- PARKING GARAGE DRAINAGE / ABA RENOVATION Federal contract opportunity
- Solicitation number
- 140P6323B0006
About this file
This amendment modifies a solicitation for construction services to repair parking garages at Mount Rushmore National Monument. The scope of work includes repairing drainage systems and completing Americans with Disabilities Act renovations. The amendment provides additional clarification on the performance period, adjusting it from 70 calendar days to 249 days total to allow for pre-winter and post-winter construction. It specifies the garage closure schedule and availability to the contractor. The bid due date is changed to July 6, 2023 at 11:00 AM Mountain Time, with bids to be submitted electronically to the contracting officer. Awards are anticipated prior to September to permit adequate preparation time for contractors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_6_20_23_0002.pdf | ||
| Sol_140P6323B0006_Amd_0002.pdf | ||
| Sol_140P6323B0006_Amd_0001.pdf | ||
| B08_Solicitation_attach_2__Drawings.pdf | ||
| B08_Solicitation_attach_4_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Solicitation_attach_1__Specifications.pdf | ||
| B08_Solicitation_attach_5__Wage_Determintation_SD20230032.pdf | ||
| B08_Solicitation_attach_3_Specifications_Submittal_List.pdf | ||
| Sol_140P6323B0006.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P6323B0006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PMN
Rapid City SD 57701 820 Columbus St
DOI, NPS, MWR - NEKOTA MABO
NPS, MWR - NEKOTA MABO
05/15/20230003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/15/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Mount Rushmore Parking Structure Repairs
The Purpose of the Amendment is to add additional information regarding the contract performance period.
The original performance period was stated at 70 calendar days. This amendment provides additional clarification and summarizes the governments expectation for successfully completing the work.
The total calendar days allotted are changed from 70 to 249 days including a pre-winter and post-winter construction period. During this period, the government expects that the
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Joseph Kirk
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6323B0006/0003 contractor will utilize 90 days starting on
9/11/2023 to complete work on the Lincoln Garage during the pre-winter period. Starting on
9/11/2023 the Lincoln Garage levels 2 and 3 can be closed, level one must remain open for the remainder of the month. On 10/01/2023 the entire
Lincoln garage will be closed by the contractor.
The post-winter period includes 60 additional construction days. After 90 days, (12/10/2023) the Lincoln Garage shall re-open, and the
Washington Garage will close and be available to the contractor. The downtime within the 249 days is inclusive of all available days. If concrete or coating cure times require the use of heat blankets, the contractor should include this necessity in their bid. The government expects onsite work will begin on 9/11/2023 and must be completed not later than 5/17/2024. The government expects to make an award prior to
September to allow the contractor adequate time to prepare required preconstruction paperwork, submittals, secure supplies, and prepare for mobilization.
Contractors must acknowledge this and all amendments.
The Bid Due Date will also now be changed to July
6, 2023 at 11AM MT.
All bids must be sent electronically to the COs email address: joseph_kirk@nps.gov.
All required documents as stipulated in the
Invitation for Bids must be provided via email.
Each attachment submitted electronically as attachments to email must be clearly identified.
No hard copies will be accepted.