This document contains an amendment to a federal solicitation to replace sewage pumps at Gateway Arch National Park. The amendment provides responses to bidder questions to clarify requirements. The period of performance in the specifications is changed from 60 calendar days to 180 calendar days due to anticipated long lead times for pumps and controls. The 4-inch discharge pipe to be replaced is approximately 3.5 feet deep and runs under a 6-inch concrete slab. It discharges into a pit containing an 8-inch header that connects both pumps to a single sewer line exiting the building. Bidders must acknowledge all amendments in their response. Other terms and conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment06_AsBuiltDrawings_0002.pdf | ||
| Sol_140P6223B0007_Amd_0001.pdf | ||
| Attachment03_DOLWageRate-St_LouisCityCounty.pdf | ||
| Sol_140P6223B0007.pdf | ||
| Attachment02_Specifications.pdf | ||
| Attachment05-SubmittalList.xlsx | XLSX spreadsheet | |
| Attachment01-ConstructionContractAdministration.docx | DOCX document | |
| Attachment04-LimitationsOnSubcontracting.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P6223B0007 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PMM
Omaha NE 68102 601 Riverfront Drive DOI, NPS, MWR - Missouri MABO NPS, MWR - Missouri MABO
08/29/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/15/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Replace sewage pumps, JEFF
The purpose of amendment two is to:
1. Provide all questions received and the government responses to those questions. See page
2 for questions and responses.
Bidders are reminded that they must acknowledge all amendments with their bid.
All other terms and conditions remain the same.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Cecilia Mitchell
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140P6223B0007 Amendment 02
Q&A
Q1: Can you provide the as built drawings that show the discharge piping from the sewage ejector pumps and also the 40’ of 4” discharge running to an 8” header that is mentioned in the work statement to be replaced?
A1: See Attachment06_AsBuiltDrawings. See P 114, P-117, P-138, P-140 of Attachment06_AsBuiltDrawings. The 4” office area is highlighted blue in these drawings.
Q2: What is the depth for the 4” that needs to be replaced?
A2: Based on a visual inspection, it appears to be 3.5 foot deep at the cleanout in the Interpretation room.
Q3: What is the thickness of the slab above the 4” that is going to be replaced?
A3: 6” slab.
Q4: The 60 day completion time will not be enough time to do the project. The pumps and panel will have a long delivery time (at least 12 weeks) and the construction time will have to be extended. Will you provide us with additional days to complete this project.
A4: Yes. Part 1, Item 1.2B(4) is in the specifications is changed from “Period of performance: Work shall be completed within 60 calendar days of the start date provided on the Notice to Proceed. The period of performance is inclusive of 0 weather days” to “Period of performance: Work shall be completed within 180 calendar days of the start date provided on the Notice to Proceed. The period of performance is inclusive of 0 weather days.”
Q5: Where is the 8” header located? Is it at the wet well location. At the walk thru, there was no mention of the 8” header, only 40’ of 4” pipe to be replaced was shown and the replacement stops in the existing hallway before you enter the mechanical room. Is this correct?
A5: The 4" pipe goes into the pit. The 8" Header is in the pit and both pumps drop into it and up to the single sewer line. From there all goes up and across the roof straight into the MSD line