SolicitationAtch3_Styrene-Butadiene-Styrene_(SBS)_Modified_Bituminous_Membrane_Roofing_0001.pdf
PDF 670 KB Posted
- Attached to
- REPLACE ROOF ON MULTIPLE BUILDINGS Federal contract opportunity
- Solicitation number
- 140P6221Q0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6221Q0015_Amd_0002.pdf | ||
| SolicitationAtch6_CertificationVaccinationPRAv7_Contractors_0002.pdf | ||
| SolicitationAtch5_Vaccination_Certification_Notification_to_DOI_Contractors_Template_082321_FINALCO_Signed_0002.pdf | ||
| Sol_140P6221Q0015_Amd_0001.pdf | ||
| SolicitationAtch4_Site_Visit_Sign_In_Sheet_0001.pdf | ||
| B08_-_SolicitationAttachment1Specs.pdf | ||
| B08_-_SolicitationAttachment2WD.pdf | ||
| Sol_140P6221Q0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 07 52 16
SELF-ADHERING STYRENE-BUTADIENE-STYRENE (SBS)
MODIFIED BITUMINOUS ROOF SYSTEM
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Self-Adhering Styrene-butadiene-styrene (SBS)-modified bituminous membrane roofing.
B. Related Sections:
1. 073113 “Asphalt Shingles” for Carpenter Shop and Warehouse.
a. See this section for coordination of asphalt shingle roofing, underlayments, and sheet metal flashing/trim.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include plans, sections, details, and attachments to other work, including the following:
1. Layout and thickness of materials.
2. Base flashings and membrane terminations.
3. Flashing details at penetrations.
4. Roof plan showing orientation of roof deck and orientation of roof membrane, fastening spacings, and patterns for mechanically fastened roofing system.
1.4 INFORMATIONAL SUBMITTALS
A. Manufacturer Certificates:
1. Performance Requirement Certificate: Signed by roof membrane manufacturer certifying that roofing system complies with requirements specified in "Performance Requirements" Article.
a. Submit evidence of complying with performance requirements.
140P6221Q0015 Attachment 3 Page 1 of 5
2. Special Warranty Certificate: Signed by roof membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty.
B. Sample warranties.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.
1.7 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Minimum 10 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Accelerated Weathering: Roof membrane shall withstand 2000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155.
B. Impact Resistance: Roof membrane shall resist impact damage when tested according to ASTM D3746/D3746M, ASTM D4272/D4272M, or the "Resistance to Foot Traffic Test" in FM Approvals 4470.
2.2 MANUFACTURERS
A. Source Limitations: Obtain components for roofing system from roof membrane manufacturer.
B. Torch and/or open-flame applications are not permitted.
2.3 BASE & INTER PLY SHEET MATERIALS
A. Basis of Design: Certainteed Flintlastic SA PlyBase.
1. Base-ply and inter-ply (Self-Adhering), SBS-modified, extra-strength fiberglass reinforcement.
140P6221Q0015 Attachment 3 Page 2 of 5
2.4 STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS CAP SHEET
A. Basis of Design: Certainteed Flintlastic SA Cap.
1. Self-adhering SBS modified bitumen cap sheet with top-side mineral granules.
2. Color: As selected by COR from manufacturer’s full range.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.
3.2 PREPARATION
A. Prepare roof deck per roofing system manufacturer’s written installation instructions.
3.3 INSTALLATION OF ROOFING, GENERAL
A. Install roofing system according to roofing system manufacturer's written instructions.
B. Complete terminations and base flashings, and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast.
1. Remove and discard temporary seals before beginning work on adjoining roofing.
C. Install roof membrane and auxiliary materials to tie into existing roofing to maintain weathertightness of transition.
D. Coordinate installation and transition of roofing system components.
E. Asphalt Heating: Heat and apply SEBS-modified roofing asphalt according to roofing system manufacturer's written instructions. The use of torch or open-flame application is NOT permitted.
F. Substrate-Joint Penetrations: Prevent roofing asphalt and adhesives from penetrating substrate joints, entering building, or damaging roofing system components or adjacent building construction.
3.4 INSTALLATION OF ROOFING MEMBRANE, GENERAL
A. Install roofing system according to roofing system manufacturer's written instructions and applicable recommendations in ARMA/NRCA's "Quality Control Guidelines for the Application of Polymer Modified Bitumen Roofing."
140P6221Q0015 Attachment 3 Page 3 of 5
B. Coordinate installation of roofing system so insulation and other components of the roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.
1. Provide tie-offs at end of each day's work to cover exposed roofing sheets and insulation with a course of coated felt set in roofing cement or hot roofing asphalt, with joints and edges sealed.
2. Complete terminations and base flashings, and provide temporary seals to prevent water from entering completed sections of roofing system.
3. Remove and discard temporary seals before beginning work on adjoining roofing.
3.5 INSTALLATION OF BASE SHEET
A. Before installing, unroll base sheet, cut into workable lengths, and allow to lie flat for a time period recommended by manufacturer for the ambient temperature.
B. Loosely lay one course of sheathing paper, lapping edges and ends a minimum of 2 inches (51
mm) and 6 inches (150 mm), respectively.
C. Installation of SBS-Modified Self-Adhered Fiberglass-Mat Base Sheet:
1. Install base sheet according to roofing manufacturer's written instructions, starting at low point of roofing system.
2. Extend roofing sheets over and terminate above cants.
3. Install base sheet in a shingle fashion.
4. Install base sheet without wrinkles, rears, and free from air pockets.
5. Laps: Accurately align roofing sheets, without stretching, and maintain uniform side and end laps.
a. Lap side laps as recommended by roof membrane manufacturer but not less than 3 inches (76 mm).
b. Stagger end laps not less than 18 inches (450 mm).
c. Completely bond and seal laps, leaving no voids.
6. Repair tears and voids in laps and lapped seams not completely sealed.
7. Apply pressure to the body of the base sheet according to manufacturer's instructions, to remove air pockets and to result in complete adhesion of base sheet to substrate.
3.6 INSTALLATION OF INTERPLY SHEETS
A. Install two ply sheets, starting at low point of roofing.
1. Align ply sheets without stretching.
2. Shingle side laps of ply sheets uniformly to achieve required number of plies throughout thickness of roofing membrane.
a. Shingle in direction to shed water.
3. Extend ply sheets over and terminate above cants.
140P6221Q0015 Attachment 3 Page 4 of 5
3.7 INSTALLATION OF SBS-MODIFIED BITUMINOUS CAP SHEET
A. Install modified bituminous roofing cap sheet according to roofing manufacturer's written instructions, starting at low point of roofing system.
3.8 PROTECTING AND CLEANING
A. Protect roofing system from damage and wear during remainder of construction period.
1. When remaining construction does not affect or endanger roofing, inspect roofing system for deterioration and damage, describing its nature and extent in a written report, with copies to Contracting Officer.
B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.
C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.
END OF SECTION
140P6221Q0015 Attachment 3 Page 5 of 5
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Self-Adhering Styrene-butadiene-styrene (SBS)-modified bituminous membrane roofing. |
| B. Related Sections: |
| 1. 073113 “Asphalt Shingles” for Carpenter Shop and Warehouse. |
| a. See this section for coordination of asphalt shingle roofing, underlayments, and sheet metal flashing/trim. |
| 1.2 PREINSTALLATION MEETINGS |
| A. Preinstallation Conference: Conduct conference at Project site. |
| 1.3 ACTION SUBMITTALS |
| A. Product Data: For each type of product. |
| B. Shop Drawings: Include plans, sections, details, and attachments to other work, including the following: |
| 1. Layout and thickness of materials. |
| 2. Base flashings and membrane terminations. |
| 3. Flashing details at penetrations. |
| 4. Roof plan showing orientation of roof deck and orientation of roof membrane, fastening spacings, and patterns for mechanically fastened roofing system. |
| 1.4 INFORMATIONAL SUBMITTALS |
| A. Manufacturer Certificates: |
| 1. Performance Requirement Certificate: Signed by roof membrane manufacturer certifying that roofing system complies with requirements specified in "Performance Requirements" Article. |
| a. Submit evidence of complying with performance requirements. |
2. Special Warranty Certificate: Signed by roof membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty.
B. Sample warranties.
| 1.5 CLOSEOUT SUBMITTALS |
| A. Maintenance data. |
| 1.6 QUALITY ASSURANCE |
| A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty. |
| 1.7 WARRANTY |
| A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period. |
| 1. Warranty Period: Minimum 10 years from date of Substantial Completion. |
| PART 2 - PRODUCTS |
| 2.1 PERFORMANCE REQUIREMENTS |
| A. Accelerated Weathering: Roof membrane shall withstand 2000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155. |
| B. Impact Resistance: Roof membrane shall resist impact damage when tested according to ASTM D3746/D3746M, ASTM D4272/D4272M, or the "Resistance to Foot Traffic Test" in FM Approvals 4470. |
| 2.2 MANUFACTURERS |
| A. Source Limitations: Obtain components for roofing system from roof membrane manufacturer. |
| B. Torch and/or open-flame applications are not permitted. |
| 2.3 BASE & INTER PLY SHEET MATERIALS |
| A. Basis of Design: Certainteed Flintlastic SA PlyBase. |
| 1. Base-ply and inter-ply (Self-Adhering), SBS-modified, extra-strength fiberglass reinforcement. |
| 2.4 STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS CAP SHEET |
| A. Basis of Design: Certainteed Flintlastic SA Cap. |
| 1. Self-adhering SBS modified bitumen cap sheet with top-side mineral granules. |
| 2. Color: As selected by COR from manufacturer’s full range. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work. |
| 3.2 PREPARATION |
| A. Prepare roof deck per roofing system manufacturer’s written installation instructions. |
| 3.3 INSTALLATION OF ROOFING, GENERAL |
| A. Install roofing system according to roofing system manufacturer's written instructions. |
| B. Complete terminations and base flashings, and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast. |
| 1. Remove and discard temporary seals before beginning work on adjoining roofing. |
| C. Install roof membrane and auxiliary materials to tie into existing roofing to maintain weathertightness of transition. |
| D. Coordinate installation and transition of roofing system components. |
| E. Asphalt Heating: Heat and apply SEBS-modified roofing asphalt according to roofing system manufacturer's written instructions. The use of torch or open-flame application is NOT permitted. |
| F. Substrate-Joint Penetrations: Prevent roofing asphalt and adhesives from penetrating substrate joints, entering building, or damaging roofing system components or adjacent building construction. |
| 3.4 INSTALLATION OF ROOFING MEMBRANE, GENERAL |
| A. Install roofing system according to roofing system manufacturer's written instructions and applicable recommendations in ARMA/NRCA's "Quality Control Guidelines for the Application of Polymer Modified Bitumen Roofing." |
| B. Coordinate installation of roofing system so insulation and other components of the roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast. |
| 1. Provide tie-offs at end of each day's work to cover exposed roofing sheets and insulation with a course of coated felt set in roofing cement or hot roofing asphalt, with joints and edges sealed. |
| 2. Complete terminations and base flashings, and provide temporary seals to prevent water from entering completed sections of roofing system. |
| 3. Remove and discard temporary seals before beginning work on adjoining roofing. |
| 3.5 INSTALLATION OF BASE SHEET |
| A. Before installing, unroll base sheet, cut into workable lengths, and allow to lie flat for a time period recommended by manufacturer for the ambient temperature. |
| B. Loosely lay one course of sheathing paper, lapping edges and ends a minimum of 2 inches (51 mm) and 6 inches (150 mm), respectively. |
| C. Installation of SBS-Modified Self-Adhered Fiberglass-Mat Base Sheet: |
| 1. Install base sheet according to roofing manufacturer's written instructions, starting at low point of roofing system. |
| 2. Extend roofing sheets over and terminate above cants. |
| 3. Install base sheet in a shingle fashion. |
| 4. Install base sheet without wrinkles, rears, and free from air pockets. |
| 5. Laps: Accurately align roofing sheets, without stretching, and maintain uniform side and end laps. |
| a. Lap side laps as recommended by roof membrane manufacturer but not less than 3 inches (76 mm). |
| b. Stagger end laps not less than 18 inches (450 mm). |
| c. Completely bond and seal laps, leaving no voids. |
| 6. Repair tears and voids in laps and lapped seams not completely sealed. |
| 7. Apply pressure to the body of the base sheet according to manufacturer's instructions, to remove air pockets and to result in complete adhesion of base sheet to substrate. |
| 3.6 INSTALLATION OF INTERPLY SHEETS |
| A. Install two ply sheets, starting at low point of roofing. |
| 1. Align ply sheets without stretching. |
| 2. Shingle side laps of ply sheets uniformly to achieve required number of plies throughout thickness of roofing membrane. |
| a. Shingle in direction to shed water. |
3. Extend ply sheets over and terminate above cants.
| 3.7 INSTALLATION OF SBS-MODIFIED BITUMINOUS CAP SHEET |
| A. Install modified bituminous roofing cap sheet according to roofing manufacturer's written instructions, starting at low point of roofing system. |
| 3.8 PROTECTING AND CLEANING |
| A. Protect roofing system from damage and wear during remainder of construction period. |
| 1. When remaining construction does not affect or endanger roofing, inspect roofing system for deterioration and damage, describing its nature and extent in a written report, with copies to Contracting Officer. |
| B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to wa... |
| C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction. |