(x)
140P8222Q0035 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPP
Honolulu HI 96850 Box 50165 300 Ala Moana Blvd, Room 6-226
DOI, NPS, PWR - HONO MABO
PPP
Honolulu HI 96850 Box 50165 300 Ala Moana Blvd, Room 6-226
NPS, PWR - HONO MABO
09/01/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/01/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Please return a signed copy of this amendment with your offer, consistent with the solicitation Instructions to Offerors.
The purpose of this Amendment 0001 is to implement the following changes:
a. Amend the specifications via revised Attachment 1, Specifications (Revised 9.6.2022).
All other terms and conditions remain the same.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Edward Cortez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8222Q0035/0001
Period of Performance: 09/26/2022 to 12/26/2022
National Park Service Point of Contact:
Edward Cortez, Contracting Officer, 808-699-8747
/ edward_cortez@nps.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Attachment 1 Specifications
Mower and Attachments for
Honouliuli National Historical Site Honolulu, HI 96818 (Revised 9/6/2022)
OVERVIEW
Honouliuli National Historical Site (HONO) intends to purchase a commercially available mower and mower attachments.
HONO requires a compact, safe, dependable, versatile piece of equipment to perform a variety of mowing and landscaping capabilities. The mower shall be of the full-time, hydrostatic, all-wheel drive nature, with an articulated and oscillated frame design to both protect the terrain and promote maneuverability. The mower shall permit maneuvering from finish mowing to field mowing and shall also permit slope mowing on slopes of up to thirty degrees in any direction.
The attachments must work with base unit/mower as an integrated system.
A. MINIMUM SALIENT CHARACTERISTICS or GENERALLY ACCEPTABLE SPECIFICATIONS
PRIMARY MOWER BUILD / STANDARD FEATURES:
- Current model year production
- Kubota diesel D902 engine or equivalent
• Equivalent salient characteristics o Diesel o Max operating speed: 3600 RPM o Minimum alternator: 60 Amp o Minimum horsepower: 25 o Minimum peak torque: 42 ft lb o Minimum displacement: 898cc o Minimum cylinders: 3 o Cooling: Liquid o Slope rating (intermittent/continuous): 20 degrees / 30 degrees
- Thermostatically controlled oil cooler
- Articulating chassis with low center of gravity
- Enclosed muffler
- Universal Power-Take-Off (PTO)
- Digital slope indicator
- Horn
- Suspension seat
- Work lights
- All-wheel drive
- Dual wheels for slopes up to 30-degrees
- Turf tires
- Easy to adjust Power-Take-Off (PTO) belt tensioner
- Dual front hydraulics -- must work with attachments
- Battery disconnect switch with circuit breaker
- Pre-wired plug and play wiring harness
- Electrical power outlets: 12-volt outlets on BOTH the rear and front of mower -- must work with attachments
- Sealed electrical system
- Category 1, 3-point hitch
- Trailer hitch
- Weight transfer system
- On-board diagnostic system
- Engine HP- 25 HP or greater
- DEF (Diesel Exhaust Fluid) tank shall be clearly marked
REQUIRED MOWER ATTACHEMENTS
Boom Mower with 12-volt switch / control front mount:
- Current model year production
- Minimum cutting width: 39"
- Double action sickle bar
- Minimum material cut diameter: ½"
- Minimum vertical reach (from ground): 142"
- Minimum horizontal reach: 103"
- Minimum flat top cut (from ground): 82"
- Head angle ranging from 45-degree below horizontal to 90-degree vertical
- Maintains head angle when extending or retracting boom arms
- Ability to operate on minimum 10-degree slope
- Spool float hydraulics
- Weight kit to offset reach
Flail Mower:
- Current model year production
- Front mount design
- Minimum cutting width: 56"
- Blade type: "Y"
- Minimum number of blades: 48
- Cutting height range: 1"-5"
- Minimum cutting size .5"
Finish Mower:
- Current model year production
- Deck constructed of high strength steel
- Minimum cutting width: 60"
- Minimum cutting blades: 3
- Cutting height range: 1" - 5"
- Minimum cutting heights increments: ¼"
- One lever height adjustment
- Field serviceable spindles/ pulleys with bottom grease fittings
- Minimum anti-scalp rollers: 3
- Mulch kit
- Hydraulic flip-up deck for maintenance
- Rubber discharge shoot
- Tool free belt tensioner
- Must work with the vacuum collection system
Vacuum Collection System:
- Current model year production
- Minimum 10 horsepower engine with electric start
- Minimum collection bin capacity: 300 lbs
- All steel construction
- Hydraulic lift and dump
- Minimum lifting capacity: 300 lbs
- Minimum bin lifting height: 60"
- Storage stand
Aerator:
- Current model year production
- Front mount
- Working width: 48" Min 36” Max 60”
- Core tine: ¾" hardened steel
- Coring tine length: 5-1/2"
- Additional weights. 340 pounds
Spreader:
- Minimum capacity: 200 lbs
- Minimum spread distance: 6 ft
- Spreads a variety of material: seeds, fertilizer, and mulch
- Hopper cover
- Remote gate and diffuser control
- Mounts to the rear of tractor
REQUIRED TRAILER
Trailer:
- One flatbed utility trailer for transporting the mower and attachments
- 6,000-6,500 lb. payload capacity
- Gross vehicle weight rating – 9,000 – 10,000 lbs.
- Tandem axle, both with electric brakes
- 2-inch treated wood deck
- Frame material: steel
- Drop-bed or tilt-deck style frame for loading/unloading
- Bed length – 168 inches (14 feet)
- Bed width – 82 inches
- Deck height – 19 inches
- A-frame tongue
- Coupler size – 2 5/16 inches with safety chains
- 12,000 lb. rated side-wind jack (primary)
- 7,000 lb rated front-wind jack (for trailer tongue or front)
- 3-leaf springs
- Four 15-inch tire and wheel assemblies
- Steel round wheel fenders with back
- LED lights with sealed wiring
- Electric breakaway kit with charger
- Spare tire and wheel mount
- Spare tire and wheel
WARRANTY
- 24-month, unlimited hours extended manufacturer’s warranty from date of delivery
LOCAL SERVICE AND REPAIR SHOP
- The vender shall have an identified service and repair shop located within 20 miles of Honolulu, HI.
This service and repair shop shall be able to receive, service and repair all the types of items ordered under this effort within a reasonable amount of time.
*Please provide with your quote any product cut sheets, catalog sheets, or other documentation necessary to clearly demonstrate in sufficient detail that the items being quoted meet all specifications noted above.
Note: All products must meet Buy American Act requirements.
B. DELIVERY LOCATION AND TIMEFRAME
DELIVERY LOCATION
- Pearl Harbor National Memorial, 1 Arizona Memorial Place, Honolulu, HI 96818
DELIVERY TIMEFRAME
- 120 days after contract award
B. DELIVERY LOCATION AND TIMEFRAME
File details come from the government source that posted it. Updated .