Attch_1_-_Specification.pdf
PDF 2 MB Posted
- Attached to
- LAKE24-0078-REPLACE BB LIFT STATION Federal contract opportunity
- Solicitation number
- 140P8124B0005
About this file
This document is a technical specification for the replacement of the main sewage lift station at Boulder Beach in Lake Mead National Recreation Area. The project requires selective demolition of existing sewerage collection system components, including the redundant lift station, piping, valves, electrical cabinets, conduits, and conductor cables, as well as site concrete. The work includes construction of a new 8-foot diameter wet well with semi-permanent submersible, non-clog sewer pumps, motors, and all requisite appurtenances to have a complete and operational sewage lift station. Additional scope includes a new valve vault with piping and valves, a new flow meter vault with magnetic flow meter, new electric control panels, a new jib crane with hoist, and construction of some new gravity sewer collection system piping and valves. The total performance period for this project is 210 calendar days, with on-site construction to start within 30 days of the notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8124B0005_Amd_0003.pdf | ||
| Sol_140P8124B0005_Amd_0002.pdf | ||
| Attch_10_-_Pump_Station_Design_0001.pdf | ||
| Attch_12_-_Site_Visit_Attendants__Business_Cards_0001.pdf | ||
| Attch_9_-_Final_Design_Report_0001.pdf | ||
| Sol_140P8124B0005_Amd_0001.pdf | ||
| Attch_11_-_Site_Visit_Sign_In_Sheet_0001.pdf | ||
| Sol_140P8124B0005.pdf | ||
| Attch_4_-_Wage_Determination.pdf | ||
| Attch_8_-_Schedule_of_Values.pdf | ||
| Attch_2_-_Drawings.pdf | ||
| Attch_7_-_Proj_Mgt_Software_and_Electronic_Payrolls_Requirement.pdf | ||
| Attch_5_-_Limitation_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Attch_3_-_Pictures_and_Maps.pdf | ||
| Attch_6_-_Construction_Contract_Administration_Notice.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PMIS #311964 Replace Boulder Beach Main Lift Station AUTHORS - 1
LAKE MEAD NATIONAL RECREATION AREA AUTHORS OF SPECIFICATIONS
AUTHORS OF SPECIFICATIONS
Lake Mead National Recreation Area, Boulder City, Nevada Replace Boulder Beach Main Lift Station – PMIS No. 311964
April 2024
Divisions 01, 02, 03, 22, 31, 33 and 40 Robert O. Anderson, PE, CFM, WRS
R.O. ANDERSON ENGINEERING, INC.
Division 26 Michael J. Jensen, PE
JENSEN ENGINEERING, INC.
PMIS #311964 Replace Boulder Beach Main Lift Station AUTHORS - 2
LAKE MEAD NATIONAL RECREATION AREA AUTHORS OF SPECIFICATIONS
This page intentionally blank.
PMIS #311964 Replace Boulder Beach Main Lift Station TOC - 1
LAKE MEAD NATIONAL RECREATION AREA TABLE OF CONTENTS
TABLE OF CONTENTS
Technical Specifications
Lake Mead National Recreation Area, Boulder City, Nevada Replace Boulder Beach Main Lift Station – PMIS No. 311964
01 11 00 Summary of Work 1-14 01 25 00 Substitution Procedures 1-4 01 27 00 Definition of Bid Items 1-10 01 30 00 Administrative Requirements 1-6 01 31 00 Project Management and Coordination 1-4 01 33 00 Submittals 1-4 01 36 00 Accident Prevention 1-2 01 40 00 Quality Requirements 1-2 01 50 00 Temporary Facilities and Controls 1-8 01 51 00 Temporary Services 1-4 01 56 00 Barriers 1-2 01 57 00 Temporary Controls 1-2 01 60 00 Product Requirements 1-2 01 73 00 Cutting And Patching 1-4 01 77 00 Closeout Procedures 1-6 01 77 20 Field Engineering 1-2 01 78 23 Operation & Maintenance Data 1-6 01 78 39 Project Record Documents 1-4
02 25 00 Sanitary Sewer System 1-12 02 41 19 Electrical Demolition 1-4
03 10 00 Concrete Forming And Accessories 1-10 03 20 00 Concrete Reinforcing 1-6 03 30 00 Cast-In-Place Concrete 1-10 03 39 00 Concrete Curing 1-2
22 13 29.40 Sewerage Pump Testing 1-2
26 05 19 Low-Voltage Power Conductors and Cables 1-4 26 05 23 Control-Voltage Electrical Power Cables 1-6 26 05 26 Grounding and Bonding for Electrical Systems 1-6
PMIS #311964 Replace Boulder Beach Main Lift Station TOC - 2
LAKE MEAD NATIONAL RECREATION AREA TABLE OF CONTENTS
26 05 29 Hangers and Supports for Electrical Systems 1-4 26 05 33 Raceways and Boxes for Electrical Systems 1-8 26 05 43 Underground Ducts and Raceways for Electrical Systems 1-6 26 05 53 Identification for Electrical Systems 1-10 26 05 73.13 Short-Circuit Studies 1-6 26 05 73.16 Coordination Studies 1-8 26 05 73.19 Arc-Flash Hazard Analysis 1-8 26 27 26 Wiring Devices 1-6 26 28 13 Fuses 1-4 26 28 16 Enclosed Switches and Circuit Breakers 1-6 26 29 13.06 Soft Start Motor Controllers 1-10 26 43 13 Surge Protection 1-4
31 05 13 Soils for Earthwork 1-4 31 10 00 Site Clearing 1-4 31 23 16 Excavation 1-4 31 23 16.23 Trenching 1-6 31 25 00 Erosion and Sedimentation Controls 1-4
33 01 12 Inspection and Testing of Water/Wastewater Utilities 1-6 33 05 09.23 Adaptors for Utility Piping 1-2 33 05 13 Manholes and Structures 1-6 33 05 19 Ductile Iron Piping 1-6 33 05 26 Utility Identification 1-2 33 31 00 Sanitary Sewage Piping 1-6 33 31 11 Public Sanitary Utility Sewage Piping 1-12 33 32 17 Field Erected Submersible Utility Wastewater Pumping Station 1-8
40 05 52 Process Valves Four-Inch Diameter and Larger 1-4 40 05 62 Plug Valves 1-4 40 05 63 Ball Valves 1-2
PMIS #311964 Replace Boulder Beach Main Lift Station
LAKE MEAD NATIONAL RECREATION AREA
01 11 00 - 1
SUMMARY OF WORK
SECTION 01 11 00 SUMMARY OF WORK
1.1 EXISTING CONDITIONS
The Main Lift Station now in use at Boulder Beach was constructed in 2002 by HFE Process, Inc., Tulsa, OK1. The corrosive environment together with operating conditions within the wet well have caused deterioration of components that dictate the need to replace the lift station. This lift station is a critical component to pumping raw sewage generated from all Boulder Beach facilities, including NPS facilities and housing, concessioner commercial facilities and employee housing, to the existing wastewater treatment lagoons.
The existing Main Lift Station is located north of the Boulder Beach Campground and east of Boulder Beach Access Road, at latitude 36.043505 N, longitude 114.807169 W (WGS 1984). Below is a Location Map of the existing and proposed facilities in a regional context, as well as a Vicinity Map of the site relative to existing roads.
In addition to the Main Lift Station at this site, there is also a redundant lift station, which is shown relationally to the Main Lift Station on the project’s drawings. The redundant lift station is not currently in use and will be removed to allow construction of the new lift station.
1 HFE Process, Inc. 7925 E. 40th Street, Tulsa, OK 74145 (918) 663-9083. Job No. HY000713.
01 11 00 - 2
The existing wet well, electronic controls and alarms of the Main Lift Station are deteriorating and some of the valves are inoperable; the frequency of failures in motors, pumps and the vacuum system has shortened to the point where major repairs are required. Due to the "Mission Critical" nature of this lift station and the increase in downtime for repairs, the lift station will be replaced by a new lift station with appropriate piping, valves, and electronic controls.
1.2 GENERAL PROJECT STATEMENT
A. The project requires selective demolition of existing sewerage collection system components including the redundant lift station, piping, valves, electrical cabinets, conduits, and conductor cables, miscellaneous site concrete all as needed to construct a new field-erected wastewater pump station that is configured as an 8-foot diameter wet well with semi-permanent submersible, non-clog sewer pumps, motors and all requisite appurtenances to have a complete and operational sewage lift station. The work includes construction of a new valve vault with piping and valves, new flow meter vault with magnetic flow meter, new electric control panels, new jib crane with hoist, construction of some new gravity sewer collection system piping and valves. Upon successfully commissioning the new lift station, the work requires that the existing Main Lift Station and other site piping and valves be demolished and taken out of service permanently. Some components, at the direction of the Contracting Officer, shall be salvaged and suitably stored at the project site. All other components to be demolished must be removed from the site and disposed of at a suitable location.
B. A site visit will be scheduled for a pre-bid visit with the interested respondents.
C. Approval for construction and operation of the new lift station shall be obtained (if needed) from the State of Nevada Division of Environmental Protection prior to start of construction.
D. Permit for dust control shall be coordinated with and obtained from the Clark County Division of Air Quality. Sign shall be posted on the job site. A copy of the Permit shall be forwarded to the COR.
E. Water for compaction and dust control may be drawn from Lake Mead. Contractor shall set up their own pump system to draw the water. Any gas-powered pumps, or generators shall have secondary containment from oil or gasoline spillage into the lake. A totalizer flow meter shall be installed on the pumps or tanks to record the amount of water used. The water totals shall be reported to the NPS monthly and for the project total amount used. The location of the pumping equipment shall be approved by the COR. The location of the facilities shall minimize the disturbance of the Park-visiting public.
F. Alternatively, non-potable water for construction activities will be available within the park and access will be provided by the Utility Service Branch. Contractor will be provided instructions on billing/reimbursement procedure.
a. The cost per thousand gallons of water used will be provided at current/present rate and has potential to increase annually. The current rate (March 2024) is $17.20 per 1,000 gallons.
b. The connection will be metered and billed, with hydrant meter being provided.
Contractor to provide air gap on the fill line to the tank, or a reduced pressure principle backflow assembly (double check valve) will be required. The backflow unit shall have been tested by a certified backflow prevention assembly tester in the last year (per NAC 445A.6569) and a copy of the certification must be provided. AWWA California-
01 11 00 - 3
Nevada Section maintains a list of certified Backflow Prevention Assembly Testers in California and Nevada: Backflow (ca-nv-awwa.org).
c. Only an approved spanner wrench shall be used to operate any fire hydrant. Any other type of wrench is strictly forbidden. Hydrants must be opened and closed slowly with an approved fire hydrant wrench. The Contractor shall be responsible for any damage to a fire hydrant caused by the Contractor’s personnel operating the hydrant, and shall be responsible for the cost of all repairs.
d. When filling any/all water trucks from a park fire hydrant, the Contractor shall ensure there is an air gap between the hose attached to the hydrant and the tank on the water truck. The air gap separation can be achieved by a metallic pipe permanently installed on the water transporting vehicle which will serve as the fill line or an air gap between the end of the fill line from the hydrant and the water transporting vehicle.
e. If the Contractor chooses not to use an air gap, then a reduced pressure principle backflow assembly shall be required. The backflow unit shall be tested by a Licensed Tester and provided at the Contractors expense.
1.3 SCOPE OF WORK
The scope of work for this contract consists of:
A. See REPLACE BOULDER BEACH MAIN LIFT STATION, LAKE MEAD, NRA, NEVADA plans.
B. Onsite – Clear the site and mobilize.
C. All asphalt and concrete removal shall be done by saw cutting. A clean square edge shall be maintained. Replace the asphalt and concrete upon completion of the trenching operation.
Material shall match line and grade of existing. Material type, thickness and color (if concrete is currently colored) shall match existing.
D. In areas of gravel being the surface material, a compacted depth of 2” layer of type II gravel shall be applied over the disturbed area including areas disturbed by the trench, equipment tracks and spoil piles. Material shall be compacted upon application.
E. The contractor shall have the project permitted by Nevada Division of Environmental Protection (NDEP). Provide to the CO/COR a copy of the permit application and any approvals from NDEP. The NPS will work with the contractor to coordinate the application process by providing review and any needed signatures from the site owner. The contractor shall have their own Professional Engineer licensed in Nevada to prepare the permit applications and provide close out information and inspections for the permit.
F. The plans were created in AutoCAD. These files will be made available to the contractor upon request. Upon completion on the project shall include revising the AutoCAD file to show the constructed location of the facilities per Section 01 78 00. In addition to the AutoCAD file, the Contractor shall provide a PDF file and a hard copy of the record drawings.
G. All materials, equipment, and components incorporated into the work shall be new and undamaged prior to installation and shall be properly handled and stored on site.
H. Laydown and storage areas shall be coordinated with the COR on site.
01 11 00 - 4
I. Designs and specifications refer to the use of the 2019 Clark County Water Reclamation District “Design and Construction Standards for Wastewater Collection Systems.” Southern Nevada 4th Edition. Referred to as “Clark County Specs.”
https://www.cleanwaterteam.com/services/development-services/plan-review
J. Compaction tests should reference Clark County Specs Section 3.15 Soil Testing and Table G.
Contractor shall submit test results of the analysis of bedding, cover and backfill material.
Frequency of the tests shall be per Table G. Compaction testing shall be done by a licensed testing firm and results shall be provided to the NPS regularly during construction.
K. Pipe bedding and backfill material testing shall follow Clark County Specs Section 3.13.4 for 95% under sections that will be paved with asphalt or concrete. 90% compaction for all other areas
L. Pipe bedding shall be Type II or granular material. See SD-14, SD-15, and Table F. This material shall be used for bedding, haunch support and initial backfill cover. The remaining material to the finished grade or subgrade for asphalt may be native soils dug out of the initial trench. All materials shall be properly compacted.
M. Force main pipe shall be C900 PVC, DR14 minimum rated.
N. When using C900 pipe, Contractor shall place all bends and connections in Ductile Iron Mechanical Joint fittings. All fittings and joints shall be for wastewater applications.
O. Installation of piping shall follow ANSI/AWWA C900 Water Transmission Pipe guidelines for the proper installation of piping.
P. Pipe depth shall be 3.5’ to the top of pipe. Clark County Specs 2.5.4
Q. Trench details shall follow Clark County Specs SD-16 and SD-17.
R. Concrete thrust blocks shall be used per Clark County Specs 2.5.10, UDACS Spec 2.14 and UDACS Plate 31.
S. Force main pipe clearances shall be a minimum of 2 feet. See Clark County Specs 2.3.11 and 2.3.12.
T. All fittings and joint connections shall be thoroughly cleaned, coated and wrapped. See UDACS 3.11.01.A.3 and UDACS Section 3.16. Preference is to have the bolts greased and then entire fitting or valve wrapped in 8 mil polyethylene film, tightly sealed and taped.
(AWWA C105).
U. Tracer wire shall be placed in the trench adjacent to the pipe. An insulated wire or a plastic-coated metal strip is laid above the pipe after installation. Access to this tracer wire shall be made available at locations of manholes, risers and valves. Pipe Locator Ribbon indicating a “WASTEWATER Line is Located Below” shall be placed per Clark County Specs Section 3.14.6.
https://www.cleanwaterteam.com/services/development-services/plan-review
01 11 00 - 5
V. Materials and Equipment: The Contractor shall provide all materials, equipment, and labor required to perform the work described in this specification. All materials and equipment shall be NEW and Contractor furnished from outside the park.
W. PVC materials shall be manufactured within eighteen (18) months of installation. UDACS Section 3.11.01. Pipe shall show no signs of damage or sun burns upon installation. Material shall be inspected of manufacturing dates by the COR prior to installation.
X. All products supplied for permanent installation shall be new and comply with Clark County Specs and AWWA standards for sanitary sewer applications. Certifications for the products shall be included in the Operations and Maintenance Manuals (O&M) at the completion of the project. Inventory of all items installed shall be included in the O&M manual including as-builts and cut sheets showing manufacture, size, and model number.
Y. Testing of the system shall be done per these specifications or the Clark County Specifications. Pressure testing shall be performed on both the gravity and the pressure mains.
Z. A final inspection and operational testing shall be performed at the site with the COR and a representative of the Lake Mead Utility Systems Branch present.
AA. All excess material, including asphalt and concrete, that has been removed/demolished or was unused shall be disposed of outside of the park boundaries.
BB. Bypass pumping may be required so as not to disrupt sewage flow to the Main Lift Station.
Bypass pumping will be required during switch over to new sewer force main and lift station.
Replacement work cannot impede the ability of the NPS to provide safe and suitable sewage pumping operations. Bypass pumping may include the use of a tanker/pumper truck hauling the collected sewage out of the wet well and depositing it in the NPS lagoons that serve the Boulder Beach Main Lift Station.
CC. For erosion control and permanent slope protection, Contractor shall provide Coir fabric sediment control wattles on the downstream side of the work zone. The wattle shall extend across the width of the disturbed area. Material shall be all biodegradable and contain no plastics in it. Wattles shall be installed and properly staked to keep them in place and functional.
DD. The Contractor shall manage a weekly progress meeting, conference call or Teams meeting between the contractor and the COR or NPS representatives.
1. A weekly schedule update shall be presented at the meeting. Schedule shall show the previous weeks accomplishments and tasks. The schedule shall show the proposed work schedule for the future two (2) weeks of work. Three (3) weeks of work shall be shown.
It should be updated weekly and sent to the COR in a PDF format.
2. Photographs of the work progress shall be taken. Regular submittal of a PDF file showing progress photos, or a log of the previous weeks’ work shall be done weekly.
3. Regular submittals of compaction test results shall be done at the weekly meeting, submitted weekly or when received from the testing firm or agency.
EE. Other Items related to the Installation:
1. Items shown on the plans may vary in quantity and location. Field verify all items and underground components.
01 11 00 - 6
2. Notify the COR of construction phasing. Close coordination between the NPS and contractor is required in order to coordinate the down time of the existing Main Lift Station. A three-day notification to the NPS and COR is needed for any shutdown of the existing force main system for work. Any shutdown should occur during the mid-week.
Tuesday, Wednesday, or Thursday.
1.4 ESTIMATED SCOPE OF QUANTITIES
The following materials list is provided for Contractor’s general reference:
1. Mobilization, Insurance, Bonds, General Requirements, Record Drawings, Testing Requirements, Utility Locates, Demobilization and Site Maintenance.
1 L.S.
2. General electrical requirements including site investigation, miscellaneous fees, standard field tests & arc flash, identification, submittals, final observation, and preliminary operation
1 L.S.
3. Supply and perform demolition of existing lift station 6 electrical and control components including salvage of existing equipment as directed by COR
1 L.S.
4. Supply and perform demolition of existing lift station 1 electrical and control components including salvage of existing equipment as directed by COR
1 L.S.
5. Supply and install stainless steel 4x Double-Throw fusible Disconnect Switch 1 EA
6. Supply and install Generator Inlet Receptacle 1 EA
7. Supply and install stainless steel Lift Station Enclosure & Accessories (e.g., lights, fans, solar shield, sub-panels, dead fronts, etc.)
1 EA
8. Supply and install 5 kVA Panel Transformer 1 EA
9. Supply and install 60A (40 HP) RVSS (Open-style) 3 EA
10. Supply and install power distribution block 1 EA
11. Supply and install grounding bar kit 1 EA
01 11 00 - 7
12. Supply and install 480V surge protection device 1 EA
13. Supply and install 120/240V surge protection device 1 EA
14. Supply and install 17”x30” handhole complete with extension and lid 2 EA
15. Supply and install 10”x17” handhole, complete with extension and lid 1 EA
16. Supply and install control elements including PLC, relays, power supply, cover controls, wireways, integration and programming 1 EA
17. Supply and install float switches 4 EA
18. Supply and install pressure transducer 1 EA
19. Supply and install over temperature/seal leak relay 3 EA
20. Supply and install flow meter tube/sensor and transmitter 1 EA
21. Supply and install intrusion alarm with contact switches 2 EA
22. Supply and install auto-dialer & relocating existing cell modem 4 HR
23. Supply and install enclosure alarm light and horn 1 EA
24. Supply and install modifications to existing lift station utility power transfer switch 1 EA
25. Supply and install new lift station conductors 1 L.S.
26. Supply and install new lift station underground conduits 1 L.S.
27. Supply and install seal-offs for new lift station 9 EA
28. Perform demolition of existing lift stations including salvage of existing equipment 2 EA
29. Perform demolition of existing valve vaults including salvage of existing equipment 2 EA
30. Abandon existing sewer pipe 440 LF
01 11 00 - 8
31. Abandon existing valves and appurtenances 6 EA
32. Supply and install project sign 1 L.S.
33. Supply and install new 8-foot diameter well 1 EA
34. Supply and install submersible, non-clog, semi-permanent sewage pumps 3 EA
35. Supply and install pump discharge piping 85 LF
36. Supply and install precast concrete valve vault 1 EA
37. Supply and install precast concrete meter vault 1 EA
38. Supply and install eccentric plug valve (6-inch) 3 EA
39. Supply and install eccentric plug valve (8-inch) 3 EA
40. Supply and install swing check valve 3 EA
41. Supply and install combination air-vacuum valve 1 EA
42. Supply and install totalizing meter 1 EA
43. Supply and install emergency storage vault 1 EA
44. Supply and install miscellaneous site sewer piping (8-inch) 110 LF
45. Supply and install miscellaneous site sewer piping (10-inch) 45 LF
46. Supply and install sanitary sewer manhole 2 EA
47. Supply and install connection to existing 10-inch sanitary sewer 1 EA
48. Supply and install connection to existing 8-inch sanitary sewer force main 1 EA
49. Supply and install jib crane with hoist including foundation and appurtenances 1 L.S.
01 11 00 - 9
1.5 LOCATION
A. Project Location: Near Boulder Beach Campground, Boulder City, Clark County, Nevada;
within Lake Mead National Recreation Area (LAKE NRA).
1.6 PERFORMANCE PERIOD
A. The project schedule is based on calendar days from the "Notice to Proceed" (NTP) date. The total performance period for this project is 210 calendar days. On-site construction work to be started within 30 days of the NTP.
1.7 FIELD VERIFICATION
A. The Contractor shall field verify all new and existing dimensions affecting the work in this contract before ordering any materials, equipment, or parts.
1.8 CONTRACTOR'S USE OF PREMISES
A. Most of the site is located outside areas frequented by the general public; however, the Contractor is responsible to maintain site security during construction. Utility personnel visit the site regularly for routine maintenance and as necessary to address emergency conditions.
Contractor shall provide access to the site for utility operations and maintenance personnel 24 hours per day, 365 days per year.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the recreation area visitors and employees.
C. The contractor shall at all times make the job site safe to the public.
1. Traffic control devices shall be used around the active job site.
2. Open trenches should be minimized when the contractor is not working.
3. Trench shall be brought back up to existing grade in active driving areas or the use of steel plates shall be used to cover the trench for vehicular traffic when not being actively worked on.
D. Contractor shall at all times protect and maintain as functional and operational the existing force main, lift station, and sewage collection system. Coordination with the NPS to maintain these systems as operational is required.
E. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
F. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for interruption of existing utility service, if appropriate.
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair the utility at no additional expense to the Government.
2. The NPS can assist to locate utilities but the NPS does not know where all of the utilities are located.
3. Nevada Dig Alert at 811 shall be called to locate utilities. They will only locate public utilities. They will not locate NPS owned utilities.
01 11 00 - 10
G. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent.
H. Work Limits: The Contractor shall be confined to conduct his work to job site area and work limits as shown on drawings or approved by the Contracting Officer. Contractor shall be responsible to pay for rehabilitation work for any resource damage outside authorized work limits.
I. Care shall be taken to ensure that fuel, oil, and other spills do not occur. If spills occur, cleanup will be completed at no additional expense to the Government.
1.9 HOURS OF OPERATION
A. Hours of operation shall be Monday through Friday between the hours of 7:00 AM and 5:00 PM unless alternate hours are approved by the Contracting Officer and the Contracting Officers Representative (COR). Requests for changes shall be submitted to the COR.
B. Due to the location of the construction site and vicinity of the public, these hours should be adhered to including idling of equipment, starting of equipment, backup alarms of equipment and delivery of equipment in hours outside of the approved times.
1.10 SPECIAL PROVISIONS
A. Permitting and Fees:
1. The Contractor is responsible for obtaining and paying for all fees and costs for necessary permits and approvals for all construction activities associated with this Project.
2. Permits from the Nevada Department of Environmental Protection are expected to be needed.
3. Permits for Clark County Dust Control are expected to be needed.
4. Scott Bell, Environmental Protection Specialist shall be listed as the owner/operator for all NDEP applications and permits.
5. Prior to beginning site construction, apply for and receive any needed permits and approvals from NDEP. No work shall commence prior to receiving permits and approvals. A copy of the permits and approvals shall be forwarded to the NPS for review.
6. Contractor shall provide all needed Professional Engineering services for inspections, signatures and closures needed to approve or close out any permit.
B. Time Constraints:
1. Quiet Hours in the park are from 10:00 PM until 6:00 AM. The Contractor shall not operate equipment or make loud noise between these hours.
2. No work will be performed on weekends or on federal holidays without the advanced, written authorization of the CO.
3. Any request to work outside of normal working days and hours shall be submitted to the
CO and COR at least three business days before the requested event for authorization.
C. Park Entry:
1. The contractor shall furnish a list of personnel with phone contact information. Vehicles associated with the contractor shall be waived entrance fee upon entering in a marked
01 11 00 - 11 company vehicle or by providing the names of employees entering in personal vehicles.
The entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.
D. Park Regulations:
1. Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
E. Emergency Medical and Accident Reporting:
1. All accidents and incidents shall be reported to the CO and COR.
a. The Contractor or subcontractor shall contact Park Dispatch for any medical emergency or traffic accident occurring within the Park. Emergency number: Dial 911 as needed.
Park Dispatch: 702-293-8932 EMERGENCY
Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles (e.g. ambulance) need to enter the Park and so that any available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.
b. The Contractor or subcontractor is required to report ANY personal injury and/or property damage incident occurring within the park. This report must be made to a Law Enforcement Ranger at the first available opportunity before leaving the park:
Park Dispatch: 702-293-8998 NON-EMERGENCY
F. Logistics:
1. The public access in the public areas shall always be maintained. NPS Employee access should be maintained to all facilities during construction.
2. The Contractor shall be responsible for the security of all materials staged/stored on
LAKE NRA property.
G. Environmental Compliance Requirements:
1. The Contractor and all employees working on the Project will be required to take “Desert
Tortoise Awareness Training” which will be provided by the Government at no cost to the Contractor. This training will take approximately 30 minutes or less.
2. The Contractor’s employees shall never handle a desert tortoise.
3. The Contractor and employees shall immediately report the presence of any desert tortoise to the COR.
4. Herbicides shall not be used in or around the Project site.
5. Contact the COR for coordination with the LAKE Resources Team.
H. Equipment Washing:
1. Equipment washing is required to preclude the introduction and spread of non-native species into the Park. Therefore, all equipment shall be cleaned outside of the Park before entering the Park. Equipment leaving the park for any reason must be re-washed before returning to the job site. Equipment that is moved from the job site, but remains within the original developed area, need not be re-washed prior to returning to the job site. It is also known that there are areas inside the Park that have non-native plants and weed
01 11 00 - 12 species infestation. Therefore, before equipment can be moved from one developed area to another, it must be washed at the location identified on the Site Plan (see attached site plan and mileage table) to ensure weeds are not spread from one developed area to another.
2. The Contractor shall clean all equipment prior to the equipment entering Lake Mead National Recreation Area. It is recommended that cleaning be accomplished by hot water, pressure washing, using water only. All equipment surfaces shall be cleaned, with special emphasis given to the undercarriage. This includes, but is not limited to: wheel wells, bumpers, radiator grills, springs, shock absorbers, wire harnesses, skid plates, oil pans, axles, frame ledges, buckets, tracks, belly pans, etc. Cleaning shall also include all dirt and debris inside the cab, or operator area. A Shop-Vac or commercial car wash vacuum system may be used for operator compartments, provided the method used effectively removes all visible debris. Equipment cleaning is for the purpose of removing any seed and soil accumulations to prevent the potential spread of non-native plant and weed species from outside the park to locations inside the park. Cleaning shall be performed in a manner that will reasonably remove all visible soil, plant, and other foreign material.
All equipment that requires washing shall be inspected by government personnel, or contractors/partners assigned to this duty, to ensure compliance.
3. Equipment that requires washing is generally defined as track or rubber-tired machinery intended for use primarily off-road. Examples include backhoes, loaders, earthmovers, graders, rollers, bulldozers, water trucks, etc; or four wheel drive or passenger vehicles that are driven in off road areas. Equipment may also be stationary, such as a material screening plant, conex storage containers, or a mobile office (mobile offices may be cleaned in the same manner as operator compartments as outlined in paragraph 2). The equipment is generally under the direct control of the contractor or sub-contractors, is likely to remain on the construction site for an extended period of time, and may contain adhered soil and seed from other project sites.
4. Equipment/Vehicles that do not require washing are defined as those normally used for highway driving only, and travel primarily on paved surfaces and well maintained service roads and parking areas (this includes approved staging areas). Examples include semi-tractor trailers, dump trucks, concrete trucks, pickup trucks, fuel trucks, service trucks, etc.
These delivery and passenger vehicles are generally not under the direct control of the contractor, have no earth-moving function, and do not remain on the project site. These vehicles have a low probability of carrying adhered soil and seed from other projects.
However, every vehicle and piece of equipment is subject to rejection from entering the park if there are obvious signs (covered in mud, plant material adhered to it, etc.) that it could be transporting non-native species into the Park.
I. Post Equipment Washing Inspections:
1. All equipment subject to inspection will be inspected by government, or other authorized personnel prior to leaving the paved surface or designated washing area identified on the Site Plan. Equipment determined to be free of soil or mud based on visual examination by government personnel will be cleared to enter the project area, or proceed to other areas of the park as appropriate. The Contractor shall arrange for needed inspections by contacting the NPS inspection office no less than 5 working days prior to the inspection.
Such contact shall provide sufficient time to accommodate scheduling and travel to the site. Equipment not passing initial inspection must be rewashed outside the park at no additional expense to the government.
01 11 00 - 13
2. A list of government Inspectors for this project will be provided by:
Kelly Wallace Cell Phone: 702-371-9673
Contact the COR for coordination with the Lake Resources Team
1.11 DESIGNATED OFFICIALS
A. The NPS Project Manager (PM) and Contracting Officer's Representative (COR) will be:
Carl Bush PE, Lake Mead NRA Telephone: 702-293-8735 (w) 702-859-0194 (cell) E-mail: carl_bush@nps.gov
B. The Contracting Officer (CO) will be:
TBD
END OF SECTION 011100
01 11 00 - 14
01 25 00 - 1
SUBSTITUTION PROCEDURES
SECTION 01 25 00 SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Quality assurance.
B. Product options.
C. Product substitution procedures.
1.2 QUALITY ASSURANCE
A. Contract is based on products and standards established in Contract Documents without consideration of proposed substitutions.
B. Products specified define standard of quality, type, function, dimension, appearance, and performance required.
C. Substitution Proposals: Permitted for specified products except where specified otherwise. Do not substitute products unless substitution has been accepted and approved in writing by Owner.
1.3 PRODUCT OPTIONS
A. See Section 01 60 00 - Product Requirements.
1.4 PRODUCT SUBSTITUTION PROCEDURES
A. Document – General Conditions of the Contract specifies time restrictions for submitting requests for substitutions.
B. Substitutions may be considered when a product becomes unavailable through no fault of Contractor.
C. Document each request with complete data, substantiating compliance of proposed substitution with Contract Documents, including:
1. Manufacturer's name and address, product, trade name, model, or catalog number, performance and test data, and reference standards.
2. Itemized point-by-point comparison of proposed substitution with specified product, listing variations in quality, performance, and other pertinent characteristics.
3. Reference to Article and Paragraph numbers in Specification Section.
4. Cost data comparing proposed substitution with specified product and amount of net change to Contract Sum.
5. Changes required in other Work.
6. Availability of maintenance service and source of replacement parts as applicable.
7. Certified test data to show compliance with performance characteristics specified.
8. Samples when applicable or requested.
01 25 00 - 2
9. Other information as necessary to assist Architect/Engineer's evaluation.
D. A request constitutes a representation that Contractor:
1. Has investigated proposed product and determined that it meets or exceeds quality level of specified product.
2. Will provide same warranty for substitution as for specified product.
3. Will coordinate installation and make changes to other Work that may be required for the
Work to be complete with no additional cost to Owner.
4. Waives claims for additional costs or time extension that may subsequently become apparent.
5. Will coordinate installation of the accepted substitute, making such changes as may be required for the Work to be complete in all respects.
6. Will reimburse Owner and Architect/Engineer for review or redesign services associated with reapproval by authorities having jurisdiction.
E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals without separate written request or when acceptance will require revision to Contract Documents.
F. Substitution Submittal Procedure:
1. Submit requests for substitutions on CSI Form 13.1A Substitution Request-within the time restrictions noted in Section 01 25 00, 1.4A.
2. Submit three copies of Request for Substitution for consideration. Limit each request to one proposed substitution.
3. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer.
4. Architect/Engineer will notify Contractor in writing of decision to accept or reject request.
1.5 INSTALLER SUBSTITUTION PROCEDURES
A. Document - Instructions to Bidders specifies time restrictions for submitting requests for substitutions during Bidding period.
B. Document each request with:
1. Installer's qualifications.
2. Installer's experience in work similar to that specified.
3. Other information as necessary to assist Architect/Engineer's evaluation.
C. Substitution Submittal Procedure:
1. Submit three copies of Request for Substitution for consideration. Limit each request to one proposed substitution.
2. Architect/Engineer will notify Contractor in writing of decision to accept or reject request.
01 25 00 - 3
PART 2 - PRODUCTS - Not Used
PART 3 - EXECUTION - Not Used
END OF SECTION 012500
01 25 00 - 4
01 27 00 - 1
DEFINITION OF BID ITEMS
SECTION 01 27 00 DEFINITION OF BID ITEMS
1.1 DESCRIPTION
A. The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends and another begins.
B. If no bid item exists for a portion of the work, include the costs in a related bid item.
1.2 LIST OF ANTICIPATED BID ITEMS
A. BID ITEM No. 01 – Mobilization, Insurance, Bonds, General Requirements, Record Drawings, Testing Requirements, Utility Locates, Demobilization and Site Maintenance.
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum (LS) Price. This price shall encompass all work, materials, equipment, and labor for insurance, mobilization and demobilization, testing requirements, utility location, temporary facilities including pedestrian fencing and chemical toilets, and site maintenance including Best Management Practices (BMPs). This item shall include all work pertaining to submittals, record drawings, operation and maintenance manuals, construction schedules, and coordination activities required of the Contractor including meetings, pre-grade inspections, and other activities associated with preliminary work and approvals. This work also includes equipment coordination, delivery and removal, site maintenance throughout the contract, maintenance and removal of BMP’s, and site cleanup. Testing requirements include testing of new lines, compaction testing, and other work as described in the contract specifications and drawings.
B. BID ITEM No. 02 – General electrical requirements including site investigation, miscellaneous fees, standard field tests & arc flash, identification, submittals, final observation, and preliminary operation
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum (LS) Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the general electrical requirements as identified in the drawings and specifications that are not otherwise listed in other bid items.
C. BID ITEM No. 03 – Supply and perform demolition of existing Lift Station 6 electrical and control components including salvage of existing equipment as directed by COR
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum (LS) Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the demolition of the existing electrical and control systems that serve Lift Station 6 as
01 27 00 - 2 identified in the drawings and specifications, including the salvaging components as requested by the COR and disposing of equipment demolished.
D. BID ITEM No. 04 – Supply and perform demolition of existing Lift Station 1 electrical and control components including salvage of existing equipment as directed by COR
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum (LS) Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the demolition of the existing electrical and control systems that serve Lift Station 1 as identified in the drawings and specifications, including the salvaging components as requested by the COR and disposing of equipment demolished.
E. BID ITEM No. 05 – Supply and install stainless steel 4x Double-Throw fusible Disconnect Switch
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the stainless steel 4x Double Throw Fusible Disconnect Switch and appurtenances as identified in the drawings and specifications.
F. BID ITEM No. 06 – Supply and install Generator Inlet Receptacle
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the Generator Inlet Receptacle with appurtenances as identified in the drawings and specifications.
G. BID ITEM No. 07 – Supply and install stainless steel Lift Station Enclosure & Accessories (e.g., lights, fans, solar shield, sub-panels, dead fronts, etc.)
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the Lift Station Enclosure with appurtenances and accessories as identified in the drawings and specifications.
H. BID ITEM No. 08 – Supply and install 5 kVA Panel Transformer
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the
01 27 00 - 3 installation of the Panel Transformer with appurtenances as identified in the drawings and specifications.
I. BID ITEM No. 09 – Supply and install 60A (40 HP) RVSS (Open-style)
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the 60-amp (40HP) RVSS with appurtenances as identified in the drawings and specifications.
J. BID ITEM No. 10 – Supply and install power distribution block
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the Power Distribution Block with appurtenances as identified in the drawings and specifications.
K. BID ITEM No. 11 – Supply and install grounding bar kit
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the Grounding Bar Kit with appurtenances as identified in the drawings and specifications.
L. BID ITEM No. 12 – Supply and install 480V surge protection device
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the 480-volt Surge Protection device with appurtenances as identified in the drawings and specifications.
M. BID ITEM No. 13 – Supply and install 120/240V surge protection device
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the 120/240-volt surge protection device with appurtenances as identified in the drawings and specifications.
N. BID ITEM No. 14 – Supply and install 17”x30” handhole
01 27 00 - 4
1. UNIT – Each encompass all work, materials, equipment, and labor necessary to complete the installation of the 17”x30” handhole complete with extension and lid as identified in the drawings and specifications.
O. BID ITEM No. 15 – Supply and install 10”x17” handhole
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the 10”x17” handhole complete with extension and lid as identified in the drawings and specifications.
P. BID ITEM No. 16 – Supply and install control elements including PLC, relays, power supply, cover controls, wireways, integration and programming
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the control elements including PLC, relays, power supply, cover controls, wireways, integration and programming, including any needed appurtenances or accessories as identified in the drawings and specifications.
Q. BID ITEM No. 17 – Supply and install float switches
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the control elements including PLC, relays, power supply, cover controls, wireways, integration and programming, including any needed appurtenances or accessories as identified in the drawings and specifications.
R. BID ITEM No. 18 – Supply and install pressure transducer
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the pressure transducer, including any needed appurtenances or accessories as identified in the drawings and specifications.
S. BID ITEM No. 19 – Supply and install over temperature/seal leak relay
01 27 00 - 5 installation of the Over Temperature Leak Relay, including any needed appurtenances or accessories as identified in the drawings and specifications.
T. BID ITEM No. 20 – Supply and install flow meter tube/sensor and transmitter
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the flow meter tube/sensor and transmitter, including any needed appurtenances or accessories as identified in the drawings and specifications.
U. BID ITEM No. 21 – Supply and install intrusion alarm with contact switches
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the Intrusion Alarm, including any needed appurtenances or accessories as identified in the drawings and specifications.
V. BID ITEM No. 22 – Supply and install auto-dialer & relocating existing cell modem
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the Auto Alarm and relocating existing cellular modem, including any needed appurtenances or accessories as identified in the drawings and specifications.
W. BID ITEM No. 23 – Supply and install enclosure alarm light and horn
1. UNIT – Each
2. DEFINITION – Basis of payment shall be at the Contract Unit Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of the enclosure alarm, including the light and horn as well as any needed appurtenances or accessories as identified in the drawings and specifications.
X. BID ITEM No. 24 – Supply and install modifications to existing lift station utility power transfer switch
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation and make the specified modifications to the existing utility power transfer
01 27 00 - 6 switch, including any needed appurtenances or accessories as identified in the drawings and specifications.
Y. BID ITEM No. 25 – Supply and install new lift station conductors
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of new lift station conductors, including any needed appurtenances or accessories as identified in the drawings and specifications.
Z. BID ITEM No. 26 – Supply and install new lift station underground conduits
1. UNIT – Lump Sum
2. DEFINITION – Basis of payment shall be at the Contract Lump Sum Price. This price shall encompass all work, materials, equipment, and labor necessary to complete the installation of conduits to serve the new lift station, including any needed appurtenances or accessories as identified in the drawings and specifications.
AA. BID ITEM No. 27 – Supply and install…