This document contains questions and answers related to a forthcoming National Park Service solicitation for pavement and site improvement work at the Indiana Dunes National Park. The work includes installation of new asphalt surfacing covering approximately 14,712 square feet, as well as associated base materials, aggregates, parking stops, fencing, signage, and solar lighting. The solicitation will have a total small business set-aside with a magnitude between $100,000 and $250,000. Offerors must be registered in SAM.gov and have an active UEI number to be eligible for award. The contracting office is the National Park Service Midwest Region and the point of contact is identified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Specifications_-_21_Feb_2023_0002.pdf | ||
| Revised_Pictures_-_21_Feb_2023_0002.pdf | ||
| Revised_Drawings_-_21_Feb_2023_0002.pdf | ||
| Questions_and_Answers_0002.pdf | ||
| Sol_140P6423Q0007_Amd_0002.pdf | ||
| Revised_Specifications_-_8_Feb_2023_0001.pdf | ||
| Sol_140P6423Q0007_Amd_0001.pdf | ||
| Revised_Pictures_-_8_Feb_2023_0001.pdf | ||
| Revised_Drawings_-_8_Feb_2023_0001.pdf | ||
| Bid_Schedule_-_Pavement-Site_Improvements.pdf | ||
| Attachment_-_Notice_to_Contractors.pdf | ||
| Specifications_-_Pavement-Site_Improvements.pdf | ||
| Attachment_-_Pictures.pdf | ||
| Attachment_-_Construction_Contract_Administration.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Bid_Schedule_-_Pavement-Site_Improvements.xlsx | XLSX spreadsheet | |
| Wage_Determination_-_Porter_Co.pdf | ||
| Technical_Questionnaire.pdf | ||
| Attachment_-_Submittal_List.pdf | ||
| Attachment_-_Drawings.pdf | ||
| Sol_140P6423Q0007.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140P6423Q0007
Amendment #: 0001
Pavement & Site Improvements – INDU
Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response 1.
How many SF of the parking area is to be removed?
The existing parking lot surface is gravel. None of the existing surface area will be removed. This project consists of the installation of a new Hot Mix Asphalt Surface see Specifications Section 01 10 00 Part 1 Item 1.2B
2.
The drawings are showing 4 solar lights for this project. Drawing C09 has technical specifications for the CIGS solar panel wrap. Please provide contact information for the CIGS rep or their website address.
CIGS stand for Copper Indium Gallium Selenide which is a variety of thin-film module as a main semiconductor material for the absorber layer for a solar panel. There are several companies that provide this product. One of them is SolarPath Sun Solutions (1-888-333-7652, 201-490- 4499) www.solarpathusa.com. Or
City Electric Supply Chesterton #426
(POR)
1541 S. Calumet Rd. Chesterton, IN 46304 Office: (219) 395-2002 Cell: (219) 940-8480 Zachary.West@cityelectricsupply.com
SOLTECH LLC
1460 PARK AVENUE
EMERYVILLE, CA 94608
(510) 891-1056 fiona@soltechlighting.com
See Answer Question No. 11 for additional Specifications.
3.
If the park will keep the stop wheels?
Yes, the park will remove all the stop wheels before the contractor starts demolition.
http://www.solarpathusa.com/ mailto:Zachary.West@cityelectricsupply.com
4.
Have the fire crews removed the trees for this project?
Yes, the fire crews have taken care of all the trees to be removed for this project. In other words, this project has no trees to be removed.
5.
Should we pave the gravel spot by the picnic area?
No. Keep a gravel surface in the picnic area.
6.
The takeoff numbers on Sheet C03-B are incorrect?
The numbers are short for 14711 square feet of area.
The numbers on Sheet C03-B are correct. Another row have been added to clarify the quantities. Total area is (14,712 Square Feet), Total amount of HMA surface (2,452 Cubic Feet), Total amounts Base Binder (3,678 Cubic Feet) Compacted Base Aggregate No 53 (3,678 Cubic Feet), Compacted Aggregate No. 73 (908 Cubic Feet)
7.
Is grouting of parking stops required? Called out on C09-D
Yes, follow provided detail.
8.
Thermoplastic pavement marking or Standard Lot Marking paint? Called out on C07-C
All Pavement Markings and stripping shall be thermoplastic.
9.
Per Section 6.2 B of the Project Specifications Document: Allow 60 days before starting pavement marking?
Use 14 days for Thermoplastic.
10.
Is there a vendor the NPS recommends for the large wooden Park sign called out on C11?
Harper’s Ferry Center - HFC_SI@nps.gov 304-535-6724
11.
Are there better specifications for the Solar lights and light poles called out on C09-E? (Model and Manufacturer, etc)
Solar Street Lights:STC/Sunlike PRO 30W Bronze 3000K Article NO.: STLSTCPRO303YYBZ LED: Lumileds Lumens: 6000Lm Efficacy: 200Lm/W Housing: Bronze Color temp.: 3000K Dimension (LxWxH): 900x420x94 mm Dimension (LxWxH): 35x17x4 in Battery: 13.5V 25AH/-40 C~+60 C degree Ambient Tc, Discharging mailto:HFC_SI@nps.gov and Charging
EPA: 6.26
12.
Does the NPS have a supplier for Gate hardware, as well specifications to follow?
The park used last time:
Aluminum Welding on US 12.
225 W Dunes Hwy Chesterton, IN 46304
(219) 787-8066
13.
Drawing C09-C calls out the fence posts required at IDNP South Porter Lot. The drawing calls out 8' posts and the fence schedule below the drawing calls out 9' posts. Which is correct?
Use 8’ post.