SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040409670
NPS, MWR - Missouri MABO
11 North 4th Street
St Louis MO 63102
PMM
Matthew Frank (314) 655-1685
108/17/2018
140P6218Q0070
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Description: Complete deck replacement work upon a 5-panel Pratt Pony Truss bridge consisting of cleaning debris from the bridge, removal and disposal of all exiting deck runners, decking, stringers, and fasteners; removal and salvage of all stringer clamps of a historic bridge that is approximately 960 square feet; installation of salvaged stringer clamps; installation of contractor supplied stringers, lag bolts, decking, fasteners, and deck runners; clean-up of work site; and provide a 1 year warranty on workmanship.
The NAICS code for this project is 237310 and the small business size standard is
$36.5 Million.
100% Total Small Business Set-aside.
Site Visit:
28 August 2018 @ 13:00 Central
Wilson's Creek National Battlefield
424 West Farm Road 182
Van Buren, MO 65738
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 90 calendar days and complete it within ________________ ________________ calendar days after receiving
09/07/2018
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, MWR - Missouri MABO 11 North 4th Street
St Louis MO 63102
PMM
Neal Hause
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 34
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P6218Q0070
Completion Time: 90 Days includes allowable days for weather, final inspection, completion of all punch list items and all clean-up.
The project is located in Wilson¿s Creek National
Battlefield 424 West Farm Road 182
Van Buren, MO 65738
Please enter your DUNS:
FOB: Destination
Legacy Doc #: NPS
Delivery: 11/30/2018
Delivery Location Code: 0009060448
NPS, MWR, Wilsons Creek NB
6424 W. Farm Road 182
Republic MO 65738-9514 US
FOB: Destination
00010 Remove & Replace Wire Road Bridge Deck
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
140P6218Q0070 WICR – Bridge Revamp Page 6 of 34
CLAUSES AND PROVISIONS
TABLE OF CONTENTS
SECTION A – Solicitation/Contract Form 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.252-5 Authorized Deviations in Provisions (Apr 1984)
SECTION B – Quoter’s Price Schedule SECTION C – Description / Specifications / Statement of Work SECTION E – Inspection and Acceptance Clauses Incorporated by Reference 13 52.246-12 Inspection of Construction (Aug 1996)
SECTION F – Deliveries or Performance Clauses Incorporated by Full Text 13 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
SECTION G – Contract Administration Data Clauses Incorporated by Full Text 13 G-1 Contract Administration 1452.201-70 Authorities and Delegations (Sep 2011) 1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996) 1452.204-70 Release of Claims – Department of the Interior (Jul 1996) 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996) DOI Electronic Invoicing – Electronic Invoicing and Payment Requirements – Invoice Processing Platform
(IPP) (April 2013)
SECTION I – Contract Clauses Clauses Incorporated by Reference 15 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 15 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) 52.204-13 System for Award Management Maintenance (Oct 2016) (Incorporated by reference) 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-6 Protecting the Government Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997) 52.219-6 Notice of Total Small Business Set-Aside. (Nov 2011) 52.219-28 Post Award Small Business Program Representation (Jul 2013) 52.222-3 Convict Labor (June 2003) 52.222-6 Construction Wage Rate Requirements (May 2014)
140P6218Q0070 WICR – Bridge Revamp Page 7 of 34
52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (May 2014) 52.222-9 Apprentices and Trainees (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination – Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sep 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-50 Combating Trafficking in Persons (Mar 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep
2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) Alternate I (Jul 1995) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug Free Workplace (May 2011) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016)
52.223-15 Energy Efficiency in Energy-Consuming Products (Dec 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (May
2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) 52.223-20 Aerosols (Jun 2016) 52.223-21 Foams (Jun 2016) 52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008) 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance – Work on a Government Installation (Jan 1997) 52.228-11 Pledges of Assets (Jan 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.232-5 Payments Under Fixed-Price Construction Contracts (May 2014) 52.232-23 Assignment of Claims (May 2014)
52.232.27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Jul 2013) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)
140P6218Q0070 WICR – Bridge Revamp Page 8 of 34
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) Alternate I (Dec 1991) 52.233-3 Protest After Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)
52.236-10 Operations and Storage Area 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-14 Suspension of Work (Apr 1984) 52.243-5 Changes and Changed Conditions (Apr 1984) 52.244-6 Subcontracts for Commercial Items (Jan 2017) 52.246-21 Warranty of Construction (Mar 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) Alternate I
(Apr 1984) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) Alternate I (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) Clauses Incorporated by Full Text 18 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016) 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014) 52.225-9 Buy American – Construction Materials (May 2014) 52.228-13 Alternative Payment Protections (Jul 2000) 1452.236-70 Prohibition Against Use of Lead-Based Paint – Department of the Interior (Jul 1996)
SECTION J – List of Documents, Exhibits and Other Attachments List of Documents, Exhibits and Other Attachments
SECTION K – Representations, Certifications and Other Statements Provisions Incorporated by Full Text 23 52.204-8 Annual Representations and Certifications (Jan 2018)
SECTION L – Instructions, Conditions, and Notices
140P6218Q0070 WICR – Bridge Revamp Page 9 of 34
Provisions Incorporated by Reference 26 52.204-7 System for Award Management (Oct 2016) 52.204-16 Commercial and Government Entity Code Reporting (Jul 2016) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.236-28 Preparation of Proposals – Construction (Oct 1997) Provisions Incorporated by Full Text 26 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for
Construction (Feb 1999) 52.225-10 Notice of Buy American Requirement – Construction Materials (May 2014) 52.236-27 Site Visit (Construction) (Feb 1995) 1452.215-71 Use and Disclosure of Proposal Information – Department of the Interior (Apr 1984) 1452.233-2 Service of Protest – Department of the Interior (Jul 1996) (Deviation)
SECTION M – Evaluation Factors for Award
140P6218Q0070 WICR – Bridge Revamp Page 10 of 34
SECTION A – Solicitation/Contract Form
This solicitation/contract is prepared using the uniform contract format in accordance with FAR prescription 15.204- 1.
52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar http://farsite.hill.af.mil
(End of clause)
52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The quoter is cautioned that the listed provisions may include blocks that must be completed by the quoter and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the quoter may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar http://farsite.hill.af.mil
(End of provision)
52.252-5 Authorized Deviations in Provisions (Apr 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.
(b) The use in this solicitation of any Department of the Interior Acquisition Regulation (DIAR) (48 CFR Chapter
14) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of provision)
(End of Section A) https://www.acquisition.gov/?q=browsefar http://farsite.hill.af.mil/ https://www.acquisition.gov/?q=browsefar http://farsite.hill.af.mil/
140P6218Q0070 WICR – Bridge Revamp Page 11 of 34
SECTION B – Quoter’s Price Schedule
(a) Preparation of Quotations: The Government will not be responsible for any costs incurred by Quoter in the research, preparation, or submission of its proposal.
(b) Quoter is to complete the bid schedule located in this section at (d).
(c) Notwithstanding the Quoter’s written submission of pricing on the SF-1442 and completion of part (d) of this section, further pricing details/information may be requested of the Quoter by the Contracting Officer throughout the evaluation process. The Quoter shall promptly furnish the information requested to the Contracting Officer.
(d) In case of error in the extension of prices, unit price governs. In case of error in summation, the total of the corrected amounts governs. Only one award will be made.
Please be sure the Overhead and Profit percentage and dollar amounts are accurate.
(End of Section B)
Item Description Unit Unit
Cost
Total
10 The project is to include all labor, equipment, material and tools necessary to complete the following: Work consists of cleaning debris from the bridge, removal and disposal of all exiting deck runners, decking, stringers, and fasteners; removal and salvage of all stringer clamps of a historic bridge that is approximately 960 square feet; installation of salvaged stringer clamps; installation of contractor supplied stringers, lag bolts, decking, fasteners, and deck runners; clean up of work site; and provide a 1 year warranty on workmanship.
1 Lump Sum $ $
(Not to include overhead and profit)
Percent of work completed by personnel of the prime contractor:
Overhead percentage % Overhead Dollar
Amount:
Profit percentage: % Profit Dollar
Amount
GRAND TOTAL N/A N/A $
140P6218Q0070 WICR – Bridge Revamp Page 12 of 34
SECTION C – Description / Specifications / Statement of Work
Project: WICR – Bridge Revamp
Location: 6424 West Farm Road 182 Van Buren, MO 65738
Description: The work will consist of the Contractor, in accordance with local, state, and federal regulations, OSHA, EPA, and the terms and conditions of the solicitation/contract, providing all labor, supervision, materials, tools, equipment, supplies, transportation, vehicles, licenses, certifications, permits, and other items, services, and incidentals necessary to complete work upon a 5-panel Pratt Pony Truss bridge consisting of cleaning debris from the bridge, removal and disposal of all exiting deck runners, decking, stringers, and fasteners; removal and salvage of all stringer clamps of a historic bridge that is approximately 960 square feet; installation of salvaged stringer clamps;
installation of contractor supplied stringers, lag bolts, decking, fasteners, and deck runners; clean-up of work site; and provide a 1 year warranty on workmanship.
All work required by the project documents to successfully and satisfactorily complete the work in its entirety, will be performed by the Contractor, to include minor items/services that may not be specifically mentioned in the project documents.
(End of Section C)
140P6218Q0070 WICR – Bridge Revamp Page 13 of 34
SECTION E – Inspection and Acceptance
Clauses Incorporated by Reference
52.246-12 Inspection of Construction (Aug 1996)
(End of Section E clauses)
SECTION F – Deliveries or Performance
Clauses Incorporated by Full Text
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than ninety (90) calendar days. The time stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Section F clauses)
SECTION G – Contract Administration Data
Clauses Incorporated by Full Text
G-1 Contract Administration
Contracting Office for this procurement is:
Department of the Interior, National Park Service Midwest Region / Missouri Major Acquisition Buying Office (MABO) 11 N. 4th St.
St. Louis, MO 63102
Contracting Specialist assigned to this procurement is:
Matt Frank Phone: (314) 655-1685 E-mail: matthew_frank@nps.gov
1452.201-70 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
mailto:matthew_frank@nps.gov
140P6218Q0070 WICR – Bridge Revamp Page 14 of 34
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of clause)
1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996)
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205–1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
(End of clause)
1452.204-70 Release of Claims – Department of the Interior (Jul 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
(End of clause)
1452.228-70 Liability Insurance – Department of the Interior (Jul 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
140P6218Q0070 WICR – Bridge Revamp Page 15 of 34
$250,000 each person $500,000 each occurrence $1,000,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
(End of clause)
DOI Electronic Invoicing – Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov. Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
Contractor is to email Contractor’s invoice to the Contracting Officer prior to Contractor electronically submitting request for payment through IPP.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of clause)
(End of Section G clauses)
SECTION I – Contract Clauses
Clauses Incorporated by Reference
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016)
52.204-13 System for Award Management Maintenance (Oct 2016) (Incorporated by reference)
52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016)
52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) https://www.ipp.gov/
140P6218Q0070 WICR – Bridge Revamp Page 16 of 34
52.209-6 Protecting the Government Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015)
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015)
52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997)
52.219-6 Notice of Total Small Business Set-Aside. (Nov 2011)
52.219-28 Post Award Small Business Program Representation (Jul 2013)
52.222-3 Convict Labor (June 2003)
52.222-6 Construction Wage Rate Requirements (May 2014)
52.222-7 Withholding of Funds (May 2014)
52.222-8 Payrolls and Basic Records (May 2014)
52.222-9 Apprentices and Trainees (Jul 2005)
52.222-10 Compliance with Copeland Act Requirements (Feb 1988)
52.222-11 Subcontracts (Labor Standards) (May 2014)
52.222-12 Contract Termination – Debarment (May 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014)
52.222-14 Disputes Concerning Labor Standards (Feb 1988)
52.222-15 Certification of Eligibility (May 2014)
52.222-21 Prohibition of Segregated Facilities (Apr 2015)
52.222-26 Equal Opportunity (Sep 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015)
52.222-50 Combating Trafficking in Persons (Mar 2015)
52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015)
52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013)
52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) Alternate I (Jul 1995)
52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)
52.223-6 Drug Free Workplace (May 2011)
52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016)
140P6218Q0070 WICR – Bridge Revamp Page 17 of 34
52.223-15 Energy Efficiency in Energy-Consuming Products (Dec 2007)
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (May 2008)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011)
52.223-20 Aerosols (Jun 2016)
52.223-21 Foams (Jun 2016)
52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008)
52.227-4 Patent Indemnity – Construction Contracts (Dec 2007)
52.228-2 Additional Bond Security (Oct 1997)
52.228-5 Insurance – Work on a Government Installation (Jan 1997)
52.228-11 Pledges of Assets (Jan 2012)
52.228-12 Prospective Subcontractor Requests for Bonds (May 2014)
52.228-14 Irrevocable Letter of Credit (Nov 2014)
52.232-5 Payments Under Fixed-Price Construction Contracts (May 2014)
52.232-23 Assignment of Claims (May 2014)
52.232.27 Prompt Payment for Construction Contracts (Jan 2017)
52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Jul 2013)
52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
52.233-1 Disputes (May 2014) Alternate I (Dec 1991)
52.233-3 Protest After Award (Aug 1996)
52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)
52.236-2 Differing Site Conditions (Apr 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)
52.236-5 Material and Workmanship (Apr 1984)
52.236-6 Superintendence by the Contractor (Apr 1984)
52.236-7 Permits and Responsibilities (Nov 1991)
52.236-8 Other Contracts (Apr 1984)
140P6218Q0070 WICR – Bridge Revamp Page 18 of 34
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)
52.236-10 Operations and Storage Area
52.236-11 Use and Possession Prior to Completion (Apr 1984)
52.236-12 Cleaning Up (Apr 1984)
52.236-13 Accident Prevention (Nov 1991)
52.236-14 Availability and Use of Utility Services (Apr 1984)
52.236-15 Schedules for Construction Contracts (Apr 1984)
52.236-17 Layout of Work (Apr 1984)
52.236-26 Preconstruction Conference (Feb 1995)
52.242-14 Suspension of Work (Apr 1984)
52.243-5 Changes and Changed Conditions (Apr 1984)
52.244-6 Subcontracts for Commercial Items (Jan 2017)
52.246-21 Warranty of Construction (Mar 1994)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) Alternate I (Apr 1984)
52.249-10 Default (Fixed-Price Construction) (Apr 1984) Alternate I (Apr 1984)
52.253-1 Computer Generated Forms (Jan 1991)
(End of Section I clauses incorporated by reference)
Clauses Incorporated by Full Text
52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)
(a) Definitions. As used in this clause–
“Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
140P6218Q0070 WICR – Bridge Revamp Page 19 of 34
“Safeguarding” means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than
140P6218Q0070 WICR – Bridge Revamp Page 20 of 34 commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
(End of clause)
52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
52.225-9 Buy American – Construction Materials (May 2014)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
140P6218Q0070 WICR – Bridge Revamp Page 21 of 34
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
140P6218Q0070 WICR – Bridge Revamp Page 22 of 34
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material ____________ ____________ ____________
Domestic construction material ____________ ____________ ____________
Item 2:
Foreign construction material ____________ ____________ ____________
Domestic construction material ____________ ____________ ____________
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
140P6218Q0070 WICR – Bridge Revamp Page 23 of 34
(End of clause)
52.228-13 Alternative Payment Protections (Jul 2000)
(a) The Contractor shall submit one of the following payment protections:
(1) Payment Bond, or
(2) Irrevocable Letter of Credit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within ten (10) calendar days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause)
1452.236-70 Prohibition Against Use of Lead-Based Paint – Department of the Interior (Jul 1996)
Paint containing more than .06 percent by weight of lead in paint, or the equivalent measure of lead in the dried film of paint already applied, shall not be used in the construction or rehabilitation of residential structures under this contract or any resulting subcontracts.
(End of clause)
(End of Section I clauses incorporated by full text)
(End of Section I clauses)
SECTION J – List of Documents, Exhibits and Other Attachments
List of Documents, Exhibits and Other Attachments
The Attachments identified below are hereby incorporated as Attachments 1 through 8 and made a part of this solicitation / contract.
Attachment No. Title No. of Pages
1 Scope of Work – Remove and Replace Decking for Wire Road Bridge 62
2 DOL Wage Determination, General Decision No. MO20170001 07/20/2018 M01 32
(End of documents, exhibits and other attachments)
(End of Section J)
140P6218Q0070 WICR – Bridge Revamp Page 24 of 34
SECTION K – Representations, Certifications and Other Statements
Provisions Incorporated by Full Text
52.204-8 Annual Representations and Certifications (Jan 2018)
(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.
(2) The small business size standard is $36.5 million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b) (1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the quoter is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the quoter may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The quoter shall indicate which option applies by checking one of the following boxes:
□ (i) Paragraph (d) applies.
□ (ii) Paragraph (d) does not apply and the quoter has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures;
or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
140P6218Q0070 WICR – Bridge Revamp Page 25 of 34
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.