 140P8321Q0073
Historic Structure Report
North Cascades NP Vendor Questions and Answers
Q: Can you provide pictures of the site including the structures?
A: See Enclosure
Q: Can we submit something in our corporate format, or should the format of the submittal consist only of the forms included in Attachment C Forms to Return With Quote?
A: Attachment C forms are not required. Prospective vendors may use their company formatted documents.
Q: Would you like federal past performance questionnaire (PPQ) forms submitted as part of the bid, or is it sufficient to include just the names and contact information as listed on page 9 of the solicitation for the references?
A: Prospective vendors may use either format.
Q: Will the National Park Service be able to provide backcountry permits as necessary to help the contractor meet the field work schedule?
A: Most of the campsites needed will not be hard to get through the public reservation system. For those that may be more challenging, the selected contractor will need to provide the COR with dates of proposed campground stays no later than January 28th, 2022 so that the campsites can be reserved prior to the reservation system being opened to the public.
Q: Regarding HSR content and format, Part 4 – Appendices: would the NPS expand upon expectations for the type and number of drawings to be included?
A: The park would like one plan view and four elevations for each building. If the drawings are done in a digital program, such as CADD, please provide the park with digital files.
Figure 1. Spruce Mill Tent on the floor of Main Hangar.
Figure 2. Detail of Spruce Mill Tent.
Figure 3. Spruce Mill Model exhibit on floor of Main Hangar.
Figure 4. Detail of Spruce Mill Model exhibit on floor.
Figure 5. Historic Hangar floor with historic aircraft in storage. Planes will be moved by NPS Staff once Main Hangar (Phase 1) is complete.
Figure 6. Historic Hangar floor with historic aircraft in storage. Planes will be moved by NPS Staff once Main Hangar (Phase 1) is complete.
Desolation Lookout
Sourdough Lookout http://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwjQqerUy4LWAhUpwlQKHVkgCfwQjRwIBw&url=http://forums.clubtread.com/37-washington-state/17158-void-desolation-dismay-north-cascades.html&psig=AFQjCNG10E66i3GgChKU8VM3jqO5q7fIYw&ust=1504307026092770
Copper Lookout
Meadow Cabin East
Meadow Cabin West
USGS Snow Survey Cabin
Rock Cabin
Gilbert’s Cabin
Perry Creek Shelter
Beaver Pass Shelter
Deer Lick Cabin
Courtney Cabin
Hozomeen Fish and Game Cabin
Little Beaver Shelter
Hidden Hand Cabin
| Vendor Questions & Answers |
| Pictures |
File details come from the government source that posted it. Updated .