This document is a set of Questions and Answers related to a federal contract opportunity for the design and installation of a fire suppression system at Housing Quarters #51 at Mount Rushmore National Monument.

The key details are:

  • No fire alarm panel is required for this project.
  • The Statement of Work (SOW) calls for the NFPA 13D standard, but the RFI response indicates the NFPA 13R standard should be the guideline, and the piping shall be PVC.
  • The federal agency involved is the Department of the Interior National Park Service Midwest Region.
  • The solicitation number is 140P6324Q0037 and the opportunity type is a Request for Quote (RFQ).

View the file

Other files for this federal contract opportunity

Other files attached to MORU INSTALL FIRE SUPPRESSION SYSTEM QTS #51, newest first.
File Type Posted
Sol_140P6324Q0037_Amd_0004.pdf PDF
Atch_5_Questions_and_Answers_0004.pdf PDF
Sol_140P6324Q0037_Amd_0003.pdf PDF
Sol_140P6324Q0037_Amd_0002.pdf PDF
Atch_6_Site_Visit_-_Sign-in_Sheet_0001.pdf PDF
Sol_140P6324Q0037_Amd_0001.pdf PDF
Atch_5_Questions_and_Answers_0001.pdf PDF
Sol_140P6324Q0037.pdf PDF
Atch_4_DOL_Wage_Determination_SD20240029.pdf PDF
Atch_1_SOW.pdf PDF
Atch_2_Floor_Plan.pdf PDF
Atch_3_Experience_Questionnaire.xls XLS spreadsheet
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

12. Does a fire alarm panel need installed?

• No

13. Where does this fire alarm panel ideally get installed?

• N/A No panel is required.

14. In the SOW, division 1 specs 1.2 only has paragraph 1 and 2, not a 3 as stated in previous Q&A.

From the SOW:

15. The RFI response calls for NFPA 13R but the SOW calls for NFPA 13D, which are we to follow?

• NFPA 13R standard should be the guideline. The piping shall be PVC.