Atch_1_Questions_Answers_0001.pdf
PDF 122 KB Posted
- Attached to
- MIMI Refinish Visitor Center Floors
- Solicitation number
- 140P6324Q0013
About this file
This document is a set of Questions and Answers related to a federal contract opportunity to refinish the visitor center floors at Minuteman Missile National Historic Site.
The key details are:
- The contract number is 140P6324Q0013.
- The project involves refinishing the visitor center floors at the Minuteman Missile National Historic Site.
- Weekend and after-hours work will be permitted to minimize disruption to normal facility operations, as the visitor center is closed to the public on Sundays and Mondays.
- The government will have staff, furniture, equipment, and fixtures removed from the floor areas, except for a few items that are bolted down.
- A dumpster can be placed on the north side of the building for disposal, but the contractor must ensure it is covered to prevent littering.
- This is a National Park Service site, so all applicable regulations under 36 CFR apply, including prohibitions on littering.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_2_Site_Visit_Sign_In_Sheet_0001.pdf | ||
| Sol_140P6324Q0013_Amd_0001.pdf | ||
| Atch_3_Addendum_Updated_Measurements_0001.pdf | ||
| Atch_3_DOL_Wage_Determination_SD20240022.pdf | ||
| Sol_140P6324Q0013.pdf | ||
| Atch_2_Experience_Questionnaire.xls | XLS spreadsheet | |
| Atch_1_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Minuteman Missile NHS-Refinish Visitor Center Floors 140P6324Q0013 Ques�ons/Answers
Ques�on 1.
Will weekend work and a�er-hours work be permited for this project? This will help minimize down�me of normal opera�ons for the facility.
Government Response
The park is closed to the public on Sunday and Monday. The normal hours the visitor center is open is 8:00 am to 4:00 pm Tuesday thru Saturday. A�er 4 pm work will be permited to help aid in comple�on of the project, since no park visitors will be on-site during this �me.
Ques�on 2.
Can you confirm that the facility will be moving all furnishings, equipment, and fixtures off of the floor for this project?
Government Response
In the staff lunchroom all chairs and table will be moved, all items on the floor behind the informa�on counter will be moved, all items in the bookstore on the floor will be moved, the two items the will not be moved is the passport cancella�on sta�on and the dona�on box (these are bolted to the floor) these two items will require being tape off and covered while work is being performed.
Ques�on 3.
Will there be an area to place a dumpster for this project?
Government Response
A dumpster can be place on the north side of the building. It is the contractor’s responsibility to ensure that it has a cover (i.e., screen, tarp), to prevent materials from flying out and liter the landscape. This is a Na�onal Park Service site and all rules, regula�ons under 36CFR apply for litering.